HomeMy WebLinkAbout20071995 Ver 1_More Info Received_20080923Sip. x ). 2019 J AIM IAi)W 14 J TEWEa4. °
21) f.
m
?>?a?:i?'tl???iii r?¦ ??'ii?a>?Rt-!?!??
Sopwwft 92,
bfiKda m *(Wow QmdiW
wb
?y
lr
AmmikK WSW
For of W At '
M ameoW AAM tM
SEP.22.2008 9:46AM RALPH WHITEHEAD ASSO
NO. 273 P. 3
website: ht62://h.2o.enr.state.nc.us/su/bmn forms.htm. Please erasure that all items
noted on Worksheet #2: Checklists are clearly identified on the engineeringplans.
2. The EEP mitigation acceptance letter submitted with the application is no longer
valid. Please provide a new EEP mitigation letter.
3. Please provide construction details for the boulder (toe protection) installation
and the cross vane installation with the stream relocation/restoration area.
4. Please provide a planting plan for the stream buffer on the north side of the
channel that includes the standard planting density as indicated in the Stream
Mitigation Guidelines document found on the USACE website:
http://wwv.saw_usaee_army.miVWETL4NDSIMitization-1,Weam mitigation.html. The
Division acknowledges that planting density will not be feasible in the riparian
buffer between the stream and the roadway, however some tree and shrub
vegetation will be required to be planted immediately adjacent to the stream
bank. :
As stated previously, we intend to submit the requested materials to your office before
October 15`x', 2008. Please do not hesitate to contact either of the undersigned at 704-
372-1885, if you have any questions.
Sincerely,
STV/PALPH WHITEHEAD ASSOCIATES, INC.
1 0/t?
Brandon Phillips, .H.M.M.
Sr. Environmental Specialist
Michael A. , P.W.S.
Senior Scientist
cc: Keith Pugh, P.E., City of High Point
Ian McMillan, DWQ ,