HomeMy WebLinkAboutSW6170501 - 2nd submittal_revised plans110 MISSY BYRD DR HOPE MILLS, NC 28348 910-309-4230 ignature JAMES B. REED Printed Name Project Engineer PROPOSED PARKING LOT EXPANSION FOR SANDHILLS UTILITY SERVICES FORT BRAGG, NORTH CAROLINA PROJECT SITE �G TER RD U B � Q BUTNER RD m z D z ;aTERMAN ST LET -{ cn DRUFF $T -� un cin WDD Z � MACOMB ST T RD LONGSTREE PN St RAN OL ON MIKE ,,,R PROJECT LOCATION MAP i6'6e11la�e 9 epp,pp3j `A A P,SEAL e 0333'5 4 s,®;,► Professional Certification: I hereby certify that these documents were prepared and approved by me and that I am a dully licensed professional engineer under the laws of the State of North Carolina. ISSUED FOR CONSTRUCTION STATUS: DATE: 100% DESIGN - REGULATORY REVIEW MAY 24, 2017 VICINITY MAP SHEET G-01 G-02 G-03 CD -01 CS -01 CG -01 SCM -01 THRU SCM -03 EC -01 DT -01 THRU DT -03 PLAN INDEX DESCRIPTION COVER GENERAL NOTES 8 LEGEND EROSION CONTROL NOTES EXISTING CONDITIONS AND DEMOLITION PLAN SITE LAYOUT PLAN GRADING AND DRAINAGE PLAN STORMWATER MANAGEMENT PLANS EROSION CONTROL PLAN DETAILS ISSUED PROJECT PLAN SETS DATE 5TATU5REMARKS 7/21/2016 PRELIM DESIGN - DESIGN OPTIONS CLIENT REVIEW RALEIGH 90% DESIGN CLIENT 8 FORT BRAGG REVIEW 4/4/2017 64 CLIENT 8 FORT BRAGG REVIEW 4/24/2017 WILSON ASHEBORO 5/24/2017 100% DESIGN REG. REVIEW - ISS'D FOR CONS. 70 MITHFIELD 0 9 SANFORD Z1 GOLDSBORO BISCOE U 1 70 4 01 oMT. OLIVE ORT BRAGG 21 1 15FAYETTEVILLE S I TE 74 , CL INTON OCKINGHAM 1 1 17 1 LAURINBURG 95 70 WALLACE 74 15 501 LUMBERTON ELIZABETHTOWN 1 Zt u s . �y �; 17 95 301 f,4�p� 1 j o`jq� DARLINGTON 76 74 0 WHITEVILLE 76 701 WILMINGTON 100% DESIGN - REGULATORY REVIEW MAY 24, 2017 VICINITY MAP SHEET G-01 G-02 G-03 CD -01 CS -01 CG -01 SCM -01 THRU SCM -03 EC -01 DT -01 THRU DT -03 PLAN INDEX DESCRIPTION COVER GENERAL NOTES 8 LEGEND EROSION CONTROL NOTES EXISTING CONDITIONS AND DEMOLITION PLAN SITE LAYOUT PLAN GRADING AND DRAINAGE PLAN STORMWATER MANAGEMENT PLANS EROSION CONTROL PLAN DETAILS ISSUED PROJECT PLAN SETS DATE 5TATU5REMARKS 7/21/2016 PRELIM DESIGN - DESIGN OPTIONS CLIENT REVIEW 8/22/2016 90% DESIGN CLIENT 8 FORT BRAGG REVIEW 4/4/2017 90% DESIGN CLIENT 8 FORT BRAGG REVIEW 4/24/2017 100% DESIGN REGULATORY REVIEW 5/24/2017 100% DESIGN REG. REVIEW - ISS'D FOR CONS. 4:kDr Signature Printed Name Water Management Branch aper en Associates Engineering • Surveying 1, Environmental Services 230 Donaldson Street, Suite 500A Fayetteville, NC 28301 Ph: 910.486.10700 NC Firm License No. C-0861 U C/) Z U Z > O W U � p � z O U Cn p J z = < p Z z Q C� _ (n (n W � O Z z W cn z Q Q w � W 00 Cl) J Z_ y - Q p o W N U) N � U-) O (n � Z O U O Cn cn W W O Q J W ffz V VJ 0 0 0 0 N O LL N C.0 U- 0 z H U O po-- W 0 O z O p O r EXISTING GENERAL NOTES 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF FORT BRAGG, NORTH CAROLINA UNLESS OTHERWISE NOTED. 2. EXISTING PAVEMENT, CONCRETE, AND OTHER UNSUITABLE MATERIALS SHALL NOT BE USED AS FILL AND SHALL BE DISPOSED OF OUTSIDE THE PROJECT LIMITS AT THE CONTRACTOR'S EXPENSE. CONTRACTOR IS RESPONSIBLE FOR PERMITTING AND FEES FOR DISPOSAL. GRADING, ROADS, & SIDEWALK 1. ALL SELECT AND BORROW MATERIAL SHALL MEET CRITERIA SET FORTH BY SECTIONS 1016 AND 1018 OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION'S STANDARDS AND SPECIFICATIONS FOR ROADS AND STRUCTURES. 2. UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS ALL MATERIALS AND CONSTRUCTION METHODS FOR ROADWAYS & STORM DRAINAGE IMPROVEMENTS TO FORT BRAGG ROADWAYS SHALL CONFORM TO THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARDS & SPECIFICATIONS. 3. CONTRACTOR SHALL PLACE AND COMPACT FILL MATERIALS FOR THAT PORTION OF THE FILL UNDER PARKING AREAS, DRIVEWAYS, CONCRETE PADS, AND SIDEWALKS, COMPACT TO A DENSITY OF NO LESS THAN 95 PERCENT OF THE MAXIMUM STANDARD PROCTOR DRY DENSITY AS DETERMINED BY AASHTO METHOD T99. OTHER FILL MATERIAL SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 90 PERCENT OF THE MAXIMUM STANDARD PROCTOR DRY DENSITY AS DETERMINED BY AASHTO METHOD T99. SITE LEGEND CURB & GUTTER CURB & GUTTER 24" CURB & GUTTER 2' CONCRETE RIBBON CURB PAVEMENTS PAVEMENT SAWCUT LINE SITE IMPROVEMENTS BUILDING/STRUCTURE SIGNS TOPOGRAPHY/GRADING PROPOSED H 291 — GROUND/GRADE CONTOUR (MINOR) 291 -moi-- — GROUND/GRADE CONTOUR (MAJOR) 291 300.55' SPOT ELEVATION2 96.9o EXISTING DRAINAGE 1. DEWATERING: THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT PROPERTY OR OTHER CONSTRUCTION. UTILITIES 1. ALL STORM DRAINAGE PIPES SHALL BE RCP CLASS III, AND APPROPRIATELY BEDDED, UNLESS OTHERWISE NOTED ON THE PLANS. 2. THE ENGINEER AND THE CONTRACTOR SHALL INSPECT ALL EXISTING PIPES USED IN THE FINAL DRAINAGE SYSTEM AND AGREE ON THE CONDITION OF THE PIPES PRIOR TO CONSTRUCTION. IF DAMAGE OCCURS TO THESE PIPES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OR REPLACEMENT OF THE PIPE(S). 3. THE CONTRACTOR SHALL CONTACT THE LOCATOR AT 910-394-2776 BEFORE COMMENCING ANY WORK. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES WHETHER INDICATED ON THE DRAWINGS OR NOT. THE CONTRACTOR WILL ASSURE THE PRESENCE ONSITE OF A REPRESENTATIVE OF THE GAS COMPANY WHEN WORKING IN THE VICINITY OF ANY GAS MAINS. UTILITIES LEGEND PROPOSED COMMUNICATIONS OHC OVERHEAD CABLE LINE UGC UNDERGROUND CABLE LINE T TELEPHONE LIN FO FIBER OPTIC/TELEPHONE LINE NATURAL GAS G NATURAL GAS MAIN © NATURAL GAS METER POWER/ELECTRIC OHE OVERHEAD ELECTRIC LINE UGE UNDERGROUND ELECTRIC LINE UNKE UNKNOWN ELECTIC LINE PIP POWER POLE 0 AREA LIGHT/LUMINAIRE SANITARY SEWER SS PIPE SS Q MANHOLE Q COo CLEANOUT coo STORM DRAINAGE SD STORM PIPE SD CB ® D Q CATCH BASIN, DROP INLET, G 09 OPEN -THROAT INLET O STORM MANHOLE Q �-� STORM OUTLET/ENDWALL WATER W WATER MAIN W VEGETATION FIRE HYDRANT ASSM. TREELINE/WOODSLINE VALVE OW WATER MANHOLE Q STAND ALONE TREE OR BUSH 0 o WATER METER EXISTING CONDITIONS SURVEY SITE COORDINATE CONTROL AND EXISTING CONDITIONS SHOWN FROM A TOPOGRAPHIC SURVEY PERFORMED IN JULY 2016 BY: JOYNER KEENY, INC. JOYNER KEENY JOB NO. 160098A Q 0 L O W Ur NO O 00 ., N Z CUO U) NZO N 'oa)oV Cc=(o Cco E (h N IL CL Z Z STANDARD ABBREVIATIONS ?' A.D. AREA DRAIN FT. FOOT, FEET QUAN. QUANTITY APPX, APPROXIMATELY GND, GROUND R RADIUS BLDG. BUILDING HC HANDICAP RCP REINFORCED CONCRETE PIPE CB CATCH BASIN HYD, HYDRANT REQ. REQUIRED CEM, CEMENT HW HEAD WATER RET. RETURN CFS CUBIC FT PER SECOND I.E. INVERT ELEVATION R/W RIGHT-OF-WAY C.O. CLEAN OUT IN, INCHES S.B. SEDIMENT BASIN CONC. CONCRETE INV, INVERT SCH. SCHEDULE CUMM CUMMULATIVE L.F, LINEAR FEET SD STORM DRAIN DB DEED BOOK MAX. MAXIMUM SECT, SECTION DET. DETAIL MECH, MECHANICAL SF SILT FENCE DIP DUCTILE IRON PIPE MH MANHOLE SPEC. SPECIFICATIONS D.S. DOWN SPOUT MIN. MINIMUM SQ. FT, SQUARE FEET DWG.(S) DRAWING(S) MISC. MISCELLANEOUS SS SANITARY SEWER E EAST, EASTING MPH MILES PER HOUR STA. STATION EA. EACH N NORTH, NORTHING STD. STANDARD EL., ELEV, ELEVATION N/A NOT APPLICABLE SW SIDEWALK ELEC. ELECTRIC NO. NUMBER TEL. TELEPHONE EQUIP, EQUIPMENT O.C. ON CENTER TYP. TYPICAL EX„ EXIST, EXISTING P.G. PAGE W WATER FES FLARED END SECTION P.P POWER POLE W/ WI TH FF FINISHED FLOOR ELEVATION PSI POUNDS PER W.G. WATER GAUGE SQUARE INCH WV WATER VALVE Q 0 L O W Ur NO O 00 ., N Z CUO U) NZO N 'oa)oV Cc=(o Cco E (h N IL CL Z Z oiE.siS�oAI.�°%iI O ?' SEAL '. _ V 033en c I' NG r NES, U) CU Q 0 L O W Ur NO O 00 ., N Z CUO U) NZO N 'oa)oV Cc=(o Cco E (h N IL CL Z Z OU) �__w U) CU Q 0-w o W w z F- O V W Zi J (D ,6 (D�IU) z m FW- U) Z LL w = O Z LL Lu 0 Z (� wQ U) U) O� 0- OLL O CL 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 M PROJECT DESCRIPTION: THIS PROJECT IS TO EXPAND THE EXISTING POV PARKING FACILITIES FOR THE SANDHILLS UTILITY SERVICES BUILDING AT BUTNER AND 3RD BCT POV PARKING FACILITY ON THE WEST SIDE OF BIGLER ROAD AND REILLY STREET ON FORT BRAGG, NC. THE PROJECT WILL INVOLVE THE CONSTRUCTION OF A NEW PAVED PARKING AREA WITH CONNECTION TO THE EXISTING PARKING FACILITY ON-SITE. THE NEW PARKING AREA WILL PROVIDE FOR AN ADDITIONAL 66 PARKING SPACES. ALL SITE WORK WILL BE ACCOMPLISHED TO IMPACT APPROXIMATELY 2.5 ACRES OF EARTH -DISTURBING ACTIVITY DURING THE CONSTRUCTION. SINCE THE PROJECT IMPACTS MORE THAN 1.0 ACRE, EROSION AND SEDIMENTATION CONTROL AND STORMWATER MANAGEMENT PERMITS ARE REQUIRED BY NCDEQ.; ADDITIONALLY, PLAN APPROVAL IS REQUIRED BY THE FORT BRAGG DPW ENVIRONMENTAL PRIOR TO THE START OF CONSTRUCTION. SITE DESCRIPTION: THE TOTAL EXPECTED AMOUNT OF LAND IMPACTED BY EARTH -DISTURBING ACTIVITY FOR THIS PROJECT IS APPROXIMATELY 2.5 ACRES. THE EXISTING SITE IS BEST DESCRIBED AS A PORTION OF THE FORMER POPE AFB GOLF COURSE. T A T NCE A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE WILL BE PLACED AT THE SITE'S NEW ENR CONNECTION AS REQUIRED. TEMPORARY SEDIMENT FENCE SHALL BE PLACED AS REQUIRED AROUND THE PERIPHERY OF THE SITE AS REQUIRED. TEMPORARY DIVERSIONS WILL BE USED TO DIRECT SEDIMENT -LADEN RUNOFF TO A SKIMMER SEDIMENT BASIN AT THE LOWER END OF THE SITE. SPOIL MATERIALS WILL BE DISPOSED OF AT AN APPROVED OFF-SITE LOCATION. ALL DISTURBED AREAS WILL BE CONSTRUCTED TO FINAL SURFACE STABILIZATION BY PAVEMENTS AND/OR BY SEED/SOD THROUGH VEGETATIVE MEASURES. PLANNED SEDIMENTATION AND EROSION CONTROL PRACTICES TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS 1. SEDIMENT FENCE: DESCRIPTION, CONSTRUCTION SPECIFICATIONS, AND MAINTENANCE AS PER DETAIL(S). 2. TEMPORARY CONSTRUCTION ENTRANCE: DESCRIPTION, CONSTRUCTION SPECIFICATIONS, AND MAINTENANCE AS PER DETAIL(S). 3. HARDWARE CLOTH 8 GRAVEL INLET PROTECTION: DESCRIPTION, CONSTRUCTION SPECIFICATIONS, AND MAINTENANCE AS PER DETAIL(S). 4. CURB INLET PROTECTION: DESCRIPTION, CONSTRUCTION SPECIFICATIONS, AND MAINTENANCE PER DETAIL(S). 5. ROCK PIPE INLET PROTECTION: DESCRIPTION, CONSTRUCTION SPECIFICATIONS, AND MAINTENANCE AS PER DETAIL(S). 6. ROLLED EROSION CONTROL PRODUCT (RECP): DESCRIPTION, CONSTRUCTION SPECIFICATIONS, AND MAINTENANCE AS PER DETAIL(S). 7. SKIMMER SEDIMENT BASIN: DESCRIPTION, CONSTRUCTION SPECIFICATIONS, AND MAINTENANCE AS PER DETAIL(S). 8. FERTILIZING SEEDING AND MULCHING: TO BE INSTALLED AS PER TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS. SEE SEEDING SPECIFICATIONS ON THE CONTRACT DOCUMENTS. REFER ALSO TO SECTIONS 6.10 AND 6.11 OF THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. MAINTENANCE: RESEED AND MULCH AREAS WHERE SEEDING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. MAINTENANCE PLAN: 1. ALL EROSION CONTROL PRACTICES WILL BE CHECKED DAILY FOR STABILITY AND OPERATION AND FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT WILL BE REMOVED FROM BEHIND SEDIMENT FENCE AND INLET PROTECTION MEASURES WHEN IT BECOMES ABOUT 0.5 FT DEEP ON THE SEDIMENT STORAGE SIDE OF THE RESPECTIVE MEASURE. REPAIR AS NECESSARY TO MAINTAIN BARRIERS. 3. ALL UTILITY TRENCHES ARE TO BE PROTECTED FROM WATER INFILTRATION. 4. SPOIL PILES ARE TO BE CONTAINED AT ALL TIMES. 5. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE SPECIFICATIONS TO MAINTAIN A VIGOROUS, DENSE VEGETATION COVER. IF SEEDING FAILURE OCCURS, THOSE AREAS SHALL BE RESEEDED WITH ANNUAL VEGETATION, SUITABLE FOR THE TIME OF YEAR FOR TEMPORARY STABILIZATION AND PREPARED FOR PERMANENT SEEDING. SEEDING AND MULCHING WILL BE IN ACCORDANCE WITH THE ATTACHED SPECIFICATION. CONSTRUCTION SEQUENCE 1. THE CONTRACTOR SHALL NOTIFY THE ENGINEER SEVEN (7) DAYS BEFORE COMMENCING ANY LAND DISTURBING ACTIVITY. INSTALL APPLICABLE EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO THE ONSET OF ANY LAND DISTURBING ACTIVITY. 2. INSTALL TEMPORARY CONSTRUCTION ENTRANCE AND SEDIMENT FENCE AS SHOWN ON DRAWINGS OR AS REQUIRED. CLEAR ONLY AREA REQUIRED TO INSTALL EROSION CONTROL DEVICES. 3. INSTALL TEMPORARY SKIMMER SEDIMENT BASIN. CLEAR ONLY AS REQUIRED TO INSTALL EROSION CONTROL DEVICES. 4. INSTALL TEMPORARY DIVERSIONS AND RECP LINERS (AS REQUIRED). CLEAR ONLY AS REQUIRED TO INSTALL EROSION CONTROL DEVICES. 5. INSTALL STORM WATER PIPING AND APPURTENANCES. INSTALL INLET PROTECTION MEASURES. 6. BEGIN GRADING AND EARTHWORK, PLACEMENT, AND SHAPING OF NEW BASE COURSE MATERIALS. 7. CONSTRUCT MATERIALS TO TOP OF FINAL SURFACE COURSE. TOPSOIL, SEED OR SOD AND FERTILIZE AREAS TO BE VEGETATIVELY STABILIZED AS APPROPRIATE AS GRADES ARE ESTABLISHED. 8. MAINTAIN ALL EROSION CONTROL MEASURES AS NEEDED. 9. PROVIDE TEMPORARY AND/OR PERMANENT SEEDING (AND MULCH, AS REQ'D.) AFTER CLEARING AND GRUBBING IN ACCORDANCE WITH STANDARD FORT BRAGG EROSION AND SEDIMENTATION CONTROL NOTES (NOTES 5 8 6). 10. CONTRACTOR SHALL INSPECT ALL DEVICES DAILY AND AFTER EVERY RAIN AND SHALL MAINTAIN THE DEVICES ACCORDING TO THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 11. ONLY AFTER DISTURBED AREAS ARE STABILIZED, AS APPROVED BY THE CONTRACTING OFFICER, THE CONTRACTOR SHALL REMOVE THE TEMPORARY DEVICES AND PROPERLY DISPOSE OF THE TRAPPED SEDIMENT AND BEGIN CONSTRUCTION OF INFILTRATION BASINS AS SHOWN ON THE GRADING AND DRAINAGE PLAN (CG -01). CONTRACTOR SHALL STABILIZE AND PROTECT THE NEW STORMWATER MANAGEMENT FACILITIES DURING CONSTRUCTION WITHIN THE USE OF PROPER EROSION AND SEDIMENT CONTROL MEASURES AND MAINTENANCE AS REQUIRED. IMMEDIATELY PRIOR TO FINAL COMPLETION, THE CONTRACTOR SHALL MAKE PROVISION AND ENSURE PERMANENT GROUND STABILIZATION, AS REQUIRED, IN ALL DISTURBED AREAS OF THE SITE. EROSION CONTROL LEGEND TEMPORARY -LOC- SF LIMITS OF CONSTRUCTION SEDIMENT FENCE DIVERSION DITCH/SWALE TEMPORARY CONSTRUCTION ENTRANCE INLET PROTECTION PERMANENT SEDIMENT AND EROSION CONTROL SHALL BE STRICTLY ENFORCED FORT BRAGG SEEDING SPECIFICATIONS FORT BRAGG SEEDING SPECIFICATION (Rv. 7 October 2013) Apply fertilizer/Lime at rates as determined by laboratory soil analysis of soils at the job site. In the absence of the soil analysis, apply soil amendments at the rates indicated in steps 2 and 3. 1. Area will be tilled to 4" depth. 2. Apply lime at 70 pounds per 1000 square feet, or 1.5 tons per acre. 3. Apply 10-20-20 fertilizer at a rate of 650 pounds per acre or 20 pounds per 1000 square feet. The fertilizer should be either slow time release or applied in two applications, half at time of planting and the second half offer permanent seed germinates. 4. The lime and fertilizer will be worked into the top 2 to 4 inches of soil prior to seeding. 5. Seed Mix and Rote: Permanent Seeding "Cool Season": planted between 1 September and February 28 50 pounds per acre Kentucky 31 Tall Fescue (Festuco orundinocea) 25 pounds per acre common Bermuda (Cynodon doctylon), hulled 25 pounds per acre common Bermuda (Cynodon doctylon), unhulled "Worm Season": planted between 1 March and 31 August 50 pounds per acre Kentucky 31 Toll Fescue (Festuco orundinocea) 50 pounds per acre common Bermuda (Cynodon dociylon), hulled Temporary Seeding "Cool Season": planted between 1 September and February 28 120 pounds per acre Winter Wheat (Triticum spelto) "Worm Season": planted between 1 March and 31 August 65 pounds per acre German (Setario iialico), Brown Top (Setorio itolico), or Fox Tail Millet (Brochiorio ramosum) FOR PROJECTS IN THE VICINITY OF POPE ARMY AIRFIELD, MACKALL ARMY AIRFIELD, OR SIMMONS ARMY AIRFIELD Permanent Seeding "Cool Season": planted between 1 September and February 28 50 pounds per acre Kentucky 31 Toll Fescue (Festuco orundinoceo) 25 pounds per acre common Bermuda (Cynodon doctylon), hulled 25 pounds per acre common Bermuda (Cynodon doctylon), unhulled "Worm Season": planted between 1 March and 31 August 50 pounds per acre Kentucky 31 Tall Fescue (Festuco orundinocea) 50 pounds per acre common Bermuda (Cynodon doctylon), hulled Temporary Seeding "Cool Season": planted between 1 September and February 28 50 pounds per acre Kentucky 31 Toll Fescue (Festuco orundinoceo) "Worm Season": planted between 1 March and 31 August 50 pounds per acre Kentucky 31 Toll Fescue (Festuco orundinocea) Straw Mulch: Apply at 4,000 pounds per acre; leaving no bare spot larger than a quarter. Straw must be stabilized by either use of emulsified asphalt or by crimping the straw into the ground. Emulsified Asphalt: Emulsified asphalt shall be applied at a rate heavy enough that the entire area appears block in color; with particular attention paid to the edges of areas, crests of ridges, and banks to prevent wind damage. Crimping: Straw may be crimped with a mulch anchoring tool or a wheel disk with dull blades set nearly straight may be used as a mulch anchoring tool. Crimping is not permitted on slopes steeper than 3:1. Hydroseeding: Hydroseeding sho// on/y be o//owob/e on s/apes sleeper /hon / horizonlo/ /o I verlico/. Steps 1 through 4 must be completed prior to hydroseeding. Hydroseeding should be applied in two applications. The first application will consist of 1/3 of the mulch and 2/3 of the seed and the second application will consist of 2/3 of the mulch and 1/3 of the seed. The mulch will include a tockifier and will be applied at a rote of 2,000 pounds per acre or the manufacturer's recommendation, whichever is higher. 6. EXEMPTIONS: Special Use Areas, such as airfields, helipads, General Officer quarters and the historic district. Contact the Fort Bragg Water Management Branch (WMB) at 910-396-2301/2823/2897 when seeding these areas. 7. Upon completion of the project, prior to leaving the site, the Water Management Branch shall be notified to inspect the project. POC Mr. Jack Wilson at 396-2301/2823/2897, extension 224. Note: G.S. 113A-57 No gond-disturbing activity subject to this Article shall be undertaken except in accordance with the following mandatory requirements: (1) Permanent groundcover for all disturbed areas shall be provided within 14 working days or 90 calendar days (whichever is shorter) following the completion of construction or development (final grode). (2) The ongle for groded slopes and fills shall be no greater than the ongle that con be retained by vegetative cover or other adequate erosion -control devices or structures. In any event, slopes left exposed will, within 14 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. All perimeter dikes, ditches, swales, perimeter slopes or slopes greater than 3 horizontal to 1 vertical (3:1) sholI be provided temporary or permanent stobiIizctIon with ground cover as soon as practicable but in any event within 7 calendar days. GROUND STABILIZATION * SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES AND SLOPES HIGH QUALITY 7 DAYS NONE WATER (HOW) ZONES Q SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' OR LESS IN THAN 3:1 LENGTH AND ARE NOT STEEPER XU)U THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER z THAN 50 FEET IN LENGTH. ALL OTHER AREAS WITH 14 DAYS NONE (EXCEPT FOR PERIMETERS SLOPES FLATTER THAN 4:1 AND HOW ZONES) * "EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE" (SECTION II. B(2)(b)) Maintenance During Establishment Period Maintenance of the seeded areas shall include protecting embankments and ditches from surface erosion; maintaining erosion control materials and mulch; protecting installed areas from traffic; mowing; watering; and post-fertilizotion. Mowing 0. Turf Areas: Turf areas shall be mowed to a minimum 3 -inch height when the turf is a maximum 4 inches high. Clippings shall be removed when the amount cut prevents sunlight from reaching the ground surface. b. Erosion Control Areas: Erosion control areas shall be mowed to a minimum 4 inch height when the plants are a maximum 8 inches high. Clippings shall be removed when the amount cut prevents sunlight from reaching the ground surface. Post-Feriilizotion After the permanent gross has been accepted, and between the dotes of April 15 and October 15, apply 425 pounds of fertilizer per acre. Repair or Reinstall Unsatisfactory stand of gross plants and mulch shall be repaired or reinstalled, and eroded areas shall be repaired until a satisfactory stand of gross results. STANDARD FORT BRAGG EROSION AND SEDIMENTATION CONTROL NOTES 1. THE CONTRACTOR SHALL NOTIFY THE USACE AREA OFFICE ENVIRONMENTAL COORDINATOR AT (910-396-1211 EXTENSION 223) SEVEN (7) DAYS BEFORE COMMENCING ANY LAND DISTURBING ACTIVITY AND, UNLESS WAIVED BY THE USACE OR THE FT. BRAGG WATER MANAGEMENT BRANCH (WMB), SHALL BE REQUIRED TO HOLD A PRE -CONSTRUCTION MEETING BETWEEN USACE PROJECT REPRESENTATIVES AND A REPRESENTATIVE OF WMB. 2. THE CONTRACTOR MUST NOTIFY USACE AND THE WMB IN WRITING AND BY TELEPHONE AT THE FOLLOWING POINTS: A. THE REQUIRED PRE -CONSTRUCTION MEETING. B. FOLLOWING INSTALLATION OF SEDIMENT CONTROL MEASURES. C. DURING THE INSTALLATION OF SEDIMENT BASINS (TO BE CONVERTED INTO PERMANENT STORMWATER MANAGEMENT STRUCTURES) AT THE REQUIRED INSPECTION POINTS (SEE SEQUENCE OF CONSTRUCTION ON APPROVED PLAN). NOTIFICATION PRIOR TO COMMENCING CONSTRUCTION OF EACH STEP IS MANDATORY. D. PRIOR TO REMOVAL OR MODIFICATION OF ANY SEDIMENT CONTROL STRUCTURE(S). E. PRIOR TO REMOVAL OF ALL SEDIMENT CONTROL DEVICES. F. PRIOR TO FINAL ACCEPTANCE. 3. THE CONTRACTOR SHALL CONSTRUCT ALL EROSION AND SEDIMENT CONTROL MEASURES PER THE APPROVED PLAN AND CONSTRUCTION SEQUENCE AND SHALL HAVE THEM INSPECTED AND APPROVED BY THE INSPECTOR PRIOR TO BEGINNING ANY OTHER LAND DISTURBANCES. MINOR SEDIMENT CONTROL DEVICE LOCATION ADJUSTMENTS MAY BE MADE IN THE FIELD WITH THE APPROVAL OF THE WMB INSPECTOR. THE CONTRACTOR SHALL ENSURE THAT ALL RUNOFF FROM DISTURBED AREAS IS DIRECTED TO THE SEDIMENT CONTROL DEVICES AND SHALL NOT REMOVE ANY EROSION OR SEDIMENT CONTROL MEASURE WITHOUT PRIOR PERMISSION FROM WMB OR STATE INSPECTOR AND AGENCY INSPECTOR. THE CONTRACTOR MUST OBTAIN PRIOR USACE APPROVAL FOR CHANGES TO THE SEDIMENT CONTROL PLAN AND / OR SEQUENCE OF CONSTRUCTION. 4. THE CONTRACTOR SHALL PROTECT ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS TO PREVENT THE DEPOSITION OF MATERIALS ONTO PUBLIC ROADS. ALL MATERIALS DEPOSITED ONTO PUBLIC ROADS SHALL BE REMOVED IMMEDIATELY. 5. THE CONTRACTOR SHALL INSPECT DAILY AND MAINTAIN CONTINUOUSLY IN AN EFFECTIVE OPERATING CONDITION ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SUCH TIMES AS THEY ARE REMOVED WITH PRIOR PERMISSION FROM INSPECTOR. ALL SEDIMENT BASINS, TRAP EMBANKMENTS AND SLOPES, PERIMETER DIKES, SWALES AND ALL DISTURBED SLOPES STEEPER OR EQUAL TO 3:1 SHALL BE STABILIZED WITH SOD OR SEED AND ANCHORED STRAW MULCH, OR OTHER APPROVED STABILIZATION TPERIMETER OF E MEASURES, AS SOON AS POSSIBLE BUT NO LATER THAN SEVEN (7) CALENDAR DAYS AFTER ESTABLISHMENT. ALL AREAS DISTURBED OUTSIDE TH SEDIMENT CONTROL SYSTEM MUST BE MINIMIZED. MAINTENANCE MUST BE PERFORMED AS NECESSARY TO ENSURE CONTINUED STABILIZATION. (REQUIREMENT FOR STABILIZATION MAY BE REDUCED TO THREE (3) DAYS FOR SENSITIVE AREAS). 6. THE CONTRACTOR SHALL APPLY SOD OR SEED AND ANCHORED STRAW MULCH, OR OTHER APPROVED STABILIZATION MEASURES SUCH THAT GROUND STABILIZATION OF DITCHES, PERIMETER AREAS, AND SLOPES 3H:1V OR STEEPER SHALL BE ACHIEVED WITHIN 7 DAYS OF TEMPORARY OR PERMANENT CESSATION OF STRIPPING AND GRADING ACTIVITIES. GROUND STABILIZATION OF ALL OTHER AREAS SHALL BE ACHIEVED WITHIN 14 DAYS OF TEMPORARY OR PERMANENT CESSATION OF STRIPPING AND GRADING ACTIVITIES. MAINTENANCE SHALL BE PERFORMED AS NECESSARY TO ENSURE CONTINUED STABILIZATION. 7. PRIOR TO REMOVAL OF SEDIMENT CONTROL MEASURES, THE CONTRACTOR SHALL STABILIZE AND HAVE ESTABLISHED PERMANENT STABILIZATION FOR ALL CONTRIBUTORY DISTURBED AREAS USING SOD OR AN APPROVED PERMANENT SEED MIXTURE WITH REQUIRED SOIL AMENDMENTS AND AN APPROVED ANCHORED MULCH. WOOD FIBER MULCH MAY ONLY BE USED IN SEEDING SEASON WHERE THE SLOPE DOES NOT EXCEED 10% AND GRADING HAS BEEN DONE TO PROMOTE SHEET FLOW DRAINAGE. AREAS BROUGHT TO FINISHED GRADE DURING THE SEEDING SEASON SHALL BE PERMANENTLY STABILIZED AS SOON AS POSSIBLE, BUT NOT LATER THAN FOURTEEN (14) CALENDAR DAYS AFTER ESTABLISHMENT. WHEN PROPERTY IS BROUGHT TO FINISHED GRADE DURING THE MONTHS OF NOVEMBER THROUGH FEBRUARY, AND PERMANENT STABILIZATION IS FOUND TO BE IMPRACTICAL, TEMPORARY SEED AND ANCHORED STRAW MULCH SHALL BE APPLIED TO DISTURBED AREAS. THE FINAL PERMANENT STABILIZATION OF SUCH PROPERTY SHALL BE APPLIED BY MARCH 15 OR EARLIER IF GROUND AND WEATHER CONDITIONS ALLOW. FOR WETLAND AREAS THE FORT BRAGG ENDANGERED SPECIES BRANCH RIPARIAN SEEDING SPECIFICATIONS WILL BE USED. 8. THE SITE'S APPROVAL LETTER, APPROVED EROSION AND SEDIMENT CONTROL PLANS, DAILY LOG BOOKS, AND TEST REPORTS SHALL BE AVAILABLE AT THE SITE FOR INSPECTION BY DULY AUTHORIZED OFFICIALS OF NCDEQ, WMB AND THE AGENCY RESPONSIBLE FOR THE PROJECT. 9. SURFACE DRAINAGE FLOWS OVER UN -STABILIZED CUT AND FILL SLOPES SHALL BE CONTROLLED BY EITHER PREVENTING DRAINAGE FLOWS FROM TRAVERSING THE SLOPES OR BY INSTALLING PROTECTIVE DEVICES TO LOWER THE WATER DOWN SLOPE WITHOUT CAUSING EROSION. DIKES SHALL BE INSTALLED AND MAINTAINED AT THE TOP OF A CUT OR FILL SLOPE UNTIL THE SLOPE AND DRAINAGE AREA TO IT ARE FULLY STABILIZED, AT WHICH TIME THEY MUST BE REMOVED AND FINAL GRADING DONE TO PROMOTE SHEET FLOW DRAINAGE. PROTECTIVE METHODS MUST BE PROVIDED AT POINTS OF CONCENTRATED FLOW WHERE EROSION IS LIKELY TO OCCUR. 10. PERMANENT SWALES OR OTHER POINTS OF CONCENTRATED WATER FLOW SHALL BE STABILIZED WITH SOD OR SEED WITH AN APPROVED EROSION CONTROL MATTING, RIP -RAP, OR BY OTHER APPROVED STABILIZATION MEASURES. TEMPORARY SEDIMENT CONTROL DEVICES MAY BE REMOVED, WITH PERMISSION OF INSPECTORS, WITHIN THIRTY (30) CALENDAR DAYS FOLLOWING ESTABLISHMENT OF PERMANENT STABILIZATION IN ALL CONTRIBUTORY DRAINAGE AREAS. STORMWATER MANAGEMENT STRUCTURES USED TEMPORARILY FOR SEDIMENT CONTROL SHALL BE CONVERTED TO THE PERMANENT CONFIGURATION WITHIN THIS TIME PERIOD AS WELL. 11. NO PERMANENT CUT OR FILL SLOPE WITH A GRADIENT STEEPER THAN 3:1 WILL BE PERMITTED IN LAWN MAINTENANCE AREAS. A SLOPE GRADIENT OF UP TO 2:1 WILL BE PERMITTED IN NON -MAINTENANCE AREAS PROVIDED THAT THOSE AREAS ARE INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN WITH A LOW -MAINTENANCE GROUND COVER SPECIFIED FOR PERMANENT STABILIZATION. SLOPE GRADIENT STEEPER THAN 2:1 WILL NOT BE PERMITTED WITH VEGETATIVE STABILIZATION. 12. FOR FINISHED GRADING, THE CONTRACTOR SHALL PROVIDE ADEQUATE GRADIENTS TO PREVENT WATER FROM PONDING FOR MORE THAN TWENTY FOUR (24 ) HOURS AFTER THE END OF A RAINFALL EVENT. DRAINAGE COURSES AND SWALE FLOW AREAS MAY TAKE AS LONG AS FORTY-EIGHT (48) HOURS AFTER THE END OF A RAINFALL EVENT TO DRAIN. AREAS DESIGNED TO HAVE STANDING WATER SHALL NOT BE REQUIRED TO MEET THIS REQUIREMENT. 13. SEDIMENT TRAPS OR BASINS ARE NOT PERMITTED WITHIN 20 FEET OF A FOUNDATION THAT EXISTS OR IS UNDER CONSTRUCTION. NO STRUCTURE SHALL BE CONSTRUCTED WITHIN 20 FEET OF AN ACTIVE SEDIMENT TRAP OR BASIN. 14. THE INSPECTOR HAS THE OPTION OF REQUIRING ADDITIONAL SAFETY OR SEDIMENT CONTROL MEASURES, IF DEEMED NECESSARY. 15. ALL TRAP DEPTH DIMENSIONS ARE RELATIVE TO THE OUTLET ELEVATION. ALL TRAPS MUST HAVE A STABLE OUTFALL. ALL TRAPS AND BASINS SHALL HAVE STABLE INFLOW POINTS. 16. VEGETATIVE STABILIZATION SHALL BE PERFORMED IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL. REFER TO APPROPRIATE SPECIFICATIONS FOR TEMPORARY SEEDING, PERMANENT SEEDING, MULCHING, SODDING, AND GROUND COVERS. 17. SEDIMENT SHALL BE REMOVED AND THE TRAP OR BASIN RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE QUARTER OF THE TOTAL DEPTH OF THE TRAP OR BASIN. TOTAL DEPTH SHALL BE MEASURED FROM THE TRAP OR BASIN BOTTOM TO THE CREST OF THE OUTLET. 18. SEDIMENT REMOVED FROM TRAPS (AND BASINS) SHALL BE PLACED AND STABILIZED IN APPROVED AREAS, BUT NOT WITHIN A FLOODPLAIN, WETLAND OR TREE -SAVE AREA. WHEN PUMPING SEDIMENT LADEN WATER, THE DISCHARGE MUST BE DIRECTED TO A SEDIMENT TRAPPING DEVICE PRIOR TO RELEASE FROM THE SITE. A SUMP PIT MAY BE USED IF SEDIMENT TRAPS THEMSELVES ARE BEING PUMPED OUT. ALL WATER REMOVED FROM EXCAVATED AREAS (E.G. UTILITY TRENCHES) SHALL BE PASSED THROUGH AN APPROVED DEWATERING PRACTICE OR PUMPED TO A SEDIMENT TRAP OR BASIN PRIOR TO DISCHARGE FROM THE SITE (I.E. VIA FUNCTIONAL STORM DRAIN SYSTEM OR TO STABLE GROUND SURFACE). 19. SEDIMENT CONTROL PROCEDURES FOR UTILITY CONSTRUCTION OR AS DIRECTED BY ENGINEER OR WMB INSPECTOR: A. EXCAVATED TRENCH MATERIAL SHALL BE PLACED ON THE HIGH SIDE OF THE TRENCH. B. TRENCHES FOR UTILITY INSTALLATION SHALL BE BACKFILLED, COMPACTED, AND STABILIZED AT THE END OF EACH WORKING DAY, NO MORE TRENCH SHALL BE OPENED THAN CAN BE COMPLETED THE SAME DAY, UNLESS; C. TEMPORARY SILT FENCE SHALL BE PLACED IMMEDIATELY DOWNSTREAM OF ANY DISTURBED AREA INTENDED TO REMAIN DISTURBED FOR MORE THAN ONE DAY. 20. WHERE DEEMED APPROPRIATE BY THE ENGINEER OR INSPECTOR, SEDIMENT BASINS AND TRAPS MAY NEED TO BE SURROUNDED WITH AN APPROVED SAFETY FENCE. THE FENCE MUST CONFORM TO LOCAL ORDINANCES AND REGULATIONS. THE DEVELOPER OR OWNER SHALL CHECK WITH LOCAL BUILDING OFFICIALS ON APPLICABLE SAFETY REQUIREMENTS. WHERE SAFETY FENCE IS DEEMED APPROPRIATE AND LOCAL ORDINANCES DO NOT SPECIFY FENCING SIZES AND TYPES, THE FOLLOWING SHALL BE USED AS A MINIMUM STANDARD: THE SAFETY FENCE MUST BE MADE OF WELDED WIRE AND AT LEAST 42 INCHES HIGH, HAVE POSTS SPACED NO FARTHER APART THAN 8 FEET, HAVE MESH OPENINGS NO GREATER THAN 2 INCHES IN WIDTH AND 4 INCHES IN HEIGHT WITH A MINIMUM OF 14 GAUGE WIRE. SAFETY FENCE MUST BE MAINTAINED AND IN GOOD CONDITION AT ALL TIMES. 21. OFF-SITE SPOIL OR BORROW AREAS ON STATE OR FEDERAL PROPERTY MUST HAVE PRIOR APPROVAL BY WMB AND OTHER APPLICABLE STATE, FEDERAL, AND LOCAL AGENCIES; OTHERWISE APPROVAL MUST BE GRANTED BY THE LOCAL AUTHORITIES. ALL WASTE AND BORROW AREAS OFF-SITE MUST BE PROTECTED BY SEDIMENT CONTROL MEASURES AND STABILIZED. 22. SITES WHERE INFILTRATION DEVICES ARE USED FOR THE CONTROL OF STORMWATER, EXTREME CARE MUST BE TAKEN TO PREVENT RUNOFF FROM UN -STABILIZED AREAS FROM ENTERING THE STRUCTURE DURING CONSTRUCTION. SEDIMENT CONTROL DEVICES PLACED IN INFILTRATION AREAS MUST HAVE BOTTOM ELEVATIONS AT LEAST TWO (2) FEET HIGHER THAN THE FINISH GRADE BOTTOM ELEVATION OF THE INFILTRATION PRACTICE. WHEN CONVERTING A SEDIMENT TRAP TO AN INFILTRATION DEVICE, ALL ACCUMULATED SEDIMENT MUST BE REMOVED AND DISPOSED OF PRIOR TO FINAL GRADING OF INFILTRATION DEVICE. 23. WHEN A STORM DRAIN SYSTEM OUTFALL IS DIRECTED TO A SEDIMENT TRAP OR SEDIMENT BASIN AND THE SYSTEM IS TO BE USED FOR TEMPORARILY CONVEYING SEDIMENT LADEN WATER, ALL STORM DRAIN INLETS IN NON -SUMP AREAS SHALL HAVE TEMPORARY ASPHALT BERMS CONSTRUCTED AT THE TIME OF BASE PAVING TO DIRECT GUTTER FLOW INTO THE INLETS TO AVOID SURCHARGING AND OVERFLOW OF INLETS IN SUMP AREAS. 24. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 25. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 26. SITE INFORMATION: A. TOTAL AREA OF FACILITY (BASE, CAMPUS, PARK, ETC.) N/A ACRES. B. TOTAL AREA OF PROJECT SITE: 2.50 ACRES. C. AREA DISTURBED (FOR THIS PHASE): 2.50 ACRES. D. AREA TO BE ROOFED OR PAVED N/A ACRES. E. TOTAL CUT (N/A) CUBIC YARDS F. TOTAL FILL (N/A) CUBIC YARDS G. OFF-SITE WASTE / BORROW AREA LOCATION N/A H. WETLAND IMPACT 0 ACRES. I. PERENNIAL STREAM IMPACT 0 LINEAR FEET. J. LENGTH OF RESTORED STREAM 0 LINEAR FEET. K. LENGTH OF NEWLY CREATED STREAM 0 LINEAR FEET. ,- ®.•ear �'•�� .� �o %7 c SEAL_ 3 i✓ ��k+a B. t N ISE ��� V0 ■CU t O '4) oZ- 00 U) o 1 tl) 4-0 O c 00 W 4- N Z • CVc (Dozo 70 r% t6.�cOJ C O • O O >✓ L- LL 00 N co (a NLLa.Z W Z 0(/) I- W W U Q XU)U W W z p }. � C� O z 0 Z m Z O _J O 0O LL 0 Z 1 W W Q U Ory O/ O L.L LL 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 r 3 m EXISTING CONDITIONS AND DEMOLITION PLAN NOTES: 1. COORDINATE DEMOLITION WORK WITH SITE LAYOUT PLAN, GRADING AND DRAINAGE PLAN (CG -01), EROSION CONTROL PLAN (EC -01) AND CONSTRUCTION SEQUENCE (G-03). 2. ALL DEMOLITION WORK SHALL OCCUR WITHIN THE LIMITS OF CONSTRUCTION AS SHOWN ON THE EROSION CONTORL PLAN (EC -01). 3. THE CONTRACTOR SHALL COMPLY WITH GENERAL AND EROSION CONTROL NOTES (SHEETS G-02 AND G-03). 4. LOCATION AND QUANTITY OF DEMOLITION WORK MAY VARY DEPENDING UPON ACTUAL FIELD CONDITIONS. 5. WATER LINE/IRRIGATION SYSTEM ABANDONED PER ONUS. COORDINATE WITH ONUS ON EXTENT OF ABANDONMENT AND REMOVE AS REQUIRED TO CONSTRUCT SITE IMPROVEMENTS. 0 SEAL j 33 Q "h hold uu►` X17 2"" (n a) 4-jQ c •ti0 E� t O U Ln o •� 00 W u o Wo o NM O W NO , N Z c W C NVZo c 0 N ��o2 C00 • 0a),qE L 0 �X-LL (D M(u -cU IN LL a z C� w 0 oiio z EXISTING CURBISOGUTTER � f1 11 ry OU) p w REMOVE APPX. 226 LF U) C) DESIGNED BY: Q > EXISTING CURB 8 GUTTER xU)U Lu Z z J 0 zzz a- _jz a cl HOODm cl T. m 47 OUHORIZONTAL �00 0 `O O z�00�0 J I— Z w QTOU'o EXISTING CURBISOGUTTER � f1 11 ry REMOVE APPX. 226 LF DESIGNED BY: EXISTING CURB 8 GUTTER zzz DRAWN BY: a cl HOODm cl T. m 47 OUHORIZONTAL CHECKED BY: `O O J NAIL I ISLAND) 512,88,6.66 $O$ " f5.3�T� N SCALE: e �. .� P_ ., DATE: , � `T $96 HORIZONTAL CONTROL SIDEWALK GRAPHIC SCALE MAY 24, 2017 q< NAIL 3 30 0 15 30 60 PROJECT NUMBER: 5 13.023. F16275F-02 2,000,213® 70, ELEVATION: zG* AssHowN CD -07 r SITE LAYOUT PLAN NOTES: 1. COORDINATE SITE WORK WITH EXISTING CONDITIONS AND DEMOLITION PLAN (CD -01), GRADING AND DRAINAGE PLAN (CG -01), EROSION CONTROL PLAN (EC -01) AND CONSTRUCTION SEQUENCE (G-03). 2. ALL SITE WORK WORK SHALL OCCUR WITHIN THE LIMITS OF CONSTRUCTION AS SHOWN ON THE EROSION CONTROL PLAN (EC -01). 3. THE CONTRACTOR SHALL COMPLY WITH GENERAL AND EROSION CONTROL NOTES (SHEETS G-02 AND G-03). 4. UNLESS NOTED OTHERWISE, RADII AND DIMENSIONS SHOWN ARE TO EDGE OF ASPHALT, EDGE OF PAVEMENT MARKINGS, SIDEWALK OR BUILDING. N OrWE 299,70' ASPHALT PARKING 67 STALLS ASPHALT - - - PARKING TOR WATER NFI TRATION ,ASIN #2 ABANDONED CONC PAD KEY PAS SAWCUT ccmc PA EXISTING PAVEMENT I id - v v '- 30 0 15 30 60 (IN FEET) AS SHOWN A 0111, • SEAL '7 � 03 B U) a) cu •N U� O� cn I< w C •qa 11 CL .z c w L Z cn E- w U)U Q> xwU W Z F- 0 F- C� Z U m Q � _ 0 Z ' w Q U) U) O� 0- of o ry LL CL • a� 00 0 U) U "o0 N Z cVo � 0 '�NpU (a (o 00,q:E NULL tri ('10 V NLLa.Z 0 J H U) 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 Cis -o I \—NEW 24" CURB & GUTTERT° 0.7-4 BUTNER ROAD OFFTALLED EXISTING DRIVEWAY to HORIZONTAL CONTROL r,.20 JK NAIL 12 (IN ISLAND) ��.� n 2WMW )�H N; 512.1386M��� E.- VA S 2811.910" HORIZONTAL CONTROL SOMA" K NAIL 03 N: 5113$0.23<3 E-. 2,000,213,79 ELEVATION,- 267.66" v v '- 30 0 15 30 60 (IN FEET) AS SHOWN A 0111, • SEAL '7 � 03 B U) a) cu •N U� O� cn I< w C •qa 11 CL .z c w L Z cn E- w U)U Q> xwU W Z F- 0 F- C� Z U m Q � _ 0 Z ' w Q U) U) O� 0- of o ry LL CL • a� 00 0 U) U "o0 N Z cVo � 0 '�NpU (a (o 00,q:E NULL tri ('10 V NLLa.Z 0 J H U) 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 Cis -o I In GRADING AND DRAINAGE PLAN NOTES: 1. COORDINATE GRADING AND DRAINAGE WORK WITH THE EXISTING CONDITIONS AND DEMOLITION PLAN (CD -01), SITE LAYOUT PLAN (CS -01) AND CONSTRUCTION SEQUENCE (G-03). 2. ALL GRADING AND DRAINAGE WORK SHALL OCCUR WITHIN THE LIMITS OF CONSTRUCTION AS SHOWN ON THE EROSION CONTROL PLAN (EC -01) .II I 3. UNLESS INDICATED OTHERWISE, SPOT ELEVATIONS SHOWN ARE i RIPRAP OUTLETeI PILLwAY TO THE FINISHED GRADE OF PAVEMENTS OR FINISHED GROUND. a (SEE STORMWAt/�TfER MGMT 60,1 4. ALL DISTURBED AREAS NOT PERMANENTLY STABILIZED BY PLANS AND,[TAILS) PAVEMENTS OR RIPRAP SHALL BE VEGETATIVELY STABILIZED �w �R AS REQUIRED BY SEED f NG AND/OR SODDING. 76'07°"E 62.65' 11, a x IT c 5. THE CONTRACTOR SHALL COMPLY WITH GENERAL AND EROSION ° CONTROL NOTES ( SHEETS G-02 AND G-03) . 6. ALL RIPRAP OUTLET PROTECTION MEASURES SHALL USE FILTER FABRIC UNDERLAYMENT FOR THE ENTIRETY OF ITS FOOTPRINT. 1 N STOR W TER 7. SEE EROSION CONTROL PLAN FOR LOCATION AND QUANTITY OF a °' INFI T TION R TR MEASURES S I N U I G TEMPORARY � BAS II EROSION CONTROL E CL D N E CONSTRUCTION ENTRANCE, SEDIMENT FENCE SKIMMER BASIN, `%, p I AND INLET PROTECTION MEASURES. QUANTIfiIES SHOWN ARE g OP - APPROXIMATE AND MAY VARY DEPENDING UPON ACTUAL FIELD' CONDITIONS. I� 267.5 261 267 265 `-' 264 263 : - 5_ 5,►_' TABLE OF NOMINAL DIMENSIONS FOR RIPRAP OUTLET PROTECTIONS RIRRAP OUTLET PROTECTION CALL -OUT OP -IA 0P-1 B OP -IC 0P -2A 0P -2B OP -2C 0P-3 OP -4 WIDTH AT F = M A PIPE/FLUME IN. ID I E LU E 9 FT 9 FT 9 FT 4 FT .5 9 FT 9 FT � 9 FT 4 FT 5 PFT M R/ = WIDTH AT AP P IN ID APRON/POOL END 9 FT 9 FT 9 FT 8 FT 9 FT 9 FT 9 FT 8 MIN. LENGTH OF APRON/POOL (LA) = 6 FT. 10 FT. 10 FT. 8 FT, 6 FT. 10 FT. 10 FT. 8 FT. MIN. RIPRAP THICKNESS 18 IN. 18 IN. 18 IN. t8 IN. 18IN. 18 IN. t8 I N. 1 8 IN. RIPRAP CLASS - B B B B B NIBIN „B„ .77 ;,1 _r �s 6 - - 2 - 64 s - Pa 1 .- A12, 4 - • - 4Weg N " o -y Q► - - 39" $9E 2_99 cma �y. IT $gg z r N P 1 0 BBLDGBLDG - „� a N Of - t - Of - P -a V g V - bs L- N g LJ 9 " 1•- - 3 _-', -` ' • Rye �- - _ a 1 RCP •�6` _ - _ _ - - ' �`-:�-!.' �- - €. oN+ NV. =264.0 ? ¢" `:- h ' 'o , N o, y 6 M 2,aju PA ' SAN ggpp��+ gg¢g *; _ g•g \ � - co �¢ SANCHILLS €UTILITY �T i - _ j _ a SERIACES OFFICE �(' �IPA , ..: _ IL L BLDGASPH ALT NG F T _ CONC PAD LO' FROM, LEASE LINE- ►"" I TO WATER '- . t r a NF I TRAT I ON ' 26e 2667 2662 PARKING ASI SPACE �' 64 264 .ISS � - OP B - GRATE MOT „ 0 2A 1 �. 8 P 1 C AD 8'• RCP '7'- "��� � A. •6 � 1INv.-265.0 .__ GATE 26b 2fr4 f'tie' N G ABANDONED ,�) 267 Z6S 266 7 INV.= ®�144 IN CNC PO ��_ 7t 264.5 a = OP -4 FG 266.54 2 8 4- _ lN AB € A T $ KEY P ;.�`TC 267.04 .TC`2 PARKING C= PAD s,1a 1 t"'_ ` rvro � >� ti a FG .� :t,. _ 18" RCP s-6` y_ -- - � INV. =264.5 • -267.43' r: 065- CGONWALL C . 267 268.27 266 � X'°'� . ., N FG 266.29 P 4 t8 RCP F;L D AI 6 INV. IN=263.5 ►off 000 FGCm 265.79 AREA . 50 56116��TUTAL �� � 4'� _ s,F HOT AREA PON AD C C �` � $' A MARKER 266 `F 65 .0 - ; cl "Wo6&721 � 30- . 58'74 CP N . 2666` .7 LF- w 2 • . d .. FG 266.80± .- m XFG 2C5. OUT: 260x74" 10� FG 2 5 35t259.87'(5) , CB TC 266.24 _+ ± NCDOT 840.02 �° 9 ITS HOOD=266.24BUTNER ROAD �� EX. CB GRATE=265.74 CONVERT TO DI ���, IN=262.42 GRATE=266.03 OUT=262.34 INV. IN=260.82 INV. OUT=260.74 8 v _mrwlw� wolwArM �w cl HORIZONTAL CONTROL � � H 265.,x$ OUT: 6260,7 H 266,20& JK PAIL 2 IN ISLAND UT; a26&54' - 512, 6.66 E TIE E� 14,660,1 �,- �� FADEWALK ELEVATION: 281,9SOMALK HORIZONTAL COQ OL �Q � �. NAIL #3 ir GRAPHIC SCALE N; 513.023, Z-1 3 0 30 0 15 30 60 E: 2,000.21 ELE ATIM .267.66" (IN FEET) AS SHOWN T_ co U O r- U �co 6 N z W a) c� �Z0 N U -0 No._ i5=(o_j ty O _ Q) LL O A ••U N LL 0- Z Z O� W U z> C X�U z LLJ Z IL �_ O >- - (D W Q z z m JF_ z LL J_ =O z 0 LL o Z Lu VJ O 00 L^^.L U- 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 CG -01 I I I SOUTHEASTERN I)ESI�iN AND CONSTRUCTION, INC. r RIP PROT (SEE N �eQ OU TL E"T ---- ION, TYP. —01 )--\ 2 7" 26 CONC. FLUME QD 04 + + + 4 1. SHWT GREATER THAN 96" I DEPTH F M THE E ISTING GR 10' ELEVA TI . 2. INFIL A TION RA S BASED KSA T VAL ES AS IN ICA TED. HORZ. IIS N EXIS GROU ING 18" RCP STORM INS L2�T BASIN ON PIPE / WAS BERMUDA O BOR NG LOCA TI = 14.14 LEV. = 26 N3 N. /HR. .5'# NTO BASIN W FINI EL = USO H GRADE 4.0 BORIN KSA T AT EL L OGA TION 12.57 IN V. = 262. 02KSA /HR.AT ►f 4T" O SCM�A / CONC. FL UME I TO BASIN -IN wc'�wno o GINTO. BASTwr OREBA Y 18 " THICK LASS "B" IFIL TER F IPRAP BRI C FO (It" CLASS W/ BA Y THICK "B" RI IL TER FAB AP I C NOTES: 1. SHWT GREATER THAN 96" I DEPTH F M THE E ISTING GR ND SURFA ELEVA TI . 2. INFIL A TION RA S BASED KSA T VAL ES AS IN ICA TED. SCM# 1 INFIL TRA TION BASIN SECTION 1-1 NOT TO SCALE 272 264 260 NOTES: 1. WORK FOR FINAL GRADING AND STABILIZATION FOR STORMWATER INFILTRATION BASINS TO OCCUR ONLY AFTER ESTABLISHMENT OF GROUND STABILIZATION OF THE MAJORITY OF THE SITE IN ACCORDANCE WITH THE EROSION CONTROL PLAN AND CONSTRUCTION SEQUENCE. 2. DIMENSIONS AND CROSS-SECTION LINES SHOWN IN RELATION TO SECTION AND PROFILE VIEWS PROVIDE NOMINAL DIMENSIONS AND ARE INTENDED TO PROVIDE DESIGN INTENT REGARDING STORMWATER TREATMENT. 3. COORDINATE ASPECTS OF CONSTRUCTION OF THE STORMWATER INFILTRATION BASINS WITH OTHER CIVIL SITE AND GRADING AND DRAINAGE PLANS HEREIN. 4. SEE DETAIL SHEETS AS NEEDED FOR ADDITIONAL STORM DRAINAGE DETAILS. 5. FINAL SAND GRADATION FOR BASINS SHALL MEET OR EXCEED KSAT VALUES AS SHOWN ON THESE PLANS AS PREVIOUSLY DETERMINED BY THE SOILS SCIENTIST. GRAPHIC SCALE 10 0 5 10 20 (IN FEET) AS SHOWN N %q -�. SEAL t 33,5 "'4114116410 L 4 H OD U O U �o M O +3N Z �0 N v0i ? o0 70a)oV -CO -I 0 4-1 o .L O >LL + o M cc�U N LL a Z ZZ aQ wz w- og QJ Z w a� 00 I- � �U) 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 SCM -01 Q �j W� y �v r 272 • •• 264 260 MIA NO S: 10, f . HW T ISJA TER THA96"IND TH FROM THE EXIS GROUNDURFACE EL VA TION. 2.INFIL TRA RA TES SED ON K T VALUES S INDICA D. HORZ. N EXISTING GROUND --� l8" RCP TORM BAST 18" RC STORM EQUAL IZA ION PIPE OUTFALL PIPE --� (FROM SC * 1) INV. 0 T=265.0 � INV. =263.6 CONC. FLUME(S) INTO BASIN — WASHED ERMUDA SO r_ 18" RCP S ORM WASHED BERMUDA SOD '� FINIS GRADE DI VERSIO V DI TCH EL =264.0 03 R RAP OUTL T P O TEC T ION RON o OREBA Y l 8" THICK (l8" THIO CLASS "B" R RAP O O ° CLASS "B" IPRAP W IL TER FARIC) W/FIL TER FABRIC) ORING L 0 TION #I SA T = 12. 7 IN. /HR. T ELEV. = 261.4' } NO S: f . HW T ISJA TER THA96"IND TH FROM THE EXIS GROUNDURFACE EL VA TION. 2.INFIL TRA RA TES SED ON K T VALUES S INDICA D. SCM#2 INFIL TRA TION BASIN SECTION 2-2 NOT TO SCALE 272 • 264 260 ES: 1. WORK FOR FINAL GRADING AND STABILIZATION FOR STORMWATER INFILTRATION BASINS TO OCCUR ONLY AFTER ESTABLISHMENT OF GROUND STABILIZATION OF THE MAJORITY OF THE SITE IN ACCORDANCE WITH THE EROSION CONTROL PLAN AND CONSTRUCTION SEQUENCE. 2. DIMENSIONS AND CROSS-SECTION LINES SHOWN IN RELATION TO SECTION AND PROFILE VIEWS PROVIDE NOMINAL DIMENSIONS AND ARE INTENDED TO PROVIDE DESIGN INTENT REGARDING STORMWATER TREATMENT. 3. COORDINATE ASPECTS OF CONSTRUCTION OF THE STORMWATER INFILTRATION BASINS WITH OTHER CIVIL SITE AND GRADING AND DRAINAGE PLANS HEREIN. 4. SEE DETAIL SHEETS AS NEEDED FOR ADDITIONAL STORM DRAINAGE DETAILS. 5. FINAL SAND GRADATION FOR BASINS SHALL MEET OR EXCEED KSAT VALUES AS SHOWN ON THESE PLANS AS PREVIOUSLY DETERMINED BY THE SOILS SCIENTIST. GRAPHIC SCALE 10 0 5 10 20 I mmmmi�� (IN FEET) AS SHOWN Y SEAL _933375- _ / c: a T L tanHW� 1-"Q N r - +j 0c0 O U co O N 00 �N Z c U) OZo N N � �OpU c • 00 0a)gE O 0) .� U Nu - b- Z c w L 0 Z Ocn �w U) CU Z > Q � XwU w Z OJ Z � m Y J H � J � In 0 � oz w< U) U) o� O� ,* zz J (n Q �m ZZ w� Q Z J Z_ w� W Q Q 0 1-0 � (j) I-- 0 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 SCM -02 i 264 260 256 k I N NOTES: 1. WORK FOR FINAL GRADING AND STABILIZATION FOR STORMWATER INFILTRATION BASINS TO OCCUR ONLY AFTER ESTABLISHMENT OF GROUND STABILIZATION OF THE MAJORITY OF THE SITE IN ACCORDANCE WITH THE EROSION CONTROL PLAN AND CONSTRUCTION SEQUENCE. 2. DIMENSIONS AND CROSS—SECTION LINES SHOWN IN RELATION TO SECTION AND PROFILE VIEWS PROVIDE NOMINAL DIMENSIONS AND ARE INTENDED TO PROVIDE 1-01 DESIGN INTENT REGARDING STORMWATER TREATMENT. 3. COORDINATE ASPECTS OF CONSTRUCTION OF THE STORMWATER INFILTRATION BASINS WITH OTHER CIVIL SITE AND GRADING AND DRAINAGE PLANS HEREIN. 4. SEE DETAIL SHEETS AS NEEDED FOR ADDITIONAL STORM DRAINAGE DETAILS. 5. FINAL SAND GRADATION FOR BASINS SHALL MEET OR EXCEED KSAT VALUES AS SHOWN ON THESE PLANS AS PREVIOUSLY DETERMINED BY THE SOILS SCIENTIST. TYP. NOT S: I N NOTES: 1. WORK FOR FINAL GRADING AND STABILIZATION FOR STORMWATER INFILTRATION BASINS TO OCCUR ONLY AFTER ESTABLISHMENT OF GROUND STABILIZATION OF THE MAJORITY OF THE SITE IN ACCORDANCE WITH THE EROSION CONTROL PLAN AND CONSTRUCTION SEQUENCE. 2. DIMENSIONS AND CROSS—SECTION LINES SHOWN IN RELATION TO SECTION AND PROFILE VIEWS PROVIDE NOMINAL DIMENSIONS AND ARE INTENDED TO PROVIDE 1-01 DESIGN INTENT REGARDING STORMWATER TREATMENT. 3. COORDINATE ASPECTS OF CONSTRUCTION OF THE STORMWATER INFILTRATION BASINS WITH OTHER CIVIL SITE AND GRADING AND DRAINAGE PLANS HEREIN. 4. SEE DETAIL SHEETS AS NEEDED FOR ADDITIONAL STORM DRAINAGE DETAILS. 5. FINAL SAND GRADATION FOR BASINS SHALL MEET OR EXCEED KSAT VALUES AS SHOWN ON THESE PLANS AS PREVIOUSLY DETERMINED BY THE SOILS SCIENTIST. TYP. NOT S: 1.HWT IS GREATER HE EXI S T I THAN GROUND SURFACE 9611 IN DEPTH ELEVATION. FROM 2. NFIL TRA TI RA TES BASED ON KSA T VALUES OUTLE T SP L WA Y • wo 256 TOP OF BERM EL. =261.0 7SPILL WAY CLASS 'B' RIPRAP W/FIL TER FABRIC 18" THICK, MIN. RIPRAP SPILLWAY, SECTION A -A NOT TO SCALE GRAPHIC SCALE 10 0 5 10 20 k;;� I I I I (IN FEET) AS SHOWN `a,`dA�®tCA s t^pat►r►t,lt� SEAL Cn cu U O C/)C/) T 0 Q 0 N � co O U NO O 16- N z CVoch NZoN r- -0 a) C,>M_1 0�E _o O >1 m co .c V Nu - b - Z 0 w U) O 0- 0 w J Z Q U) 0 LL F_ 0 LL M Z � Z _j U) � Q 00 W Z W O Q� Z J Z W� W Q Q 00 U)F �- U) 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 SCM -03 EXISTING OUTLE T SP L WA Y G?OUND / 4Z ATPRAP -CIA W/FIL TER BRI C 18" THICK TOP OF ERM WASHED BERMUDA SOD EL . =261.0 FINI GRADE EL -2 9.5 SPILLWAY EL. =260.5 10' HORZ. W BORING LOC4TIOfV SAT = 11.52 #4 IN. /HR. N T ELEV. = 255.8' It SCM#3 INFIL TRA TION BASIN SECTION 3-3 NOT TO SCALE wo 256 TOP OF BERM EL. =261.0 7SPILL WAY CLASS 'B' RIPRAP W/FIL TER FABRIC 18" THICK, MIN. RIPRAP SPILLWAY, SECTION A -A NOT TO SCALE GRAPHIC SCALE 10 0 5 10 20 k;;� I I I I (IN FEET) AS SHOWN `a,`dA�®tCA s t^pat►r►t,lt� SEAL Cn cu U O C/)C/) T 0 Q 0 N � co O U NO O 16- N z CVoch NZoN r- -0 a) C,>M_1 0�E _o O >1 m co .c V Nu - b - Z 0 w U) O 0- 0 w J Z Q U) 0 LL F_ 0 LL M Z � Z _j U) � Q 00 W Z W O Q� Z J Z W� W Q Q 00 U)F �- U) 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 SCM -03 M NOTES: 1. COORDINATE INSTALLATION, MAINTENANCE, AND REMOVAL OF EROSION CONTROL MEASURES IN ACCORDANCE WITH EROSION CONTROL NOTES AND CONSTRUCTION SEQUENCE (G-03) AND OTHER SITE, UTILITY, AND STORMWATER MANAGEMENT PLANS. 2. SITE, GRADING, STORMWATER MANAGEMENT INSTALLATIONS AND UTILITY WORK SHALL OCCUR WITHIN THE LIMITS OF CONSTRUCTION AS SHOWN ON THIS EROSION CONTROL PLAN (EC -01). 3. NOTE: G.S. 113A-57 NO LAND -DISTURBING ACTIVITY SUBJECT TO THIS ARTICLE SHALL BE UNDERTAKEN EXCEPT IN ACCORDANCE WITH THE FOLLOWING MANDATORY REQUIREMENTS: (1) PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED WITHIN 14 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT (FINAL GRADE). (2) THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. ALL PERIMETER DIKES, DITCHES, SWALES, PERIMETER SLOPES OR SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS. 4. SEE SHEET CG -01 AND BMP -01 FOR ADDITIONAL GRADING DESIGN, STORM DRAINAGE DESIGN AND PERMANENT EROSION CONTROL MEASURES AS A PART THEREOF. Skimmer Sediment Basin 1 TOTAL DRAINAGE AREA TO BASIN = i 2.21 1AC Q1013 20,CFS MIN. VOLUME = 1800 CFIACRE VOLUME PROVIDED �7,157°CF .._. _ - ..._._.._ _ _......_ __. . _ _ NDN. SURFACE_AREA - 325 SF/PER CFS Q10 = 4,289 SF SURFACE AREA PROVIDED = 4,290SF MIN. DEPTH = 00= FT ..__,M EMERGENCY SPILLWAY ELEV. = .._m_.2 261 5' _ EMERGENCY SPILLWAY LENGTH = 15.00 FT DRAWDOWN METHOD ��� _ SKIMMER�����"IT�� ._ REQ'D DRAWDOWN TIME = 2-1DAYS SKIMMER ORIFICE DIA. i(10) (inlhr) SKIMMER DRAWDOWN TIME= BAFFLES REQUIRED = 3 45`DAYS � 3 NONE WATER (HOW) ZONES RECP Liner Mannings "n" SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' OR LESS IN THAN 3:1 LENGTH AND ARE NOT STEEPER EX. CB C014VERT TO DI GRATE=216.03 THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER INV. OUT --262.34 THAN 50 FEET IN LENGTH. ALL OTHER AREAS WITH 14 DAYS NONE (EXCEPT FOR PERIMETERS SLOPES FLATTER THAN 4:1 AND HOW ZONES) DIV D1 I 0.35 265.00 ) 0.059 Trapezoidal 2.0 3:1 TEMP 0.51 7.84 1.4 1 0.14 0.24 4.26 2.14 BARE LINER NONE S150 0.020 0.055 0.035 1.750 0.189 0.890 4 e HOOD- 26&3W ) 1.40 VEG NONE 0.100 3.330 1.230 DIV D2 182.9 1.80 Skimmer Sediment Basin 1 TOTAL DRAINAGE AREA TO BASIN = i 2.21 1AC Q1013 20,CFS MIN. VOLUME = 1800 CFIACRE VOLUME PROVIDED �7,157°CF .._. _ - ..._._.._ _ _......_ __. . _ _ NDN. SURFACE_AREA - 325 SF/PER CFS Q10 = 4,289 SF SURFACE AREA PROVIDED = 4,290SF MIN. DEPTH = 00= FT ..__,M EMERGENCY SPILLWAY ELEV. = .._m_.2 261 5' _ EMERGENCY SPILLWAY LENGTH = 15.00 FT DRAWDOWN METHOD ��� _ SKIMMER�����"IT�� ._ REQ'D DRAWDOWN TIME = 2-1DAYS SKIMMER ORIFICE DIA. i(10) (inlhr) SKIMMER DRAWDOWN TIME= BAFFLES REQUIRED = 3 45`DAYS � 3 DIVERSION DITCHES GROUND STABILIZATION • SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES AND SLOPES Cc i(10) (inlhr) HIGH QUALITY 7 DAYS NONE WATER (HOW) ZONES RECP Liner Mannings "n" SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' OR LESS IN THAN 3:1 LENGTH AND ARE NOT STEEPER EX. CB C014VERT TO DI GRATE=216.03 THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER INV. OUT --262.34 THAN 50 FEET IN LENGTH. ALL OTHER AREAS WITH 14 DAYS NONE (EXCEPT FOR PERIMETERS SLOPES FLATTER THAN 4:1 AND HOW ZONES) • "EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE" (SECTION II. B(2)(b)) 5. REFER TO GRADING AND DRAINAGE PLAN (CG -01) FOR OUTLET PROTECTION RIPRAP INFORMATION. 6. INSTALL SEDIMENT FENCE TO PROTECT AREA TO BE CONSTRUCTED AS A STORMWATER INFILTRATION BASIN ONLY AFTER THE MAJORITY OF THE SITE HAS BEEN CONSTRUCTED AND STABILIZED. IMENT FENCE FUTURE 6. LIMITS OF CONSTRUCTION STALL SEDIMENT FENCE SURROUND FUTURE SIN, NOTE 6. ANAL PARKING __j( s A AL T" . PmxlmO BUTNER ROAD LIMITS OF CONSTRUCTION DITCH # LENGTH (LINEAL FEET) DRAINAGE AREA (ACRES) HIGH ELEV (FT) LOW ELEV (FT) SLOPE (FT/FT) Channel shape Bottom Width (FEET) Side Slope (H:V) Diversion Type I (PRMT or TEMP) Cc i(10) (inlhr) Q(10) (cfs) Normal Depth (Feet) Velocity (FPS) Channel material RECP Liner Mannings "n" Permissable Shear Stress (psF) Calculated Shear Stress (psf) m286H24 GRATE --265J4 INV. INm262.42 EX. CB C014VERT TO DI GRATE=216.03 • m INV. OUT --262.34 IN=260.82 DIV D1 84.3 0.35 265.00 260.00 0.059 Trapezoidal 2.0 3:1 TEMP 0.51 7.84 1.4 1 0.14 0.24 4.26 2.14 BARE LINER NONE S150 0.020 0.055 0.035 1.750 0.189 0.890 DRAWN BY: HOOD- 26&3W 0.33 1.40 VEG NONE 0.100 3.330 1.230 DIV D2 182.9 1.80 260.80 259.00 0.010 Trapezoidal 2.0 3:1 TEMP 0.92 7.84 13.0 0.71 1.03 4.39 2.49 BARE LINER NONE 5150 0.020 0.043 0.035 1.750 0.168 0.640 SCALE: 1.15 2.07 VEG NONE 0.055 3.330 0.720 DIV D3 56.0 1.63 264.50 1 263.50 0.018 Trapezoidal 2.0 3:1 PERM. 0.81 7.84 1 10.4 0.55 0.84 5.13 2.73 BARE LINER NONE S150 0.020 0.047 0.035 1.750 0.015 0.950 F16275F-02 ELEVATION: 267.616 0.91 2.41 VEG NONE 0.056 3.330 1.020 DIVERSION DITCH CALCS SHOW NURIVIAL Utr IH, YtLU41I T AkNu IYIANrjm%, a n t FtL►.J CALCULATIONS SHOWN FOR SHEER STRESSES FOR BARE SOIL, RECP LINER AND VEGETATED CONDITIONS CONTRACTOR TO STABILIZE ALL DIVERSIONS WITH TEMPORARY AND/OR PERMANENT LINER AND/OR SEEDING OR SODDING AS PER DETAILS AND SPECIFICATIONS. CONTRACTOR TO PROVIDE ROLLED EROSION CONTROL PRODUCT (RECP) LINER IF INDICATED IN TABLE. LINER PRODUCT SHALL MEET REQUIREMENTS FOR PERMISSIBLE VELOCITY AND SHEAR STRESS SHOWN. "RECP LINER" SHOWN IN TABLE INDICATES MODEL NO. OF TENSAR NORTH AMERICAN GREEN DOUBLE -NET PHOTODEGRADEABLE STRAW LINER OR EQUIVALENT. 100% DESIGN - REGULATORY REVIEW REVISIONS RCFe a�ry? p� " HOOD- 2c0�.46 � HOW. qq R+67 q 26, T 0260,.74' d TEMPORARY 6 ft 259, 7°(S) IN 25>} co NCDOT 840.0 .e CONSTRUCTION ENTRANCE TYP. WT -.259,77' m286H24 GRATE --265J4 INV. INm262.42 EX. CB C014VERT TO DI GRATE=216.03 • m INV. OUT --262.34 IN=260.82 INV. INLET PROTECTION, TYP. DESIGNED BY: DRAWN BY: HOOD- 26&3W a Tq ,47 CHECKED BY: 26 HOOD-Tm 26M2W SCALE: HORIZONTAL CONTROL SIDEWALK GRAPHIC SCALE DATE: MAY 24, 2017 JK, NAIL, 30 0 15 30 60 PROJECT NUMBER: N: 5-113,023.38 0,211 .7 F16275F-02 ELEVATION: 267.616 (IN FEET) AS SHOWN EC -01 I 2.0" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.56 .0" ASPHALT CONCRETE 4TERMEDIATE COURSE, TYPE 119.06 6" AGGREGATE BASE COURSE -OMPACTED SUBGRADE ASPHALT PAVEMENT SECTION NOT TO SCALE NOTES: 1, SUBGRADE AND BASE TO BE COMPACTED TO REQUIREMENTS OF NCDOT ROADWAY DESIGN MANUAL -LATEST EDITION, 2. BITUMINOUS MATERIAL SHALL CONFORM TO THE LATEST LOCAL D,O,T, SPECIFICATIONS, 3. ALL WORKMANSHIP SHALL CONFORM TO THE LATEST LOCAL D.O.T. STANDARDS AND PERFORMANCE SPECIFICATIONS. CONTINUOUS LINES EDGE LINE YELLOW OR WHITE DIAGONAL LINE STRAIGHT ARROW 20' YELLOW OR WHITE 14" (TYP STOP BAR I L _ c I -611 1/2"R 311R HA° 311R 1/8"R 12 6 7 11 ;:bH :y :i „mnr- ry pai pg A'" xA�. yy ^x�'s 611 2 1 _011 1/2"R 311R 311R 1/8"R t 11 2'-0 NOTES: 1. CONTRACTION JOINTS SHALL BE SPACED AT 10 FOOT INTERVALS, EXCEPT THAT A 15 FOOT SPACING MAY BE USED WHEN A MACHINE IS USED OR WHEN SATISFACTORY SUPPORT FOR THE FACE FORM CAN BE OBTAINED WITHOUT THE USE OF TEMPLATES AT 10 FOOT INTERVALS. JOINT SPACING MAY BE ALTERED BY THE ENGINEER TO PREVENT UNCONTROLLED CRACKING. 2. CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES OR FORMED BY OTHER APPROVED METHODS. WHERE SUCH JOINTS ARE NOT FORMED BY TEMPLATES, A MINIMUM DEPTH OF 1-1/2" SHALL BE OBTAINED. STANDARD 24" & 30" CURB IS GUTTER NOT TO SCALE LEFT OR RIGHT ARROW 61-411 36" 811 3211 R40"7 2811 44 111 28 ' I I 11 ■ 411 , 2411 civ 3211 2 1 1 R28" 1211 WHITE WHITE WHITE NOTES: 1, USE THE COLOR WHITE FOR ALL PAVEMENT MARKING SYMBOLS WITHIN PARKING LOTS. 2. DO NOT LOCATE PAVEMENT MARKING SYMBOLS AS TO ENCROACH INTO INTERSECTION AREAS. 3. DO NOT PLACE PAVEMENT MARKING SYMBOLS ACROSS TRANSVERSE EXPANSION JOINTS ON PORTLAND CEMENT CONCRETE PAVEMENTS, UNLESS APPROVED BY THE ENGINEER. 4. CONFORM ALL SYMBOLS TO THE FHWA "STANDARD ALPHABETS FOR HIGHWAY SIGNS AND PAVEMENT MARKINGS." SYMBOL DIMENSIONS CAN VARY AMONG MANUFACTURERS, THEREFORE SLIGHT VARIANCES ARE ACCEPTABLE, HOWEVER, ALL SYMBOLS ARE REQUIRED TO BE APPROVED BY THE ENGINEER. 5. PAVEMENT MARKINGS WILL BE THERMOPLASTIC OR PAINT AS DIRECTED BY THE OWNER OR OWNER'S REPRESENTATIVE. PAVEMENT MARKINGS (FOR PARKING LOT) DETAIL v am H -� �DH� z DC�0 m0 r O o H z�p _ 2 c, =N00 -a-n O DDD CD0 1 O - Z e nm O r Zcn H N -mcn mM> m c 0 > v C*) v Im � D H m N Z H -n Z 0 1 OF 2 0.02 BACK OF CURB - X Y o v -p v PLAN X Y NOT TO SCALE GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 640.66- OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR 94 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD, NO. 840.00. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOR 8'-0" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLAB. OVER B'-0" TO 16'-0" IN HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. SECTION Y -Y RISER HT. VARIES s" 'o WHERE 30" TO 36" PIPE IS USED RISER HT. VARIES _ 6 • WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION SECTION X -X SEE MMMI Ild i o E -1B T e': 6„ D D' •a T SECTION J -J WHERE 30" TO 3B" PIPE IS USED J D• � o � M .a, B °7 Q PLAN 6" G D SECTION M -M WHERE 42" TO 54" PIPE IS USED PLAN x � a Z U- H cs N Z Qm H cc = IL V7 0 V W = 1- 1- U) W - _ 'C` N T H J O cs U Z W 840.02 4" WHITE EDGE LINE 4" WHITE DIAGONAL LINE PAVEMENT MARKING DETAIL FOR PARKING LOT ISLAND v vm H H' Z Q rO pm � 0 mZ =� = -on =CD 00 z H -0 -n HOOD cn � 0 Z NOT TO SCALE 6" _11't" _Lu R ¢` x JT m 6 LL TLu PLAN OF TOP SLAB 0.1 A v', m PLAN x � a Z U- H cs N Z Qm H cc = IL V7 0 V W = 1- 1- U) W - _ 'C` N T H J O cs U Z W 840.02 4" WHITE EDGE LINE 4" WHITE DIAGONAL LINE PAVEMENT MARKING DETAIL FOR PARKING LOT ISLAND v vm H H' Z Q rO pm � 0 mZ =� = -on =CD 00 z H -0 -n HOOD cn � 0 Z NOT TO SCALE 6" _11't" _Lu R ¢` x JT m 6 LL TLu PLAN OF TOP SLAB SHEET 2 OF 2 840.02 6" 1�,x co P V _ ¢ 1n 0 Q a a• O as w 11 SECTION S -S #4 BAR r Fes- I DOWEL PROVIDE 1, 6" TOPSOIL AND SEEDING/SOD FOR PERMANENT STABILIZATION 'Q 6.5" AT T R EN E LINE O C (TYP) 2% • e I1.. 1 ^'j Q - FILL. a 4 _Q SELECT MATERIAL BACKFILL, TYP. of A ��'�A-A ° fax. .�• .� 0�° x 6" BASE COURSE (TYP) 161 6" L 1' REFERENCE LAYOUT POINT AND CUT FINISHED GRADE ELEVATION 2% /' ,• • SELECT MATERIAL 4 BACKFILL, TYP. .PSI= :PORTLA `` NT- CONCF ETE . � `..: ' •`' ' NOTES: 1. GROOVE JOINTS EVERY 10 FEET. 2. EXPANSION JOINTS EVERY 30 FEET. 3. ADJUST EARTH SLOPES TO GRADING PLAN AS REQUIRED. TYPICAL SECTION - CONCRETE FLUME NOT TO SCALE PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP USE ON FLAT ELEV. EXPANSION JOINT GRADES 2% AND UNDER �0�j DEPRESSED GUTTER LINE EXPANSION JOINT ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE EXPANSION JOINT TOP USE ON GRADES VER 2% ELEV. DEPRESSED GUTTER LINE I 10" 6'-0" EXPANSION JOINT MAX. -..- ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES m MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN BASED ON MIN. HEIGHT N n z O r MIN. HEIGHT H COVER DIMENSION E F Z H BARS -W NO. LENGTH TOTAL LBS. 1C9 cp= 12" 3`-0" N 2'-9" X w U 6" E #8 "W" BARS M M D 4 'SPACES 0.772 0.015 z L 0 A 3'-0" c O D 3'-0" m Q z�m v 0.235 ' 0.023 C-) v 3'-0" 4 BAR 11�" -°D H f SECTION R -R w 0.235 0.887 0.033 m 24" 3'-0" 2'-2" N 3'-9" 0� H ON O Z m 0.059 0.085 30" 3'-0" O 3'-4" 4'-3" V-2" 4'-0" SHEET 2 OF 2 840.02 6" 1�,x co P V _ ¢ 1n 0 Q a a• O as w 11 SECTION S -S #4 BAR r Fes- I DOWEL PROVIDE 1, 6" TOPSOIL AND SEEDING/SOD FOR PERMANENT STABILIZATION 'Q 6.5" AT T R EN E LINE O C (TYP) 2% • e I1.. 1 ^'j Q - FILL. a 4 _Q SELECT MATERIAL BACKFILL, TYP. of A ��'�A-A ° fax. .�• .� 0�° x 6" BASE COURSE (TYP) 161 6" L 1' REFERENCE LAYOUT POINT AND CUT FINISHED GRADE ELEVATION 2% /' ,• • SELECT MATERIAL 4 BACKFILL, TYP. .PSI= :PORTLA `` NT- CONCF ETE . � `..: ' •`' ' NOTES: 1. GROOVE JOINTS EVERY 10 FEET. 2. EXPANSION JOINTS EVERY 30 FEET. 3. ADJUST EARTH SLOPES TO GRADING PLAN AS REQUIRED. TYPICAL SECTION - CONCRETE FLUME NOT TO SCALE PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP USE ON FLAT ELEV. EXPANSION JOINT GRADES 2% AND UNDER �0�j DEPRESSED GUTTER LINE EXPANSION JOINT ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE EXPANSION JOINT TOP USE ON GRADES VER 2% ELEV. DEPRESSED GUTTER LINE I 10" 6'-0" EXPANSION JOINT MAX. -..- ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES • RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT z O 0 H rp Q Q 1Z'1�0V LLJ�Hz C) oo= QU1=0c-u H 1-4 (nf-WOJ CC 0 O In Z ,> ~ H d 0 O cr o Z LL cs co FA m H = a L) cc o v :3 z LLI Q I H I- cf) Lu = 1= N r J O 0 5 z W 840.02 Ik '7: SEAL- • �= 033 , .,���'•MES B . R�.• iia X11 i� N tl ►iI�`� �I� 1%� � .1 00 :3 O U NON O 4- z C00 NZ0 O U c > 0 Oa)d' E O Oa) , 0) LL M msV NLLaz z MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN BASED ON MIN. HEIGHT N WITH NO RISER PIPE D DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN A B C G MIN. HEIGHT H COVER DIMENSION E F BARS -U N0. LENGTH BARS -V NO- LENGTH BARS -W NO. LENGTH TOTAL LBS. CU.YDS. CONC. IN BOX TOP BOTTOM i07.CONC. SLAB SLAB YINT11.11 HEI H DEDUCTIONS ONE PIPE C.Y, R.C. 12" 3`-0" 2'-2" 2'-9" X w U wiz 0.235 0.772 0.015 0.026 15" 3'-0" 2'-2" 3'-0" (D Q z�m o 0.235 0.829 0.023 0.036 18" 3'-0" 2'-2" 3'-3" f Q 0.235 0.887 0.033 0.049 24" 3'-0" 2'-2" r V) 3'-9" 0� ON O 0.235 1.001 0.059 0.085 30" 3'-0" 2'-2" 3'-4" 4'-3" V-2" 4'-0" 4 1'-5" 2 W-9" 3 3'-9" 39 0.123 0.321 1.433 0.092 0.127 36" 3'-0" 2'-2" 3'-10" 4'-9" 1'-8" 4'-0" 4 1'-11" 3 3'-9" 3 3'-9" 43 0.161 0.358 1.714 0.132 0.178 42" 3'-0" 2'-2" 4'-5" 5'•3 1'-5" 3'-2" 4 1`-8" 2 2'-11" 3 2'-11" 32 0.112 0.318 1.738 0.180 0.243 48" 3'-0" 2'-2" 5'-0" 5'-9" 2'-0" 3'-2" 4 2'-3" 3 2'-11" 3 2'-11" 35 0.145 0.352 2.052 0.235 0.317 54" 3'-0" 2'•2" 5'-7" 6'-3" 2'-7" 3'-2" 4 2'-10" 5 2'-11" 3 2'-11" Al 0.180 0.386 2.387 0.297 0.401 • RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT z O 0 H rp Q Q 1Z'1�0V LLJ�Hz C) oo= QU1=0c-u H 1-4 (nf-WOJ CC 0 O In Z ,> ~ H d 0 O cr o Z LL cs co FA m H = a L) cc o v :3 z LLI Q I H I- cf) Lu = 1= N r J O 0 5 z W 840.02 Ik '7: SEAL- • �= 033 , .,���'•MES B . R�.• iia X11 i� N tl ►iI�`� �I� 1%� � .1 00 :3 O U NON O 4- z C00 NZ0 O U c > 0 Oa)d' E O Oa) , 0) LL M msV NLLaz z 0� �- W U) L) z> Q X w U wiz F-- p-jC� J_(D cn (D Q z�m o Y J H Q=O f Q Z W Q r V) U) 0� ON O L.I. LL 1..1. 900% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 DT -01 r SKIMMMER SEDIMENT BASIN USE: FAIRCLOTH SKIMMERWILL PROVIDE AN AREA FOR RUNOFF TO POOL AND SETTLE OUT A PORTION 1' MIN. 1' 5' NOTE: OF THE SEDIMENT CARRIED DOWNGRADIENT.A SKIMMER IS USED TO PROVIDE WATER LEVEL DURING STORM FREEBOARD 1' TOP OF DAM SEE PLANS FOR BASIN SIZE AND DIMENSIONS JUTE BACKED BY COIR A MEANS OF DEWATERING FROM THE TOP OF THE WATER SURFACE WHERE MIN. FORESLOPE 2:1 EROSION BLANKET THE WATER IS CLEANEST. NEEDED WHERE DRAINAGE AREAS ARE T00 LARGE if EMERGENCY FLOW--►£ -�,wp. SPILLWAY ELEV. 2 MAVEL =' I MAX LEVEL OF SEDIMENT 11€, FILTER -1 1 FLOOD STORAGE ZONE ,. 1- MINIMUM COLLECTED CLEAN BASIN EARTH I BACKSLOPE 2:1 WHEN THIS LEVEL IS °-._ SEDIMENT STORAGE 7C1NE��; DAM �I PLACEMENT OF BAFFLES ZONE SURFACE AR A% INLET 35 1ST CHAMBER 25 2ND CHAMBER 25 OUTLET 15 BAFFLE (TTr. ) FOR TEMPORARY SEDIMENT TRAPS. REFER TO SECTIONS 6.64 AND 6.65 OF EARTHEN BERM THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. SKIMMER SEDIMENT BASIN MAINTENANCE: INSPECT SKIMMER SEDIMENT BASINS AT LEAST DAILY AND AFTER EACH REACHEDr,.1SIGNIFICANT RAINFALL EVENT (ONE-HALF INCH OR GREATER), AND MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REMOVE SEDIMENT AND RESTORE IIIII 1EI 1I `I ''' `l 77_� THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE TO REMOVE SEDIMENT ACCUMULATED BENEATH IT. EXCAVATE 'II#II - THE SEDIMENT FROM THE ENTIRE BASIN NOT JUST AROUND THE THE NOTE 2 ���;1�=` I�=;�.;-�-.. � , ANTI -FLOATATION DEVICE -itll. SEDIMENT PIT SKIMMER OF THE FIRST CELL. ENSURE THAT VEGETATION GROWING IN ANTI -SEEP COLLAR THE BOTTOM OF THE BASIN DOES NOT HOLD THE SKIMMER DOWN. OUTLET PIPE CROSS SEC TION REPAIR BAFFLES IF THEY ARE DAMAGED. RE -ANCHORED THE BAFFLES IF EMER. SPILLWAY WATER IS FLOWING UNDERNEATH OR AROUND THEM. CHECK THE SKIMMER NOT TO SCALE FAIRCLOTH SKIMMER FOR CLOGS AND REPAIR/REPLACE IF NEEDED. REMOVE ALL DEBRIS AND NOTES : OUTLET PIPE TRASH FROM THE BASIN. 1. SEE PLANS FOR SIZES OF RISER, SKIMMER, OUTLET PIPE, INVERTS, ETC. CHECK THE EMBANKMENT FOR PIPING, SETTLEMENT, AND OTHER DAMAGE AND MAKE REPAIRS IMMEDIATELY AS REQUIRED. 2. BASIN IS INTENDED FOR FUTURE USE AS A STORMWATER FACILITY. THE CONTRACTOR SHALL ENSURE THE STABILIZATION OF THE JOB SITE PRIOR TO CONVERSION. PRIOR TO CONSTRUCTION/CONVERSION REFER TO SECTIONS 6.64, AND 6.65 OF THE NCDENR EROSION AND OF THE BASIN, BUT AFTER THE JOB SITE HAS BEEN STABILIZED, THE CONTRACTOR SHALL REMOVE AND PERSPECTIVE VIEW SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. PROPERLY DISPOSE OF TRAPPED SEDIMENT. SKIMMER SEDIMENT BASIN DETAIL NOT TO SCALE NOT TO SCALE NOTES 1. INLET PROTECTION SHALL BE INSTALLED IN LOCATIONS AS INDICATED ON THE PLAN. 4' MAX. SPACING ( POST TO POST) 2. SANDBAGS SHALL BE INSTALLED ADJACENT TO 5' STEEL T -POSTS DRIVEN 2' INTO THE GROUND INLETS ON SLOPES, SANDBAGS SHALL NOT BE WIRE SCREEN INSTALLED ADJACENT TO BASINS IN LOW AREAS. 1' MIN. (TOP OF HARDWARE x A P D A N0. 57 STONE CLOTH TO TOP OF POST ) / d1 i 19 -GAUGE WIRE MESH m D �� 3. "GUTTER BUDDY" OR EQUIVALENT INLET HARDWARE CLOTH WITH PROTECTION FILTERS MAY BE USED IF APPROVED I !/4 -INCH MESH OPENINGS I MI I 11/ d / BY AGENCY HAVING JURISDICTION. fIl�� Li �s�d CLOTH ABOVE II - 2' OF HARDWARE ry STONE I u. � d / SANDB GS BE OND 'TO DIVERT WATER �� f 3' (GROUND TO TO BOX ON SLOPES���' 16" NCDOT #5 OR..._. TOP OF POST)#57 WASHED STONE ti . , . ,. ,, add/�✓��/% ,�°,.`,�r � ` _.----\.�► c* � SANDBAGS �� _ �, _ �� f f � .�.��--� BEYOND TO GUTTER BUDDY** �� a DIVERT WATER 5 MAX _ ` - / � O ' — OR WIRE SCREEN ��" - =�� TO BOX ON ) 2" WRAPPED �� O --� ` SLOPES AROUND NO. _ 57 STONE STONE PLACED TO A HEIGHT OF _. 12"-18" MINIMUM ABOVE TOP OF BOX EXIST. BOX'`` i SECTION "A -All HARDWARE CLOTH & GRAVEL INLET PROTECTION CURB INLET PROTECTION USE: CURB INLET PROTECTION MAINTENANCE: A TEMPORARY MEASURE OF HARDWARE CLOTH OR WIRE -SCREEN INSPECT INLETS DAILY AND AFTER EACH SIGNIFICANT (1/2 INCH WRAPPED STONE AND/OR APPROVED RECYCLED SYNTHETIC FIBERS OR GREATER) RAINFALL EVENT. CLEAR THE WIRE -SCREEN OR HARDWARE CLOTH & GRAVEL INLET PROTECTION USE: HARDWARE CLOTH & GRAVEL INLET PROTECTION MAINTENANCE: PLACED IN THE GUTTER AND EDGE OF PAVEMENT AROUND HARDWARE CLOTH/FABRIC OF ANY DEBRIS TO PROVIDE THE OPENING OF A CURB INLET. THIS TYPE OF PROTECTION IS USED ADEQUATE FLOW FOR SUBSEQUENT RAINS. REMOVE SEDIMENT A TEMPORARY MEASURE OF WIRE -MESH HARDWARE CLOTH INSPECT INLETS DAILY AND AFTER EACH SIGNIFICANT (1/2 INCH TO PREVENT SEDIMENT FROM ENTERING A PREVIOUSLY CONSTRUCTED COLLECTED ALONG THE PERIMETER IF PRESENT UPON INSPECTION. AROUND STEEL POSTS SUPPORTING WASHED STONE PLACED OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY STORM DRAIN CATCH BASIN. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE -SCREEN AROUND THE OPENING OF A DROP INLET. THIS TYPE OF DEBRIS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. OR FABRIC DURING SEDIMENT REMOVAL. REPLACE AS NEEDED PROTECTION IS USED TO PREVENT SEDIMENT FROM ENTERING TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH AND/OR AS RECOMMENDED BY MANUFACTURER. YARD INLETS DURING CONSTRUCTION. REFER TO SECTION 6.51 DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. OF THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING CURB INLET PROTECTION AND DESIGN MANUAL. NOT TO SCALE 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE 3 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE SEDIMENT FENCE USE: s� MINIMUM 10 GAUGE WILL RETAIN SEDIMENT FROM SMALL DISTURBED AREAS. SEDIMENT LINE WIRES ( TOP & FENCE WILL BE PLACED ALONG SLOPES AS SHOWN ON CONSTRUCTION `LASS 1 RIP RAP (SEE SECTION �' ROCK PIPE INLET PROTECTION USE: d oda=. BOTTOM) DETAILS. REFER TO SECTION 6.62 OF THE NCDENR EROSION AND I �� =SEDIMENT SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.. I led A HORSESHOE SHAPED ROCK DAM STRUCTURE AT A PIPE INLET WITH ;. ;', �;:w A SEDIMENT STORAGE AREA AROUND THE OUTSIDE PERIMETER OF �� '�_ j� FENCE FABRIC �� � ��` ��� MINIMUM 12-1/2 ,� � � �.� .� INSTALLED TO GAUGE INTERMEDIATE SEDIMENT FENCE MAINTENANCE: i ---class i RIP RAP HEADWALL THE STRUCTURE. USED TO PREVENT SEDIMENT FROM ENTERING, ;� ��� PSE ,� ACCUMULATING IN AND BEING TRANSFERRED BY A CULVERT OR • SECOND WIRE .,: WIRES INSPECT SEDIMENT FENCES DAILY AND AFTER EACH RAINFALL. MAKE.: r STORM DRAINAGE SYSTEM PRIOR TO STABILIZATION OF THE ti FROM TOP v..,. ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A �i�� ..-,` DISTURBED DRAINAGE AREA. THIS PRACTICE ALLOWS EARLY USE OF '^ GRADE SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME" sEDj/77777777�����11111'% #57 WASHED STONE. t' THICK X 3' HIGH MIN. THE STORM DRAINAGE SYSTEM. INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS �� / z T 11111 1 � / AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE / NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FRONT VIEW FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING 1 THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING ` r` NOTES: ROCK PIPE INLET PROTECTION IS DESIGNED DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TO PROTECT EXISTING PIPE INVERTS THAT DRAIN STEEL POST PERSPECTIVE VIEW NO MORE THAN 10 ACRES. WIRE FENCE NOTES: NOT TO SCALE 2. DIMENSIONS SHOWN ARE MINIMUM ACCEPTABLE SEDIMENT FENCE 1. USE SEDIMENT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED UNLESS OTHERWISE NOTED. ROCK PIPE INLET PROTECTION MAINTENANCE FABRIC 1/4 -ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. AREAS TO BE DISTURBED SEDIMENT STORAGE PIPE o = 2. END OF SEDIMENT FENCE NEEDS TO BE TURNED UPHILL. (CUT, FILL, ETC.) FLOOD STORAGE ZONE RIP RAP HEADWALL INSPECT ROCK PIPE INLET PROTECTION WEEKLY AND AFTER EACH cv 8" DEPTH x 4" WIDTH 3. REMOVE SEDIMENT DEEPER THAN 12" AND REPAIR ANY UNDERMINING �' ' 111 ` � 1/2 -INCH (OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. ap BACKFILLED TRENCH IMMEDIATELY. NATURAL GROUND REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA 4. PLACE WIRE FENCE 6" BELOW GRADE AND SEDIMENT FABRIC 8" DOWN���o s 3 ��TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED EXTEND WIRE FENCE w� �z� 6" BELOW GRADE GRADE AND 4" FORWARD ALONG TRENCH BOTOM. BACKFILL AND THOROUGHLY FILTER FABRIC TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE SEDIMENT - COMPACT TRENCH WITH NCDOT #57 STONE. FOR REPAIRS, REPLACE CLASS 1 RIP -RAP THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE STONE TO GRADE AND COMPACT AS NEEDED. #57 WASHED STONE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK STRUCTURE MAX. SEDIMENT DEPTH (CLEAN OUT POINT) FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE 0 5. CONTRACTOR SHALL BE RESPONSIBILE FOR PLACEMENT AND REMOVAL MUST BE REPLACED IMMEDIATELY. AFTER ALL SEDIMENT PRODUCING ANCHOR MATERIALS OF FENCE .SECTION THRU BASIN FILTER AND CULVERT PIPE AREAS HAVE BEEN PREMANENTLY STABILIZED, REMOVE THE STRUCTURE N AS DIRECTED BY 6. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING DISTURBED ' AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH ENGINEER (NOTE 4) NOT TO SCALE AREAS TO PRE -CONSTRUCTION CONDITION. THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. EXTENDFORWARDALG BDOWN AND" SEDIMENT FENCE ROCK PIPE INLET PROTECTION (TEMPORARY) SIDE VIEW TRENCH .z, '7 �V SEAL ' a 3337 Q 13 W 4_0 U 0 W a I! W to 0 c W 0 Z 0 (� w U Z > Q � Xw� w OJ J _ Z :D � J 0 � W Z UQ O� 00 U- 0 L0 a) 0 0 U a) M O a) 00 N Z QUO C 0Zo N 6.2 0 E a) LL � cu N I.1_ CL Z J U °� Z z � O V z o 0 m w w 0 LL F - w 0 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 DT -02 CONSTRUCTED 1.5' HT. EARTH BERM OR EXISTING GROUND (* ENSURE 2.5' HT. IF BERM IS CONSTRUCTED) - 2' MIN. COMPACTED TOP WIDTH VARIES 2.5' - - - ._ FINISH GRADE - SIDE SLOPES AS INDICATED PER GRADING PLAN. 2:1 MAX. (TYP.) BOTTOM WIDTH MIN. 1' SECTION PROVIDE GROUND COVER WITHIN 7 OR 14 DAYS PER GROUND STABILIZATION REQUIREMENTS TABLE AS INDICATED ON PLAN (SHEET EC -01). DEPTH VARIES. SEE PLANS FOR DITCH BOTTOM ELEVATIONS. ENSURE 18" MIN. DEPTH. ---------------- q COMPACT 2' WIDTH ALONG TOP OF DITCH (TYP. EACH SIDE) "'s. `4 � `io 'a `e ',', \ �4. „ : 4•'. y''. eq,. 4`i. \ ",. i 4`S 'a � �q "'. SIDE SLOPES AS INDICATED PER GRADING PLAN. 2:1 MAX. (TYP.) STABILIZE TOP, SIDE SLOPES -;o -► -�► AND BOTTOM OF DITCH WITH SEEDING OR SODDING. w / BOTTOM WIDTH, MIN. 1 OR AS INDICATED ON PLAN. ° -- I - - - - - - - - - - - - -- �DITCHLINE. PLAN VIEW DIVERSION DITCH USE: A TEMPORARY RIDGE, CHANNEL, OR COMBINATION THEREOF CONSTRUCTED ON A DESIGNED GRADE ACROSS SLOPING LAND. USED TO DIVERT WATER FROM AREAS WHERE IT IS IN EXCESS TO LOCATIONS WHERE IT CAN BE USED OR RELEASED WITHOUT EROSION OR FLOOD DAMAGE. DIVERSION DITCH MAINTENANCE: MAINTAIN TEMPORARY DIVERSION DITCHES BY INSPECTING AFTER EVERY RAINFALL DURING CONSTRUCTION OPERATION, AND AFTER SIGNIFICANT (1/2 -INCH OR GREATER) RAINFALL EVENTS AFTER STABLIZATION. IMMEDIATELY REMOVE OBSTRUCTIONS FROM THE FLOW AREA, AND REPAIR THE DIVERSION RIDGE(S). CHECK OUTLETS, AND MAKE TIMELY REPAIRS AS NEEDED. MAINTAIN THE VEGETATION IN A VIGOROUS, HEALTHY CONDITION AT ALL TIMES. TEMPORARY DIVERSION DITCH & BERM NOT TO SCALE INSTALLATION: 1. EXCAVATE SUBGRADE BELOW DESIGN ELEVATION TO ALLOW FOR THICKNESS OF FILTER AND RIPRAP. INSTALL RIPRAP TO MINIMUM THICKNESS OF 1.5 TIMES MAXIMUM STONE DIAMETER. FINAL STRUCTURE SHOULD BE TO LINES AND ELEVATIONS SHOWN IN PLANS. 2. CONSTRUCT APRON ON ZERO GRADE. IF THERE IS NO WELL-DEFINED CHANNEL, CROSS SECTION MAY BE LEVEL OR SLIGHTLY DEPRESSED IN THE MIDDLE. IN A WELL-DEFINED CHANNEL, EXTEND RIPRAP AND FILTER TO THE TOP OF THE BANK OR AS SHOWN ON PLANS. BLEND RIPRAP SMOOTHLY TO THE SURROUNDING LAND. 3. COMPACT ANY FILL USED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. SUBGRADE SHOULD BE SMOOTH ENOUGH TO PROTECT FABRIC FROM TEARING. 4. INSTALL A CONTINUOUS SECTION OF EXTRA -STRENGTH FILTER FABRIC ON SMOOTH, COMPACTED FOUNDATION. 5. PROTECT FILTER FABRIC FROM TEARING WHILE PLACING RIPRAP WITH MACHINERY. REPAIR ANY DAMAGE IMMEDIATELY BY REMOVING RIPRAP AND INSTALLING ANOTHER SECTION OF FILTER FABRIC. UPSTREAM SECTION OF FABRIC SHOULD OVERLAP DOWN STREAM SECTION A MINIMUM OF 1 FT. 6. IMMEDIATELY FOLLOWING INSTALLATION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION AS SHOWN IN PLANS. NOTES: *-SEE APPROPRIATE SCHEDULE FOR DIMENSIONS 1. LA IS THE LENGTH OF THE RIPRAP APRON. 2. D = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" 3. IN WELL-DEFINED CHANNELS EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK WHICH EVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. A FILTER BLANKET D NOTE: STONE CLASSIFICATIONS OF CLASS B REQUIRE A SUBLAYER OF FILTER FABRIC OR FS -2 FILTER STONE WITH A BEDDING THICKNESS OF 6". SECTION A -A IA PLAN VIEW OUTLET PROTECTION DETAIL (PIPE OUTLET) NOT TO SCALE i J A, BURY THE TOP END OF THE LINER STRIPS IN A TRENCH 4 INCHES OR MORE IN DEPTH, B, TAMP THE TRENCH FULL OF SOIL, SECURE WITH A ROW OF STAPLES, 10 INCH SPACING, 4 INCHES DOWN FROM TRENCH C, OVERLAP - BURY UPPER END OF LOWER STRIP AS IN "A" AND "B", OVERLAP END OF TOP STRIP 4 INCHES AND STAPLE, DOUBLE ROW OF STAPLES TAMPED BACKFILL D. EROSION STOP - FOLD OF LINER BURIED IN SILT TRENCH AND TAMPED, DOUBLE ROW OF STAPLES. NOTES: 1, INSTALL TACKED MULCH IN EXISTING DITCHES AT AREAS WHERE DITCH IS DISTURBED UNLESS OTHERWISE NOTED, 2, INSTALL AND SECURE IN ACCORDANCE WITH REQUIRED RECP LINER MANUFACTURER'S RECOMMENDATIONS, JUTE NET OR STRAW WITH NET '°" 2 INCH OVERLAP OF LINER STRIPS WHERE TWO OR MORE STRIP WIDTHS ARE ARE REQUIRED, STAPLES ON 3' TO 4' CENTERS PLACE STAPLES 4 TO 10 FEET APART, to o TEMPORARY RECP LINERS NOT TO SCALE WIDTH OF RIPRAP _ AT FLUME OR END OF RIPRAP POOL (SEE PLANS) 1.5-(TYP.) TYPICAL STAPLES NO. 8 GAUGE WIRE RECP LINER USE: ROLLED EROSION CONTROL PRODUCTS (RECP) ARE MATS AND BLANKETS MANUFACTURED INTO ROLLS DESIGNED TO REDUCE SOIL EROSION AND ASSIST IN THE GROWTH, ESTABLISHMENT AND PROTECTION OF VEGETATION. RECP LINER MAINTENANCE: INSPECT ROLLED EROSION CONTROL PRODUCT (RECP) LINER AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 -INCH OR GREATER) RAINFALL EVENT. ENSURE RECP LINER OCCURS WITH GROUND AND EROSION HAS NOT OCCURRED BENEATH THE RECP. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE SHALL BE FIXED AND THE ERODED AREA PROTECTED. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER HAS ESTABLISHED. �G- FILTER FABRIC BLANKET SECTION A -A RIPRAP THICKNESS (SEE PLANS) WIDTH OF RIPRAP AT FLUME OR END OF RIPRAP POOL (SEE PLANS) RIPRAP THICKNESS (SEE PLANS) FILTER FABRIC BLANKET SECTION B -B NOTES: 1. SEE PLANS FOR APPROPRIATE SCHEDULE FOR DIMENSIONS. 2. STONE CLASSIFICATIONS OF CLASS B REQUIRE A SUBLAYER OF FILTER FABRIC OR FS -2 FILTER STONE WITH A BEDDING THICKNESS OF 6". 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. OUTLET PROTECTION DETAIL (RIPRAP POOL AT FLUME OUTLET) NOT TO SCALE Z OU) w U)U Z — Q XWU L LJ Z O J (7 _Z m X20 Z W Q U) U) O� �O O/ LL LL co O U NM O 200 ,N Z CVO U) NZo 70 Iu 0_0 —(oJ O CD co (urU NILaZ J z O O O W J F_ O 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 DT -03 z PLAN VIEW w ZINSTALLATION: a1. EXCAVATE SUBGRADE BELOW DESIGN ELEVATION TO ALLOW FOR Q THICKNESS OF FILTER AND RIPRAP. INSTALL RIPRAP TO MINIMUM THICKNESS OF 1.5 TIMES MAXIMUM STONE DIAMETER. FINAL a STRUCTURE SHOULD BE TO LINES AND ELEVATIONS SHOWN IN PLANS. 2. CONSTRUCT POOL BOTTOM ON ZERO GRADE. IF THERE IS NO 0 WELL-DEFINED CHANNEL, CROSS SECTION MAY BE LEVEL OR 3 SLIGHTLY DEPRESSED IN THE MIDDLE. IN A WELL-DEFINED CHANNEL, EXTEND RIPRAP AND FILTER TO THE TOP OF THE BANK OR AS SHOWN ON PLANS. BLEND RIPRAP SMOOTHLY TO THE SURROUNDING LAND. 3. COMPACT ANY FILL USED IN THE SUBGRADE TO THE DENSITY OF - THE SURROUNDING UNDISTURBED MATERIAL. SUBGRADE SHOULD BE SMOOTH ENOUGH TO PROTECT FABRIC FROM TEARING. 4. INSTALL A CONTINUOUS SECTION OF EXTRA -STRENGTH FILTER FABRIC ON SMOOTH, COMPACTED FOUNDATION. 5. PROTECT FILTER FABRIC FROM TEARING WHILE PLACING RIPRAP WITH MACHINERY. REPAIR ANY DAMAGE IMMEDIATELY BY REMOVING RIPRAP AND INSTALLING ANOTHER SECTION OF FILTER FABRIC. UPSTREAM SECTION OF FABRIC SHOULD OVERLAP DOWN STREAM SECTION A MINIMUM OF 1 FT. 6. IMMEDIATELY FOLLOWING INSTALLATION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION AS SHOWN IN PLANS. 1.5-(TYP.) TYPICAL STAPLES NO. 8 GAUGE WIRE RECP LINER USE: ROLLED EROSION CONTROL PRODUCTS (RECP) ARE MATS AND BLANKETS MANUFACTURED INTO ROLLS DESIGNED TO REDUCE SOIL EROSION AND ASSIST IN THE GROWTH, ESTABLISHMENT AND PROTECTION OF VEGETATION. RECP LINER MAINTENANCE: INSPECT ROLLED EROSION CONTROL PRODUCT (RECP) LINER AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 -INCH OR GREATER) RAINFALL EVENT. ENSURE RECP LINER OCCURS WITH GROUND AND EROSION HAS NOT OCCURRED BENEATH THE RECP. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE SHALL BE FIXED AND THE ERODED AREA PROTECTED. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER HAS ESTABLISHED. �G- FILTER FABRIC BLANKET SECTION A -A RIPRAP THICKNESS (SEE PLANS) WIDTH OF RIPRAP AT FLUME OR END OF RIPRAP POOL (SEE PLANS) RIPRAP THICKNESS (SEE PLANS) FILTER FABRIC BLANKET SECTION B -B NOTES: 1. SEE PLANS FOR APPROPRIATE SCHEDULE FOR DIMENSIONS. 2. STONE CLASSIFICATIONS OF CLASS B REQUIRE A SUBLAYER OF FILTER FABRIC OR FS -2 FILTER STONE WITH A BEDDING THICKNESS OF 6". 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. OUTLET PROTECTION DETAIL (RIPRAP POOL AT FLUME OUTLET) NOT TO SCALE Z OU) w U)U Z — Q XWU L LJ Z O J (7 _Z m X20 Z W Q U) U) O� �O O/ LL LL co O U NM O 200 ,N Z CVO U) NZo 70 Iu 0_0 —(oJ O CD co (urU NILaZ J z O O O W J F_ O 100% DESIGN - REGULATORY REVIEW REVISIONS DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: DATE: MAY 24, 2017 PROJECT NUMBER: F16275F-02 DT -03