Loading...
HomeMy WebLinkAboutU-5706_Concurrence Point 1 Meeting Summary_2017.05.10.docxMEETING SUMMARY Merger Meeting — Concurrence Point 1 TIP No. U-5706 Eastern Rockingham Corridor Study, Richmond County, NC Date .................... May 10, 2017 Time .................... 1:00 p.m. Location ............. Century Center A, Structure Design Conference Room Purpose .............. Request concurrence on project purpose and project study area Attendees: Name Organization Email Address Gary Jordan USFWS garyJordan@fws.gov Cynthia Van Der Wiele USEPA vanderwiele.cynthia@epa.gov Amy Chapman NCDWR amy.chapman@ncdenr.gov Travis Wilson NCWRC travis.wilson@ncwildlife.org Jay Mclnnis NCDOT — PDEA jmcinnis@ncdot.gov Joseph Miller NCDOT — PDEA josephmiller@ncdot.gov Herman Huang NCDOT — Community Studies hhuang@ncdot.gov Deanna Riffey NCDOT — NES driffey@ncdot.gov Ron Cribbs NCDOT — Roadway Design rlcribbs@ncdot.gov Kerry Morrow NCDOT — TPB kmorrow@ncdot.gov Mike Stanley NCDOT — Planning & Programming mtstanley@ncdot.gov Jeffrey Teague NCDOT — Division 8 jlteague@ncdot.gov John Olinger NCDOT — Division 8 jolinger@ncdot.gov Jamie Yow NCDOT — Division 8 Utility jdyow@ncdot.gov Mark Staley NCDOT — Roadside Environmental mstaley@ncdot.gov Greg Myrick NCDOT — Location & Surveys gmyrick@ncdot.gov Jim Harris NCDOT — Rail Division jbharris@ncdot.gov Bryan Lopez NCDOT — Bike & Ped Division balopez@ncdot.gov Kristin Maseman Lochner kmaseman@hwlochner.com Brian Eason Lochner beason@hwlochner.com Kenny Smith Lochner ksmith@hwlochner.com Joining Via Conference Call: Name Organization Email Address Andy Williams USACE Andrew.E.Williams2@usace.army.mil James Lastinger USACE James.C.Lastinger@usace.army.mil Summary of Discussions Lochner provided a meeting handout including a discussion of the proposed project purpose and need and the project vicinity and environmental features map (attached). Page 1 MEETING SUMMARY Merger Meeting — Concurrence Point 1 TIP No. U-5706 Eastern Rockingham Corridor Study, Richmond County, NC Following opening remarks by Joseph Miller and introductions by attendees, Kristin Maseman provided an overview of the project and elaborated on certain items using the PowerPoint presentation. Key points discussed at the meeting were: 1. Screening criteria for purpose and need — Andy Williams suggested that the project team consider establishing screening criteria for evaluating the ability of various alternatives to meet the project purpose. After discussions, the Merger Team concluded that screening criteria do not need to be established at this stage of project development. 2. Purpose and Need — The Merger Team concurred with the project purpose and need as listed in the meeting handout. Merger Team members present at the meeting signed the concurrence form; NCDOT will provide an electronic copy of the concurrence form to the members not present at the meeting (USACE, HPO, and Lumber River RPO) and request their signatures via Docusign. 3. Proiect Studv Area — To better facilitate development of project alternatives and to provide a consistent northern terminus for alternatives, meeting attendees agreed to shift the northwest boundary of the study area to follow Richmond Road. A project study area map showing the revised study area is attached to the concurrence form. There was discussion about the possibility of shifting the eastern boundary of the project area to incorporate Wiregrass Road, allowing development of an alternative that would improve Wiregrass Road. NCDOT explained that preliminary analysis and discussions with local planners in Rockingham have indicated that area travelers do not typically use Wiregrass Road to travel between residential areas northeast of town and the commercial areas on US 74 Business. For this reason, the project team does not think that an alternative on Wiregrass Road would meet the project purpose. There was also discussion about the possible relationship of the R-2501 US 1 Bypass project with U-5706. John Olinger explained that the status of R-2501 is uncertain due to changing conditions in the vicinity of that project. Division 8 is now considering refocusing that project to improvements to US 1, rather than a new location bypass. 4. Project Alternatives — Cynthia Van Der Wiele indicated that EPA would favorably view incorporating multimodal improvements into the typical section for U-5706. 5. Project Schedule ■ Alternative Screening Merger Meeting — July 2017 ■ Public Meeting — August 2017 ■ Concurrence Point 2(Alternatives Carried Forward) — October 2017 ■ State FONSI — May 2019 ■ Right-of-way Acquisition — 2020 ■ Project Let - 2021 Action Items 1. Lochner will revise project study area boundary and forward a revised study area map to NCDOT. 2. NCDOT will send the Concurrence Form to USACE, HPO, and the Lumber River RPO for signatures via Docusign. (Meeting Summary Prepared By: Kristin Maseman, 5/11/17) Page 2