HomeMy WebLinkAboutFW U-5706 Concurrence Point 1 Merger Meeting SummaryCarpenter,Kristi
From: Chapman, Amy
Sent: Wednesday, May 31, 2017 10:22 AM
To: Norton, April R; Carpenter,Kristi
Cc: Ridings, Rob
Subject: FW: U-5706 Concurrence Point 1 Merger Meeting Summary
Attachments: U-5706_Concurrence Point 1 Meeting Summary_2017.05.10.docx;
Exhibitl_ProjectVicinityRevised.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Apri I,
This was before you started. The notes look accurate.
Kristi Lynn, can you put this in pre-app in laserfiche?
Thanks!
From: Maseman, Kristin [mailto:kmaseman@hwlochner.comj
Sent: Tuesday, May 30, 2017 2:23 PM
To: Kristin Maseman <kmaseman@hwlochner.com>
Subject: U-5706 Concurrence Point 1 Merger Meeting Summary
Hello all-
Attached is a draft summary of the Concurrence Point 1 Merger Meeting for U-5706
(held on May 10). A revised project study area map is also attached. If you have any
comments or questions about the draft summary, please send them to me by June 9.
Thanks-
Kristin
Kristin B. Maseman, A/CP CEP
Project Manager
LOCHNER
2840 Plaza Place, Suite 202
Raleigh, NC 27612
Phone: 919.571.7111
Mobile: 919.710.0032
kmaseman(a�hwlochner.com
www.hwlochner.com