HomeMy WebLinkAbout20170490 Ver 1_More Info Received_20170525
Johnson, Alan
From:Emily Morris <Emily.Morris@mcgillengineers.com>
Sent:Thursday, May 25, 2017 4:12 PM
To:Johnson, Alan
Subject:FW: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN
Application
Attachments:15.05303 Impacts NWP 13&18.pdf; 4112017 Drawing Set Wetlands Added.pdf; PCN-
Application_Episcopal Church_052517.pdf
Hi Alan,
I just realized I forgot to copy you on this e-mail to Catherine with the updates she requested on the Episcopal Church
Stream Stabilization project.
Thanks,
Emily
-----Original Message-----
From: Emily Morris
Sent: Thursday, May 25, 2017 4:06 PM
To: Janiczak, Catherine M CIV USARMY CESAW (US) <Catherine.M.Janiczak@usace.army.mil>
Subject: RE: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN Application
Hi Catherine,
Attached is the updated PCN application, plan sets with wetlands, and impacts map with all of the impacts on the
engineering drawing.
Thanks,
Emily
-----Original Message-----
From: Janiczak, Catherine M CIV USARMY CESAW (US) \[mailto:Catherine.M.Janiczak@usace.army.mil\]
Sent: Wednesday, May 24, 2017 12:18 PM
To: Emily Morris <Emily.Morris@mcgillengineers.com>
Subject: RE: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN Application
Emily,
I've discussed this project with the project manager in the office and he is recommending that the PCN be resubmitted.
Here is all corrections I will need:
1.) A majority of this project will go under a NWP 13, however, the grade stabilization will have to go under a NWP 18 or
a NWP 27.
2.) You will need to justify the filling of the wetland. Right now, we cannot find a reason why this area cannot be
avoided with the project you are proposing. Stabilization and coir matting sounds like a permanent impact.
3.) I will need updated engineer drawings with all the impacts of Area 1 and Area 2. The drawing with the first PCN was
good but it did not include the wetland. A new drawing with this information should be included.
1
Please let me know if you have any questions. Thank you.
Catherine M. Janiczak
Regulatory Specialist
U.S. Army Corps of Engineers
Charlotte Regulatory Satellite Office
Phone: 704-510-1438
-----Original Message-----
From: Emily Morris \[mailto:Emily.Morris@mcgillengineers.com\]
Sent: Wednesday, May 24, 2017 10:36 AM
To: Janiczak, Catherine M CIV USARMY CESAW (US) <Catherine.M.Janiczak@usace.army.mil>
Cc: kmwoggon@gmail.com; Johnson, Alan <alan.johnson@ncdenr.gov>
Subject: \[Non-DoD Source\] RE: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN Application
Catherine,
I have attached the updated PCN addendum with the plot sizes now listed on the data sheets.
Thanks
-----Original Message-----
From: Janiczak, Catherine M CIV USARMY CESAW (US) \[mailto:Catherine.M.Janiczak@usace.army.mil\]
Sent: Wednesday, May 24, 2017 10:07 AM
To: Emily Morris <Emily.Morris@mcgillengineers.com>
Cc: kmwoggon@gmail.com; Johnson, Alan <alan.johnson@ncdenr.gov>
Subject: RE: Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN Application
I need one correction on the field data sheets: Please list the appropriate plot sizes. I know the plot size for the wetland
is going to be small but it still should be listed. For the upland data point, please use the standard (30ft, 15ft, 5ft, etc.)
found in the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and
Piedmont Region (Version 2.0). Thank you and let me know if you have any questions.
Catherine M. Janiczak
Regulatory Specialist
U.S. Army Corps of Engineers
Charlotte Regulatory Satellite Office
Phone: 704-510-1438
-----Original Message-----
From: Emily Morris \[mailto:Emily.Morris@mcgillengineers.com\]
Sent: Monday, May 22, 2017 9:39 AM
To: Janiczak, Catherine M CIV USARMY CESAW (US) <Catherine.M.Janiczak@usace.army.mil>
Cc: kmwoggon@gmail.com; Johnson, Alan <alan.johnson@ncdenr.gov>
Subject: \[Non-DoD Source\] Episcopal Church Stream Stabilization (SAW-2017-00805) Addendum to PCN Application
Hi Catherine,
2
Attached is the addendum to the PCN application for the Episcopal Church of the Ascension project SAW-2017-00805
with the documents and information you and Alan requested.
Thanks!
Emily
3