Loading...
HomeMy WebLinkAbout20170632 Ver 1_Shoreline Stabilization_20170522State of North Carolina Department of Environment and Natural Resources DWR Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center i 2 Raleigh, NC 27699-1617 R C@L�aC D MAY 2 2 2017 I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Mack Boyte Mailing Address: 4142 Marquesas Ave. Tega Cay, SC 29708 Telephone Number: 704-280-6658 Fax Number: E-mail Address: mackbarb@comporium.net 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Gaston Nearest Town: Belmont Subdivision name or site address (include phase/lot number): Directions to site - please include road names and numbers, landmarks, etc.: 1-85 Exit 27 towards Belmont. Left on Southpoint Road, Right on Gaither, Right on Riverfront 1d5-1Z Latitude (in decimal degrees) N 35 Longitude (decimal degrees) W 81 ' 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Residential 6. Property size (acres): .6 acre 7. Lake/ river/ ocean adjacent to property: Lake Wylie 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Dredge channel for boat access 9. Will work be conducted from land? M✓ From water? Id 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 0 FORM: SSGP 10-2013 Page 2 of 3 Owner/Agent's Signatureq%e /5— Printed Name /I Date y [15A NCAC 02H .0502(f)] Agent's signature is valid only if an authorization letter from the owner is provided. Lake ` I Full Pond/ Normal Water Level Shoreline kf5 zX1:s11is e Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 0 100 200 feet ont Dr 4-