Loading...
HomeMy WebLinkAbout20071134 Ver 1_Georges Fork, Site 26. R-2519A, Site Visit Report_20170531TI P: R-2519A DATE 11-22-2016 11-22-2016 11-22-2016 5/24/2017 SITE VISIT HISTORY Mitigation Site: US 19 Streams- Site 26 Georges Fork COMMENTS Right bank recently mowed. Site has very few trees, needs planting with monitoring clock reset. Which bank had been excavated? Stream bank is also eroded in some sections where it appears the structures were placed in the wrong location for stream geomorphology. Signage needed throughout. discuss resetting the clock due to lack of plantings in 2016 monitoring comments site looked ok, has been fenced so church will not mow, replanted. Visited with dot randy, byron and jason after r2518A&b closeouts, marla, wrc, and dot ginny and kevin 5/31/2017