HomeMy WebLinkAbout20170272 Ver 1_Corps of Engineer Correspondence_20170601 (2)
Homewood, Sue
From:Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil>
Sent:Thursday, June 01, 2017 11:27 AM
To:Chris Oliver
Cc:'Chad Abbott'; 'Randy Hall'; Homewood, Sue
Subject:RE: \[Non-DoD Source\] 14-0243 - Bedford Hills Subdivision - Wetland Impacts
Chris,
Thank you for meeting me yesterday at the above referenced site. During our site visit I verified that the fill and runoff material
had been removed behind lots 77 and 78 according to our requirements. As such, I will send a letter today closing out our
Unauthorized Activity action on this property. Furthermore, I field verified (via tape measure) the staked headwall locations of the
permitted southern creek crossing to confirm the length of permitted culvert footprint stream impacts. I found that the staked
headwall locations fit within the permitted culvert impact thresholds, and thus the project is in compliance with Special Condition
1 of Nationwide Permit 29 verified for use on 5/17/2017. Thank you for your coordination and cooperation, and please let me
know if you have any as construction proceeds.
-Dave Bailey
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do
so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Chris Oliver \[mailto:chris.oliver@summitde.net\]
Sent: Monday, May 22, 2017 4:36 PM
To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil>; 'Homewood, Sue' <sue.homewood@ncdenr.gov>
Cc: 'Chad Abbott' <chad.abbott@summitde.net>; 'Randy Hall' <randy.hall@summitde.net>
Subject: RE: \[Non-DoD Source\] 14-0243 - Bedford Hills Subdivision - Wetland Impacts
Sue and David,
Good afternoon. The work described below was completed on Thursday (5/18) and Friday (5/19) of last week. Please see attached
pictures for your reference.
The contractor is almost ready for installation of the southern creek crossing for Phase II, and the limits of disturbance have been
staked. What is your availability for a final site inspection/pre-construction meeting late next week (5/31-6/2) or the week of 6/5?
1
Please let me know if you have any questions or would like to discuss.
Thank you,
Chris W. Oliver, E.I.
Land Development
Phone: (919) 732-3883
Fax: (919) 732-6676
From: Bailey, David E CIV USARMY CESAW (US) \[mailto:David.E.Bailey2@usace.army.mil\]
Sent: Thursday, May 04, 2017 4:18 PM
To: Chris Oliver
Cc: 'Chad Abbott'; 'Homewood, Sue'
Subject: RE: \[Non-DoD Source\] 14-0243 - Bedford Hills Subdivision - Wetland Impacts
Thanks for the summary, Chris. Your synopsis covers what we discussed and the completion date is reasonable.
-Dave Bailey
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil>
2