HomeMy WebLinkAbout20170634 Ver 1_Approval Letter_20170524En viron men tu I
Qua(ity
Site
ROY COOPER
MICFiAEL S. REGAN
Sz, �,-, ri, r
S. JAY LIMMERMAN
� � , ,,.�;;.,
r.�ay �a, �o i �
1�'ayne Counry
NCDR'R Project No. 20176G34
Bridge I�6 on SR I 101
State P!ojeC[ # DF150Q42G96128
APPROVAL af 40l N'ATF.R QUALITV CERT{FICATION and NEUSF BUFFER AUTHORI7.ATION,
with ADDITIONAL CONOITIONS
N,r. Tim Litde, PE, Divi�iun Engineer
NCDOT, Dioision 4
PO Box3155
Wilson,NC 27595
Dear Mr. Little:
You have our approval, in accordance with the rnnditions IisteA below, for the following imn�cts for the purpose of
replacing Brid�,e 155 in 1Nayne Cnur.ry:
Imnacis in ihr \'euse Ricer Kasir
b7echauiied
Tota! 0.01
Totai �i'ella�id Impact far ProjecL• 0.01 acres.
Neu.e Ri ariaa Baffer
'Lone I [mpact Zone ! R�ftcr Mitigation
(sa ftl � Reauired fusine 3:1 raliol
Totals I 47fi6
N/A
• nia = Total for Site is less ihan I/3 acre and I50 lin�
To[ai BufFer Impacl for Yroject: 7159 square feet�
2one 2 Impac[
(sa ft)
2393
�f imUac[, no m
0.01
Lone 2 BuCI'er Mitigation
:eauired fusine 1.5:1 ratit
N/A
The project shall be constructed in accordance with your application received May 22, 20I7. After reviewing your
applicatien, we have decided that thece impacts are cavemA hy General Water Qualih� Certification Number 4U85.
This certifica�ion cunespends to [he Nationwirie Permi['. issuzd by tha Corps oPCngineers. This aF�proval i� aho
valid for Ihe'�euse Ripa;ian RuffCf RLI05 �' SA NCAC �F3.0_'33). !n addition, ynu should :icynire any othr.r f daraf.
sta[z or local permits beicre you proceed wiih ynvr pruject includiug (bm not limit�u to) Sediment ar�d Erosion
Control, Non-llischarge �nd Water Supply Watershed regulations. This apprnval wili etpire witn the accompanyine
dU4 prrniit.
itair of Norrh l'3rnhna ; en�iromncn4�i Qcality
i n; 7 Mad Srrv¢e Cantcr i Raieigh. Noitn Carol�.nx 27645- i I; 7
This approval is valid solely for the purpose and design described in your application (unless modified below).
Siiouicl your project change, you must notify the NCDWR and submit a new applicaiion. If ihe �roperty is soid, the
new �wn�r must be given a copy of this Cert:fication and apnroval ]etter, and is thereby responsible for comply;ng
with ail the conditions. If total wetland fiils for this project (now or in ihe futurej exceed one acre, or of total
impacts to streams (now or in thP future) exceed 1501inear feet, compensatory mitigation may be requred as
described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation
as described in 15A NCAC 2B.0233. For this approval to remain valid, you must adhere to the conditions listed in
S.i�� ��ilt;?'2j C'�r!if::a+i�n ancl any ad3itiorial co,id�tioi_s :is�ed be:c�tr�.
�ohd�t'sa .� af �Cer#i.�ication:
l. As a condition of this 401 Water Quality Certification, ±he bridbe demo?ition and constructien must be
uce�r.:plisl;ed :n strict cornpliar.cz :�ith the most reaEr,t versi�n ef NCBOT's �es± Management Pract:ces fo:
Constriiction andMaintenance Act�viiies. [15A NCfii, O�H .0507(d)(2i and ISA �;CAC U2H .0506(b)(5)�
2: T3�•idge deck ur�;ns shal? not discharge directly ir_tG :he strenm. S:.^:rn.wa�er shaL' be directed across the bridgE and
pre-treated thro�agh site-appropriate means (grassed swales, pre-formed s�our holes, vegetated buffers, etc.) before .
ent�ring the stream. To meet ±he rPyuirements oi NCLjOT's NPBES permit NCS��OQ250, nlease refer to ±he mosi
recerit versior, af th? 1Vorlh Caroli;zv De.prj•tme�tt ofTt•r�tSpUt'tptlo� ,Sior�rnwczter• Best tbfo.n4agerrent Pructices
Toolbox manual. for approved measures. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)]
3. Lrid�e p:les ard bents shall he constructed usir.g driven pilzs (hamr.ier or v:brata.ry) ar drilled shaft ccnstruction
methods. More specifically, jetting or other methods of pile driving are prohibited without prior written approval frozn
the 1�TCD�NR first. [15A 1�TCAC 02H.0546(b)(2)]
4. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters.
This water shall be captured, treated, and disposed of properly. [15A NCAC 02H .0506(b)(3)
�. fi turbidity c�artain will be installed in the stream if driving or driliing activities occ�..u� within the stream channel,
on the stream bank, or within 5 feet of the top of bank. This condi±ion can he waived with prior apnroval from the
1�?C??l��R. [15A?�jCAC 02H .0506�b;�3)]
C. A;] gtO.f3lVrater run�fi snal� �e ciire:,ted as sheeifl�w t.;lrou�n stceam bu� :,i's at nor�-eros;v� Ve.�Cit1eS, uri:eSS '
uinerw;se approv�d by this certification. [i5A IvTC�iC 2B.�233]
7. All riparian buffers impacted by the placement of temporary .fill or clearing activities shall be restored to the
pr�car.s�u��tian �olitours and re .�ege�ated. P�iaintained buffers si:ali b� �;ennai:eutly revege�at�d �vit.i .i•�n-ruoody
species by the end of the growing season f�llowing campletion of constniction. For the puraose of this condition,
rnaintn:ned �u:�er a:�as �re defined as areas ���it�iir� t':�e trans�o�tas_io : cerridor that tvill be s�ibject t� r�gular �e�� �
:riauitenance activiti�s iacli.iding m�wing. The arEa �vi�h r.��:i-mair.tzs:ed buffers shal] 'ca p;,rmaaien..tly revegetated with
nat�ve iv�udy s�,ecies before tl?e riext grovving seasun foliowir_g c�;ripi_eiian of c:;nstruc±ion. [15A NCA�' 2BA233;
$. Pursuant t�,_ 1SA NCAC 2B.0233(6), se�iment and Qrosion cor_trol devices shall not be placed in Zone 1 of any
21��us� �uffer wiYbe�t prior appro�Jai by the NCD��'R. At this time, tne iI�DWR has approved no se�?ment and
eros?on con?rol devi.es in 'Lene 1, o�stside of the apgroved project impacts, ar.ywhere on this project. Mereover,
ser3?m�nt an� er�sion contro� dev�ces shall b� al!owed in Zone 2 of the baffers provicied that Zene ? is not
compromised and that discharge is released as diffizse fovr.
9. Ii concrete is used daring coi�st-uctiin, a�y work area shall be main�ained to przvent dir�ct contact betwe.,r
�.u�ing ��ncr;te and s�e�m vrater. ��at�r tnat inadvPrtent?y contacts i:.nc�.�red concrete shali not be discharged to
s��rface �maters due t� the poten±ial for ele��ated �H and possible a�uatic life and fsh kil?s. [l SA NCAC 02B.0200]
10. Dw-ing the ccr�st;�uction of tha �,raject, no staging of ec�u:pment of an�� l:ind is perr:�itted in v✓ate; s of the U.S., cr
;�rotecied ripar.ar� buffers. (15t`. i�;r .4C (?2H.050�(b)(2);
11. The dimension, pattern and profile of the stream above and below�the crossing shall not be modified. Disttvbed
fi��idp�airs �,-�d s�-ea,r.s sbalE be _�estcr•e.d �a r:at��r�l ge��r�or�l:ic ccn�it�ons. [t�;� N�.HC J2�3.t?`Of(b,(7 j]
12. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream
staoilizaiion sliail be piaced in stream channels in sucn a manner that it does not impede aquatic Iiie passage. [i5A
NCAC 02H.0506(hl(2)1
1�. The Permittee shall enstre that the fmal design drawings adhere ta the permit and to the per.mit drawings
submitted for approval. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
J 4. Ei?1 work ir. ar �d;ac�nt to streaL� �:vater5 s�.ai'_ be �:57id�:cted si a�.sy u�ork are�. ApprovPd B��f[' tn�ast�res fram
tne most ca�-r�nt version of NCDQ 1' CUnstt;�ciioii an� Nia:ntena�.ce Ac:ivilies manuai sudi as sar.dbags, rack nerms,
eofferdams arid crthei divvrs;on s.�-uctares si-�all be used tc prevei.t excavation in floi�ving �,vater. [15:1 rdL�C
G?H.0505(b)(;) a.nd ��)l3)�
15. Nea�ry equipmer_t shall be o�erated from the banks rather than in the stream channel in order to minimize
se3i�ner�tati�n and red��c� the :n�rodact:�n af other pollutants in±o the stream. [I SA NC? C 02II.OSCS(b)�3)]
16. Ail rriechatiized equipment operaied near surface waters must ue regularly ins�iected and mau�tained to prevent
contaminatir�n c�f strea;n �vaters from fii�ls, 1u�s•ic�nts, hydrai;lic fluids, or other �or,;c materials. [15A NGAC
oax.oso6ro)(3);
l7. No roc.<., san�3 or a�her �ate;r�als s;�all be cU•edged fruni the str�am c,b�,r.e; ex�e�at tivhere au���arir,�� b_y ,.ris
certification. [i5A NCAC 02H.0506(bl(3)]
18. Disc �a:ging hydrasee.a. mi�rarzs and �ashing out hydroseeders ard other cquipment in or adjacer�t ta surface waters
is prohibited. [1.5A NCAC 02H.0506(b)(3)]
19. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other
appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being
met (ineluding the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that
further condiiions are necessary io assure compliance, ine NCDWR may reevaluate and modify this certification. [15A
N(�AC 02.B.Q2.Q0]
2�. A copy ot�tr�is �'Jater Qualit-y Certifica�i�n shal: he �aint�ined ar� the consnuction site at all t:mes. ln ��ddition, th.e
`��a�er ?a�lity Ce�if catiar. and ail subs�.ciuent t?;oai�icai:ons, ii any, srali b� mai�t�li.ed :�✓ith t�e Divisi�n Engi_r,eer aru
tne on-sice project manager. [15r� �v�Cf;C 02H .0�"v7(�� atid 1�A i1CAC G2i� .0506 (b)(2) arid (c)�2)]
21. The outside buffer, wetland or water boundary located within the construction corridor approved by this
autroriza�ian, ii:r.ia�ir.g ail no:i-coir�cner�°ial uo�row ai:d waste sites ass�ciatel with the pro;ect, shali ue clearly mar4e�
by highiy visible f�ncing prior to any land disturbing aciivities. Impacts to areas within the fencing are prohibited unless
etherwise authar.7e� b;� ihis c:.rti ication. [15Ei ?�TCl�� G2H.G501 a7d ,0502;
22. T'i�e issuar�ce of tilis ce�ificatior, does no� exanlpt the Fermitt�� uorn �om�lying with any and al: s�atutes, n.zies,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdicti�n, including but not .limited to applicable buffer rules, stormwaier managemeat rules, soil erosior and
s�dimer.tation conirol requirements, ei:;. �
23. The Permittee shall rPport an;� viol�tions of this certification ±o th� TJivision of Water Resonrces �vithin 2� hours ef
dISCOY'Lry. [15A N� ac o2s.�sos������
2Y. Upon co„l�letior, oi the p:aiect (;ncludi.ig any hnpacts at associat:,d borrow or ;�aste sites), tr�e :�TCDCT �ivision
Engir:�er shall cemplete and rer:r7 +l:e �nclosed "C.ertifcat:on of Completion Farm" to notify the NCDlxIR wh�n ai?
�Nork included �n the 401 Certification has b�en cor*ipleted. �15A NCAC 02H.OS0�(fl]
25. Nutivz riparia;� veg:,tation (i.e., trees atld sh�u�s native to y�ar geog�aphic region) must �e r:,�stablished in the
r:�arian areas wi�h�n the ce�lst���:cti� :;imits �f th� projeci by t'r�� er_d ci ti?e.gr:;��Lig seasc�n fc!lowing compiztio>> of
construction. [15A NCAC 02B.0233(10)]
�A. i'hCrE St1431 ba 1l0 CXt.aYci`1701� fi'OiYt� Oi �ruSt2 �?��'i�Sd� IfliO� jU;iS�:C�10iil1 W�i�t1Ii�S O: �V%iCCS uSS�C12iC� W1Lr1 ii:iS
I)Erlilt Wlti?011t ��Ys'opr;aie i11flCEIt1G?TlG�il. �17a`�.l:iQ 'vV3St2 �Y' i1(tiT'YQ`.�V Si;BS, GI` �,C�:eSS I'�?uS i() �R'BSie. J'' �'Jt��'2'l�W g1tC;S� �%0
.a�ated •,u a�etlands ar sireams, compensa?ar� mitig?t�et� `uill be r�qui�cd since that :s a uirect i�n�act irom re•r.c�
�cnss�lect3an activi�iP: �I�A NCAC J2H.G�Q�;�;(3) ancf t;cj(�};
27. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design,
installation and operation and maintenance of such Best Management Practices in order to protect surface waters
s[andards [ISA NCAC 02H.0506(bx3) and (cx3)]:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolrna Sediment and Erosron
Comrol P(anning cnd De.si�n A,un,uul.
b. The design, installation, operation, and maintenance of the sediment and erosion wntrol measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the h'orth
Carolina Sediment and F.rosion Control Manual. The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including conhactorowned or leased borrow pits
associated with the project.
c. For borrow pit sites, G'�c erosion and sediment control measures must be designed, installed operated,
and maintained in accordance with the most recent version of the North Caralina Surfuce Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accurdance witti the
requirements of the Sedimentation Pollution Control Act.
28. Sediment and erusion contrul messures shall not be placed in weNands or waters unless utherwise approvml by t6is
Certificatioa [I SA NCAC 02H.0506(bx3) and (cx3)]
If you wish to contest any statement in the attached Certification you must file a petition for an administ;ative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday dvough Friday between the hours of 8:OOam and S:OOpm, except
for official state holidays. The original and one (1) copy of the pedtion must be filed with the Office of
Administrative Hearings.
The petition may be faxed-pmvided the original and one copy of the dxument is received by the Office of
Administrative Hearir.gs within five (.5) business days follow•iog the faxed hxnsmission.
The mailing address for the Of�ice of Administrative Iiearings is:
Office of Adminisuative Heazings
6714 Mail Service Cznter
Raleigh, NC 27699-6714
Telephone:(919)431-30Q0, Facsimile:(919)4�1-3100
A copy of the petiriun must also be served on llEQ as fotlows:
Mr. Bill F. Lane, General Counsel
Department of F,nvironmental Quality
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 40l ef the Clean Wa!er Act. If you
have any ques[ions, please contact Rob Ridings at 919-707-8786.
Sincerely,
�/L�
/ /
f'� S. Jay Zimmerman, Director
Uivision of Wa[er Resources
Electronic copy only distribution:
Tom S.effens, US q�y Corps of Engineers, Washington Field Office
Chad Co�;ins, Division 4 Environmental Ofticer
I� ile CoPY
Enviroiunentnl
Quality
NCDWR Project No.:
.4ppticanh --------------
Project Name:
Date of Issuance nf 4Q1 \4ater Qnality (':rtificztion:
Coun[,y:
ROY COOYER
�;_„� .,.
MICHAELS.REGAN
��� �.,���i����
S. JAY lIMMERMAN
� � ,,, ��; �
Certificate of Completiun
IJpon completion af all work appeovzd within fhz 401 Watzr Quality Certific2tion or epplic�ble Buffer Rulec, and
any ;ubseauent modifca[ions, [!ie applicant is reuuircd [c re[um this certifi:;ate [o the 40! Tra�sportation Permitt:ng
Uni[. North Carolina Division of Water Resources, 1617 Mail Service Center. Raleieh, NC, 27699-1617. This form
may be returned w NCDWR nv ine appiica��t. the appiicau['s au[horized agenl. nr thc pi��iect cngineer. It is not
necessary to send certiticates t�om all of these.
Applican!'s Cerrification
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent ofthe 401 Water Qualiry Certification and Buffer Nules, the approved plans and
specificaiions, and u[hei suppurting materials.
_
�ignsn�re� `ate:
Agen!'s feslifica�roi�
I, , hereby stare that, to thc he;t of my abilitics, due c�re and diGgence
was used in the observation of the construction such that the construction was observed to be built withm substantial
cotupliance and inteut of' Ihe 40'. VJat�r Quality Cerificaiion and Buf'Yer Rules, the apG�U�ed plans and
specifications, and rnher supportine materials.
Sigrature:
F_ngineePs Certificalinn
�31t13� �'Nff�
1, , as a duly regis,ered Professional Gngir.eer in the State of North
Carelina, h2�ding becn autharized to obser.e (pzriodically, wrekly, full [ime) [he ccrns[ruction uf th: project for thc
Permittee hereby state that, to the best of my abilitizs, due care and diligEnce was used m the observation of the
cunstructinn such tnar Ihe cunstruction was ub>erved tn he ouilt withio subs[nn!ial compliance and iutent oi the 401
Watzr Quality Certification and l3uffer Rules. thz aoproved plans and spe:ificztions. and other supcortina materials.
Signalure
Daic
Regisn alion Nu.
9ate n� North Ca�oiir:a'� F.nvuonme�tzl �:unl�n
1617 Maii Sen�icc Cen[ei I�lei@h, iVorth l'arnline 276ti9-itii"i