Loading...
HomeMy WebLinkAbout20170659 Ver 1_Vance 12 Buffer Permit Drawings_20170526� � • � � V � � O V See Sheet 9A For Index of Sheets See Sheet 9B For Conventlonol Symbols BUFFER DRAWING SHEET 1 OF 3 0 s�, �`���I°1� C�1F 1��1��II�� �� I��1I�II1���'� ��'�1I��[�� '�1� lI���1�['�'�.����� T�A11lCE CO U11lTY LOCATION: BRIDGE 1110.12 OVER LONG CREEK 0111 SR II05 (KITTRELL COLLEGE RD.) TYPE OF WORK: GRADING, DRAINAGE, PAVI11lG, A11tD STRUCTURE BUFFER IMPACTS PERMIT / s N Q � I � a Z CLEARING ON THIS PROJECT SHALL BE TO LIMITS ESTABLISHED USING METHOD III. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. TO�� INCOMPL]ETE II�LANS DO NOT USF. FOR R! W AC�UiSITiON DOGUMENT NOT GONSIDEREO FINAL UNLE55 ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared an tae o�,�es of� �nnauLres E�vcINEEx LENGTH ST�RUCTU ES � TATE PRO ECT�B BP.S.R 62 0.023 mi. �e�" ° ���� ��_ �EN� rI�E� ����� so 25 o so �oo A�T = i3oo — S T E�✓A R T GICAL �� B°��p� � V = 45 MPH — ERING ���� �.�� PLANS TOTAL LENGTH STATE PROJECT 176P.5.R.62 = 0.275 mi. zot2 sra.vo,axo srEcrFrcnrroxs :ID � CLASS = MINOR Y.t. COLLECTOR RIGHT OF WAY DATE: ANDY YOUNG. PE SlGNATURE: � � 50 25 0 50 100 � � SUBREGIONAL TIER FEBRUARY 7, 2017 rao�Ecr exciNSEa ROADWAY DESIGN ENGINEER �, � PROFILE (HORIZONTAL) RlGHT OF WAY MICHAEL BURNS, EI ��.��. ��.�� COMPLETE: PROJECT DES7GN ENGINEER �yg p����� 10 5 0 10 20 LETTING DATE: LISA GILCHRIST, EI NCDOT CONTACT �,E PROFILE (VERTICAL) OCTOBER 24, 2017 sicxnruxs: N Z O � � / ,_ CLASS B RIP RAP ���� E5T 2 TONS � � . EST 7 SY GEOTE%TILE REMOVE— L ;GE W DAYE / �.^.3"� PG_608 :. � � � 1�` � SPECIAL CUT DITCH SEE DETAIL 1 CLA55 I RIP RAP '; EST 120 TONS �'' EST 190 SY GEOTEXTILE .h� a°' �\:�i„ ti �. �\ .__.+92.05 \ � . _ � � - \ � R \ Oa01 � C F � � � � �\ I \ \ \ C \ �+if.. � � "� \ C � i3.. \ � C � \\ � ��i \ \ 9� ���iir � � � � "�;:; ��,�,� , i i ... � \ �l{��_{j��� . �Y NT DITCH \ 'bw �< SEE DETAIL 8 � CLA55 B RIP RAP f� EST 75 TONS �'Pr EST 220 SY GEOTEXTILE t��,E'�_ +.r5/3,.. �Iii�. tl �, �`�'r SPECIAL CUT DITCH �A SEE DETAIL 1 CLA55 II RIP RAP E5T 90 TONS EST 745 SY GEOTEXTILE REMOVE B �� � SITE 3 .� CUT DITCH SEE DETAIL 8 O CLA55 B RIP RAP � EST 235 TONS EST 700 SY GEOTEXTIIE SECOND DISTRICT RE� I � . . r � �, �. , . BERM DITCH SEE DETAIL 3 � CL4S5 I RIP RAP EST 175 TONS �\ '\EST 185 SY GEOTEX7ILE �� . � ' � , � � �� .. . . . STANDARD BASE DITCH---//"�'�i��� CL4S5 I RIP RP.P EST 36 TONS EST 53 SY GEOTEXTILE 040 EST DDE = 120 CY SLOPE = 8% � SEE DETAIL 4 / � � LIG���S�NT�PROJECIS F SITE 1 AND SITE 2 � �� � ���'lSi.r. �\\ \����� � i ����� �i;l,"�D>�\ GRADE TO DRAIN -L- Pl Sta 10+54J1 Pl Sta /4+8256 Pl SYo 24+/5.25 Pl Sta 26-I�03J1 �= 3' 3/' S42' (LTJ �= 55 32' 18.6" ILTJ 0=/5 3/' 09.9' (RTJ �_/E /6' 25.6' fRTJ D= 3' l5' S3A' D= 8' 03' 305' D= 8' 03' 30.5" D= 9' 3/' 033' L= 108J8' L= 689J9' L= 20499' L= 17099' T= 54J1' T= 37438' T= 1032/' T= 86A7' R=/,755.00' R= 7/1.00' R= 7/lAO' R= 602A0' S.E. = 4% S.E = 4% RUNOFF = 84' RUNOFF = 84' DETAIL 1 DETAIL 2 SPECIAL CUT DITCH SPECIAL GUT OITCH � Noi m s<aie� � No� �o xaie� Froni Franl �o� omn H �o� omn G�ou�d d1) D 3F\os� SIoPe G�ou�d d7:) D ryF\�g� SIoPe Gao�u�ilc Gao�oxtilc Min. D-1.5 Ft. Min. p=1.5 F. Type o(Liner= CLA55 IRIPRAP Max.d-1.0 Fi. Type o(Liner= CLASS B RIPRAP Max.d=1.0 H. FROM STA 15+00 TO STA 15+75 L RT FROM STA 11+00 TO STA 12+00 L LT FROM STA 21+08 TO STA 25+50 L RT FROM STA 21+25 TO STA 24+50 L LT DETAIL 4 DETAIL 5 PROIECT REFERENCE NO. SHEET NO. l7BP.5.R.62 4 :OADWAY DESIGN HYDRAULICS ENGINEER ENGINEER NC�MFLE�I°E PLANS DO NOT USE FOR / W ACQUISITION �"i � y� , �: i- � ECOLOGICAL ENGINEERING DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REMOVE ALL PORTIONS OF THE EXISTING CONCRETE FOOTERS ADJACENT TO BOTH STREAMBANKS AND INSTALL BANK STABILIZATION FOLLOWING DETAIL 6 USE IMPERVIOUS DIKE NCDOT STANDARD BMP ALONG WEST STREAMBANK TO REMOVE THE CONCRETE FOOTER AN� INSTALL BANK STABILIZATtON IN THE DRY THE PLACEMENT OF THE IMPERVIOUS DIKE IS CONSIDERED INCIDENTAL TO REMOVAL OF THE FOOTER AN� INSTALLATION OF THE STREAMBANK ALL PORTIONS OF THE STANDARD BASE DITCH TOE PROTECTION FROM STA 15+00 TO STA 16+15 L LT EXISTING TIMBER PILES SHOULD BE COMPLETELY REMOVED ONE FOOT BELOW MUD i No� m xaiel i Hoi io s�oie� LINE. DETAIL 8 U��� CUT DSTCH G�o�nd 7� p 1.� Ground Nqiukn� 1`��R d GaouH� F�p s�ore � Nai io �alel �� d � ohvn �ao,e.,�e g M�� o— , 5 F, ��EorE���E �a,�.a, a, °e� B U F F E R D RAW I N G Max.d- 7.5 F. d-1.5 F. Gro��d 2:/ p F�o�� 'wne� B�. � 6.0' B- 2.0 Fi. d Type of L'iner � CLA55 I RIPFAP TyPe of Liner= CL4SS B RIPRAP Gea�a.+le M, D �.5 F�. S H E ET 2 O F � STA 15+73 L RT FROM STA 17+85 TO STA 19+00 L LT Type ofLner CuSS e RIPrsAP M.d-1.0 Fi. � DETAIL b ^ BANK STA8ILIZATION p� iNo�ms<oie� ^ a.o mm. \ zo' �O Nws (� 4 � GEOTE%TILE TypeoiL'iner= CL45511RIPftAP FROM STA 19+40 TO STA 19+52 -L- RT TOE PROTECTION SEE DETA�L 5 FROM STA 73+00 TO STA 17 . 80 L LT FROM S1A. 13 : 50 TO S7A. 15 �i 00 L RT DETAIL 7 FF O FALSE SUMP ;�o N � No� ro s�oie� . Outs de Ditch Traffic Flow �� I 2 � 'IZ � �- 5 — Gc. S-Difch $lope � Proposed Diich STA. 15+86 -L- LT CLASS B RIP RAP SITE 1 EST 40 TONS EST 120 SY GEOTEXTILE SITE 2 CLA55 B RIP RAP / � � ES\ 2 TONS � +y:� EST 7 S GEOTEXTILE � � — �` �,__ _._, � � 4 75" w� 1� ��p✓ �� �., � . � � E%CAVATION_/ � i ti� ti0 / �ti� BANK STABALIZATION� SEE DETAIL 6 CLASS II RIP RAP S ITE 2 EST 100 70N5 ES7160 SY GEOTEXfILF� � / / /. � � ������ ►� �\\\\\\ ������� : � KPffNERINE K, u�ERNS � J m�JB ZqU PG 200 N ¢r^" // // mN/ � /� y/ �� � �� : �`' /� CL455 I RIP RAP �EST 4 TONS EST 12 SY GEOTEXTILE .i��� PROPOSED GATE BM'I / . �� - F =i VLOPMENT��k:� � � " �.�`� / F ��n P6 513 ,� � � oao9 +750�. 74, �\ 55�9� � C � ��� 1 � �; �m-, N � �� ss3g iio.F o ���s-���� F \ � � � � S .,��"'�;��.� � ./ / / CLA55 II RIP RAP � �,0 EST 4 TONS EST 12 SY / GEOTEXTILE SITE 3 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 C C \ / FORMOSA LONG CR�-EI< COUf� i LLC DB 1246 PG 939 50' 0' 100' GRAPHIC SCALE 25' 0' 50' INSET SCALE � d \� �,�\ \,� � � �� � � ��\ f �7 " �SPECIAL CUT DITCH � V SEE DETAIL 2 ��' CLASS B RIP RAP ��� EST 135 TONS y� EST 405 5Y GEOTEXTILE F���l�a \ � .���.�' � a' � eM*2 � ry _ \� O � � �'.�`� \ O ��'�,'j�y� O°� "�f,_�� ���"-�r � � � >/ �/'i � �! J .. �` i� R=3 .. CB��2 op \ � �a,"R � � c SPCCIAL NT DITCH F �� �h SEE DETAIL 2 04�10 � \ C1A55 B RIP RAP F EST 110 TONS �"� � ` EST 330 SY GEOTEXTILE � 0411 ��Q' i �� S4 _ <T Tao� &9 i � � Li ' / +5C' � &k< \ \ � ` � F BL—l03 V� I FOR —L— PROFILE.SEE SHEET 5 I fOR STRUCfURE PLANS,SEE SHEETS 5—ITHRU 5—? 'D 57ATE PROJECT l7BP.5R.62 ,qu pRNEWAY RADIIARE l0'UNLESS OTHEftWISE NOTED — POC STA25+50.00 BUFFER IMPACTS SUMMARY IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) 1 1@85', 1@35' BOX BEAM 18+96 TO 19+57 -L- LT X 1530.0 998.0 2528.0 2 1@85', 1@35' BOX BEAM 19+75 TO 20+40 -L- LT X 1299.0 888.0 2187.0 3 1@85', 1@35' BOX BEAM 19+72 TO 20+26 -L- RT X 561.0 363.0 924.0 TOTAL: 3390.0 2249.0 5639.0 0.0 0.0 0.0