Loading...
HomeMy WebLinkAbout20150610 Ver 3_More Info Letter_20170601+ i Water Resources Environmental Quality June 1, 2017 Duke Power Company Attn: Steve Cahoon 411 Fayetteville St Mail Code: NC14 Raleigh NC 28601 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director DWR # 15-0610 v3 Rockingham County Subject: REQUEST FOR ADDITIONAL INFORMATION Dan River Steam Station Stormwater Diversion Project and associated Projects Dear Mr. Cahoon: On May 2, 2017, the Division of Water Resources — Water Quality Programs (Division) received your application dated April 28, 2017, requesting an Individual 401 Water Quality Certification from the Division for your project. The Division has determined that your application is incomplete and cannot be processed.. The application is being placed on -hold until all of the following information is received: This project includes a revision to impacts previously approved by the Division on May 12, 2016 (DWR#2016-0156v2). These impacts were for an access road for the Dan River Scarp Repair and were approved as temporary impacts. The current application for an Individual Permit requests that these impacts be approved as permanent impacts. The original review by the Division was based on temporary impacts and therefore the Division requires a more detailed analysis of the purpose and need for permanent impacts as well as a more detailed analysis of avoidance and minimization measures. In addition, this project will be placed on hold until a compliance inspection of these culverts has been conducted. [15A NCAC 02H .0506(f) and (g)] 2. Your application indicates that 130 linear feet of stream stabilization will occur at location DR -134 however Plan Sheet DR -134 Section Detail, Figure 02 shows riprap shading throughout the entire channel bed. Please clarify whether riprap will be extended throughout the channel bed. 3. As requested in the pre -application, please provide a detailed analysis of the velocity expected at outfall SW010, the riprap pad specifications and details, and an analysis of the impact this additional flow and velocity may have on wetlands that are present immediately downslope of this area. State of North Carolina I Environmental Quality 450 W. Hanes Mill Road, Suite 300, Winston-Salem, North Carolina 27105 Phone: 336-776-98001 FAX: 336-776-9797 Duke Energy DWR# 2015-0610 v2 Request for Additional Information Page 2 of 2 Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending two copies of all of the above requested information to the 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, INC 27699-1650. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact me at 336-776-9693 or Sue. Homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Sue Homewood Winston-Salem Regional Office cc: Julia Tillery, Amec Foster Wheeler Environment & Infrastructure Inc. (via email) David Bailey, USACE Raleigh Regulatory Field Office (via email) DWR WSRO 401 files DWR 401 & Buffer Permitting Unit