Johnson, Alan
From:Emily Morris <Emily.Morris@mcgillengineers.com>
Sent:Wednesday, May 24, 2017 8:08 AM
To:Johnson, Alan
Subject:RE: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN
Application
Hi Alan,
The length of the forebay will be 8 ft.
Thanks!
From: Johnson, Alan \[mailto:alan.johnson@ncdenr.gov\]
Sent: Tuesday, May 23, 2017 3:04 PM
To: Emily Morris <Emily.Morris@mcgillengineers.com>
Subject: RE: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN Application
What is the length of the forbay ? 30 ft??? Please see design below. Basic design criteria. I can then kick it
out. Thanks, Alan
From: Emily Morris \[mailto:Emily.Morris@mcgillengineers.com\]
Sent: Monday, May 22, 2017 9:39 AM
To: Catherine.M.Janiczak@usace.army.mil
Cc: kmwoggon@gmail.com; Johnson, Alan <alan.johnson@ncdenr.gov>
Subject: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN Application
Hi Catherine,
Attached is the addendum to the PCN application for the Episcopal Church of the Ascension project SAW-2017-00805
with the documents and information you and Alan requested.
Thanks!
Emily