HomeMy WebLinkAbout20120107 Ver 1_Ph 4 Cover Letter_20170515PotashCorp
Helping Nature Provide
Federal Express
April 21, 2017
Mr. Tom Steffens
U.S. Army Corps of Engineers
Washington Regulatory Field Office
2407 West 5th Street
Washington, North Carolina 27889
Dear Mr. Steffens:
PotashCorp - Aurora
Enclosed is the P and U Lands mitigation site Phase 4 (Year 2) monitoring report for the 2016
monitoring year. The entire report, including all text, tables, figures and appendices, as well as
the 2016 well data tables, are located on the CD which accompanies the report. Planting in Phase
4 was complete in March 2015. If you have any questions, please call me at (252) 322-8249, or
Julia Berger of CZR Incorporated at (910) 392-9253.
Sincerely,
kefirey C. Furness
Senior Scientist
Enclosure
PC: Mac Haupt, DWR - Raleigh w/encl.
Anthony Scarbraugh, DWR — Wash. w/ encl.
S. Cooper, CZR w/encl.
23-11-020 w/encl.
1530 NC Hwy 306 South, Aurora, NC USA 27806 T (252) 322-4111
PotashCorp. I www.potashcorp.com