HomeMy WebLinkAboutNC0003671_Compliance Evaluation Inspection_20170516fer Resources
.A20NMEN"" QUALITY
May 16, 2017
Ms. Ranae Smith
Magellan Terminal Holdings, L.P.
One Williams Center, OTC -8
Tulsa, OK 74172
SUBJECT: Compliance Evaluation Inspection
Magellan Terminal II — Greensboro, NC
NPDES Permit No. NC0003671
Guilford County
Dear Ms. Smith:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
RECEIVED/NCDENWR
MAY 19 2017
Water Quality
Permitting Section
On May 16, 2017, Min Xiao and Paul DiMatteo of this office met with Bobby Sands to perform a
Compliance Evaluation Inspection on the wastewater/stormwater discharge from the Magellan Terminal II
located at 7109 West Market Street, Greensboro. The facility was found to be compliant with the NPDES
permit. The inspection findings are detailed below and an inspection checklist is attached.
I. Permit
The permit became effective January 1, 2017, and shall expire at midnight on June 30, 2021. A current
copy of the permit was kept on-site.
H. Self -Monitoring Pro ram
The DMRs were reviewed for calendar year 2016. The facility was found to be compliant with the permit
effluent limits for this period. In regards to the permit monitoring requirements, it was noted that all
sampling was performed per the frequencies specified in the permit. The last discharge event was in April,
2017. Only flow is measured on-site, and other parameters are tested by R&A Labs.
III. Facility Site Review
The Magellan Terminal II facility has the following wastewater/stormwater control structures:
• truck loading -rack drain area followed by an oil/water separator (OWS) which discharges by
gravity into the retention pond.
• four secondary containment dikes surrounding the hydrocarbon fuel and ethanol AST's. The lower
two dikes have locked manual valves to control the release of water to the retention pond.
• single retention pond which receives water from the OWS and diked areas. The discharge from the
retention pond is controlled by a locked valve.
State of North Carolina I Environmental Quality I Water Resources
450 West Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
Phone: 338-778-98001 Intemet: www.ncdenr.gov
IV. Flow Measurement
The permit requires episodic flow monitoring. No meters were used to record the flow. The discharge
volume from the retention pond is calculated using flow rate (an estimation of 9000 gallons per hour) and
flow duration. It was noted that no discharge occurred in the months of February and March in 2017.
V. Records/ReL)orts
A review of the facility files showed that all records were being maintained according to the permit. A
comparison of the October 2016 DMR with the corresponding certified laboratory data sheets from R&A
Labs showed that all results were properly transcribed onto the self-monitoring report.
VI. Effluent/Receivina Waters
The system discharges outside of the perimeter fence to a dry -ditch that runs under the railroad tracks and
W. Market Street. The effluent eventually reaches a tributary of Horsepen Creek, class "WS -III; NSW"
waters of the Cape Fear River Basin. No effluent was being discharged on the day of the inspection.
Your efforts to comply with the permit are appreciated. Should you have any questions concerning this
report, please contact Min Xiao at (336) 776-9800.
Sincerely,
V
�'-' Sherri V. Knight, PE
Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources
cc: Bobby Sands (bobby. sands@magellanlp.com)
Central Files
NPDES Unit
WSRO
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type
Inspector Fac Type
1 In' I 2 IF I 3 i NC0003671 ill 12 17/05/16 17 18 i n t
19 i G I 201
211 I I I I I I I I I 11 I 1 1 I I I I I I I I I l i i l l l l l l i
l I I I I I( r6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA
Reserved -------
72 LNJ 73 I _74 75 1 1 1 80
67 70 LJ 71 [_j
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
09:07AM 17/05/16
17/01/01
Greensboro Terminal II
Exit Time/Date
Permit Expiration Date
7109 W Market St
Greensboro NC 27419
10:OOAM 17/05/16
21/06/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
//l
Bobby R Sands/ORC/336-299-3621!
Name, Address of Responsible Official/Title/Phone and Fax Number
Paul Patts,PO Box 22186 Tulsa OK 741212186/1918-573-16051 Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit E Flow Measurement Operations & Maintenance E Records/Reports
Self -Monitoring Program ■ Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers
Date
Min Xiao WSRO WQ//336769800/
A'� �(',�
r/ 1612,0) ,
Signature of Management Q A ReviewerAgency/Office/Phone and Fax Numbers
Date
co�" tkj
/r
,3`ll% ! Zt17
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
31 NC0003671 �11 12 17/05/16 17 18 ICI
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NC0003671 Owner - Facility: Greensboro Terminal II
Inspection Date: 05/16/2017 Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ ■ ❑
application?
Is the facility as described in the permit?
M
❑
❑
❑
# Are there any special conditions for the permit?
❑
# Is flow meter used for reporting?
❑
❑
Is access to the plant site restricted to the general public?
M
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The Permit became effective Janua 1. 2017 and shall expire at midnight on June 30, 2021
A current co of the permit was kept on-site.
pond is
calculated using flow rate fan estimation of 9000 gallons per hour) and flow duration
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
❑
0
❑
❑
Is flow meter calibrated annually?
❑
❑
0
❑
Is the flow meter operational?
❑
❑
0
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
■
❑
Comment: No meters were used to record the flow. The discharge volume from the retention
pond is
calculated using flow rate fan estimation of 9000 gallons per hour) and flow duration
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
■
❑
Comment: No effluent was being discharged on the day of the ins ection.
O erations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? ■ ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ® ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The site appeared to be operated and maintained well.
Page# 3