HomeMy WebLinkAbout20161013_060110_hyd_permit_drawings_2017-1-23_20170517Hi�hWay North Carolina Department of Transportation /�N�—
�
Stormw�ater �" e
,,,,,�„�,,, Highway Stormwater Program \���
STORMWATER MANAGEMENT PLAN �`"'�%
(Version 2.07; Released October 2016) FOR NCDOT PROJECTS
WBS Element: 17BP.2.R.67 TIP No.: County(ies): Beaufort Page 1 of 2
General Project Information
WBS Element: 17BP2.R.67 TIP Number: Project Type: Bridge Replacement Date: 1/22/2017
NCDOT Contact: Jay B. Johnson - Division Environmental Officer Contractor / Designer: HNTB North Carolina, P.C. / James A B rd, PE
Address: 105 Pactolus Hwy. (NC 33) Address: 343 E. Six Forks Road
PO Box 1587 Suite 200
Greenville, NC 27835 Ralei h, NC 27609
Phone: 252 439-2800 Phone: 919 424-0437
Email: 'b'ohnson@ncdot. ov Email: 'ab rd hntb.com
Cit /Town: Washin ton Count (ies : Beaufort
River Basin(s): Tar-Pamlico CAMA Count ? Yes
Wetlands within Project Limits? No
Pro'ect Descri tion
Pro'ect Len th lin. miles or feet): 0.10 Surroundin Land Use: Rural Residental and Agriculture
Pro osed Pro'ect Existin Site
Pro'ect Built-U on Area ac. 0.3 ac. 0.3 ac.
Typical Cross Section Description: 2- 11' asphalt paved lanes with 2' paved shoulders, 4' grass shoulders, 2- 10' asphalt paved lanes with 6' grass shoulders, 1:1 grass ditches,
3:1 grass ditches, and two gravel drives at bridge. and two soil drives at bridge.
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 3400 Year: 2031 Existin : 4400 Year: 2014
General Project Narrative: State project 176P.2.R.67 involves the replacement of Beaufort County Bridge #060110 on SR 1507 (Slatestone Rd.) over Beaverdam Swamp. The existing bridge consists of
(Description of Minimization of Water 1@ 15' - 7", 1@ 15' - 2", 1@ 15' - 8" reinforced concrete deck spans on timber joists and is to be replaced with a 1@ 40' - 0", 1@ 30' - 0", 21" cored slab bridge (70' total
Quality Impacts) length, 33' total width) at the same location. The project also includes 0.07 miles of approach roadway improvements and the re-grading of two existing drives prior to the
crossing of Beaverdam Swamp.
In accorance with Tar-Pamlico River Buffer Regulations, the propsoed bridge does not contain deck drains. All stormwater from the bridge and approches will be collected
by a storm drainage system and discharged into a grass lined 3:1 'V' ditch. The drainage system will outlet outside of the buffer limits in the northeast quadrant at -L- station
15+48 LT. No wetlands are present within the project limits.
All four quadrants have ditches that tie directly to Beaverdam Swamp with ditch in the southeast quadrant being classified as jurisditional. This ditch will be pipied 120' to
minamize impacts to adjacent properties, the remaining ditches that are impacted by the project are designed to replacate the existing drainage patterns. The ditch in the
northwest quadrant will be impacted only to replace the 42" drive pipe that will be longer than the existing due to the regrading of the gravel drive over that ditch.
Waterbod Information
Surface Water Body (1): Beaverdam Swamp NCDWR Stream Index No.: 29-10-2
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Sup iemental Classification: Nutrient Sensitive Waters (NSW) Swam Waters (Sw)
Other Stream Ciassification:
Impairments:
A uatic T&E S ecies? Comments:
NRTR Stream ID: Buffer Rules in Effect: Tar-Pamlico
Project Includes Brid e S anning Water Bod ? Yes Deck Drains Dischar e Over Buffer? No Dissi ator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
Hl hW� North Carolina Department of Transportation rs"�
�Stormwater ' "�,=1
,,,,,.,�.,, Highway Stormwater Program -
STORMWATER MANAGEMENT PLAN -
(Version 2.07; Released October 2016) FOR NCDOT PROJECTS
WBS Element: 17BP2.R.67 TIP No.: Count (ies): Beaufort Pa e 2 of 2
Swales
Station & Coordinates Surface Base Front Back Drainage Recommended Actual Longitudinal Rock BMP
Sheet (Road and Non Road Water Width Slope Slope Area Treatm't Length Length Slope Q2 V2 Q10 V10 Checks Associated w/
No. Pro'ects Bod it H:1 H:1 ac ft ft % cfs (fps) (cfs f s Used Buffer Rules?
4 -L- 14+64 RT (1)Beaverda 0.0 3.0 3.0 4.4 440 1300 0.50% 7.0 2.4 9.6 2.6 No No
35.577062 / - 77.017752 m Swamp
4 -L- 15+15 LT (1)Beaverda 0.0 3.0 3.0 0.9 90 450 2.12% 1.3 1.8 1.7 1.9 No No
35.576906 / -77.017894 m Swamp
4 -L- 14+80 RT (1)Beaverda 3.0 3.0 3.0 68.0 6800 630 2.81 % 8.5 3.1 15.0 3.6 Yes No
35.57422 / -76.93088 m Swamp
Additional Comments
Due to the extensive drainage area, the recommended length could not be obatined for the relocated jursidictional stream.
�
Z
O
>
�
6
�
� DENOTES IMPACTS IN
� SURFACE WATER
�
r -DRV2-
W2 ,
PERMANENT WETLAND IMPACTS = O.O Ac /O SF F'� Sta�10+45.67
� MECHANIZED CLEARING IN WETLANDS = 0.0 Ac/0 SF �- `�3'l6'S1.2'(RTl
M � PERMANENT STREAM IMPACTS = 0 LF D=%/4' 35' 29.6'
� N TEMPORARY STREAM IMPACTS = 0 LF C= 3�.77'
p Q r = i9.84�
�Z R = 50.00'
DETAIL 1 O
SPECIAL LATERAL V' DITCH � � �
lNo��a scaie7 .
N� � 1
PROIECT REFERENCE NO. SHEET NO.
C� N T B HNTB NORTH CAROLINA, P C.
aaa e. six Forks Road, s�ite 2oo 17BP.2.R.67 4
Raleigh, North Carolina 27609
NC LiCense No: C-1554 RNJ SHEETNO.
. � -- - � ROADWAY DESIGN HYDRAULICS
_ M9 � i o ��� . � � �/� � ENGINEER ENGINEER
e PERMANENT WETLAND IMPACTS = 0.0 Ac /0 SP
'`£ �' MECHANIZED CLEARING IN WETLANDS = 0.0 Ac /0 SF C�I
\�'e;�;tc O PERMANENT STREAM IMPACTS = 0 LF
��„ E 4 ° TEMPORARY STREAM IMPACTS = 0 LF dNC��I[1P1LE lE �I..�N�
DO NOT USF, FOR 6 W Af,QI!ISITION
_-_ � I
' � , � j C = r38A0'
---- �osaFe� � ,;y��s ra000 -�- T = 69.20'
__' � eo 00 �T R= n.459.16�
, _ �
� C1A55 'I' RIP-RAP
��. �- 1� � � �- esr. a TONs DOCUMENT NOT CONSIDERED FINAL
�_ _ ti e5T 7 Sv�F I UNLESS ALL SIGNATURES COMPLETED
� `� CLA55 'I' RIP-RAP 15" RCP-III �
o �,a .. .. F��n
�,o,,,,a 3.� p�� siope � � PUE PUE 50' iaPea 70 PUE,� -� PUE (�
m�,,. o= i.o F. . . a � �-- _ �isxiµ� .. --- � - �
- - �-__ _. � -t3
cr-�2 y � x�s� � °����� -�: _ - � - - 4
, _ � - - -�-
FROM -L- STA. 12+80 TO STA. 14-64 RT, �- .__ E _ F�_ _-
FROM -L- STA. 15+15 TO $TA.16+50 LT. - �41 N _
�, , o
, ii o M �
- - - o �
- �- -
DETAIL 2 . ' �, i��_ F-. _ -- i5' R
RIP RAP AT EMBANKMENT ' T�. il �_� ���� C
�N „a s�oa� GPS MON) �, PD _���
601101 "' � �F �
io�m . - ' � i i o ,
Dtch � -- I 1 � 1 I ' N 7�'.
c,ade i.o�m� -is . . � � ��. '� :. � WC
aEMAi?Y CHURCH OF CHRISS'� � +
." TSff-827 PG��I46 . _ .
GEOTEXnIE - SPECIAL LAT.'V' DITCH
SEE DETAIL 1 CLA$$ 'I' RIP-RAP
Type ahLncr- 1� TONS Ct I Rip-Rap
Geo+e.tle 25 s EST. � TONS
FROM -L- STA. 14 � 50 TO STA. 14:70 RT. �/3 EST. 15 SYGF �
FROM L- STA. 14+77 TO STA. 14+91 RT.
PERMANENT WETLAND IMPACTS = 0.0 Ac /0 SF
DETAIL 3 MECHANIZED CLEARING IN WETLANDS = 0.0 Ac /0 SF
PERMANENT STREAM IMPACTS = 11 LF
SPECIAL LATERAL BASE DITCH TEMPORARY STREAM IMPACTS = 0 LF ��
iHor�o s�oiel ..
�°o��a 3o p F�o��e, s'�o�� p= 72' 23' 32.1° (LT 1 �= 65' S4' 47.8" (RT ) �
Le,f M��. o= i o F�. D= l90' S9' 09.4" D=/90' S9' 09.4°
e= a.o F+. L= 37.90' L= 345/'
T= 2195' T= 19.45' J
FROM -L-STA.14�i�80 TO STA.16i..25 ar. .. R= 30.00' R= 30.00�
50
40
30
-DRV2-
-DRV2- STA 10+70.00
) ELEV. = 33.55
��+0� �� +�0
RIP-RAP AT Ef
SEE DETAIL 2
EST.10 iONS
EST 25 SYGF
O
EST.20 TONS �^ .
EST.39 SYGF SPECIAL LAT.'V'
� DITCH
see oerna i GPS MON
, DU DUE- UE DUE ' I )
3 i �a,�� \ 60110 2
F BL, _ � �
- -- ��-_ ' � -
--�
� � �. --�_ '�-'. � "�=-" -- --- - ----
' - - � L�', J �_ -. --_ - - � -'��---- -- . . _ - � r:� _ `� - _ _ _
. � C' ---- -i'a _ -- a-�1'��- _ - - _- -- _.
MATERIAL TO BE REMOVED WETLAN D VC
-.. 8.TTAPER � '��"" ���- -- - - . ---=�E.-�� s ' _- - - - - - -
_ _. ____ ' . . _ .
- - _ __ - �..' - ._-
N _' _ ---- .-. - -- . _ . _
i r ; � � -- i - _ _ i_ ;�:- - T __ _ -t -s �6• 23� �2.0' E
^ � w II - - ----
J._.. _ _ � -�- - - T
; :n- n-a.:.�r. g.} TAP�F . _ . _ _ � '"' _ _ --�� _ .__ -- � - `�-...
. _-- 3�-- - �F� __ __ J-�___
/� - __ _ n,• S 1 - __
_ �... ., ,_ , }��___ _ ..__ -, � -K
_� C__ Ly � �'__ � , 9 1 �� j �� . �i _
w
�� � ���_ � � ��., N`�'� ` � . �� � � ��� ���� _
C � � iQ0 :, � i., � i �/� i �^i
i �
� i �- - - - - PDE -� � PUE _ _ .. �i � �3s .GLORIA A WOOLAR� �i ' � � � �� � �
PD C � . - _34-- � � � i 'llB 642 PG 528 , � 31 . -'� i
i i � ���oc..
� - � FREbERICIS E � ' � _ i --" - ' 1, " F�� �v L � �c�
� . SPECIA� 3, .. � ' - - WIL-SE)N g� ' � � - �� �w � �8 jci _
F LAT. BASE DITCH O � - DB 64� PG SJI I B� � y � �` �� _.
SEE DETAIL 3 �� . i FIIVIE N F3I ��y�B R ' , Flnll>HE�f '�k O �-
� . , �s �iEYF7��fd ' _ �L�� p ➢� i _
O � . ' . I ' Il", .
„ , , TL l 3f.]I' `
� �� . . . _ � �\` � �/' � � \���
��
j�. RIP RAP AT EMBANKMENT I ._ 3 - 3 , a 9e . .� ..
� SEE DETAIL 2 � " � _ _ _ M �
� � � ��t EST 7 TONS . _ _ . . . � .. .
,�� � 3� EST 13 SYGF � . I . m �n�i i FJ1ic_ .
.'� \`
' W4
PERMANENT WETLAND IMPACTS = 0.0 Ac /0 SF
MECHANIZED CLEARWG IN WETLANDS = 0.0 Ac /0 SF
PERMANENT STREAM IMPACTS = 163 LF
STREAMIMPACTS TEMPORARY STREAM IMPACTS = 0 LF
_r;
- BRIDGE HYDRAUUC DAT A
DESIGN DISCHARGE = 72/ CFS
_- DESIGN FREOUENCY = 25 YRS
- DESIGN HW ELEVATION = 35.6 FT
BASE DISCHARGE = 1127 CFS
- BASE FREOUENCY = 100 YRS
- BASE HW ELEVATION = 3627 FT
OVERTOPPING DISCHARGE = N/A CFS
OVERTOPPING FREQUENCY= � 500 f+) YRS
- OVERTOPPING ELEVATION = 37.39 FT
-_. �
- DATE OF SURVEY = 03-15-20�6 =-_�
_
W.S.ELEVATION
�- I AT DATE OF SURVEY = 27.80 FT
11 +00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00
- DRV1 -
� -DftYl- SlA 11-�-36.00
ELEV. - 36.�4 :
40 !- :
-�- :� � : :-
�� � '
� (-lTs9�2� �... -�-
�-----�j �
30 ��I � �
BEGW GRADE
-DR 1- ST 10+20. 1 �
ELEV. = 37.99 �
2� _
10+00 11 +00
6
�
m
�
Z
O
N
>
�
�DENOTES IMPACTS IN
SURFACE WATER
O
W2
PERMANENT WETLAND IMPACTS = 0.0 Ac /0 SF
M � MECHANIZED CLEARING IN WETLANDS = 0.0 Ac /0 SF
PERMANENT STREAM IMPACTS = 0 LF
� N TEMPORARY STREAM IMPACTS = 0 LF
OQ
ZZ
DETAIL 1 O
SPECIAL LATERAL'V' DITCH �
1No��a scaie7
Nm�,oi ._. F��n
Gro�nd 3�� p��� Slope � PUE
m��. o= i.o r+.
_�._.
-l�RV2-
Pl Sto l0+45.67
p = 43' /6' S1.2' (RT l
D = //4' 35' 29.6'
C = 37.77'
r = i9.84�
R = 50.00'
PUE PUE,� PUE {�
SO' TAPER TO � y,i
exisTwc �
__-__ _ ...- Q
_ _ -� ---- 4
FROM -L- STA. 72+80 TO STA. 14-64 RT. . _ �J_ _ _ F�_
FROM -L- STA. 15+15 TO STA.16+50 LT. O i � -.
. . � � _ - _ _ _ �� _.0 �_ �7J
... ,� ., .. W o M
__: .. � i o � �
. - - �' � - �-� . __' .__ _ _
DETAIL 2 , i,-r �- F - `-, �5' R
RIP RAP AT EMBANKMENT i �. 'T� T � �Q �� -
iN,�as�oai ;GPS MON) �1 I o F Pp C __ C
�o.m 60110-1 0
� ry �, :
Drch 1.0'mn
�,ade � -is � � . + W�� .
GEOTEXnIE - SPECIAL LAT.'V' DITCH
SEE DETAIL 1 CLASS 'I' RIP-RAP
Type ahLincr- 1� TONS Ct I Rip-Rap
G o e.t le- 25 s EST. i TONS
FROM -L- STA. 14-50 TO STA. 14:70 RT. �/3 EST. 15 SYGF
FROM - L- STA. 14+77 TO STA. 14+91 RT. .
PERMANENT WETLAND IMPACTS = 0.0 Ac /0 SF
DETAIL 3 MECHANIZED CLEARING IN WETLANDS = 0.0 Ac /0 SF
PERMANENT STREAM IMPACTS = 11 LF
SPECIAL LATERAL BASE DITCH TEMPORARY STREAM IMPACTS = 0 LF � �-` �
INorro s�oel
�°o��a 3o p F�o��e, s'�o�� p= 72' 23' 32.1" (LT 1 �= 65' S4' 47.8" (RT ) i
Le,f M��. o= i o F�. D= l90' S9' 09.4" D=/90' S9' 09.4"
e= a.o F+ L= 37.90' L= 345/'
T= 2/.95' T= 19.45' J
FROM -L- STA. 14 i 80 TO STA. 16 i 25 RT. R= 30.00' R= 30.00�
50
40
30
-DRV2-
-DRV2- STA 10+70.00
) ELEV. = 33.55
��+0� �� +�0
�
�
CLA55 'I' RIP-RAP
EST.20 TONS �
E5T.39 SYGF
�DUE
� -- J��
O
C� N T B NC1eicense�NohoCai55anaS27609200
W1 �
PERMANENT WETLAND IMPACTS = 0.0 Ac /0 SP
MECHANIZED CLEARING IN WETLANDS = 0.0 Ac /0 SF C�I
PERMANENT STREAM IMPACTS = 0 LF
TEMPORARY STREAM IMPACTS = 0 LF
JASPER ' ...... -!-80.00 -L-
�' �� 60.00' LT
C1A55 'I' RIP-RAP I
� - EST. 3 TONS
EST 7 SYGF
15" RCP-III _
SPECIAL LAT.'V'
DITCH
UE SEE DETAIL � DUE
i
- --� ' 1��-wre
-- ..� ��-
_ � -+ --
-` $�� c � �I ,,_ -
r__ ---- .---
ryg.l TAPF�F _ - - _-- ---
� -� �� �
J
� � C� � 1 ��� � � � � i , r�.� �,�.z5�
�g.:�
O I � -- E� �PUE�
�F\ \ c�i �- --- PD
� �PD _ C �_
\ � \ � SPECIAL 3' -
F' F LAT. BASE DITCH O
SEE DETAIL 3 �
j 1
O „ .
RIP-RAP AT EMBANKMENT � � RIP-RAP AT EMBANKMENT
SEE DETAIL 2 SEE DETAIL 2
EST.10 iONS EST.7 TONS
EST 25 SYGF EST 13 SYGF
O
��; �,�" MATERIAL TO BE REMOVED WETLAN D& STREAM IMPACTS
I �� REDERICK E
WILSON
�� !�f3 642 PG 531 i ao
� FIIVI F FI � iN
tLEV / ft9'
��W F]uno
. F EV �..87'
L = lJ6.`1U
T = 69.20'
R = 11.459.16'
�PS MO
60110-2
PROIECT REFERENCE NO. SHEET NO.
17BP.2.R.67 4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
dN�'�M[1P1LE lE ��..�N�
DO NOT USF, FOR 6 W Af,QI!ISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
�K ��� _�y�- _ -\��- ��
K ,
F�
- - � _-� _ � e----_Ed-S 76°23'l2.0'E ,-
� - .
� '�- - � - J-� ' - -� - - _
�� i M u, --
i �.i�. �� I . . .4," � � �, .
i, � �, �
� � �,2� ' �
,; �„ � ';�
� � I
� GLORIA A WOOLAR� i � � � �
i DB 642 PG 528 - � ��
� �
i � � �oc
� a ,,,��L�
' �f Wv �F g,1�G
FINI HEL CF. "�i �
ELE� j O
L W P.JPof4
EL- l 3..�i'
� � i�
� I
W4.
PERMANENT WETLAND IMPACTS = 0.0 Ac /0 SF
MECHANIZED CLEARWG IN WETLANDS = 0.0 Ac /0 SF
PERMANENT STREAM IMPACTS = 163 LF
TEMPORARY STREAM IMPACTS = 0 LF
_r;
... m'.�n . . !_'�`��.
- BRIDGE HYDRAUUC DAT A
DESIGN DISCHARGE = 72/ CFS
_- DESIGN FREOUENCY = 25 YRS
- DESIGN HW ELEVATION = 35.6 FT
BASE DISCHARGE = 1127 CFS
- BASE FREOUENCY = 100 YRS
- BASE HW ELEVATION = 3627 FT
OVERTOPPING DISCHARGE = N/A CFS
OVERTOPPING FREQUENCY= � 500 f+) YRS
- OVERTOPPING ELEVATION = 37.39 FT
-_. �
- DATE OF SURVEY = 03-15-20�6 =-_�
_
W.S.ELEVATION
�- I AT DATE OF SURVEY = 27.80 FT
11 +00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00
- DRV1 -
� -DftYl- SlA 11-�-36.00
ELEV. - 36.�4 :
40 !- :
-�- :� � : :-
�� � '
� (-lTs9�2� �... -�-
�-----�j �
30 ��I � �
BEGW GRADE
-DR 1- ST 10+20. 1 �
ELEV. = 37.99 �
2� _
10+00 11 +00
�
Z
O
w
�
�� N
OQ
ZZ
�
r
B2
ZONE 1 BUFFER IMPACTS = 186 SF
ZONE 2 BUFFER IMPACTS = 919 SF
ZONE 1 EXEMPT IMPACTS = 7020 SF
ZONE 2 EXEMPT IMPACTS = 0 SF
-DRV2-
PI Sta��10+45.67 `
� = 43' /6' S1.2' (RT l
D = %/4' 35' 29.6'
L = 37.77'
r = i9.84�
R = 50.00'
C� N T B nRiC1ei9ense�NthoCai55anaS2760920o
� __"`
�- �
i ' . . .`r � � .
� �� � ' . �
°e � Bl
, �,�£; � ,
��,: ;`tc ZONE 2 B UFFF R I MP ACTS = 411 SF Pl St0 /9+68.27 �
�„_ E O ZONE 1 EXEMPT IMPACTS = 1029 SF p= Q' Q/� 3�,� ��T I
'__ '1 ZONE 2 EXEMPT IMPACTS = 435 SF D= 0'30'00.0"
L = 138.40'
asPF�; ° �-a000 -�- T = 69.20'
DETAIL 1 O
SPECIAL LATERAL'V' DITCH � . REMOVE�
�No�+o Scale� �
Nm�,oi I .. .. F��n ..
�,o,,,,a 3.� D�� siope . � r PUE PUE �� PUE PUE, -
m�,,.o= i.o F. . . .,. 3 .. _-- "- _ -__ - _ �
... cxi§�+iw � �-�' _._ __._� _— _ -.-�
_ '�vy5m , _ - i- -- � - -
. . ��. � y' � p � - -= ��. ---
FROM -L- STA. 12+80 TO STA. 14-64 RT �- -. _ 'E _' � _ � _ _
-' . . , - .-- . � _
FROM -L- STA. 15+15 TO $TA.16+50 LT. - —�— --�-- � i — -
l �
DETAIL 2 _-- ss��� �
RIP RAP AT EMBANKMENT �. '-� ����kFGP.�N
iNo,�a s�oai GPS .MON) - eeTniN� �,,,1"'� Pp�'-�
�om,,_ 60110-1 � � ��
eade i.o�m� -is �� : .
GEOTEX�IIE �� $PECIAL LAT.'V� DIT
SEE DETAIL 1
Type ahLncr- 1� TONS Ct I Rip-Rap
Geo+e.fle 25 s
FROM -L- STA. 14 � 50 TO STA. 14:70 RT. ._B3
FROM L- STA. 14+77 TO STA. 14+91 RT.
ZONE 7 BUFFER IMPACTS = 1907 SF
DETAIL 3 ZONE 2 BUFFER IMPACTS = 1772 SF
SPECIAL LATERAL BASE DITCH
,�o,�o s�o,, -ORVI-
P� Sio 10+61.43 P� Sto 11+06.83
�°���a 3� o F�o��e' si'°ae 0= 72' 23 32J' (CT l �= 65' S4' 47.8" (RT )
Le,f M��. o= i o F�. D= 190' 59' 09.4' D= l90' S9' 09.4°
e= a.o F+. L= 37.90' L= 345P
T = 2195' T = 19.45'
FROM -L-STA.14�i�80 TO STA.16i..25 ar. R= 30.00' , R= 30.00� �
��
,_ �
50
40
30
3�..--__�___' . .
-DRV2- STA 10+70.00
) ELEV. = 33.55
��+0� �� +�0
�i
CLASS 'I' RIR-RAP
EST. � TONS
EST.15 SYGF �
� RIP-RAP AT Ef
�� SFE DETAIL 2
�� EST.10 iONS
� i EST 25 SYGF
x
o> ' eo 00 �T R= 11.459.16'
I I _ C1A55 'I' RIP-RAP I
E5T.3 TONS
ti EST 7 SYGF
N
CLA55 'I' RIP RAP 15" RCP-III �
E51.20 TO 5 �^ .
EST.39 SYG SPECIAL LAT.'V' _
DITCH
-'--` UE see oerna i �UE (GPS MON)
� % % "''3�� /' -,yy�' ; 60110-2
;j �/��j; � -� . � ..
�� ii,r .� - a� - � RBTAIN � ,,�r. qly_ x
��. � �iii,, � � � �_ �,: - � � =� -- _ �_-
�. �_�___._�_� — _ � , � = - �—� - � ' -
_� .
PROIECT REFERENCE NO. SHEET NO.
17BP.2.R.67 4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
dN�'�M[1P1LE lE ��.�N�
DO NOT USF, FOR 6 W Af,QI!ISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
--_ - . .—.--_ .Z --T__ _—._ .-_.___ --- .. _ — --
'62G1 FG / . � ,..-_ _ . p RETAIN � _ _ � _ _ �TAIP� . . _ _ . _ - "" — _ —
---- -�§- �§- , : � ='�� . �T � �� � - �-'�
_ _ I u
_ � � �'_ '� � ``. W '• --
� � ��� � � � e� ���
Q i.. � i � � �,i
E� �PUE-f _ i-�3 , . � � .
� PD ' s �GLORIA A WOOLAR� �i ' � �� �
' � �� i �llB 642 PG 528 ' 31 � �� �
i
� �_ � i i � - � ���oc.. ..
� ` FREbERICK E �_ � ,-' � �, �- F�\�v L ��o
SPECIAL 3' � - WI�$f)N g� ' � �� W�F g�o
LAT. BASE DITCH O � �_- DB 64� PG SJI I B� � y � �` - �� _.
SEE DETAIL 3 �� . i Fllll N F3I �Vy7BR , /Flnll>HE�f.'�k a /� �-
� �.�, �i�i�F7�NB - L,W � i.• . . � ..-_ '. / .
i i � �
� .
� � � � P .
�
� � F-EV 4.37' i i �` �� T� �
p.� ,,., . . . ..
� � ---- � . � - -
RIP-RAP AT EMBANKMENT � -"3 ,
see oeTnu z I �-�'_°� ��- NOTE: ZONE 1 AND ZONE 2 EXEMPT
EST.7 TONS IMPACTS ARE HAND CLEARING ONLY
EST 13 SYGF ' ' � �
�. O . � � .. . . ` _ '
� "--U �\ _
�--
-� -� ,�--_ BUFFER IMPACTS , \�-
64
��; ZONE 1 BUFFER IMPACTS = 1545 SF
ZONE 2 BUFFER IMPACTS = 967 SF
_r;
11 +00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00
LEGEND
� ALLOWABLE IMPACTS ZONE 1
����� AILOWABLE IMPACTS ZONE 2
���������� E%EMPT IMPACTS ZONE 1
: ,/'.>......
��:'f/%t%/�%% EXEMPT IMPACTS ZONE 2
BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE = 72/ CFS
DESIGN FREOUENCY = 25 YRS
DESIGN HW ELEVATION = 35.6 FT
BASE DISCHARGE = 1127 CFS
BASE FREOUENCY = 100 YRS
BASE HW ELEVATION = 3627 FT
OVERTOPPING DISCHARGE = N/A CFS
OVERTOPPING FREQUENCY= � 500 f+) YRS
OVERTOPPING ELEVATION = 37.39 FT
DATE OF SURVEY
W.S.ELEVATION
AT DATE OF SURVEY
�ilr9�•�'.i�:
= 27.80 FT
j �
�� E ' D �GRADE � � �
RVl- STA }+36.00
ELEV. = 36.�4 :
40 !- :
-�- :� � : :-
�� � '
� (-lTs9�2� �... -�-
�-----�j �
30 ��I � �
BEGW GRADE
-DR 1- ST 10+20. 1 �
ELEV. = 37.99 �
2� _
10+00 11 +00
�
Z
O
w
�
6
�
�
�
r
��,� � B2
� N ZONE 1 BUFFER IMPACTS = 186 SF
ZONE 2 BUFFER IMPACTS = 919 SF
� Q ZONE 1 EXEMPT IMPACTS = 7020 SF
ZZ ZONE 2 EXEMPT IMPACTS = 0 SF
DETAIL 1
-DRV2-
PI Sto l0+45.67
p = 43' /6' S1.2' (RT l
D = //4' 35' 29.6'
L = 37.77'
r = i9.B4�
R = 50.00'
SPECIAL LATERAL'V' DITCH O REMOVE�
lNo��a scaie7
No��,oi .. _ F'�n
�,o,,,,a 3.� p��� siope r PUE PUE PUE PUE,
M�,,. o= i.o F. W
> >
n.�� ._ __.- - .._ -Q
- ' -___.___::
i- I
- -
FROM -L- STA.72+80 TO STA.14-64 RT. . __�J ... F� -�---------
FROM -L- STA.15+15 TO STA.16+50 LT. ---- -- '�'i - -. _
DETAIL 2 F
RIP RAP AT EMBANKMENT GPS MON �- " RETAIN "
i No� �a s� al � .
to'm �. r 60� � �-�
Drch 1.0'mi� .
Grade - �'S � �� �
/f
GEOTEX�IIE - $PECIAL LAT_'V� DIT(
SEE DETAIL 1
Type ahLncr- 1� TONS Ct 'I'Rip-Rap
G le= 25 s
FROM -L- STA. 14 � 50 TO STA. 14:70 RT. ._B3
FROM L- STA. 14+77 TO STA. 14+91 RT.
ZONE 7 BUFFER IMPACTS = 1907 SF
DETAIL 3 ZONE 2 BUFFER IMPACTS = 1772 SF
SPECIAL LATERAL BASE DITCH
,�o,�o s�o�,, -ORVI-
PI Sto �0+61.43 P� Sto I1+06.83
�°o°�e a:� o F�,��e� `si'ope p= 72' 23' 32J' (LT l �= 65' S4' 47.8" (RT )
U M��. o= i o F�. D= 190' 59' 09.4' D= l90' S9' 09.4°
e= a.o F+ L= 37.90' L= 345/'
T = 2/.95' T = 19.45'
FROM -L- STA. 14 i 80 TO STA. 16 i 25 RT. R= 30.00' R= 30.00'
50
40
30
CLASS I' RIP-RAP
EST. � TONS
EST.15 SYGF
� RIP-RAP AT Ef
SEE DETAIL 2
� EST.10 iONS
EST 25 SYGF
�' O
�
�
O
JASPER ..� -..
D= "�
C1A55 'I' RIP-RAP I
� E5T.3 TONS
EST 7 SYGF
� C� N T B nRiC1ei9ense�NthoCai55anaS2760920o
B1 �
ZONE 1 BUFPER IMPACTS = 267 SF -�- �
ZONE 2 BUFFER IMPACTS = 411 SF Pl St0 /9+68.27
ZONE 1 EXEMPT IMPACTS = 1029 SF p= Q'Q/�3�,���T1
ZONE 2 EXEMPT IMPACTS = 435 SF D= 0'30'00.0"
L = 138.40'
+ao 00 -�- T = 69.20'
�,,1 R = 11.459.16'
CLA55 'I' RIP RAP 15" RCP-III _
EST.20 TO 5
EST.39 SYG SPECIAL LAT.'V' _
DITCH
UE SEE DETAIL � DUE
-3�� / ',4y�,
/ % � �
�� � % . -�-� � i
..._ - � RETAIN � �'.'
�. �, �// _._ �..- ` � _ _ - : : _
�PS MO
60110-2
PROIECT REFERENCE NO. SHEET NO.
17BP.2.R.67 4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
N�'�M[1P1LE�JCIE ��..�N�
DO NOT USF, FOR 6 W Af,QI!ISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
� .._� � .-...�..___`,�� ��rr . .�� . - -- . - _- _ .
.. r-' I--_.. ._ -_- _..:...- - - -_----....-.-..--_----
.- . - . _.:Z _--_ �'_ - _
. �-✓ F � pRETAIN :,.,T . �TA - - �- ----
'82GI FG � . :K.� � - . -- - �: . �'�' ' �.� �
' � �� ---
� . - - , , � --
. - � ��- = u;� , .
�� � i
� � / C � � i � .i,�.� I _i � P'� ��S/��
M i��
,QQE �_ i / �
�� �- PUE -� ' � i
� PDE � GLORIA A WOOLAR� i � � �
- i DB 642 PG 528 - ��
i �
1 1 �,pUF
FREDERICK E �F�_
SPECIAL 3' � WILSON � ���� Wv �8 p�G
� LAT. BASE DITCH O DB 642 PG 531 ��o i-C � t
SEE DETAIL 3 � �
` RIP-RAP AT EMBANKMENT
SEE DETAIL 2
EST.7 TONS
EST 13 SYGF
BUFFER IMPACTS
FIIII F FI ('�.N FINI HEL F�i -
tLEV '18. ELE� j �� ^
��W P]ur�L� L W r.����+ l 7
F EV '..37' EL . /
C NOTE: ZONE 1 AND ZONE 2 EXEMPT
IMPACTS ARE HAND CLEARING ONLY
G N
� ALLOWABLE IMPACTS ZONE 1
64
ZONE 1 BUFFER IMPACTS = 1545 SF \\\\\ AILOWABLE IMPACTS ZONE 2
ZONE 2 BUFFER IMPACTS = 967 SF j///////// E%EMPT IMPACTS ZONE i
��,,..
:'f/%t%/�%% EXEMPT IMPACTS ZONE 2
._ . . . . . __i-i_i -- i_i - - L ___ . . . . . . . . . . . . .
i i i �-i -i i i i i i i i i
-DRV2- STA 10+70.00
) ELEV. = 33.55
��+0� �� +�0
_r;
11 +00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00
BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE = 72/ CFS
DESIGN FREOUENCY = 25 YRS
DESIGN HW ELEVATION = 35.6 FT
BASE DISCHARGE = 1127 CFS
BASE FREOUENCY = 100 YRS
BASE HW ELEVATION = 3627 FT
OVERTOPPING DISCHARGE = N/A CFS
OVERTOPPING FREQUENCY= � 500 f+) YRS
OVERTOPPING ELEVATION = 37.39 FT
DATE OF SURVEY = 03-15-20�6
W.S.ELEVATION
AT DATE OF SURVEY = 27.80 FT
j �
�� E ' D �GRADE � � �
RVl- STA }+36.00
ELEV. = 36.�4 :
40 !- :
-�- :� � : :-
�� � '
� (-lTs9�2� �... -�-
�-----�j �
30 ��I � �
BEGW GRADE
-DR 1- ST 10+20. 1 �
ELEV. = 37.99 �
2� _
10+00 11 +00
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 -L- 14+70 TO 14+82 21 " Cored Slab Bridge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20 0 0
1 -L- 14+82 TO 16+35 3' S ecial Lateral Base Ditch 0.00 0.00 0.00 0.00 0.00 0.00 0.00 154 0 0
TOTALS: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 174 0 0
BUFFER IMPACTS SUMMARY
IMPACT BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
SITE NO. STRUCTURE SIZE / TYPE STATION
(FROM/TO) ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
CROSSING BRIDGE IMPACT (ftZ) (ftZ) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2)
1 21 " Cored Slab Bridge -L- 14+42 TO 15+14 X 3905 4069 7974 0 0 0 0 0
TOTAL: 3905 4069 7974 0 0 0 0 0
Notes: 1. There are 2049 SF of Exempt Impacts in Zone 1 and 435 SF of Exempt Impacts in Zone 2