Loading...
HomeMy WebLinkAbout20071445 Ver 2_Approval Letter_20080923o`1"? wAT ?RP? Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality September 23, 2008 Mr. Tim W. Owens Town of Carolina Beach 1121 North Lake Park Boulevard Carolina Beach, NC 28428 Re: Wilmington Beach Street Improvements, New Hanover County Atlantic Ocean [030624, 99-(3), SB] DWQ #20071445; USACE Action ID. No. 2007-00912-065 APPROVAL of 401 Water Quality Certification with Additional Conditions - MODIFICATION Dear Mr. Owens: Attached hereto is a copy of Certification No. 3723 issued to Mr. Tim W. Owens and the Town of Carolina Beach, dated September 23, 2008. This Certification replaces the Certification issued to you on January 17, 2008. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. Sinc ely, Coleen H. Sullins CHS/cbk/ijm Attachments: Certificate of Completion cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789 U.S. Army Corps of Engineers, Wilmington Regulatory Field Office, Wilmington District, USACOE Chad Coburn, DWQ, Wilmington Regional Office DLR Wilmington Regional Office Doug Huggett, DCM Anne Deaton, P.O. Box 769, Morehead City, NC 27557 File Copy Central Files Nicole Thomson, S&EC, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614 Filename: 071445W ilmingtonBeachStreetImprovements(NewHanover)401_IC-MOD 401 Oversight/Express Review Permits Unit 1650 Mail Service Center, Winston-Salem, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Winston-Salem; North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-68931 Internet: htto://h2o.enr.state.nc.us/ncwetlands tW Carolina urldy An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper ,I Town of Carolina Beach Page 2 of 2 September 23, 2008 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section.0500 to Mr. Tim W. Owens and the Town of Carolina Beach, to fill or otherwise impact 0.882 acres of 404/wetland, and 0.5367 acres of open waters (ditches - 0.5259 acres of permanent impact and 0.108 acres of temporary impact), to construct the proposed Wilmington Beach Street Improvements, which are located within the Wilmington Beach area of the Town of Carolina Beach, New Hanover County, North Carolina, pursuant to an application dated July 31, 2008 and received by the DWQ on July 31, 2008. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. Sediment and Erosion Control: Town of Carolina Beach Page 3 of 3 September 23, 2008 b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project; 5. Protective Fencing - The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities; Continuing Compliance: 6. Mr. Tim W. Owens and the Town of Carolina Beach shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. Tim W. Owens and the Town of Carolina Beach, and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Tim W. Owens and the Town of Carolina Beach, in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; 7. Construction Stormwater Permit NCG010000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing Town of Carolina Beach Page 4 of 4 September 23, 2008 construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http://h2o.enr.state.nc.us/su/Forms Documents.htm; Stormwater Management Plan Implementation Procedures (No Further Approval Needed) • The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site. If a development is phased, then the approved SMP for each future phase must be constructed and operational before any permanent building or other structure associated with that phase is occupied. • The approved SMP as well as drainage patterns must be maintained in perpetuity. • The SMP may not be modified without prior written authorization from the SMP approval authority. If the SMP falls under another state stormwater program, then a copy of the approval letter and the modified SMP must be submitted to the 401 Oversight/Express Unit prior to the commencement of the modifications. 9. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/newetiands. The text of the sample deed notification may be modified as appropriate to suit to this project. 10. Sewer Systems The project shall comply with 15A NCAC 2H.0219(i)(2)(G) and all other State, Federal and local sewer system regulations. 11. Construction Plans Any final construction plans for this project must include or reference the application and plans approved by the DWQ under this authorization letter and certification. 12. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit, and the authorization to proceed with your proposed impacts to Isolated Wetlands as depicted in your application and as authorized by this Permit, shall expire upon expiration of IWGP100000 (October 30, 2008) or unless otherwise rescinded by the Director of the Division of Water Quality. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Town of Carolina Beach Page 5 of 5 September 23, 2008 Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 23d day of Se tember 2008 7 DIV ON F rLITY Coleen H. Sullins 3723 CHS/cbk/ijm