Loading...
HomeMy WebLinkAbout20170617 Ver 1_Additional Justification_20170524Strickland, Bev From: Ginger Turner <gturner@stroudengineer.com> Sent: Wednesday, May 24, 2017 2:25 PM To: Beecher, Gary H CIV USARMY CESAW (US); Scarbraugh, Anthony Subject: RE: Kia -Mazda of New Bern Fill request Attachments: Additional Justification.pdf Gary, Please see the attached for additional justification as requested. Ginger Turner, PE Senior Engineer Stroud Engineering, PA 107B Commerce Street Greenville, NC 27858 252-756-9352 x233 Click here to upload files. -----Original Message ----- From: Beecher, Gary H CIV USARMY CESAW (US) [mai lto:Gary.H.Beecher@usace.army.mi1] Sent: Tuesday, May 23, 2017 12:19 PM To: Ginger Turner <gturner@stroudengineer.com> Cc: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Subject: RE: Kia -Mazda of New Bern Fill request Ok thanks, If they can re -design the parking lot and building and keep the impact under .10 acre they may not have to buy credits from the mitigation bank. Thanks again, Gary -----Original Message ----- From: Ginger Turner [mailto:gturner@stroudengineer.com] Sent: Tuesday, May 23, 2017 12:12 PM To: Beecher, Gary H CIV USARMY CESAW (US) <Gary.H.Beecher@usace.army.mil> Cc: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Subject: [Non-DoD Source] RE: Kia -Mazda of New Bern Fill request Gary, Thank you for the quick response. We will provide additional information on possible minimization and avoidance. With respect to the wetland bank I have been in contact with them and they have indicated there are credits available for purchase (please see the attached email). Thank you, Ginger Turner, PE Senior Engineer Stroud Engineering, PA 107B Commerce Street Greenville, NC 27858 252-756-9352 x233 Click here to upload files. -----Original Message ----- From: Beecher, Gary H CIV USARMY CESAW (US)[mai lto:Gary.H.Beecher@usace.army.mi1] Sent: Tuesday, May 23, 2017 11:48 AM To: Ginger Turner <gturner@stroudengineer.com> Cc: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Subject: Kia -Mazda of New Bern Fill request Ms. Turner, I've reviewed the Kia -Mazda of New Bern PCN that was submitted to this office on May 9, 2017. The NWP 39 request is for .39 acres of fill. The avoidance and minimization document that you submitted only mentions the reason why the existing Kia and Mazda buildings and parking lots are going to be expanded. It doesn't mention how the wetland impact has been avoided or minimized. Can the proposed building and parking lot(s) be re -designed to allow for a smaller wetland impact? Can additional neighboring "upland" land be purchased that would also minimize the wetland impact? In the PCN you mentioned that 0.4 acres of wetlands will be purchased from "Brices Creek Mitigation Bank". Have you contacted the mitigation bank to ensure that they have the 0.4 credits available for purchase? Can you also send me any documentation or transcripts that you have with Brices Creek Mitigation Bank on this project. Respectfully, Gary Kia -Mazda Dealership 5/24/2017 The developers reviewed other scenarios to avoid and minimize wetland impacts. The Kia building size and location is the key factor involved in this wetland fill request. The building size as shown in the drawings and configuration cannot be modified due to Kia's development standards. Kia provides the owners standardized floor plans and building elevations with sizes based on the demand and sales of the dealership and there are to be no deviations in the appearance or shape of the building. Different building locations were reviewed to determine any avoidance or minimization to the wetland impact. The location of the Mazda building is fixed given the existing building is proposed to be modified, updating it to the current standards. Option 1: Shift Mazda and Kia building north — The Mazda building location is fixed (modified and renovated in its existing location) and therefore after providing a 30' safety and fire access between the buildings the Kia building cannot be shifted any further north. Option 2: Shift Kia building east—The proposed location of the Kia building, because of its depth, is positioned to provide truck access around the rear of the building. There are service/shop entrances, located approximately 50' from the rear, on the north and south sides of the building that must be accessed by large tractor trailers to unload heavy parts. The proposed front wall is approximately 45' from its existing location. Shifting the building further toward Highway 70 will block the north and south traffic flow of the development and reduce fire access to the front of the building. The Kia building frontage also aligns with the Mazda renovation. Option 3: Shift Kia building south — Given the Mazda building is a fixed location, the proximity of this manufacturer to Kia is crucial for the day to day operation of the facility for both sales and service. The service center is shared between the manufacturers and there are common sales employees between them as well. The Kia building would need to shift 200-250' south to potentially decrease the wetland impacts, but at the cost of vehicle display area. This shift impacts the location of the required storm water pond, which would then need to be sited elsewhere on the property. This option would cause the loss of 75-100 employee, customer and display spaces, which is key for a development of this type. Option 4: Purchase additional properties — The tract is bordered by the Norfolk Southern Railroad on the west and an existing automobile dealership to the north. Additional land (1.9 acres) south of the original tract, including the closing of Buoy Street right of way, has already been purchased to provide the necessary vehicle display area. There are no additional tracts available for purchase.