HomeMy WebLinkAbout20170494 Ver 1_NWP verification bridge 198 Columbus_20170530Carpenter,Kristi
From: Hair, Sarah E CIV CESAW CESAD (US)
<Sarah.E.Hair@usace.army.mil>
Sent: Tuesday, May 30, 2017 11:02 AM
To: Rerko, James J
Cc: Steenhuis, Joanne
Subject: NWP verification bridge 198 Columbus
Attachments: brige 198 �olumbus NWP verification-signed.pdf; signed PJD.pdf;
bridge 198 plans.pdf; Mitigation Responsibility Transfer Form -
bridge 198 signed.pdf
Jim,
Attached please find the NWP 3/13 verification letter, MRT Form, PJD and plans for the
following project:
Corps Action ID: SAW-2016-00801
Project Name: bridge 198
County: Columbus
Below is the website with links to NWPs 3 and 13 along with the 2017 General and
Regional Conditions:
http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Permits/2017-
Nationwide-Permits/
No paper copy will be mailed.
Please let me know if you have any questions.
Liz
Liz Hair
Project Manager
USACE-Wilmington District
Wilmington Regulatory Field Office
69 Darlington Avenue
Wilmington, NC 28403
910-251-4049
Sarah.e.hair@usace.army.mil
1