Loading...
HomeMy WebLinkAbout20170337 Ver 1_More Info Received - Email_20170427Strickland, Bev From: Chris Hopper <chris.hopper@carolinaeco.com> Sent: Thursday, April 27, 2017 8:29 AM To: 'Alexander, Tasha L CIV USARMY CESAW (US)' Cc: Higgins, Karen; Goss, Stephanie Subject: FW: Centerpoint Apartments 1/6/17 plans Attachments: CP_POND_REV3 WIM-1 WETLAND.pdf, CP_POND_REV3.pdf Tasha Here is the most recent designs we have. The oversight was on our end. Older plans weren't deleted as new ones were received and the wrong one got attached. This still doesn't answer all your questions, so I will get those answered and provide you the information asap. Karen/Stephanie: Please update the Centerpoint PCN application with the attached plans. An older version had been attached mistakenly. Ms. Alexander's questions are pasted below for your information. Thanks, Chris Hopper CAROLINA ECOSYSTEMS INC. (919) 274-5979 www.carolinaeco.com -----Original Message ----- From: Alexander, Tasha L CIV USARMY CESAW (US) [mailto:Tasha.L.Alexander@usace.army.mil] Sent: Wednesday, April 26, 2017 5:12 PM To: Chris Hopper <chris.hopper@carolinaeco.com> Subject: 2017-00620 Center Point Pond Chris, As discussed, please provide the updated plans for this project, as it appears I have outdated plans which missing portions of the construction sequence. The plans provided indicate an earth dike will be installed after the pond has been de -watered. Flow will then be returned and the dike will divert flow during excavation. The plan notes the dike will be created from either pond sediment or imported fill. It seems that pond sediment may not be suitable material for this purpose. It may not be stable material and could create turbidity issues and sediment loss downstream. Please clarify the type of material to be used for the dike and measures to avoid increased turbidity. Additionally, please provide an approximate amount of fill to be used for the dike. The use of a NWP 29 does not allow the discharge of dredged or fill material into waters of the U.S. within the FEMA 100 -year floodplain that result in permanent above - grade fills. It is important to note all material for the dike will be removed prior to the project completion. The plans show the lay down area for excavated material post removal for dewatering. Please provide the location of the final disposal site. At this time the application is considered incomplete due to incomplete/inaccurate plans. Please provide the additional information within 30 days or I will withdraw the application. Thank you, Tasha Alexander Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers -Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919-554-4884, extension 35 email: tasha.l.alexander@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://www.saw.usace.army.mil/missions/RegulatoryPermitProgram.aspx to complete the survey online. VICINITY MAP NTS INDEX OF SHEETS CV -1 COVER SHEET EX -1 EXISTING CONDITIONS PH -1 POND PHASING PLAN GP -1 GRADING & E&S CONTROL PLAN EC -1 EROSION CONTROL DETAILS CENTER PO NT CITY OF RALEIGH WAKE COUNTY, NORTH CAROLINA 6801 WOODBEND DRIVE RALEIGH, NC PIN # :1707622980 DB 015533, PG 02236 6915 WOODBEND DRIVE RALEIGH, NC PIN #: 1707730884 DB 0 15533, PG 02236 19.99 ACRES ZONING: R-10 19.22 ACRES ZONING: R-10 TOTAL AREA: 39.21 ACRES GENERAL NOTES — CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETY ASSOCIATED WITH WORK UNDER THIS PROJECT AND FOR COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL HEALTH AND SAFETY ORDINANCES, CONES, REGULATIONS AND LAWS. THIS INCLUDES, BUT IS NOT LIMITED TO, THE CURRENT REQUIREMENTS MANDATED BY THE OCCUPATION SAFETY AND HEALTH ADMINISTRATION (OSHA). - THERE IS NO GUARANTEE THAT UNDERGROUND UTILITIES ARE DEPICTED ACCURATELY AND UTILITIES IN ADDITION TO THOSE SHOWN WILL NOT BE ENCOUNTERED. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING LOCATION OF BURIED UTILITIES BEFORE CONDUCTING ANY EXCAVATION WORK. CONTRACTOR MUST NOTIFY NC -ONE -CALL (1-800-638-4949 OR 811) AT LEAST 48 HOURS PRIOR TO THE START OF EXCAVATION OR TRENCHING TO HAVE ALL UNDERGROUND UTILITIES LOCATED. FOR LOCATION OF UTILITIES NOT MEMBERS OF 811, CONTACT UTILITY OWNER. - CONTINUITY OF SERVICE FOR ALL UTILITIES SHALL BE MAINTAINED DURING CONSTRUCTION. - CONSTRUCTION SURVEYING REQUIRED FOR AS -BUILT DRAWINGS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. - ALL PROPOSED IMPROVEMENTS SHALL BE IN ACCORDANCE WITH CITY OF RALEIGH STANDARDS AND CONFORM TO THE CONTRACT SPECIFICATIONS. -NEW DRAINAGE STRUCTURES MAY BE CAST IN PLACE, PRECAST, OR BRICK BUILT AT THE DISCRETION OF THE CONTRACTOR UNLESS OTHERWISE NOTED. SEE DETAIL SHEETS AND PROJECT SPECIFICATIONS. - CONTRACTOR SHALL RECONSTRUCT ALL LAND DISTURBED BY CONSTRUCTION ACTIVITIES TO ITS ORIGINAL GRADE AND LOCATION UNLESS NOTED OTHERWISE. - GRADES, ELEVATIONS, AND LOCATIONS SHOWN ARE APPROXIMATE. THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS, FOR STATIONS, OFFSETS AND ELEVATIONS. REFER TO THE CENTER OF DROP INLETS, MANHOLES AND JUNCTION BOXES, AND THE MIDPOINT OF THE LIP FOR CATCH BASINS. OWNED BY AND PREPARED FOR: FOGELMAN MANAGEMENT GROUP 4151 ASHFORD DUNWOODY RD SUITE 280 ATLANTA, GA 30319 GENERAL NOTES — THE CONTRACTOR SHALL USE CARE WHEN WORKING AROUND EXISTING SANITARY SEWERS AND WATER LINES. THE CONTRACTOR SHALL CONTACT THE CITY OF RALEIGH PUBLIC UTILITIES DEPARTMENT IMMEDIATELY AT (919) 250-2737 TO REPORT ANY DAMAGE TO EXISTING WATER LINES OR SEWERS.THE CONTRACTOR SHALL REPLACE ALL DAMAGED SANITARY SEWERS AND/OR WATER LINE WITH DUCTILE IRON PIPE, WITH A MINIMUM 10 -FOOT SECTION. FOR INFORMATION REGARDING UTILITY REPAIRS, THE CONTRACTOR SHALL REFER TO THE CITY OF RALEIGH PUBLIC UTILITIES HANDBOOK. 1. SIZE AND VERTICAL AND HORIZONTAL LOCATIONS OF EXISTING SANITARY SEWER AND WATER LINES TO BE FIELD VERIFIED. 2. THE CONTRACTOR SHALL ADJUST ALL WATER VALVES. WATER METER BOXES AND WATER VAULTS TO FINISHED GRADE. 3. SANITARY SEWER SERVICE SHALL NOT BE INTERRUPTED AT ANY TIME. CONTRACTOR TO PROVIDE BYPASS SYSTEM AS NECESSARY FOR CONTINUOUS SERVICE. - THE CONTRACTOR SHALL PROTECT ALL TREES AND SHRUBS OUTSIDE THE CUT/FILL LIMITS. THE CONTRACTOR IS ALSO REQUESTED TO SAVE ALL OTHER EXISTING TREES AND SHRUBS WHERE POSSIBLE. USE PLYWOOD FORMS WHEN TREE ROOTS ARE ADJACENT TO THE PROPOSED CURB AND GUTTER OR SIDEWALK. TREE ROOTS EXPOSED AND/OR DAMAGED DURING CONSTRUCTION SHALL BE PRUNED USING EQUIPMENT SPECIFICALLY DESIGNED FOR PRUNING. ALL PRUNING SHALL BE ACCOMPLISHED BY AN ISA CERTIFIED ARBORIST. PREPARED BY: WETHERILL ENGINEERING, INC. 1223 JONES FRANKLIN RD. RALEIGH, NC 27606 PH: 919.851.8077 FAX: 919.851.8107 GENERAL NOTES —THE CONTRACTOR SHALL CONTACT NC ONE CALL CENTER PRIOR TO ANY DIGGING. —ALL PUBLIC WATER AND SANITARY SEWER IMPROVEMENTS SHALL CONFORM TO LATEST CITY OF RALEIGH PUBLIC UTILITIES DEPT. STANDARDS AND SPECIFICATIONS. ALL EROSION CONTROL MEASURES SHALL CONFORM TO LATEST CITY OF RALEIGH STANDARDS AND SPECIFICATIONS. ALL UTILITY WORK AND ASSOCIATED TRAFFIC CONTROL IN EXISTING JONES FRANKLIN RD. RIGHT OF WAY SHALL CONFORM TO LATEST NCDOT STANDARDS AND SPECIFICATIONS. -THE CONTRACTOR SHALL CHECK PLANS AND FIELD CONDITIONS FOR CONFLICTS AND DISCREPANCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY CONFLICT BEFORE PERFORMING WORK IN THE AFFECTED AREA. -THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR BELOW GROUND THAT MAY OCCUR AS A RESULT OF THE WORK PERFORMED BY THE CONTRACTOR. -IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH AND ENFORCE ALL APPLICABLE SAFETY REGULATIONS. -THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXCAVATIONS AGAINST COLLAPSE AND SHALL PROVIDE BRACING, SHEETING OR SHORING AS NECESSARY. TRENCHES SHALL BE KEPT DRY WHILE PIPES ARE BEING PLACED, DEWATERING SHALL BE USED AS REQUIRED, AND PERMITTED THROUGH LOCAL GOVERNMENTAL AGENCIES AND WATER MANAGEMENT DISTRICT PER CURRENT REGULATIONS AT THE SOLE COST OF THE CONTRACTOR. FINAL DESIGN NOT RELEASED FOR CONSTRUCTION N C0 Is z v S E A L 022321 O Cy FhG GP i o 'p U U H ^ E; N ti pg ,n = QL M Wo °Lo�C? an LL v>Z =4-i �Z�w a� LU V 2� Z 0LU 01 o' �a �j I W O U Issued Date By CD 9-14-16 BKC CD 12-29-16 BKC Project No. 15387.30 Checked By M ,z Drawn By g K C Drawing COVER SHEET F le Name CP_ POND_REV3.dwg Sheet CV -1 1 OF 5 SHEETS 0 30' 60' SCALE: 1" = 30' TOPOGRAPHIC SURVEY NOTE: TOPOGRAPHIC SURVEY PERFORMED BY WETHERILL ENGINEERING, INC, NOVEMBER 2014 AND ADJUSTED TO NAD83 DATUM. CB TOP=347°75' NV OUT -340.50' CB TOP=347°87' INV IN=340.50' INV OUT=340°24' ---- END N,OT FOUND � �4 vvv ELECTRIC BOX o� vv6�� DR/N'\", ' FIRE EXT / v ��BBQ GRILL o� TOP OF CONCRETE DAM ELEV. = 338.60 INSIDE FLOOR OF OVERFLOW DAM = 330.70v vvv DRAINy vPOND MEELEVATION AT SURVEY �� 338065' `v 1000, crjd \ Q END/NOT v FUND 11 4 INV=336°68' –338 - � - 30. INV=335,49 ' i � --337 1 � 'END', NOT \ FWND _34,_0 ---- -- — \341, 340 FIRE EXT z BBQ GRILL TRASH CAN \ 343 ac SSMH TOP=342.63' INV IN=331°18' INV OUT=331°12' 0 `------------ �'� INV=337°18' `zp_ v 2 -TRASH CAN 'u 338` \ GAZEBO END NOT FOUND i --�� L' 340, 00 --- ^` - -- --- -- ---------- ---- SSMH'_,- TOP=343°53' _ — ---- _ ----––___ -- - ------_---_ - INf\V IN=331°77' _ INV QUT=331°71' _ INV -3N6,20' FIRE EXT -----_ ----- X340, 340' � STONE BBQ vv--__ - - _-� /;'; c - - --- P I T � CO - TRASH CAN DI' - - ------------ TOP= 342.35' �,- - •345- _ _ �� ENb`--NOT _--- INV IN=3-J-Q027'�/ / '� FOUND -------- INV OUT 33802 �> / -345---- __ ---- �� END NOT FOUND SSMH TOP=343.77' INV IN=337°22' INV OUT=337.19' FINAL DESIGN NOT RELEASED FOR CONSTRUCTION JpUP�pppll 111, 1111 10 N CARO S E A L 022321 C V. Z P N 0 ►_2 Issued Date By CD 9-14-16 BKC CD 12-29-16 BKC Project No. 15387.30 Checked By A ,\ z Drawn By 3 K C Drawing EXISTING CONDITIONS File Name CP POND REV3.dwc Sheet EX -1 2 OF 5 SHEETS TOPOGRAPHIC SURVEY NOTE: TOPOGRAPHIC SURVEY PERFORMED BY WETHERILL ENGINEERING, INC, NOVEMBER 2014 AND ATITTTRTFTI Tf) TTTATIR'2 TIATTTM 0 30' 60' SCALE: 1" = 30' / // - -,_'_�\200' 3�0 ELECTRIC BOX � H �/ ---- �`,6" DRAIN vv `� FIRE EXT BBQ GRIEF DIRECTION OF FLOW o, EXIS�TING2�CHAZNE'LSL'OPE _ DRAIN, ri`�/�IN�GE FILTER F/�I��IC Wit 1 WNHFCK f�`nM WITHIN 2° / POND ELEVATION A `_ , , TIME OF SURVEY vT 338.66 v3 k �o � O� 1 CLASS MASS 1 #57 WASHED STONE "B" RIP f�Af� RIP RAP TTS�1��1\ - 8 �� � --- ----- --- � SPECIAL ROCK CHECK DAM TYPE 2 ' 3 NTS ' 339 0 34p T 3 , �<,• 3s( 338 < 339 ��, ` � � �� VNI) /N Q T ,' �.:�� 335 336 337 U D 2 4 ��. R / �� �� 33j 336 335 334 � I 3 J` � I -336068 - ` PROPOSED POND r I \ / / ' \ ✓ , '' r ACCESS POINTS \ 338 WETLANDS BEING sr _ PERMITTED TO BE INV335,49' _� REMOVED v I r _ — `33 _ _ _ w ��h \ 338 338 - 337 336 35 4 - -33 7 - TRASH C A N 1 GAZEBO END NOT � TmT FOUND TTS ZEA\ END'I NOT -------- 42, - -- , w I , 341co , FIRE EXT W , BBQ GRIEF �_ �v _ ., '/ w - 340 TRASH CAN - ���� f . MAINTAIN STREAM FLOW = - _ - ` � r 340 - - - co _ 338 d(1 43 3 3 340 ° END NOT -----------_- -__- SSMH SURVEYED �SMH ` WETLANDS TO REMAIN\ TOP=342°63 � ,---- TOP=3�43.5y3 --------- ----- INV IN=331°18' `' -------__ , Il`�/ IN=33[.77` INV OUT=331°12' T' INV DUT=331.7 / _ INV=n-6,20' FIRE EXT `34p'" 4d STONE BBQ PIT ----- __ - \I-- - -- ----------- ' PHASE 1 ----__ - TRASH CAN DIS; END --NOT `---------- , ' TOP -342.35// 345— FOUND -------------- o� TOPOGRAPHIC SURVEY NOTE: TOPOGRAPHIC SURVEY PERFORMED BY WETHERILL ENGINEERING, INC, NOVEMBER 2014 AND ADJUSTED TO NAD83 DATUM. 0 30' 60' SCALE: 1" = 30' SSMH TOP=343.77' INV IN=337.22' INV OUT -J37.19/ / \ ELECTRIC BOX / / - ---- o� 6" DRAIN FIRE EXT �—BBO GRILL ��� DRAIN C / POND ELEVATION AT ` TIME OF SURVEY MAINTAIN STREAM FLOW 338066' ����v3Qo � ,� �v >< < J, �--------- 339 ------- 34 3 ' ' 339 g 34 3 3 � N /N NOT 3 �G 338 9 r , ���� 335 336 337 338 33 F � U N D 3p 336 335 334 3 Rip V--336°68' PROPOSED POND W WETLANDS BEING ACCESS POINTS 3 8 PERMITTED TO BE Tl0 REMOVED - �A�A 1 1 v I 337 - 336 35 334 -- - v r o T R A S H C A N 339 338 --- 3.3%- W // r I , __ _-- , ��-, , � •- W, I GAZEBO UND I ND NOT G � FO ---- - - , ENDII NOT 42_.'_ - - 347 340 - - - FIRE EXT BBC GRILL-------------�3 TRASH CAN �,� , 340 _ w �o _ o Q- 00 ---_, -,343 � _ , _ _ •='- � \-33g _ _ 4 � '__-- / -- - __ END NOT ------------ SSMH SURVEYED \AMjH 339 TQP=542063' T WETLANDS TO REMAIN TOP 34 3.5A --_ - -- ----- ---=�-�,�_ INV IN=331°18' ��� ,---- - - I l`�( 1N=33LJP INV OUT=331°12' `� INV CUT=351o7�' - INV=3,20' FIRE EXT - ____ 340,- _ 34d TONE BBQ `� --_- —� `T ��.,3 PIT PHASE 2 - \ ZTRASH CAN DI'- - - 345— _ _ END -NO T QD IKI\TOP342°35 // i _ FOUND--------------- SSMH TOP=343.77' INV IN=337.22' INV OUT=337°19' FINAL DESIGN NOT RELEASED FOR CONSTRUCTION CARS . o� Ess S E A L 022321 0 V. Z P z z � a a 9_2 Issued Date By CD 9-14-16 BKC CD 12-29-16 BKC Project No. 15387.30 Checked By A ,\ z Drawn By 3 K C Drawing PHASING PLAN File Name CP POND REV3.dwc Sheet PH -1 3 OF 5 SHEETS TOPOGRAPHIC SURVEY NOTE: TOPOGRAPHIC SURVEY PERFORMED BY WETHERILL ENGINEERING, INC, NOVEMBER 2014 AND ADJUSTED TO NAD83 DATUM. 0 30' 60' SCALE: 1"=30' CB TOP=347.75' NV OUT -340°50' CB TOP -347.87' INV IN=340°50' INV OUT -340024' - P �S CONSTRUCTION -- \ ENTRANCE (TYP) i PT F0UN � POND MATERIAL LAY -DOWN Q CONTRACTOR STORAGE/ - - �"��� STAGING AREA STONE FILTER (TO BE REMOVED WITH / + FINAL POND GRADING) f ' PON E') TI E O C ND/NOT UN0 R --INV=335.68' 0 IIN V= 35._49' - -337 o \- END���� NOT -- FO��ND -- ---- 342 341, FIRE EXT - 0 3130 GRIE \ - -- - - - - - - - - CONTRACTOR STO - TRASH CAN \ STAGING AREA STONE FILTER INLET PROTECTION (TO BE REMOVED WITH FINAL POND GRADING) GENERAL NOTES 1. EXISTING UNDERGROUND STRUCTURES AND UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL FILED VERIFY CONDITIONS PRIOR TO STARTING CONSTRUCTION AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES. 2. THE CONTRACTOR SHALL CONTACT NORTH CAROLINA ONE CALL AT 1-800-632-4949 FOR ASSISTANCE LOCATING EXISTING UTILITIES. THE CONTRACTOR SHALL CALL AT LEAST 48 PRIOR TO ANY DIGGING. 3. ALL CONSTRUCTION SHALL CONFORM TO THE CITY OF RALEIGH AND NCDOT STANDARDS AND SPECIFICATIONS. ALL WATER AND SEWER IMPROVEMENTS SHALL CONFORM TO THE CITY OF RALEIGH STANDARDS AND SPECIFICATION 4. WETHERILL ENGINEERING, INC. DOES NOT CERTIFY TO THE EXISTENCE OR NON-EXISTANCE OF ANY UNDERGROUND UTILITIES THAT MAY OR MAY NOT EXIST WITHIN THE BOUNDARIES SHOWN HEREON. 5. TOPOGRAPHIC SURVEY AND BOUNDARY INFORMATION TAKEN FROM SURVEY PREPARED BY WETHERILL ENGINEERING, INC. EROSION CONTROL NOTES ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. SUFFICIENT EROSION CONTROL PRACTICES MUST BE INSTALLED AND MAINTAINED TO RETAIN SEDIMENT WITHIN THE BOUNDARIES OF THE SITE. GROUND COVER STABILIZATION SHALL BE IN ACCORDANCE WITH NPDES PERMIT AND STABILIZATION CHART BELOW. MAINTENANCE: ALL EROSION AND SEDIMENT CONTROL PRACTICES TO BE INSPECTED WEEKLY AND AFTER EVERY RUNOFF PRODUCING RAINFALL EVENT. NEEDED REPAIRS WILL BE MADE IMMEDIATELY. MAXIMUM GRADED SLOPE SHALL NOT EXCEED THREE (3) TO ONE (1). TOTAL LOT G DISTURBED AREA IS 129,330 SF (2.969 ACRES). SSIVIN ' TOP -342°53' INV IN=331.18' INV OUT -331.12/ NCDENR SELF -INSPECTION PROGRAM THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TAKE EFFECT OCTOBER 1, 2010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. EXCERPTS FROM THE NORTH CAROLINA GENERAL STATUES AND THE NORTH CAROLINA ADMINISTRATIVE CODE CONCERNING SELF -INSPECTIONS ARE ENCLOSED. TO BETTER EXPLAIN THE REQUIREMENTS, A LIST OF FREQUENTLY ASKED QUESTIONS IS ALSO ENCLOSED, ALONG WITH A SELF -INSPECTION REPORT FORM. THE SELF -INSPECTION REPORT FORM WILL ALSO BE AVAILABLE AS AN EXCEL SPREADSHEET FROM THE LAND QUALITY WEB SITE, http://www.dIr.enr.state.nc.us/pages/sedimentation-new.html NOTE: ff f to me person conducts the land -disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity Is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, they shall be considered separate land -disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act. AREA. (TYP) TYPICAL EQUIPMENT .�'ACCESS ROUTE ELECTRIC •BOX 6" DRAIN, FIRE EXT / BBQ CR\L EVATION AT �� DRAIN, A\ F SURVEY \ ')8066' v \ \ INV OUB Flo ST0NE_-I�B-Q PIT \ 'I TRASH CAN DI Tom =342035' INV IN-3�a 2 INV OUT=338.25' GROUND STABILIZATION * SITE AREA LEGEND STABILIZATION TIME TEMPORARY CONSTRUCTION TIME FRAME ENTRANCE Perimeter dikes, (20'X 100') - LIMITS OF DISTURBANCE 7 days SILT FENCE X TREE PROTECTION FENCE El -w•u=�� WETLANDS Water (HOW) CB TOP=347.75' NV OUT -340°50' CB TOP -347.87' INV IN=340°50' INV OUT -340024' - P �S CONSTRUCTION -- \ ENTRANCE (TYP) i PT F0UN � POND MATERIAL LAY -DOWN Q CONTRACTOR STORAGE/ - - �"��� STAGING AREA STONE FILTER (TO BE REMOVED WITH / + FINAL POND GRADING) f ' PON E') TI E O C ND/NOT UN0 R --INV=335.68' 0 IIN V= 35._49' - -337 o \- END���� NOT -- FO��ND -- ---- 342 341, FIRE EXT - 0 3130 GRIE \ - -- - - - - - - - - CONTRACTOR STO - TRASH CAN \ STAGING AREA STONE FILTER INLET PROTECTION (TO BE REMOVED WITH FINAL POND GRADING) GENERAL NOTES 1. EXISTING UNDERGROUND STRUCTURES AND UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL FILED VERIFY CONDITIONS PRIOR TO STARTING CONSTRUCTION AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES. 2. THE CONTRACTOR SHALL CONTACT NORTH CAROLINA ONE CALL AT 1-800-632-4949 FOR ASSISTANCE LOCATING EXISTING UTILITIES. THE CONTRACTOR SHALL CALL AT LEAST 48 PRIOR TO ANY DIGGING. 3. ALL CONSTRUCTION SHALL CONFORM TO THE CITY OF RALEIGH AND NCDOT STANDARDS AND SPECIFICATIONS. ALL WATER AND SEWER IMPROVEMENTS SHALL CONFORM TO THE CITY OF RALEIGH STANDARDS AND SPECIFICATION 4. WETHERILL ENGINEERING, INC. DOES NOT CERTIFY TO THE EXISTENCE OR NON-EXISTANCE OF ANY UNDERGROUND UTILITIES THAT MAY OR MAY NOT EXIST WITHIN THE BOUNDARIES SHOWN HEREON. 5. TOPOGRAPHIC SURVEY AND BOUNDARY INFORMATION TAKEN FROM SURVEY PREPARED BY WETHERILL ENGINEERING, INC. EROSION CONTROL NOTES ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. SUFFICIENT EROSION CONTROL PRACTICES MUST BE INSTALLED AND MAINTAINED TO RETAIN SEDIMENT WITHIN THE BOUNDARIES OF THE SITE. GROUND COVER STABILIZATION SHALL BE IN ACCORDANCE WITH NPDES PERMIT AND STABILIZATION CHART BELOW. MAINTENANCE: ALL EROSION AND SEDIMENT CONTROL PRACTICES TO BE INSPECTED WEEKLY AND AFTER EVERY RUNOFF PRODUCING RAINFALL EVENT. NEEDED REPAIRS WILL BE MADE IMMEDIATELY. MAXIMUM GRADED SLOPE SHALL NOT EXCEED THREE (3) TO ONE (1). TOTAL LOT G DISTURBED AREA IS 129,330 SF (2.969 ACRES). SSIVIN ' TOP -342°53' INV IN=331.18' INV OUT -331.12/ NCDENR SELF -INSPECTION PROGRAM THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TAKE EFFECT OCTOBER 1, 2010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. EXCERPTS FROM THE NORTH CAROLINA GENERAL STATUES AND THE NORTH CAROLINA ADMINISTRATIVE CODE CONCERNING SELF -INSPECTIONS ARE ENCLOSED. TO BETTER EXPLAIN THE REQUIREMENTS, A LIST OF FREQUENTLY ASKED QUESTIONS IS ALSO ENCLOSED, ALONG WITH A SELF -INSPECTION REPORT FORM. THE SELF -INSPECTION REPORT FORM WILL ALSO BE AVAILABLE AS AN EXCEL SPREADSHEET FROM THE LAND QUALITY WEB SITE, http://www.dIr.enr.state.nc.us/pages/sedimentation-new.html NOTE: ff f to me person conducts the land -disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity Is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, they shall be considered separate land -disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act. AREA. (TYP) TYPICAL EQUIPMENT .�'ACCESS ROUTE ELECTRIC •BOX 6" DRAIN, FIRE EXT / BBQ CR\L EVATION AT �� DRAIN, A\ F SURVEY \ ')8066' v \ \ INV OUB Flo ST0NE_-I�B-Q PIT \ 'I TRASH CAN DI Tom =342035' INV IN-3�a 2 INV OUT=338.25' GROUND STABILIZATION * SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS Perimeter dikes, swales, ditches 7 days None and slopes High Quality Water (HOW) 7 days None Zones Slopes steeper 7 days If slopes are 10' or less in length and than 3:1 are not steeper than 2:1, 14 days allowed Slopes 3:1 or 14 days 7 -days for slopes greater flatter than 50 -feet in length All other areas None with slopes flatter 14 days (except for perimeters and than 4:1 HOW Zones) * "Extensions of time may be approved by the permitting authority based on weather or other site-specific conditions that make compliance impracticable." (Section II.B (2)(b) LIMITS OF DISTURBANCE 2.969 ACRES SILT FENCE (TYP) ` WETLANDS BEING PERMITTED TO BE REMOVED P-TRASH CA N\ GAZEBO % CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS. 2. INSTALL EROSION CONTROLS PER THE PLAN FOLLOWING CITY OF RALEIGH STANDARDS AND SPECIFICATIONS. SPECIAL CARE SHOULD BE TAKEN TO MINIMIZE ANY DISTURBANCE TO THE EXISTING WETLANDS ALONG THE SOUTHERN POND EMBANKMENT AND SURROUNDING TREES. 3. LOCATE ANY UNDERGROUND UTILITIES TO ENSURE THERE WILL NOT BE IN CONFLICT DURING CONSTRUCTION. 4. PUMP DOWN POND WITH THE USE OF SILTATION BAGS TO ALLOW WORK TO DO BE DONE AT THE POND OUTLET STRUCTURE. 5. INSTALL SPECIAL ROCK CHECK DAM #2 ON THE INSIDE BOTTOM OF THE EXISTING OUTLET STRUCTURE TO PREVENT SEDIMENT FROM ENTERING, ACCUMULATING AND TRANSFERRING THROUGH THE EXISTING CULVERT. 6. EXCAVATE IN FRONT OF EXISTING OUTLET STRUCTURE TO ELEVATION 334.0 IN ORDER TO INSTALL SPECIAL ROCK CHECK DAM #2. 7. INSTALL SPECIAL ROCK CHECK DAM #2 AROUND THE FRONT OF THE OUTLET STRUCTURE AS SHOWN ON THE PLANS. 8. OPEN UP EXISTING HOLE IN CONCRETE STRUCTURE FRONT WALL IF AT ELEVATION 334.0 OR DRILL A NEW 3" ORIFICE AT ELEVATION 334.0 TO ALLOW FOR STREAM FLOW. 9. DIVERT STREAM FLOW TO THE SOUTHERN SIDE OF POND BY CREATING AN EARTH DIKE TO ELEVATION 340.0 USING EXISTING POND SEDIMENT, MAINTAINING A 2.5:1 SIDE SLOPE. SEE PHASING PLAN SHEET. 10. BEGIN EXCAVATING POND SEDIMENT FROM THE NORTHERN SIDE OF POND. PLACE SEDIMENT WITHIN LAYDOWN AREAS AS SHOWN ON THE PLAN. ALLOW SEDIMENT TO DE -WATER AND DRY TO AN ACCEPTABLE LEVEL TO PREVENT SPILLAGE DURING TRANSPORT TO AN APPROVED WASTE SITE. REPEAT THIS PROCESS UNTIL A POND BOTTOM OF 334.0 IS ACHIEVED WITHIN THE NORTHERN SIDE OF THE POND. 11. FINE GRADE, PERMANENTLY SEED AND STABILIZE ALL DISTURBED AREAS AROUND THE NORTHERN EDGE OF THE POND. MAINTAIN SILT FENCING ON BANKS WHERE SOIL IS DE -WATERING. 12. MAINTAIN THE EARTH DIKE WHILE TRANSITIONING THE STREAM FLOW TO THE NEWLY EXCAVATED NORTHERN SIDE OF THE POND FROM THE SOUTHERN SIDE OF THE EARTH DIKE. MAKE GRADING ADJUSTMENTS AT THE EXISTING OUTLET STRUCTURE FIRST, THEN AT THE EASTERN END OF THE POND WHERE THE STREAM ENTERS. SEE PHASING PLAN SHEET. 13. BEGIN EXCAVATING POND SEDIMENT FROM THE SOUTHERN SIDE OF POND. PLACE SEDIMENT WITHIN LAYDOWN AREAS AS SHOWN ON THE PLAN. ALLOW SEDIMENT TO DE -WATER AND DRY TO AN ACCEPTABLE LEVEL TO PREVENT SPILLAGE DURING TRANSPORT TO A WASTE SITE. REPEAT THIS PROCESS UNTIL A POND BOTTOM OF 334 IS ACHIEVED ALONG THE SOUTHERN SIDE OF THE POND. 14. FINE GRADE, PERMANENTLY SEED AND STABILIZE ALL DISTURBED AREAS AROUND THE SOUTHERN EDGE OF THE POND. 15. TEMPORARILY PUMP STREAM FLOW AROUND POND FROM EASTERN END TO EXISTING OUTLET STRUCTURE WHILE REMOVING THE INTERIOR EARTH DAM BETWEEN NORTHERN SECTION AND SOUTHERN SECTION OF POND. CREATE SMALL EARTH COFFERDAM IN STREAM AT EASTERN END OF POND TO CONTROL STREAM FLOW WHILE REMOVING INTERIOR EARTH DAM BETWEEN POND SECTIONS. CONTRACTOR SHALL PERFORM THIS WORK WHEN THERE IS A DRY WEATHER FORECAST OF APPROXIMATELY 4-5 DAYS WHICH WOULD REDUCE THE STREAM FLOWS/PUMPING. 16. ONCE EARTH DAM IN CENTER OF POND IS REMOVED, REMOVE TEMPORARY EARTH DAM IN EASTERN END OF STREAM AND REMOVE PUMP FROM STREAM. 17. CONTINUE TO ALLOW POND SILT TO DRY ON BANK UNTIL IT IS SUITABLE FOR TRANSPORT TO APPROVED WASTE SITE. ONCE ALL POND SILT IS REMOVED FROM SITE, PERMANENTLY SEED AND MULCH ALL LAYDOWN AREAS LEAVING SILT FENCING IN PLACE UNTIL A FULL STAND OF GRASS IS ESTABLISHED. DO NOT REMOVE SILT FENCING UNTIL CITY OF RALEIGH HAS APPROVED GRASS ESTABLISHMENT. ONCE APPROVED BY THE CITY, REMOVE ALL SILT FENCING FROM SITE. TREE PROTECTION FENCE (TYP) END NOT FOUND 00 bh•M 4 \ L 340 , < _ --- - - INV::::j 34o, 340' 4/ ---'�� 3 E NZT N O 00 FOUND----------�_•__- / > � /'-345 loe -- i END NOT FOUND BEiOf9E YOU OtOl GALL 1-800-632-4949 ONE -CALL CENTER frS THE LAW1 SSMH TOP -343°77' INV 1N=337°22' INV OUT=337°15' FINAL DESIGN NOT RELEASED FOR CONSTRUCTION CA S E A L 022,321 0 %ny Fn,G� GP V. Z P Issued Date By CD 9-14-16 1 BKC CD 12-29-161 BKC Project No. 15387.30 Checked By A ,\ z Drawn By B K C Drawing GRADING & E/C PLAN File Name CP POND REV3.dwc Sheet GP -1 4 OF 5 SHEETS a Jd�w <� L z Iu 1 nr I LL 7 Cj W '¢ n, =w �w M W W� Egli dr R W �a IIIII-11, 111—II II—III r O U) N p -W � W Qc I -W � N W C7 Z NWLL zIII ..w,;w �w STANDARD FENGE OUTLET SW-W2A LL ZLi W W C[ t~rs 4i� ZZ W7 F Z f111 M¢ W IU In LU W > W=11111 =IIII. R 08 W05mwa 9 2I. IIIII �e W IggFW�� W102 0 Z !7 i w• � � z 7 F— W M W :i3 no I- U l# H W w 2 in : r ) CL W W �j IIIII Z iii Z q 0 Z Cri W 06 In J � 0- C) UJ ir a CID �0F W I� "Pooa yW tL � _ CID On lot 0 IL LLI g00 d 0 ll IN I ONN Zi nn 19 go Ir 0 ~ D iU m tZ7 D 00 D c w6 0 p�� �Zy p w �s ey ��ffi W W LL Duos a s� ray ag nD� a PEIMMUMDEPARBMW AVNKIVM �7LlPllXi IWr7d dE W &7rd11'SIx3 ENTRANCE sw'W.09 AZ ffi LLMLMII I I ML 1111 � m W 1111 T U.03 w hill m ea ifku 1111 IrU. nil Z w Z LL III LL c _ Ul W 0 Iroto r Ido l i � III L 11MEE=P Y 111111 = �'' 13 Z yw 00 Z 1i (die W 0 Z LJ CffY OF RALEIGH 2 Py rV- VIORKS DEPAR77AUr LIL! ILL 0 awry a WrTOWAIIE Q LL STANDARD RD TEMPORARY [ sEDIMENTISIll FENCE SW -20.01 W �a IIIII-11, 111—II II—III r O U) N p -W � W Qc I -W � N W C7 Z NWLL zIII g� �w a EL\ - m Z > U LL C7 7Za P N W.m a o Z= a Z J r 0!E2 W0 3 0 a 2z WI r VIII rWa v ull�- L -UI -l1 U) l _11 W. HlaIM'NIW.ZE STANDARD FENGE OUTLET SW-W2A LL ZLi W W C[ t~rs 4i� ZZ W7 F Z f111 M¢ W IU In LU W > W=11111 =IIII. R 08 W05mwa 9 2I. IIIII �e W IggFW�� W102 0 Z !7 i w• � � z 7 F— W M W :i3 no I- U l# H W w 2 in : r ) CL W W �j IIIII Z iii Z q 0 Z Cri W 06 In J � 0- C) UJ ir a CID �0F W I� "Pooa yW tL � _ CID On lot 0 IL LLI g00 d 0 ll IN I ONN Zi nn 19 go Ir 0 ~ D iU m tZ7 D 00 D c w6 0 p�� �Zy p w �s ey ��ffi W W LL Duos a s� ray ag nD� a PEIMMUMDEPARBMW AVNKIVM �7LlPllXi IWr7d dE W &7rd11'SIx3 ENTRANCE sw'W.09 AZ ffi LLMLMII I I ML 1111 � m W 1111 T U.03 w hill m ea ifku 1111 IrU. nil Z w Z LL III LL c _ Ul W 0 Iroto r Ido l i � III L 11MEE=P Y 111111 = �'' 13 Z yw 00 Z 1i (die W 0 Z LJ CffY OF RALEIGH 2 Py rV- VIORKS DEPAR77AUr LIL! ILL 0 awry a WrTOWAIIE Q LL STANDARD RD TEMPORARY [ sEDIMENTISIll FENCE SW -20.01 Or Lu Lu Z U Z W Lu x M Lu W �0 U 0 U) W a a' W �a IIIII-11, 111—II II—III r O U) N p -W � W Qc I -W � N W C7 Z NWLL zIII g� �w a EL\ Tall Fescue m Z > U LL C7 7Za IIIII Or Lu Lu Z U Z W Lu x M Lu W �0 U 0 U) W a a' U) 3 K o � Z W �Z Tali Fescue IIIII-11, 111—II II—III r KXX ZWCIR Nov. 1- Mar. I — IIIII IIIII 200 lbslacre Z NWLL zIII W �w a W Tall Fescue m Z > U LL C7 7Za N W.m a o Z= a Z J Fill F 0!E2 W0 3 0 a 2z WI r VIII rWa v ull�- L -UI -l1 U) l _11 W. HlaIM'NIW.ZE . -ILlIIIIIL_ W o F1 W L- IIHIPIILI_ zIIIII a o a O W T _ w =) _ Ld W F .9Z � IIIII z y C/) .o -.e 0 IIIII o = a IIIII (IIII IIIII IIIIIL II-IIIII=1� —111111 I IIII—p l l l= U) 3 K o � Z W �Z J Z O Z O U LU O a w LU ry O LL ui O Z CITY OF RALEIGH PUBLIC WORKS DEPARTMENT REVISIONS DATE -911113 NOT TO SCALE STANDARD TREE PROTECTION DETAIL SW -20.03 Local Seeding Schedule (per Wake Soil and Vater District) t star MIN Mal IrAe 1 Plantinci Rate Aug. 15 - Nov. 1 Tail Fescue 200 lbstacre Nov. 1 - Mar.1 Tall Fere 20D Ibsfa.cre and Abruzzi Rye "(nurse crap) 251lbstacre Mar. 1 -April 15 Tall Fescue 200 ibstacre April IS - Paine 30 Hulled Common Berrnudagrass 15 lbslacre um .; 1 I "[ M10 # Aug. 15 - Nov, 1 Tali Fescue 200 11WAcre and Serlcea Laspadeza (anhulled, unscal 60 to 70 lbs/acre Nov. 1- Mar. I F U 200 lbslacre Z NWLL 60 to 70 lbslacre W �w 25 lbs/acre W Tall Fescue m Z > U LL C7 7Za N W.m a Z o Z= a Z J Z 0!E2 W0 3 0 a w 3 WI r CD v ull�- L -UI -l1 HlaIM'NIW.ZE . -ILlIIIIIL_ W o °z L- IIHIPIILI_ a o Z T _ w .9Z O C/) .o -.e .o -.Z J Z O Z O U LU O a w LU ry O LL ui O Z CITY OF RALEIGH PUBLIC WORKS DEPARTMENT REVISIONS DATE -911113 NOT TO SCALE STANDARD TREE PROTECTION DETAIL SW -20.03 Local Seeding Schedule (per Wake Soil and Vater District) t star MIN Mal IrAe 1 Plantinci Rate Aug. 15 - Nov. 1 Tail Fescue 200 lbstacre Nov. 1 - Mar.1 Tall Fere 20D Ibsfa.cre and Abruzzi Rye "(nurse crap) 251lbstacre Mar. 1 -April 15 Tall Fescue 200 ibstacre April IS - Paine 30 Hulled Common Berrnudagrass 15 lbslacre um .; 1 I "[ M10 # Aug. 15 - Nov, 1 Tali Fescue 200 11WAcre and Serlcea Laspadeza (anhulled, unscal 60 to 70 lbs/acre Nov. 1- Mar. I Tall Fescue 200 lbslacre W 60 to 70 lbslacre W and Abruzzi Ryer 25 lbs/acre W Tall Fescue 200 lba/acre and Sel Lospodaza (scarified) a Z Mar. 15 - Jane 30 Z 10 lbs/acre 9 z 40 to 50 Ibstacr'e CD v W W U) 40 to 50 lbsfacre o °z CD a o Z LLIH J Z O Z O U LU O a w LU ry O LL ui O Z CITY OF RALEIGH PUBLIC WORKS DEPARTMENT REVISIONS DATE -911113 NOT TO SCALE STANDARD TREE PROTECTION DETAIL SW -20.03 Local Seeding Schedule (per Wake Soil and Vater District) t star MIN Mal IrAe 1 Plantinci Rate Aug. 15 - Nov. 1 Tail Fescue 200 lbstacre Nov. 1 - Mar.1 Tall Fere 20D Ibsfa.cre and Abruzzi Rye "(nurse crap) 251lbstacre Mar. 1 -April 15 Tall Fescue 200 ibstacre April IS - Paine 30 Hulled Common Berrnudagrass 15 lbslacre um .; 1 I "[ M10 # Aug. 15 - Nov, 1 Tali Fescue 200 11WAcre and Serlcea Laspadeza (anhulled, unscal 60 to 70 lbs/acre Nov. 1- Mar. I Tall Fescue 200 lbslacre and Serlcea Lespedeza (unhuNed, unscarified) 60 to 70 lbslacre and Abruzzi Ryer 25 lbs/acre Mar. 1 -Jul 1 Tall Fescue 200 lba/acre and Sel Lospodaza (scarified) 4e to 50 lbstacre Mar. 15 - Jane 30 Weeping Lovegrass 10 lbs/acre and Sodeea Lespedeza (scarified) 40 to 50 Ibstacr'e March 15 - June 30 Huked Comill Bermudagrass 15 lbs/acre mW [tr ee. Lespedeza I(scagll 40 to 50 lbsfacre Jane i -Sept. 1 Ta# Fie 200 11slacre MW Br went Millet* (ll a crop) 35 macre or Sorghum -Sudan hybrids' (nurse al 30 lbalacre Consult Conservatlon Engineer or Soil Conservation Service for additional kv� Maffw cwGeming other alternatives for vegetation of denuded areas. The above vegetation rates we those which do yell under local conditions, other seeding rate combinations are possible. 'Nurse Crop f Temporary Seadings - Resoea according to optimurn season for desired permanent vegetation. Do inapt allow tomporarycover to grow over 12 inches in height before mowing, otherwise' Fescue may be shaded out- EXISTING CH/�NNEL SL��E IIF -M 0TUQN 1111111110#11FA FLAW DRAINME FILTER FABRIC 2.09 FOR CHECK K DAM WITHIN POND 2# 0 °° #5 OR 12" CLASS CLASS 1 #57 WASHED STONE "B" RIP RAP RIP RAP SPECIAL ROCK CHECK DAM TYPE 2 NTS FINAL DESIGN NOT RELEASED FOR CONSTRUCTION N�M�pppp II II IIII IIII II II �Ubglbp� CARO Essry� S E A L 022321 O 0y�F F��PGGP .I Z Issued Date By CD 9-14-16 BKC CD 12-29-16 Bl Project No. 15387.30 Checked By M Z Drawn By g K C Drawing EROSION CONTROL DETAILS File Name CP_ POND_REV3.dwQ Sheet EC -1 5 OF 5 SHEETS CB TOP -347075' NV OUT=340°50' CB TOP=347.87' INV IN=340.50' INV OUT -J40.24' / �/ ---- END N1OT FOUNT / _ I / \ i / ELECTRIC BOX 3� /N' / FIRE EXT / —BBC GRILL l \ / v ��_ v 2-v DRAINv v / `,POND ELEVATION AT ��v TIME OF SURVEY I `v ` /� 338066' 90 100,A\ A A\ A\ \\ A A\ v V A A\ vvvvv---------- 0— ' END/N0 v�v A v F�UNfl \\ INV=336.68' \ 2 0 vv v v vv— ---------- WETLAND "A",\1 A" \ � INV=337oI8 r./ N.0olETRASH — / 337 \338., GAZEBO AN END NOT / \ / v FOUND ' _ ,END, NOT � v vv ,v_ , - , - � -, 3.� �� � � ' E06ND_-' 342, � -'---- \�, \347, i FIRE EXT BBQ GRILL _-------�340 / - - TRASH CAN - ���_ q40- / o 03 343 \ END NOT ----------- ---_--'----_ __ \\ - -34Q_ - SSMH SURVEYED\MIS =340- -- - - TOP=342°63' INV IN=331°18' ` `, f, ----____-N\V IN=331\17 INV OUT -331°12' vvv INV QUT=331.71' INV=n-6 20' _ ' FIRE EXT ----__ -- 340..- , — _ 34d STONE BBQ PIT / co--_ TRASH CAN DI /' _ TOP=342.35' ' �'' — 345-- _ ENZT NOTco INV IN=3\027'' INV OUT=338°2' —345----__ / J / WETLAND IMPACT SUMMARY WETLAND "A" = 21499 SF LEGEND WETLAND IMPACT END NOT FOUND SSMH TOP=343°77' NV IN=337°22' INV OUT=337.19' 0 30 60 Feet FINAL DESIGN NOT RELEASED FOR CONSTRUCTION FSs S E A L 022321 0 2 FGP V. Z v o p U U H ^ �� h N M2 W O °o^q i' to z° an ? a n W UZW o Z 0- UJ �a �j 0 I IM ma Issued Date By CD 9-14-16 BKC CD 12-29-16 BKC Project No. 15387.30 Checked By M` z Drawn By g K C Drawing WETLAND IMPACT MAP File Name CP_ POND_REV3.dwq Sheet WIM-1 1 OF 1 SHEETS