Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6170501 - Parking Lot Expansion for Sandhills Utility Services (2)
Fort Bragg, NC CUMBERLAND County C Heath Wadsworth, PE, Draper Aden Associates j Part If: General Project and Applicant Information Project Name: Parking Lot Expansion for Sandhills Utility Services - Date: 26=Apr-17 Project Street Address BLDG 2-6503 Butner -Road - Lat City Fort Bragg Zip 12830Y - Long = Directions to Project Sandhills Utility Services Center near the intersectio_ n_ of -Butner and Reilly County CUMBERLAND- (from UMBERLAND(from nearest intersection) Roads on Fort Bragg NON -COASTAL Project Applicant: JSandhills Utility Services, LLC-- (identify LC_(identify the corporation, organization, property owner, designated government official, etc. which owns the project.) Owner / Signing Offical's Name: Title: Address City State Zip Phone Fax Email Katherine Brown VP Cor' rate Services Bldg 2-6503 Butner Road Fort Bragg NC — 28307 910-496-2208 - katherinebrown0sandhdlsutdit6 coin Status of applicant: I - - owner River Basin Cape Fear Receiving Stream(s) Tank Creek - Stream Class(es) C (18=23.27) = - Surface Water Area (ac) 0 Coastal wetland area (ac) .0 Total property area (ac) 4.28- Total project area (ac) 4-28 Goals/characteristics YES Volume Matching (LID) NO- Drains to an offsite stormwater system NO Low Density NO , Within 575' of Saltwater ORW YES High Density NO _ Within 5 miles of a public airport Briefly summarize how the stormwater runoff wil be treated The stormwater will be treated usmg infiltration basins - Part III: Permit Information Status of construction Not Started Other permits needed YES Sedimentation & erosion controlNO 404 Permit/ 401 Certification NO . CAMA Major Permit NO Isolated Wetlands Permit NO _Threatened &Endangered Species NO, NPDES Industrial Stormwater Permit If an application for this project has been previously returned, provide the original project number and previous name of the project NIA --- Provide the permit type, number and issue date for any permits that have already been obtained for this If claiming vested rights, then identify (and attach) the supporting documents and approval dates NO Approval of a site-specific development plan or PUD Approval date NO ' Valid budding permit Issue date -NO Other Date Not Started Point of Contact STORM -EZ Version 1 4 Application Phone number - 00 95�, q. 600 7V 4/26/2017 Page 4 of 17 Fort Bragg, NC CUMBERLAND County C. Heath Wadsworth, PE, Draper Aden Associates [ Part IV: Additional Contact Information ] (Optional) Additional Contac' Person / Orginization Signing Official & Title Street address City, State, Zip Phone number(s), Email Kim Newton Procurement and Fleet Manager Bldg ,2-6503 Butner Road- _ Fort Bragg; NC- 28307 -_ Q1'0-:-49&2225- (Note. 1'0=496,2225 (Note. Person/Organization noted above may be contacted for additional project Information if applicant cannot be reached.) I Part V: Consultant Information f Complete this section if you wish to designate authority to another individual or firm so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consultant Firm Street address City, State, Zip Phone number(s)- Email C -Hgafh Wadsworth, PE Draper Aden Associates 930 Main Campus -Drive; Suite -151` - Raleigh, NC 27606 919-827=851-2 or Mobile. 919-622-4568_ hwadsworih@c1aa com - = - 6 Part VI: Property Owner /Applicant Certification I, (the Owner & Applicant listed above),r- KR,?�1r-0WIJ certify that the information included on this permit applicant form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that t required deed restrictusion and protective covenants will be recorded, and that the proposed project complies with the require�t of the applicable state atormwatnules and requirements Signature !�G[�1.,W�Y�Wt- � �� Date AN --.1Y 6ZZ or I, C. L�� (� . (Jtlt!r7� a Notary Public for the State of A/ Countf CL4lXes)C9yLe-A-A/D do hearby certify that -amu/ personally appeared before me this -ZLkday of , R e I L- and and acknowledge the due execution of the appUTtion for a stormwater permit Witness my hand and official seal, A A. /J NOTARY e PIER► IC -ate _ '!!!l1911it1\\\\ commission expires //--2- ZOZ I STORM -EZ 4/26/2017 Version 1 4 Application Page 5 of 17 Parking Lot Expansion for Sandhills Utility Services ���A (14— Fort Bragg, NC CUMBERLAND County �� ® Cape Fear River Basin WDENR RAINFALL & CALCULATION DATA Project County: CUMBERLAND Project City: FortBragg Rainfall Source: _ Fort Bragg Loaded Rainiall: Fort Bragg Design Storm: P90 Calculation Method Discrete SCS Method, - Pre -_Post - - (Minimum Design Storm = P90 for non -SA, 1 -yr, 24 -hr for SA) Storm Event Depth (inches) First Flush / WQV 1 00 P90 1 44 P95 2.06 1 -yr, 24 -hr 306 2 -yr, 24 -hr 370 10 -yr, 24 -hr 546 25 -yr, 24 -hr 652 50 -yr, 24 -hr 738 100 -yr, 24 -hr 826 NOTE Please use the Storm -EZ calculation sheets to document the stormwater design and create the O&M Agreement Highlighted Storm is Design Storm PROJECT INFORMATION I Total Property Area 428 acres Total Coastal Wetlands Area 0 00 acres Total Surface Water Area 0 00 acres Complete the breakdown of impervious area for the project Basin Information Entire Site Receiving Stream name 0 Stream Class 0 Stream Index Number Total Drainage Area 186,636 On -Site Drainage Area (sf) 186,636 Offsite Drainage Area (sf) 0 Proposed Impervious Area (sf) 128,553 Impervious Area (total) 691/. Impervious Surface Area Entire Site On -Site Buildings/Lots (sf) _ On -Site Streets (sf) On -Site Parking (sf) 56,353 On -Site Sidewalks sf) - - Other On -Site (sf) Future sf Off-site (sf) Existing BUA (sf) 72,200 Total 128,553 Total Impervious Area 295 1 acres Project •/ impervious area 69% ALL AREAS ARE IN SQUARE FEET Use Worksheet Data Yes Data in italics is derived from application forms and /and use data worksheets and cannot be changed by user STORM -EZ 4/26/2017 Version 1 4 Project Data Page 6 of 17 Parking Lot Expansion for Sandhills Utility Services WJ Fort Bragg, NC CUMBERLAND County r• Cape Fear River Basin � NCDENR Drainage Area # I ' � Of I ' 1 i PRE -DEVELOPMENT LAND USE CALCULATIONS Pre -Development Land Use: Area HSG Land -use CN (sf) (acres) -A A Imnarvm.. 99 73.417 - 1 69 39 34% Subtotal 1 186,636 1 428 Note Enter BUA Draining to Permeable Pavement Below User Defined Drainage Areas: I Comp. 1I Area HSG Descnotion CN Area (sf.) (ac) % Existing Permeable Pavement (infiltration): SCM p Description Subtotal 1 186,636 Existing Green Roofs: DSD PAW Dg, Area DSS Mp Notes SCM p Description (in) (%) (in) (sf) (acres) 1501 _ - _ 1 44 - - , - - 000 Land Use Summary: Area (sf.) From Land Use Tables 186,636 4 28 acres Permeable Pavement +Additional BUA 0 0 00 acres Green Roofs 0 000 acres Preserved Surface Waters & Non -Coastal Wetlands 000 acres Preserved Coastal Wetlands 000 acres Total Site Area: 166,636 428 acres Storm Rainfall Volume = Sod Gravel Vold Total Orifice Orifice Natural Infiltration & ET= -4 11 acre -Inches = Pavement Area Additional BUA Infiitrado Space Gravel Dia. Height BUA % Has Synthetic D S HSG n Rate Permeable Pavement Infiltration = Depth o cf Green Roof ET = Liner? BMP (Sf) (at) (In/hr) (%) (In) (In) (I n) Total Runoff Reduction = -411 acre -Inches = -14,926 cf SCM Treatment: Treated SCM Outflow = 000 acre -Inches D cf Untreated Surface Runoff = Existing Green Roofs: DSD PAW Dg, Area DSS Mp Notes SCM p Description (in) (%) (in) (sf) (acres) 1501 _ - _ 1 44 - - , - - 000 Land Use Summary: Area (sf.) From Land Use Tables 186,636 4 28 acres Permeable Pavement +Additional BUA 0 0 00 acres Green Roofs 0 000 acres Preserved Surface Waters & Non -Coastal Wetlands 000 acres Preserved Coastal Wetlands 000 acres Total Site Area: 166,636 428 acres Storm Rainfall Volume = 617 acre -Inches = 22,396 cf Runoff Reduction Components: Natural Infiltration & ET= -4 11 acre -Inches = -14,926 cf Disconnected Impervious Surfaces = 000 acre -inches = o c1 SCM Infiltration = 000 acre -Inches = o cf Permeable Pavement Infiltration = 0 00 acre -Inches = o cf Green Roof ET = 0 00 acre -inches = o of Post Filtration Discharge = 000 acre -Inches = o cf Total Runoff Reduction = -411 acre -Inches = -14,926 cf SCM Treatment: Treated SCM Outflow = 000 acre -Inches D cf Untreated Surface Runoff = 2.06 acre -inches = 7,471 cf The Pre -Development project area contains 73417 at of built upon area, resulting in an overall density of 39 34%. STORM -EZ 4/26/2017 Version 1 4 Pre -Development Page 7 of 17 Parking Lot Expansion for Sandhills Utility Services a Fort Bragg, NC CUMBERLAND County If Cape Fear River Basin NC®ENR Drainage Area# 1 of 1 POST -DEVELOPMENT LAND USE CALCULATIONS Permeable Pavement SCM If 600 Green Roofs DSD PAW Do, Area Retrofit? Downstream Comments SCM# (n) (%) (in) (sf) (acres) SCM# 600 144 - 000 1- No- - -- Residential Lot CN Calculator (Eccludina R/W and dedicated Land Use Sub -Total Area Land Exofuded, or PartraUy Excluded, from Volume Calculations. (sf) (ac ) Surface Waters & Non Coastal W etlands 0 0 00 Coastal Wetlands 0 o 00 Total Site Area 166,636 4 - Rainfall Volume= 617 acre -mores = 22,396 Runoff Reduction Components: Infiltrall Total Pavement Area AddNonal BUA Vold Space Gravel Has Orifice Orifice Down - Infiltration DeterNon HSG Pvmt Type Rate Depth Synthetic Dia Height stream cf SCM Infiltration= -240 acre-inches = Liner? SCM Check Check acre-incihes = 0 cf Green Roof ET = 0 00 acre -inches 0 ci __A 0 00 000 o c1 Ote un0 a uction = -4 96 acre -Inches = Green Roofs DSD PAW Do, Area Retrofit? Downstream Comments SCM# (n) (%) (in) (sf) (acres) SCM# 600 144 - 000 1- No- - -- Residential Lot CN Calculator (Eccludina R/W and dedicated Land Use Sub -Total Area Land Exofuded, or PartraUy Excluded, from Volume Calculations. (sf) (ac ) Surface Waters & Non Coastal W etlands 0 0 00 Coastal Wetlands 0 o 00 Total Site Area 166,636 4 - Rainfall Volume= 617 acre -mores = 22,396 Runoff Reduction Components: Natural Infiltration & ET= -257 acre-rnchas = -9,315 cr Disconnected Impervious Surfaces = 0 00 acre-md,ea = 0 cf SCM Infiltration= -240 acre-inches = -6,695 cl Permeable Pavement Infiltration = 0 00 acre-incihes = 0 cf Green Roof ET = 0 00 acre -inches 0 ci Post Filtration Discharge = 0 00 acre inches = o c1 Ote un0 a uction = -4 96 acre -Inches = -18,011 C STORM EZ 4126iZ017 Version 1 4 Post Development Page a of 17 Parking Lot Expansion for Sandhills Utility Services FortBragg, NC CUMBERLAND County ©t� la Cape Fear River Basin NCDENR Drainage Area # 1 of 1 POST -DEVELOPMENT LAND USE CALCULATIONS SCM Treatment: Treated SCMOulllow= 000aore-orches 0 Cf Untreated Surface Runoff = 1 21 acre4nches = 4,386 cf Pro -Development Runoff = 2 66 acre orches 7,471 d Ddlerence = -0 85 xrea h. -3,085 Cf The Post-Developreerd project area contains 126553 sf of built upon area, resulting In an overall density of 68 86°6 STORM -EZ 4126,2017 Verson 1 4 Post Development Page 9 of 17 Design Storm Runoff Fate Summary. Parking Lot Expansion for Sandhills Utility Services Rainfall Volume= R17 e—ahes = 22,396 et Runoff Reduction Components Fort Bragg, NC CUMBERLAND County Natural infiltration & ET = 857 axe l xlres = a315 c/ Cape Fear River Basin 000 acle-ircr = o of 6 NC®6NR a40-1?xhaa = B, r5 Dl alnage Area 4 1 of 1 Permeable Pavement Infiltration = 0 00 acre -laches = o c1 t 0 00 acre —hes = PROPOSED SI Ps & STRUCTURAL RUNOFF VOLUME CONTROLS of Post Filtration Discharge = - o cf Total Runoff Reduction- -496 vae4nehea= -18,011 of SCM Treatment Enter only runoff volume below that will be Infiltrated or drawn down over 2 to 5 days. Additional volume provided In devices should not be entered In this worksheet Treated SCMDutflow= Drawdown time requirement applies to all storm events 0 cl Untreated Surface Runoff = 121 ar Iretea _ Cffsrte Imparvlous - -_ - - -- sf Pre -Development Runoff= Area Treated - - - - cf STORMWATER CONrROL MEASURES -3,085 cl "VOLUME MATCHING ACHIEVED"" The Post-eavotopment project area contains 12aS53 al of built upan area, rasuhing N an overall al—Ity of 6888°5 ContrmWn Area Drabvge Total Post hnpervlous Porvmus --I-- °b of Total Slomge --- Area -.- Int low Inf ltraaon &-tranon Treated % of SCM SCM (a" (.0 enpernous Pernous Vohlme —.SCM Volume Valume ET Outflow Outflow Volume # Name I Lavation Ty of Oev,ca HSG 128,553 58083 Area Area (a6 # (c� (m (m () (� Utimed 708 -SCM#1 end C2 InGtlran_n Ueacv - A - - 57,236`- 11931- 45w, 2J4 5141-' - -- 5824 582,1 5424 0 0 75"a 701 SCMC3 Inhrr—D—. A 2B 217 - 15,725 1 229; 1 27% 2465 - - 2871 2871 1 2971 1 0 0 1 78% 85x53 s/ImpsrNaus ae .-Wed 27656ardospace-1—d 66°„oarai 48'&.1al wryateYto 128'54s!alipe m ppeu open apace Design Storm Runoff Fate Summary. Rainfall Volume= R17 e—ahes = 22,396 et Runoff Reduction Components Natural infiltration & ET = 857 axe l xlres = a315 c/ Disconnected Impervious Area= 000 acle-ircr = o of SCM In6ltrat—= a40-1?xhaa = B, r5 er Permeable Pavement Infiltration = 0 00 acre -laches = o c1 Green Roof ET = 0 00 acre —hes = 0 of Post Filtration Discharge = 800 acre-rrcnes = o cf Total Runoff Reduction- -496 vae4nehea= -18,011 of SCM Treatment Treated SCMDutflow= ao6 acre -[-fres = 0 cl Untreated Surface Runoff = 121 ar Iretea _ 4,386 ct Pre -Development Runoff= 206aaeiner. = 7,471 cf Difference= -o a5 —- = -3,085 cl "VOLUME MATCHING ACHIEVED"" The Post-eavotopment project area contains 12aS53 al of built upan area, rasuhing N an overall al—Ity of 6888°5 Wammga NO. Letge eiotage desms sud h as w I c y d9— pads, mn9ruGtro —bads, to "M lin bawls mey requr dird mung edoAalions Tbtoulrg caeulal r—ho ld be p,w ed tit addron to fhb apreadshaet STORM -E2 4,M2017 Vasrn 14 Slarn ga, Conlm6 Page Wel 17 STORM EZ 412N2017 Velson 14 Ranfall Fete Gnph Page 11 of 17 Parking Lot Expansion for Sandhills Utility Services FortBragg, NC CUMBERLAND County �A '�Ar 5 Cape Fear River Basin NCDENR Drainage Area: 1 of 1 FATE OF RAINFALL select Stom1 P9g BASIC TREATMENT SCALE Compliance Storm = P90 Storm - Rainfall Depth = 1 44 Inches Basic Tree-,7hre6hold VOLUME MATCHING SCALE P90 Storm - Rainfall Depth = 1 44 Inches W... MemhlhgTh—hold FATE OF RAINFALL GRAPHS Pre Development Fates Post Development Fates 100% 30A 7-Te 7OM � r - 50X i° YPa A°, 406 30% O — 0 6 0% nBltradcnand ET-1492ocf Treated Outllowhom BMF;-Ocf Unveated5,f—Runoff 74714 Infilaatlon and 9-12010d T—,,f0utfl—from BMN Od Unbaa[edylface Ru-H-4i86cf o Port Fllo-atlon Ou[flow-0cf :Pest 51-1 nOutflow-0tf ■Odie U Inflltretlonby BMP -0d O Permeable Pavammtlnhl-d -Ocf •pluronrecNdlmpaHaus lnfiltradan Od ■irem Ruo!Erapoo-an�fratlon-Oc( Other ■,nFIVabmby WM-E695cf DP=.rtneable Pavemen[IngiVabm Od ■Qux,nected imp a 1—IMriltraoen-od eG—Rmf Evapo-a r bon-0cf The-FUI1 d Ramlail mals d play me byahaage .—b,— basea on IhU cananAwls d lap usq so6lype, Ipttl gerrrM'at, — wl— by No user The mats ae Umu,W 11-;,Uy the plan n a farm whch Mugraes chmgm to the hydrologic Cydawhch result Iron mbartWim and—S siarmvela maneganern slialsg- 7 STORM EZ 412N2017 Velson 14 Ranfall Fete Gnph Page 11 of 17 Operation & Maintenance Agreement Parking Lot Expansion for Sandhills Utility Services Fort Bragg, NC CUMBERLAND County Prepared By: C. Heath Wadsworth, PE, Draper Aden Associates Cover Page ` Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & Bioretention Cell Quantity. Dry Detention Basin Quantity. Grassed Swale Quantity. Green Roof Quantity Infiltration Basin Quantity Infiltration Trench Quantity Level Spreader/VFS Quantity Permeable Pavement Quantity Proprietary System Quantity Rainwater Harvesting Quantity Sand Filter Quantity Stormwater Wetland Quantity Wet Detention Basin Quantity Disconnected Impervious Area Present: Soil Amendments Present: g O&M tables will be added automatically). Location(s): _ Location(s): _ Location(s): Location(s): _ Location(s): See Plans- Location(s): _ Location(s): Location(s): Location(s): Location(s): _ Location(s): Location(s): Location(s)- Location(s) ocations) Locations) Location(s). - I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party Title & Organization: Street address: City, state, zip: Phone number(s): Email; Katherine Brown VP Corporate Services - Sandhills-Utility Services Bldg 2=6503 Butner Road Fort Bragg, NC 28307 - _- 910-496-2208 - atherinebrown@sandhillsutility.com - Signature: / Date - RC—I, (; /l/ a Notary Public for the State of /J/ C - County of ("lkM Gr4do hearby certify that W)v personally appeared before me this day of �pgi L 2 0{ % and acknowledge the due execution of the Opev ions and Mainten nce��Agreement. Witness my hand and official seal,y: x �,�/� —, NOTARY ,G PUB L, Seal"'.;�'` hig cui, .,. My commission expires 6 2-- ZDz STORM -EZ 4/26/2017 Version 1 4 O&M Manual Page 1 of 1 Infiltration System Maintenance Requirements Important maintenance procedures: - The drainage area will be carefully managed to reduce The sediment load to The infiltration basin Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it shall be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County) Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debns is present. Remove the trash/debris The perimeter of the Areas of bare sod and/or Regrade the sod if necessary to remove the gully, and then plant a infiltration basin erosive gullies have formed. ground cover and water until it is established Provide lime and a one- time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the sediment off-site swale applicable). The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale (if applicable). control devices such as reinforced turf matting or riprap to avoid future problems with erosion The forebay Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth will not cause impacts to streams or the BMP Erosion has occurred or riprap Provide additional erosion protection such as reinforced turf matting or is displaced riprap if needed to prevent future erosion problems Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment has Search for the source of the sediment and remedy the problem if accumulated possible Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately Water is standing more than 5 Replace the top few inches of filter media and see if this corrects the days after a storm event. standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by wiping them with pesticide (do not growing in the main treatment spray). area The embankment Shrubs or trees have started Remove shrubs or trees immediately. to grow on the embankment An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM -EZ 4/26/2017 Version 1 4 O&M Manual Page 1 of 1 SUPPLEMENT -EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project Quantity Location(s) Infiltration System 3 See Construction Drawings (Labeled as SCM #1, #2, and #3) Bioretention Cell Wet Pond Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Designer information for this project: Name and Title C Heath Wadsworth, PE - Senior PM Organization Draper Aden Associates Street address. 930 Main Campus Drive, Suite 151 City, State, Zip- Raleigh, NC 27606 Phone number(s). 919-827-8512 Email hwadsworth@daa.com Designer Applicant: RECEIVED MkJ 18 2017 DENR-LAND QUALITY STORMWATER PERMITTING Envlronn,cn Quality Project Name: Parking Lot Expansion for Sandhills Utility Services Address BLDG 2-6503 Butner Road City / Town Fort Bragg, NC 28307 Company Sandhills Utility Services Contact Kim Newton - Procurement and Fleet Manager Mailing Address Bldg 2-6503 Butner Road City, State, Zip Fort Bragg, NC 28307 Phone number(s) 910-496-2225 Email. lknewton@sandhilisutility com Cover Page 1 9 24 AM 5/11/2017 Certification Statement I certify, under penalty of law that this Supplement -EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge Y�(� 0 ° 00 and belief, true, accurate, and complete, and a K" A Signature o Designer - that the engineering plans, specifications, operation and maintenance a agreements and other supporting information are consistent with the information provided here s� =y4�tfJC7 C1C3'�� y 'rI am aware that there are significant penalties for submitting false 17 information including the possibility of fines and imprisonment for knowing Seal Me violations as well as a report being made to my professional board Cover Page 1 9 24 AM 5/11/2017 INFILTRATION SYSTEMS Parking Lot Expansion for Sandhills Utility Services THE DRAINAGE AREA Drainage area number SCM #1 and #2 Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (sq ft) No Parking / driveway (sq ft) 57236 sf Total surface water area (sq ft) #9 Does the drainage easement comply with General MDC (9)? Yes Sidewalk (sq ft) No Total drainage area (sq ft) 69167 sf Roof (sq ft) #11 Is there an O&M Agreement that complies with General MDC (11)? Yes BUA associated with existing development (sq ft) 44857 sf- Roadway (sq ft) #6 What is the method for dewatering the SCM for maintenance? Proposed new BUA (sq ft) 12379 sf Other, please specify in the comment box below (sq ft) #2 Bottom of the Infiltration system (fmsl) 264 ft Percent BUA of drainage area 83% Total BUA (sq ft) 57236 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify) Fort Bragg, Millitary - Subject to Phase 11 Post -Construction SW GENERAL MDC FROM 02H .1050 ign rainfall depth (in) 1 0 in imum volume required (cu ft) 4770 cf agn volume of SCM (cu ft) 5147 of #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mametenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H V)? 31 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? No #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Other #13 Was the SCM designed by an NC licensed professional? Yes INFILTRATION SYSTEM MDC FROM 02H .1051 #1 SHWT elevation (fmsl) T>96 -m from surface #5 Length (ft) 200 ft #1 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes #5 Width (ft) 25 ft #1 Sod infiltration rate (m/hr) 11 5 in/hr #5 Depth/Height (ft) 3 ft #1 Briefly describe the hydraulic properties and characteristics of the soil profile #5 Surface area of the bottom of the infiltration system (sq feet) 4400 sf We finally found the sand in the sand hdls These sods are prefect for infiltration They are very sandy with infiltration rates ranging from 11 5 to 14 1 in/hr To make it every better, the SHWT is consistantly vey deep, there were no issues with encountering the SHWT (or even getting close) The sod scientist said "you don't find soils much better than these" Great soils' As a stormwater engineer; if all sites were like this one, I would be out of business #5 Ponding depth of the design volume (in) 12 in #5 Estimated dewatering time (hours) 2 hrs #5 For trenches only Perforated pipe diameter, if applicable (inches) #2 SHWT elevation (fmsl) Deeper than EL 258 #5 For trenches only Number of laterals #2 Bottom of the Infiltration system (fmsl) 264 ft #5 For trenches only Stone type, if applicable #2 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? No #5 For trenches only Stone void ratio (%) #3 Proposed slope of the subgrade surface (%) 0% #5 For trenches only Is stone free of fines? #3 Are terraces or baffles provided? No #5 For trenches only Is the stone wrapped in geotextde fabric? #4 Describe the pretreatment that will be provided- #6 Is the infiltration system located underground? No The preteatment is stone plunge -pools and sumps #6 If so, has at least one infiltration port been provided? '.ADDITIONAL INFORMATION (Please use this space to provide any information about this infiltration system that you think is relevant to the review Infiltration 1 9:25 AM 5/11/2017 INFILTRATION SYSTEMS Parkinq Lot Expansion for Sandhills Utility Services THE DRAINAGE AREA Drainage area number SCM #3 Break down of BUA in the drainage area (both new and existing). Total coastal wetlands area (sq ft) Parking / driveway (sq ft) 28217 sf Total surface water area (sq ft) Sidewalk (sq ft) Total drainage area (sq ft) 43942 sf Roof (sq ft) BUA associated with existing development (sq ft) - Roadway (sq ft) Proposed new BUA (sq ft) 28217 sf Other, please specify in the comment box below (sq ft) Percent BUA of drainage area 64% Total BUA (sq ft) 28217 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater programs) that apply (please specify) Design rainfall depth (in) 1 0 in Fort Bragg, Mtllitary - Subject to Phase II Post -Construction SW Minimum volume required (cu ft) 2350 cf Design volume of SCM (cu ft) 2465 cf [GENERAL MDC FROM 02H.'1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H V)? 3 1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? No #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Other #13 Was the SCM designed by an NC licensed professional? Yes INFILTRATION SYSTEM MDC FROM 02H.1051 #1 SHWT elevation (fmsl) Deeper than EL 252 #5 Length (ft) 60 ft #1 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes #5 Width (ft) 35 ft #1 Soil infiltration rate (in/hr) 11 5 in/hr #5 Depth/Height (ft) 2 ft #1 Briefly describe the hydraulic properties and characteristics of the sod profile #5 Surface area of the bottom of the infiltration system (sq feet) 2315 sf We finally found the sand in the sandhills These sods are prefect for infiltration They are very sandy with infiltration rates ranging from 11 5 to 14 1 m/hr To make it every better, the SHWT is consistantly very deep, there were no issues with encountering the SHWT (or even getting close) The soil scientist said "you don't find sods much better than these" #5 Ponding depth of the design volume (in) #5 Estimated dewatering time (hours) #5 For trenches only Perforated pipe diameter, if applicable (inches) 12 in 2 hrs #2 SHWT elevation (fmsl) 252 ft #5 For trenches only Number of laterals #2 Bottom of the Infiltration system (fmsl) 260 ft #5 For trenches only Stone type, if applicable #2 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? No #5 For trenches only Stone void ratio (%) #3 Proposed slope of the subgrade surface (%) 0% #5 For trenches only Is stone free of fines? #3 Are terraces or baffles provided? No #5 For trenches only Is the stone wrapped in geotextile fabric? #4 Describe the pretreatment that will be provided #6 Is the infiltration system located underground? No The preteatment is stone plunge -pools and sumps 1#6 If so, has at least one infiltration port been provided? ADDITIONAL INFORMATION Please use this space to provide any information about this infiltration system that you think is relevant to the review Infiltration 1 9 26 AM 5/11/2017 5/11/2017 Click Here To: Corporations Division North Carolina Elaine F Marshall u EPAR T M E NT OF THE Secretary SECRETARYOFSTATE PO Box 29622 Raleigh, NC 27626-0622 (919)607-2000 View Document Filings File an Annual Report Amend a Previous Annual Report Print a Pre -Populated Annual Report form Corporate Blames Legal: Sn,ntn,W I I S:� _ r._ ilii; -R'aI:CES,_LL-�C Limited Liability Company Information Sosld: 0520818 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 2/18/2000 Fiscal Month: December Registered Agent: Brown, Jeffery R Corporate Addresses Principal Office- 2-6503 Butner Road Fort Bragg, NC 28307 Reg Office. 2-6503 Butner Road Fort Bragg, NC 28307 Reg Mailing. PO Box 72858 Fort Bragg, NC 28307 Mailing. PO Box 72858 Fort Bragg, NC 28307 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager: Jeffery R Brown PO Box 72858 Fort Bragg NC 28307 Manager:E�a�therine ' rZb�wn PO ox 28 Fort Bragg NC 28307 RECEIVED MA;' 18 2011 DENR-LAND QUALITY STORMWATER PERMITTING Account Login Create Account https //www sosnc gov/Search/profcorp/5019922 1/1