Loading...
HomeMy WebLinkAbout20071995 Ver 1_More Info Received_20080923Sip. x ). 2019 J AIM IAi)W 14 J TEWEa4. ° 21) f. m ?>?a?:i?'tl???iii r?¦ ??'ii?a>?Rt-!?!?? Sopwwft 92, bfiKda m *(Wow QmdiW wb ?y lr AmmikK WSW For of W At ' M ameoW AAM tM SEP.22.2008 9:46AM RALPH WHITEHEAD ASSO NO. 273 P. 3 website: ht62://h.2o.enr.state.nc.us/su/bmn forms.htm. Please erasure that all items noted on Worksheet #2: Checklists are clearly identified on the engineeringplans. 2. The EEP mitigation acceptance letter submitted with the application is no longer valid. Please provide a new EEP mitigation letter. 3. Please provide construction details for the boulder (toe protection) installation and the cross vane installation with the stream relocation/restoration area. 4. Please provide a planting plan for the stream buffer on the north side of the channel that includes the standard planting density as indicated in the Stream Mitigation Guidelines document found on the USACE website: http://wwv.saw_usaee_army.miVWETL4NDSIMitization-1,Weam mitigation.html. The Division acknowledges that planting density will not be feasible in the riparian buffer between the stream and the roadway, however some tree and shrub vegetation will be required to be planted immediately adjacent to the stream bank. : As stated previously, we intend to submit the requested materials to your office before October 15`x', 2008. Please do not hesitate to contact either of the undersigned at 704- 372-1885, if you have any questions. Sincerely, STV/PALPH WHITEHEAD ASSOCIATES, INC. 1 0/t? Brandon Phillips, .H.M.M. Sr. Environmental Specialist Michael A. , P.W.S. Senior Scientist cc: Keith Pugh, P.E., City of High Point Ian McMillan, DWQ ,