HomeMy WebLinkAboutSW3170503 (5)Energy, Mineral &
Land Resources
ENVIRONMENTAL OUALITY
May 23, 2017
Mr. Joel Causey, PE
ColeJenest & Stone, PA
200 South Tryon St., Ste. 1400
Charlotte, NC 28202
Subject: Request for Additional Information
Stormwater Permit No. SW3170503
Afton Ridge Industrial
Cabarrus County
Dear Mr. Causey:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
TRACY DAVIS
Director
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater
Management Permit Application for the subject project on May 11, 2017. A preliminary review
of that information has determined that the application is not complete. The following
information is needed to continue the stormwater review:
Revise the supplement to reflect the plans that the internal pond side slopes are 3:1, not
2:1.
2. Revise C-910, OCS-EC-3 section view to show 2:1 for the outer slope to be consistent
with the plan view.
3. Provide and label a SCM access easement to the nearest public right-of-way [General
MDC 9]. Since there is not a site or grading plan sheet, please show this on the post -
construction drainage plan sheet.
4. Provide supporting calculations to demonstrate that the two forebays sum to 15-20% of
the main pool volume [MDC 5].
5. Provide a trash rack on the riser [MDC 10].
6. Provide a site specific SCM planting plan. List the species, and show where on the shelf
each species should be planted [MDC 11].
7. Please note that a permit modification will be required for the future phases of the
project.
Nothing Compares,
SState of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
512 N. Salisbury Street 11612 Mail Service Center Raleigh, North Carolina 27699-1612
919 707 9200
Please note that this request for additional information is in response to a preliminary review.
The requested information should be received by this Office prior to June 23, 2017, or the
application will be returned as incomplete. The return of a project will necessitate resubmittal of
all required items, including the application fee.
If you need additional time to submit the information, please submit your request for a time
extension to the Division at the contact below. The request must indicate the date by which you
expect to submit the required information. The Division is allowed 90 days from the receipt of
a completed application to issue the permit.
The construction of any impervious surfaces, other than a construction entrance under an
approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject
to enforcement action pursuant to NCGS 143-215.6A.
Please reference the State assigned project number SW3170503 on all correspondence. If you
have any questions concerning this matter please feel free to contact me at
Robert.Pattersongncdenr.gov or (919) 807-6369.
Sincerely,
Robert D. Patterson, PE
Stormwater Engineer
Stormwater Permitting Program
ec: Mooresville Regional Office
Sue Homewood — DWR 401 & Buffer Permitting Program
Landon Wyatt, III — CK Afton Ridge Land, LLC
Nothing Compares --,-,,-
State of North Carolina Environmental Quality Energy, Mineral and land Resources
512N. Salisbury Street 1612 Mail Service Center Raleigh, North Carolina 27699-1612
919 707 9200