Loading...
HomeMy WebLinkAbout20160130 Ver 1_Table 1_20170524Table 1. Project Components and Mitigation Credits North Fork Little River Mitigation Site Monitoring Year 0 - 2017 Mitigation Type Buffer Zone Credit Type Total Acreage Credit Ratio Credit Per Acre Mitigation Credit BPDP Zone A: Top of Bank -50' Riparian Buffer 8.34 N/A 1:1 43,560 ft' 363,290.4 ft' Restoration Zone 8: 51'-100' Riparian Buffer 5.56 April 2017 1:1 43,560 ft' 242,193.6 ft' December 2017 Year 2 Monitoring 2018 December 2018 Subtotal 605,484.00 ft2 December 2019 Zone A: 0-50' Nitrogen 1.08 Year 5 Monitoring 1:1 2,273.0216./acre 2,454.861bs. Restoration Zone B: 51'-100' Nitrogen 3.18 1:1 2,273.0216./acre 7,228.201bs. Zone C: 101'-200' Nitrogen 14.05 1:1 2,273.0216./acre 31,935.93 lbs. Subtotal 41,619 lbs. Zone A: 0-50' Phosphorous 1.08 1:1 146.4 lb./acre 158.11 las. Restoration Zone B: 51'-100' Phosphorous 3.18 1:1 146.4 lb./acre 465.55 lbs. Zone C: 101'-200' Phosphorous 14.05 1:1 146.4 lb./acre 2,056.92 lbs. Subtotal 2,680.S8 lbs. Total Buffer Restoration Credits 605,484.00 W Total Nutrient Offset Credits— Nitrogen 41,619 lbs. Total Nutrient Offset Credits - Phosphorus 2,680.58 lbs. Table 2. Project Activity and Reporting History North Fork Little River Mitigation Site Monitoring Year 0 - 2017 Activity or Report Date Collection Complete Completion or Scheduled Delivery Wildlands Holdings 11, LLC Neuse MBI N/A April 2016 BPDP N/A May 2016 Conservation Easement N/A May 2016 Bare Root Planting N/A January 2017 As -Built & Baseline Monitoring Document 2017 April 2017 Year 1 Monitoring 2017 December 2017 Year 2 Monitoring 2018 December 2018 Year 3 Monitoring 2019 December 2019 Year 4 Monitoring 2020 December 2020 Year 5 Monitoring 2021 December 2021 Table 3. Project Contact Table North Fork Little River Mitigation Site Monitoring Year 0 - 2017 Table 4. Project Information and Attributes North Fork Little River Mitigation Site Monitoring Year 0 - 2017 PROJECT INFORMATION Wildlands Holdings II, LLC Bank Sponsor 312 West Millbrook Road, Suite 225 Durham County Raleigh, NC 27609 33.4 acres 919.851.9986 36° 10'9.48- N, 78° 55'49.44- W Bruton Natural Systems, Inc Planting Contractor P.O. Box 1197 River Basin Fremont, NC 27830 Nursery Stock Suppliers Dykes and Son Nursery Monitoring Performers Wildlands Engineering, Inc. Monitoring, POC Jason Lorch Project Drainiage Area (acres) 919.851.9986, ext. 107 Table 4. Project Information and Attributes North Fork Little River Mitigation Site Monitoring Year 0 - 2017 PROJECT INFORMATION Project Name North Fork Little River Nutrient Offset and Buffer Mitigation Bank Parcel County Durham County Project Area (acres) 33.4 acres Project Coordinates (latitude and longitude) 36° 10'9.48- N, 78° 55'49.44- W PROJECT WATERSHED SUMMARY INFORMATION Physiographic Province Piedmont River Basin Neuse USGS Hydrologic Unit 8 -digit 03020201 USGS Hydrologic Unit 14 -digit 03020201020010 DWR Sub -basin 02-00-10 Project Drainiage Area (acres) 128 acres Project Drainage Area Percentage of Impervious Area <5% CGIA Land Use Classification Cropland