Loading...
HomeMy WebLinkAbout20170490 Ver 1_More Info Received_20170524 Johnson, Alan From:Emily Morris <Emily.Morris@mcgillengineers.com> Sent:Wednesday, May 24, 2017 8:08 AM To:Johnson, Alan Subject:RE: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN Application Hi Alan, The length of the forebay will be 8 ft. Thanks! From: Johnson, Alan \[mailto:alan.johnson@ncdenr.gov\] Sent: Tuesday, May 23, 2017 3:04 PM To: Emily Morris <Emily.Morris@mcgillengineers.com> Subject: RE: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN Application What is the length of the forbay ? 30 ft??? Please see design below. Basic design criteria. I can then kick it out. Thanks, Alan From: Emily Morris \[mailto:Emily.Morris@mcgillengineers.com\] Sent: Monday, May 22, 2017 9:39 AM To: Catherine.M.Janiczak@usace.army.mil Cc: kmwoggon@gmail.com; Johnson, Alan <alan.johnson@ncdenr.gov> Subject: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN Application Hi Catherine, Attached is the addendum to the PCN application for the Episcopal Church of the Ascension project SAW-2017-00805 with the documents and information you and Alan requested. Thanks! Emily 1