HomeMy WebLinkAbout20131279 Ver 2_More Info Received - Email_20170531Strickland, Bev From: Willson, Kenneth <Kenneth.Willson@cbi.com> Sent: Wednesday, May 31, 2017 10:27 PM To: Scarbraugh, Anthony; outten@darenc.com; Huggett, Doug; josh.pelletier@usace.army.mil Cc: Rosov, Brad; Biddlecome, William J JR CIV USARMY CESAW (US); Staples, Shane; Howell, Jonathan; Trowell, Steve; Dunn, Maria T.; Bodnar, Gregg; Davis, Braxton Q Lopazanski, Mike; Burdette, Jennifer a; James Medlock (James.M.Medlock@usace.army.mil); Petersen, Joen SAW Subject: RE: Hatteras Inlet Dredge Update Attachments: RC_05_HST_20170522.pdf 0 I am writing to inform you all that today (May 31, 2017) was the last day of sidecast dredging at the connector channel at Hatteras Inlet. I received word from the USACE earlier today that depths of -8 ft. MLW have been established on both the east and west side of the channel and that charter vessels were using the channel this past weekend. The attached map is a survey conducted by the USACE last week showing mainly the dredging completed on the west side. The USACE expects to conduct another survey this week and will pass that information along when available. Please let me know if you have any questions about this project. In the coming weeks we will submit any permit required reports to the respective agencies. Kind Regards, Ken Willson Client Program Manager 1 Coastal & Maritime Services Environmental & Sustainability Tel: + 1 910 791 9494 Cell: + 1 910 443 4471 Fax: + 1 910 791 4129 Kenneth.willson(cDCBI.com CB&I 4038 Masonboro Loop Road Wilmington, NC 28409 USA www.CBI.com 1` Green Gross for Safety From: Willson, Kenneth Sent: Friday, May 26, 2017 2:56 PM To: 'Scarbraugh, Anthony'<anthony.scarbraugh@ncdenr.gov>; 'outten@darenc.com' <outten@darenc.com>; 'Huggett, Doug'<doug.huggett@ncdenr.gov>; 'josh. pelletier@usace.army. mil' <josh.pelletier@usace.army.mil> Cc: Rosov, Brad <Brad.Rosov@cbi.com>; 'Biddlecome, William J JR CIV USARMY CESAW (US)' <William.J.Biddlecome@usace.army.mil>;'Staples, Shane' <shane.staples@ ncdenr.gov>; 'Howell, Jonathan' <jonathan.howell@ncdenr.gov>;'Trowell, Steve'<steve.trowell @ ncdenr.gov>; 'Dunn, Maria T.' <maria.dunn@ncwildlife.org>;'Bodnar, Gregg'<gregg.bodnar@ncdenr.gov>;'Davis, Braxton C' <Braxton.Davis@NCDENR.Gov>; 'Lopazanski, Mike' <mike.lopazanski@ncdenr.gov>; 'Burdette, Jennifer a' <Jennifer.Burdette@ncdenr.gov>; James Medlock (James. M. Medlock@usace.army.mi1) <James.M.Medlock@usace.army.mil>; Petersen, Joen SAW<Joen.A.Petersen@usace.army.mil> Subject: RE: Hatteras Inlet Dredge Update 0 As requested by the DCM as a condition of the relief granted originally on March 28, 2017 and extended on May 1, 2017, 1 am providing a weekly update to inform you of the status of the Hatteras Inlet Connector Channel Maintenance Project. Since May 11th the sidecast dredge MERRITT has been working in the Hatteras Inlet Connector Channel. As you are all aware the DCM and Division of Water Resources both agreed to allow dredging operations on this project to take place until either June 15th, or 3 weeks from the date when dredging is re-initiated, whichever comes first. On May 12, 2017 we received a copy of the correspondence from the USACE agreeing to a similar allowance of an extension for work until June 15th, 2017 or until the completion of work, whichever comes first. The three week timeframe will run until mid-day on June 1. The majority of the west side of the channel has been cleared down to a depth of -8 MLW. There is a small prism of shoaling on the northern side of the western portion of the channel that they may try to clean up before leaving. The dredge has only recently been able to break through on the east side of the channel, closer to the inlet. Some additional shoaling occurred in that area since the pre -con survey was constructed and sea conditions earlier this week were less than optimal. With W and SW winds this weekend they are hoping to make some good progress. At present the plan is that they will be finished dredging by the end of the day on May 31, which would adhere to the relief granted by DCM and USACE. They have asked that we re -assess things on Tuesday morning to measure the progress made over the weekend as to whether or not additional days beyond May 31st are necessary to establish the minimal channel dimensions. I will report back to you all as soon as we get an update. Please let me know if you have any questions about this project. I hope you all have a happy and safe weekend. Kind Regards, Ken Willson Client Program Manager 1 Coastal & Maritime Services Environmental & Sustainability Tel: + 1 910 791 9494 Cell: + 1 910 443 4471 Fax: + 1 910 791 4129 Kenneth.willson(cDCBI.com CB&I 4038 Masonboro Loop Road Wilmington, NC 28409 USA www.CBI.com 2015WiCAtP1 •fYi From: Willson, Kenneth Sent: Friday, May 19, 2017 2:13 PM To: 'Scarbraugh, Anthony'<anthony.scarbraugh@ncdenr.gov>; 'outten@darenc.com' <outten@darenc.com>; 'Huggett, Doug'<doug.huggett@ncdenr.gov>; 'josh. pelletier@usace.army. mil' <josh.pelletier@usace.army.mil> Cc: Rosov, Brad <Brad.Rosov@cbi.com>; 'Biddlecome, William J JR CIV USARMY CESAW (US)' <William.J.Biddlecome@usace.army.mil>;'Staples, Shane' <shane.staples@ ncdenr.gov>; 'Howell, Jonathan' <ionathan.howell@ncdenr.gov>;'Trowell, Steve'<steve.trowell @ ncdenr.gov>; 'Dunn, Maria T.' <maria.dunn@ncwildlife.org>;'Bodnar, Gregg'<gregg.bodnar@ncdenr.gov>;'Davis, Braxton C' <Braxton.Davis@NCDENR.Gov>; 'Lopazanski, Mike' <mike.lopazanski@ncdenr.gov>; 'Burdette, Jennifer a' <Jennifer.Burdette@ncdenr.gov> Subject: RE: Hatteras Inlet Dredge Update 0 As requested by the DCM as a condition of the relief granted originally on March 28, 2017 and extended on May 1, 2017, 1 am providing a weekly update to inform you of the status of the Hatteras Inlet Connector Channel Maintenance Project. Since May 11th the sidecast dredge MERRITT has been working in the Hatteras Inlet Connector Channel. As you are all aware the DCM and Division of Water Resources both agreed to allow dredging operations on this project to take place until either June 15th, or 3 weeks from the date when dredging is re-initiated, whichever comes first. On May 12, 2017 we received a copy of the correspondence from the USACE agreeing to a similar allowance of an extension for work until June 15th, 2017 or until the completion of work, whichever comes first. The three week timeframe will run until June 2. I've heard from locals that the dredge has been focusing on the west side of the channel up until now and was scheduled to switch to the eastern side today or in the next couple days. Jim Medlock of the USACE reported that they are approximately 30% complete. That's pretty close to the schedule with —1/3 complete in the first week of 3. Please let me know if you have any questions about this project. Kind Regards, Ken Willson Client Program Manager 1 Coastal & Maritime Services Environmental & Sustainability Tel: + 1 910 791 9494 Cell: + 1 910 443 4471 Fax: + 1 910 791 4129 Kenneth.willson(cDCBI.com CB&I 4038 Masonboro Loop Road Wilmington, NC 28409 USA www.CBI.com i r.i 71'0 2015 kl:•A1 •'4 . �'�f Yl From: Willson, Kenneth Sent: Friday, May 12, 2017 2:10 PM To: 'Scarbraugh, Anthony'<anthony.scarbraugh@ncdenr.gov>; outten@darenc.com; Huggett, Doug <doug.huggett@ncdenr.gov>; iosh.pelletier@usace.army.mil Cc: Rosov, Brad <Brad.Rosov@cbi.com>; Biddlecome, William J JR CIV USARMY CESAW (US) <William.J.Biddlecome@usace.army.mil>; Staples, Shane <shane.staples@ncdenr.gov>; Howell, Jonathan <ionathan.howell@ncdenr.gov>; Trowell, Steve <steve.trowell@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Davis, Braxton C <Braxton.Davis@NCDENR.Gov>; Lopazanski, Mike <mike.lopazanski@ncdenr.gov>; Burdette, Jennifer a <Jennifer.Burdette@ncdenr.gov> Subject: RE: Hatteras Inlet Dredge Window Extension W As requested by the DCM as a condition of the relief granted originally on March 28, 2017 and extended on May 1, 2017, 1 am providing a weekly update to inform you of the status of the Hatteras Inlet Connector Channel Maintenance Project. It is my understanding that as of today, the Dredge Merritt has returned to the Connector Channel at Hatteras. As you are all aware the DCM and Division of Water Resources both agreed to allow dredging operations on this project to take place until either June 15th, or 3 weeks from the date when dredging is re-initiated, whichever comes first. Assuming the Merritt is operating today, the three week timeframe will run until June 2. At present, I am not in receipt of any official correspondence from the USACE that the same relief has been granted by them as was granted by DCM and the Division of Water Resources. However, I did speak to Josh Pelletier on Monday (5/8/17) and he mentioned that they would be sending out the official approval on Tuesday. Neither Dare County nor CPE -NC have received a digital or hard copy of that approval at present. Josh, please confirm that the correspondence approving dredging beyond May 15th has been sent and if possible, please provide a digital copy to both the County and CPE -NC. Please let me know if you have any questions about this project. Kind Regards, Ken Willson Client Program Manager 1 Coastal & Maritime Services Environmental & Sustainability Tel: + 1 910 791 9494 Cell: + 1 910 443 4471 Fax: + 1 910 791 4129 Kenneth.willson(cDCBI.com CB&I 4038 Masonboro Loop Road Wilmington, NC 28409 USA www.CBI.com i+ Green CtOSS for Safety From: Scarbraugh, Anthony[mailto:anthony.scarbraugh@ncdenr.gov] Sent: Tuesday, May 02, 2017 1:01 PM To: Willson, Kenneth <Kenneth.Willson@cbi.com>; outten@darenc.com Cc: Rosov, Brad <Brad.Rosov@cbi.com>; Biddlecome, William J JR CIV USARMY CESAW (US) <William.J.Biddlecome@usace.army.mil>; Staples, Shane <shane.staples@ncdenr.gov>; Howell, Jonathan <jonathan.howell@ncdenr.gov>; Trowell, Steve <steve.trowell@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Davis, Braxton C <Braxton.Davis@NCDENR.Gov>; Lopazanski, Mike <mike.lopazanski@ncdenr.gov>; iosh.pelletier@usace.army.mil; 'huggetts@att.net' <huggetts@att.net>; Huggett, Doug <doug.huggett@ncdenr.gov>; Burdette, Jennifer a <Jennifer.Burdette@ncdenr.gov> Subject: RE: Hatteras Inlet Dredge Window Extension Mr. Wilson, The Division of Water Resources concurs with Division of Coastal Management. Due to the circumstances encountered by the County the DWR will agree to an extension to allow dredging operations on this project to take place until either June 15th, or 3 weeks from the date when dredging is re-initiated, whichever comes first. Regards, Anthony Scarbraugh Environmental Senior Specialist Division of Water Resources — Water Quality Regional Operations Department of Environmental Quality 252 948 3924 office anthony.scarbraugh(a)ncdenr.gov 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Huggett, Doug Sent: Monday, May 01, 2017 10:26 AM To: Willson, Kenneth <Kenneth.Willson@cbi.com>; outten@darenc.com Cc: Rosov, Brad <Brad.Rosov@cbi.com>; Biddlecome, William J JR CIV USARMY CESAW (US) <William.J.Biddlecome@usace.army.mil>; Scarbraugh, Anthony<anthony.scarbraugh@ncdenr.gov>; Staples, Shane <shane.staples@ncdenr.gov>; Howell, Jonathan <jonathan.howell@ncdenr.gov>; Trowell, Steve <steve.trowell@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Bodnar, Gregg <Rregg.bodnar@ncdenr.gov>; Davis, Braxton C <Braxton.Davis@NCDENR.Gov>; Lopazanski, Mike <mike.lopazanski@ncdenr.gov>; josh.Pelletier@usace.army.mil;'huggetts@att.net' <huggetts@att.net> Subject: RE: Hatteras Inlet Dredge Window Extension Ken As was the case with the first moratorium extension request, DCM spent a significant amount of time last week reviewing this request. DCM is aware that the most recent delay that the County has encountered was something that was totally outside of the County's control. We are also very aware of the urgency of this matter. With this in mind, and again taking into account the urgency of this project, DCM does agree to allow dredging operations on this project to take place until either June 15th, or 3 weeks from the date when dredging is re-initiated, whichever comes first. Additionally, we ask that we be notified once dredging efforts resume, and that weekly status reports be provided to DCM once work has begun so that we may remain informed about the progress being made towards project completion. Please also note that this approval on DCM's part does not eliminate the need to obtain additional approvals that may be required from any other permit agency, including but not limited to the U.S. Army Corps of Engineers. As always, If I can provide any additional information or help on this or any other matter, please don't hesitate to let me know. Sincerely, Doug -----Original Message ----- From: Willson, Kenneth[mailto:Kenneth.Willson@cbi.com] Sent: Tuesday, April 25, 2017 5:20 PM To: Pelletier, Josh R CIV CESAW CESAD (US) <Josh. R. Pelletier@usace.army.mil>; outten@darenc.com; Huggett, Doug <doug.huggett@ncdenr.gov>; Trowell, Steve <steve.trowell@ncdenr.gov> Cc: Rosov, Brad <Brad.Rosov@cbi.com>; Biddlecome, William J JR CIV USARMY CESAW (US) <William.J.Biddlecome@usace.army.mil> Subject: RE: Hatteras Inlet Dredge Window Extension No As a follow up to my email yesterday, I want to provide you with some updated information with regards to the Merritt's dredge schedule. This morning, the Merritt was pulled from operations at Hatteras Inlet by the USACE to conduct the emergency work required at Bigfoot Slough, mentioned in the previous email. Depending on weather and other conditions, the Merritt may not be able to return to Hatteras Inlet until May 17. Obviously with the current relief period only extending to May 15th, this is of concern to the County. At present, only 3 days of dredging have been conducted at Hatteras Inlet. Attached is a map of the conditional survey conducted by the USACE last week prior to any dredging. The Merritt concentrated on the western box shown in the attached map during the 3 days of dredging (April 22, 23 and 24). They were able to open a preliminary channel approximately 40 ft. wide and 6 ft. deep in that section. No dredging was conducted in the eastern box shown on the map. The USACE has suggested that they anticipate needing a little over two (2) weeks to complete the work once they return to Hatteras Inlet. However, given weather and the possibility of dredge repairs, the USACE dredge operations folks suggested we request an extentsion of the existing relief through June 15th. Please consider this a formal request for an extension of the previously issued relief to extend through June 15th. Please let me know if you have any questions. Kind Regards, Ken Willson Client Program Manager 1 Coastal & Maritime Services Environmental & Sustainability Tel: + 1910 7919494 Cell: + 1910 443 4471 Fax: + 1910 7914129 Kenneth.willson@CBI.com CB&I 4038 Masonboro Loop Road Wilmington, NC 28409 USA www.CBI.com -----Original Message ----- From: Willson, Kenneth Sent: Monday, April 24, 2017 10:50 AM To: 'Pelletier, Josh R CIV CESAW CESAD (US)' <Josh.R.Pel letier@usace.army.mil>; outten@darenc.com; Huggett, Doug <doug.huggett@ncdenr.gov>;'Trowell, Steve' <steve.trowell@ncdenr.gov> Cc: Rosov, Brad <Brad.Rosov@cbi.com>; Biddlecome, William J JR CIV USARMY CESAW (US) <William.J.Biddlecome@usace.army.mil>; MEDLOCK, James M (Jim) CIV USARMY CESAW (US) <James.M.Medlock@usace.army.mil> Subject: RE: Hatteras Inlet Dredge Window Extension Josh/Doug/Steve, I wanted to inform you all that maintenance dredging of the connector channel at Hatteras Inlet began over the weekend using the Sidecast Dredge Merritt. That said, the USACE has been notified of an emergency at Big Foot Slough, which takes priority and will require them to leave the connector channel at Hatteras sometime this week. At present they do not know what day they will have to leave or for how long. The County is waiting to receive an update from the USACE once they have a better idea of the amount of work required at Big Foot Slough. The tentative plan is to finish the emergency job and return to the connector channel at Hatteras to dredge as much as possible before May 16. As soon as the County receives an update from the USACE, we will pass this information along to you all with an estimate on the progress they expect to make in the connector channel before May 16. The permit allows for the channel to be dredged to 150' wide and -12.0' MLW. The County would like to get the channel as close to the permitted dimensions as possible, going into the summer months. Kind Regards, Ken Willson Client Program Manager 1 Coastal & Maritime Services Environmental & Sustainability Tel: + 1910 7919494 Cell: + 1910 443 4471 Fax: + 1910 7914129 Kenneth.willson@CBI.com CB&I 4038 Masonboro Loop Road Wilmington, NC 28409 USA www.CBI.com -----Original Message ----- From: Pelletier, Josh R CIV CESAW CESAD (US) [mailto:Josh.R.Pelletier@usace.army.mil] Sent: Monday, April 10, 2017 9:03 AM To: outten@darenc.com Cc: Willson, Kenneth <Kenneth.Willson@cbi.com>; Rosov, Brad <Brad.Rosov@cbi.com>; Biddlecome, William J JR CIV USARMY CESAW (US) <William.J.Biddlecome@usace.army.mil>; MEDLOCK, James M (Jim) CIV USARMY CESAW (US) <James.M.Medlock@usace.army.mil>; Ken Riley - NOAA Federal <ken.riley@noaa.gov>; Ellis, John <john_ellis@fws.gov>; Huggett, Doug <doug.huggett@ncdenr.gov> Subject: Hatteras Inlet Dredge Window Extension Mr. Outten, In coordination with the Division of Coastal Management, the National Marine Fisheries Service and the US Fish and Wildlife Service, the US Army Corps of Engineers authorizes the Department of Army permit SAW -2016-02140 to allow dredging operations until May 15, 2017. This approval is for a one-time event and all dredge window moratoriums should be strictly adhered to for any subsequent dredging actions. Please note, this authorization does not eliminate the need to obtain additional state and/or federal authorizations. All conditions of the original permit issued on March 14, 2017 will be enforced. If you have any questions or concerns, please let me know. Thanks! Josh Pelletier Project Manager US Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, North Carolina 27889 Phone: (910) 251-4605 Fax: (252) 975-1399 Email: josh. r. pelletier@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://urldefense. proof poi nt.com/v2/url?u=http-3A_corpsmapu.usace.army. mi I_cm-5Fapex_f-3Fp-3D136-3A4- 3AO&d=Dwl FAg&c=j 2Bs4Nz3 nJdA9D7J h n4VVQ&r=_AtSTZVq I mOhV_oTFM IY64H U BFtl Md N r3O7-Q1G BXy4&m=XCI D3 rc- _PM RlyvS_3-M pSU W ble1n84uZm 1bOIV8skY&s=9m i U -i 1wsEZEbAmv7ea9Z-_Qv_goobV_O33xpMAEfFM &e= Thank you for taking the time to visit this site and complete the survey. This e-mail and any attached files may contain CB&I (or its affiliates) confidential and privileged information. This information is protected by law and/or agreements between CB&I (or its affiliates) and either you, your employer or any contract provider with which you or your employer are associated. If you are not an intended recipient, please contact the sender by reply e-mail and delete all copies of this e-mail; further, you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited. This e-mail and any attached files may contain CB&I (or its affiliates) confidential and privileged information. This information is protected by law and/or agreements between CB&I (or its affiliates) and either you, your employer or any contract provider with which you or your employer are associated. If you are not an intended recipient, please contact the sender by reply e-mail and delete all copies of this e-mail; further, you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited. 75047'0"W 75046'45"W 75046'30"W 75046' 15"W 75046'0"W 75045'45"W rJ 0 O X) � L b US Army Corps of Engineers Wilmington District z Ln rJ Lf] Ln <n oto 0 cr7 iJ Q L0 M s r r X) NORTH",,, LINA Manteo Morehead City ATLANTIC OCEAN PAMLICO SOUND � s s' Morehead City ►J i M LLI LL' Z_ Z J �v)Q V♦ G7 w E ■ 0 ❑ J U LJQ Z = L: _ zw�L (3 a. 0 zoz (1)z LLJcf) 0 LL (j) Q Q 0 Z M w M z O 2 I � 75047'0"W 75°46'45"W 75046'30"W 7546'15"W 75046'0"W 75°45'45"W L0 C) r 0 T ❑ �I U) _ U z I Q m m ❑ W z Q OW m O U) cr_ W Z W J � ILW CL 4 ULL a_ W U) z W J Q {y' W X Q Q � WLO Q ¢ o C, Qz D Q � W W CJ] J W ❑ W {/� ❑ W ❑ � D U) Q 212 < < 2 N 1 a ►J i M LLI LL' Z_ Z J �v)Q V♦ G7 w E ■ 0 ❑ J U LJQ Z = L: _ zw�L (3 a. 0 zoz (1)z LLJcf) 0 LL (j) Q Q 0 Z M w M z O 2 I � 75047'0"W 75°46'45"W 75046'30"W 7546'15"W 75046'0"W 75°45'45"W