HomeMy WebLinkAbout20071134 Ver 1_Georges Fork, Site 26. R-2519A, Site Visit Report_20170531TI P: R-2519A
DATE
11-22-2016
11-22-2016
11-22-2016
5/24/2017
SITE VISIT HISTORY
Mitigation Site: US 19 Streams- Site 26 Georges Fork
COMMENTS
Right bank recently mowed. Site has very few trees, needs planting with monitoring clock reset. Which bank had been
excavated?
Stream bank is also eroded in some sections where it appears the structures were placed in the wrong location for
stream geomorphology. Signage needed throughout.
discuss resetting the clock due to lack of plantings in 2016 monitoring comments
site looked ok, has been fenced so church will not mow, replanted. Visited with dot randy, byron and jason after
r2518A&b closeouts, marla, wrc, and dot ginny and kevin
5/31/2017