HomeMy WebLinkAbout20190231_Environmetnal Assessment_20150512NC 84
NC 16 to SR 1�08 Waxhaw-1 nd ia n Trai I Road �n 1Nesley Cha el
p
Construct Four Lane Roadway, Part on New Location
Unian Caunty
Federal-Aid Project No. STP-1316{10)
WBS No. 39�19.1.1
S�'I � N o. U �34�7
Administrative Action
Environrnental Assessm�nfi
Submitted By
US Department of Transportation
Federal Highway Administration
and
North Carolina Department of Transportation
Submitted Pursuant to 42 USC 4332�2)�c)
2� 2'�0!
D;�te of l���p�-o�ral Richard ��'. Hancock, P.E., ��anager
Project De�-elopment and Environmei�tal �1na1�-��s LT1�.�
1\Iorth �arolina De�artment a� Tra.nsport��,tic�n
� � � �.''--
� �
.�.
�� 1
Date c�f �ppra�Tal ohn F. Sullit����1, III, P�, Divis�n 1�dmir�istratc�r
Feder��l High�����j- rldtninistratia1�
NC 84
NC 16 to SR 1008 �Waxhaw-Indian Trail Road) in Wesley Chapel
Construct Four Lane Roadway, Part on New Location
Union County
Federal Aid Project No. STP-1316(10)
WBS No. 39019.1.1
STI P N o. U-3467
Administrative Action
Enviranmental Assessment
M ay 2015
�- - — -
j �
�, " � � '� i .� , i`S •>� �, i? _
� . . � ' . . . .,r {�i.,i�fJ �. � . � J r'
`� i ��`� ,1� ' � ��i�!��i
� �� .4� _ y.�.� i''? �•t... ' � �� ' r � � � i; :S�'
� .. � G.', • n �' • i ���. _ . . ° .
�
! '��• ��+:. i 1 �,� R� ..�. � i ~ �` �+y..� � l� �. `'YG' �'e# G 9 , ••�' �
Documentation Prepared By:
Mulkey Engineers & Consultants
5 2�7 /t 5
Date
,��v�c.a �
Liz asckitz, AICP
Proj ect Manager
� �� _ .. e.. � rYS
� � � m,,�/"� .
<`� � ��'�.-
�
Date A. Bissett, Jr., P.E.
Principal
Document Prepared for:
North Carolina Department of Transportation
� ����5 �
Date Marshall Edwards
Project Development Engineer
� � t� '"+4� k .`j�, '��i"` k
�� �* � �. � F� � � � � .
\ �
'�i' �t � { � y ��
�. .` �� ,�.n � .s a. ?� �.'� x � � � { �
� � ,� �
� � �. ,� �, �,
:J�, v :�+ ,�: �s 1/1 ° r � a
�r' g� � � ''{ r �'�. �.
� � , �
� �� �� �'
,�
�
.��'
?' p� `. S ' 'aV.. � .
.. � . .' 4 , � �.� � . j "..
l k �
+. yt
y� i.
'.l, � t� . �' Ovr � �
a; � � � ��
.:�� �
<<i I. �
t � � � �: ��.�
'` � �
, � �� �:
PROJECT COMMITMENTS
NC 84
NC 16 to SR 1008 (Waxhaw-Indian Trail Road) in Wesley Chapel
Construct Four Lane Roadway, Part on New Location
Union County
Federal Aid Project No. STP-1316(10)
WBS Element No. 39019.1.1
STIP Project No. U-3467
Project Development & Environmental Analysis Unit - Human Environment Section
NCDOT will coordinate with the NC Historic Preservation Office regarding archaeological
investigations when a preferred alternative is selected.
Geotechnical Unit
Preliminary site assessments will be conducted for all potentially contaminated sites within the
proposed right-of-way prior to right-of-way acquisition.
Hydraulics Unit
The H�-draulics Unit will coordinate with the NC Floodplain Mapping Program (FMP) to
determine the status of the project with regard to applicability of NCDOT's Memorandum of
Agreement with FMP (dated Apri122, 2013, modified February 5, 2015), or approval of a
Conditional Letter of Map Revision (CLOMR) and subsequent final Letter of Map Revision
(LOMR).
Division 10
This project involves construction activities on or adjacent to FEMA-regulated streams.
Therefore, NCDOT Division 10 shall submit sealed as-built construction plans to the Hydraulics
Unit upon completion ofproject construction, certifying the drainage structure(s) and roadway
embankment located within the 100-year floodplain were built as shown in the construction plans,
both horizontally and vertically.
The Howard House property located on NC 16 between SR 1316 (Rea Road) and SR 1318
(Lochaven Road) is eligible for the Narional Register of Historic Places. Construction fencing shall
be erected at the back of the ditch line adjacent to Howard House during construction. No work
shall take place in, and no utilities shall encroach into, the historic boundary.
The Jacob Allen Deal Farm property located on NC 84 (Weddington Road) between SR 3675
(Lake Forest Drive) and SR 1341 (Twelve Mile Creek Road) is eligible for the National Register of
Historic Places. A 25-foot buffer shall be maintained from the historic boundary, delineated by
U-3467 Environmental Assessment May 2015
GREEN SHEET PAGE 1 of 2
construction fencing erected at the back of the ditch line. The fencing shall extend 500 feet from
each access drive, or to the property boundary, whichever is closer.
Roadway Design Unit and Structures Design Unit
Bicycle safe railing will be provided on the proposed bridge over West Fork Twelvemile Creek.
Division of Bicycle and Pedestrian Transportation and Roadway Design Unit
In accordance with NCDOT Pedestrian Policy, the inclusion of sidewalks as part of the proposed
project will be dependent upon a cost-sharing agreement with the Town of Weddington and the
Village of Wesley Chapel. Bicycle and pedestrian accommodations will be further coordinated
with the Town of Weddington and the Village of Wesley Chapel prior to final project design.
U-3467 Environmental Assessment
GREEN SHEET PAGE 2 of 2
May 2015
INTRODUCTION
What is the purpose of an Environmental Assessment?
This Environmental Assessment (EA) is an important milestone in the project planning process.
The objective of this EA is to provide the public and decision-makers with appropriate and
relevant information to make an informed decision on which transportation improvement
alternative to selection for implementation. This process is intended to provide all interested
parties with the opportunity to contribute to the decision-making process.
This EA has been prepared to comply with the National Environmental Policy Act (NEPA),
which requires that a detailed analysis be prepared if any federal agency is undertaking a major
federal action that may significantly affect the environment.
The North Carolina Department of Transportation (NCDO'I�, in cooperation with the Federal
Highway Administration (FHWA), is evaluating proposed transportation improvements in the
Weddington and Wesley Chapel areas in Union County.
What does this EA include?
The table of contents presents the overall organization of this EA and can direct you to the
appropriate page numbers in various chapters and sections in the document. Key findings are
presented in the summary section. A full discussion of the proposed project and findings are
presented in the following chapters:
■ Chapter 1— Description of Proposed Action provides a general overview of the project and
a broad summary of the actions that took place prior to this Environmental Assessment. This
chapter also discusses the current project schedule and cost estimates.
■ Chapter 2— Purpose of and Need for Project explains why improvements to the
transportation system in the project area are proposed and why they should be implemented.
This chapter also describes the existing conditions in the project study area.
■ Chapter 3— Alternatives describes the characteristics of the alternatives being considered for
implementarion, the "detailed study alternatives." This chapter also summarizes other
alternatives considered and the reasons why they were not selected for detailed study. The No
Build Alternative is also described.
■ Chapter 4— Proposed Improvements provides an overview of the proposed project's
principal features as well as other features that are necessary to support the proposed
improvements.
■ Chapter 5— Environmental Effects of Proposed Action provides an overview of the
natural and human environmental features within the project study area. The project's
potential effects on resources and people are also discussed.
■ Chapter 6— Comments and Coordination describes the public involvement and federal,
state, and local agency coordination that has taken place for the proposed project. Planned
future public involvement activities and agency coordination are also discussed.
■ Chapter 7— List of References and Technical Reports.
Also included with this EA are appendices that provide documentation of agency correspondence
and coordination, as well as the relocation reports for the proposed project.
U-3467 Environmental Assessment May 2015
This page was intentionally left blank.
U-3467 Environmental Assessment May 2015
SUMMARY
NC 84
NC 16 to SR 1008 (Waxhaw-Indian Trail Road) in Wesley Chapel
Construct Four Lane Roadway, Part on New Location
Union County
Federal Aid Project No. STP-1316(10)
WBS No. 39019.1.1
STIP Project No. U-3467
1. Type of Action
What type of federal action is this?
This is a Federal Highway Administration (FHWA) Administrative Action, Environmental
Assessment.
2. Description of the Proposed Action
What do we propose to build and where?
The North Carolina Department of Transportation (NCDO'I� proposes to extend Rea Road
(SR 1316) from NC 16 (I'rovidence Road) east to Twelve Mile Creek Road (SR 1341)/NC 84
(Weddington Road) on new location (relocate NC 84), and widen e�sting NC 84 to Waxhaw-
Indian Trail Road (SR 1008) in Wesley Chapel. The proposed project is appro�mately 4.3 miles
long. The project study area is shown on Figure S-1.
NCDOT's current Draft 2016-2025 STIP identifies funds for U-3467 right-of-way acquisition in
Fiscal Year (F� 2017, and construction in FY 2019.
3. Summary of Purpose and Need
What purpose will the project serve?
The purpose of the proposed Rea Road Extension project is to improve the mobility and
connectivity of Weddington Road (NC 84) in the project study area.
Why do we need the project?
■ Traffic volumes in 2035 are expected to exceed capacity on NC 84 in the project area.
■ Vehicles traveling west on existing NC 84 to Rea Road must follow a circuitous, or "dog-leg",
route. Currently, westbound traffic on NC 84 must turn left onto NC 16, travel approximately
0.75 mile, and then turn right onto Rea Road.
The proposed project is included in the Western Union County I.,ocal Area Regional
Transportation Plan as NC 84 Relocation (Rea Road Extension). The Plan ranks U-3467 as the
No. 1 High Prioriry Recommended Thoroughfare Plan project.
U-3467 Environmental Assessment
u�
May 2015
!'^A���� ���►L'�
�►r�M.,, 1 �,► ��'��
�►y��"iw • �I�L i�����
„���►.,{►��rc�
r�t��rir�.�/Li,���llt�ll�`���'��
-.- � -. *��#`
�
�,�ar�afte
�+, .:.
+�� ,� � F ^-;
i_�KLEri;' � A. �zre:"�I r,, _ •` t` �'rn` r
' �! �
�:'' '`` � ����o����� '
<: ��.. �,
�
, ._ ,;.,, ,;, ,
�. 3CG
�•°$12��10�5 ': , _ti� ..� � .
�' IndranTFai9 �� � �°s ,
' . W'etltl �k;�r � '
'r' •��4- Manroe �
�� z�x,
'� '
''� ���+ ]� 'µ� i.�;.�°, iil S'S:fT�'i•..�.�.1
Y, i 1
������ , .'.
� + � Project Vicinity �
� u *. �y ` , �
Jr, � ir �� .
Figure S-1
Project Vicinity
SR 1316 (Rea Road) Extension, NC 16 to SR 1008
(Waxhaw-Indian Trail Road)
NCDOT STIP Project No. U-3467
Union County, North Carolina
P�OF t.f.U0.Tfi �qRG
M � North Carolina
* *
� o Department of Transportation
Fp 4P
�EHt OF TR 0.T�SeO�
4. Alternatives Considered
What alternatives are studied in this environmental assessment?
A range of preliminary alternatives were considered for the proposed project, including the No
Build Alternative, the Improve Existing Alternative, and alternatives that considered alternate
modes of transportation.
Two Build alternatives were developed for the proposed project (Alternatives A and C). Both
alternatives extend Rea Road on new location from its current terminus at NC 1 C to existing
NC 84 appro�mately 0.35 nvle west of Twelve Mile Creek Road, and widen e�sting NC 84 to
Waxhaw-Indian Trail Road. Options foY Alternatives A and C were developed to minimize
potential impacts to wetlands (Alternatives A2 and C2). In consultation with FHWA, NCDOT
selected Alternatives A2 and C2 for detailed study because they meet the project's Purpose and
Need and minimize potential impacts to wetlands.
5. Permits Required
What permits may be necessary to construct the proposed project?
The proposed action will require permits pursuant to Section 401 and 404 of the Clean Water Act
of 1977, as amended. A Section 401 Water Quality Certification from the Water Quality Section of
the North Carolina Division of Water Resources will be needed for fill activity in adjacent wetlands
and surface waters. A Section 404 permit issued by the US Army Corps of Engineers will be
required to discharge and place fill materials into wetlands.
6. Summary of Environmental Effects
What effects does the proposed project have on the environment?
The proposed project was evaluated for impacts to the human and natural environment. Potential
impacts associated with the detailed study alternatives are summarized in Table S-1.
U-3467 Environmental Assessment
u
May 2015
'able S-1. Summary of Environmental Effects
Build Alternatives
Impact Category
A2 C2
Natural Resources Impactsl
Federally-Listed Species Present in Study Area No No
100-Year Floodplain and Floodway Impacts (acres) 7.2 7.3
Delineated Wedand Impacts (no. crossings/acres) 3/0.10 4/0.12
Delineated Stream Impacts (no. crossings/ linear feet) 8/1,397 11/2,933
Delineated Other Surface Water Impacts (acres) 0.25 0.00
Forest Impacts (acres) 39.9 43.2
Human Environment Impacts
Residential 5 5
Business 1 1
Relocations
Non-Profit 1 1
Total 7 7
Low Income/Minority Populations Present No No
Schools� 1 1
Recreational Areas/Parks3 1 1
Churches`` 2 2
Cemeteries 0 0
Historic Sites 2/No Adverse 2/No Adverse
Effect� Effect5
Section 4(� Impacts 1(de rnini7ni.r) 1(de nainiynis)
Traffic Noise Impacts (rcccptors) 8 7
Physical Environment Impacts
Prime, Statewide, and Unique Farmland Soils (acres) 62.4 63.7
Underground Storage Tanks�HazMat Sites 3 3
Preliminary Cost Estimate
Total Cost �48,481,000 �49,323,000
i Impacts are calculated based on slope stalce limits plus 25 feet.
� Current access to Weddington High School will be changed as a resule of the proposed project.
3 Right-of-wa5� impacts, including impacts to recreational fields, will occur at Weddington Optimist Park.
4 Parking spaces will be impacted at Southbrook Communiry Church and Siler Presbyterian Church as a result of the
proposed project.
s No Adverse Effect with conditions identified in Section 5.2.1.
U-3467 Environmental Assessment
vi
May 2015
7. Other Highway and Non-Highway Actions
Are any other projects being considered in this area?
NCDOT's Draft2096-2025 State Trczn.rportation ImprovementPrograln (STIP) includes four projects in
the viciniry of U-3467:
■ B-5243 — Replace Bridge No. 258 on Indian Trail Road (SR 1008) over South Fork Crooked
Creek. The Draft 2016-2025 STIP includes funding for construction in FY 2016.
■ B-5791 — Replace Bridge No. 224 on SR 1301 (Nlarvin Road) over Twelvemile Creek. The
Draft 2016-2025 STIP includes funding for right-of-way acquisition in FY 2020 and
construction in FY 2021.
■ U-5769 — Widen NC 16 (Providence Road South) to multi-lanes from SR 1316 (Rea Road
Extension) to SR 1321 (Cuthbertson Road). The Draft 2016-2025 STIP includes funding for
right-of-way acquisition in FY 2022 and construction in FY 2024.
■ U-4714 — Widen John Street — Old Monroe Road (SR 1009) to multi-lanes from Trade Street
(SR 3448 — SR 3474) in Mecklenburg County to Wesley Chapel — Stouts Road (SR 1377) in
Union County. The Draft 2016-2025 STIP includes funding for a portion of right-of-way
acquisition beginning in FY 2021 and construction beginning in FY 2023.
Roadway improvements in the project area were completed in September 2013 under NCDOT
project U-5325. The project constructed a roundabout at the NC 84/ Weddington-Matthews
Road (SR 1344) intersecrion and relocated the NC 16/Weddington Church Road (SR 1317)
intersection (completed October 2012).
8. Coordination
How has the public been or will be involved with this project? What agencies were
consulted regarding the project?
Early coordination meetings were held with representatives from Union County, the Town of
Weddington, and the Village of Wesley Chapel in July 2012 to discuss the proposed project.
NEPA�Section 404 Merger screening was conducted on September 17, 2012 with FHWA,
US Army Corps of Engineers (CTSACE), and NC Department of Environment and Natural
Resources - Division of Water Resources (NCDENR-DWR). It was agreed the project would
follow a modified process, with a joint Merger Team meeting for Concurrence Points 2A (Bridging
Decisions and Alignment Review) and 4A (Avoidance and Minimization) after the public hearing.
A project scoping letter announcing the start of U-3467 project development and environmental
and engineering studies was mailed out to federal, state, and local agencies in November, 2012. An
External Scoping meeting was held on November 14, 2012. Representatives from NCDOT,
FHWA, USACE, US Fish and Wildlife Service, US Environmental Protection Agency, NCDENR-
DWR, and NC Wildlife Resources Commission participated in the meeting.
A newsletter providing information on the proposed project and public informational meeting was
mailed to citizens in June 2013. A postcard to citizens in December 2013 announced the launch of
the project website.
U-3467 Environmental Assessment
�
May 2015
A local officials meeting and a public meeting were held for the proposed project on June 25, 2013
at Weddington Middle School. The purpose of the meetings was to present the project to the
community� and receive input during the alternatives development process. Approximately 60
citizens and s� local officials attended the meetings.
NCDOT representatives met with the Weddington Town Council and staff to provide an update
on the project at a Special Town Council Meeting on August 19, 2013.
NCDOT will conduct a public hearing for the proposed project to review the detailed study
alternarives preliminary design plans and potential environmental impacts with the public, and
receive their comments. Formal notices will be included in local newspapers a minimum of 30
days prior to the public hearing. Additional notices for the public hearing will also be sent to
persons on the project mailing list.
9. Contact Information
Who can 1 contact for additional information about this document?
Additional information regarding the proposed project and Environmental Assessment can be
obtained by contacting the following individuals:
John F. Sullivan, III, P.E.
Division Administrator
Federal Highway Administration
310 New Bern Avenue, Suite 410
Raleigh, NC 27601
(919) 856-4346
U-3467 Environmental Assessment
Richard W. Hancock, P.E., Manager
Project Development and Environmental Analysis Unit
North Carolina Department of Transportation
1548 Mail Service Center
Raleigh, NC 27699-1548
(919) 707-6000
viii
May 2015
Table of Contents
Project Commitments ................................................................................. Green Sheet
Introduction................................................................................................................... i
...
ummary....................................................................................................................... ui
1.0 Description of Proposed Action ............................................................................1-1
1.1 General Description ...................................................................................................... 1-1
1.1.1 Historical Resume and Project Status ........................................................... 1-1
1.2 Cost Estimates ...............................................................................................................1-2
2.0 Purpose of and Need for Project ...........................................................................2-1
2.1 Purpose of Project ......................................................................................................... 2-1
2.2 Need for Project ............................................................................................................ 2-1
2.2.1 Description of Existing Conditions .............................................................. 2-2
2.2.2 Transportation and Land Use Plans ............................................................. 2-8
2.2.3 System Linkage/Travel Time/Access Needs ............................................ 2-11
2.2.4 Safet�- Operations ........................................................................................... 2-12
2.3 Benefits of Proposed Project ..................................................................................... 2-15
3.0 Alternatives ............................................................................................................3-1
3.1 Alternatives .....................................................................................................................3-1
3.1.1 No Build Alternative ....................................................................................... 3-1
3.1.2 Alternative Modes of Transportation ........................................................... 3-1
3.1.3 Improve Existing ............................................................................................. 3-2
3.1.4 New Location (Relocate NC 84) Alternatives ............................................. 3-2
3.2 Alternatives Considered ............................................................................................... 3-3
3.2.1 Detailed Study Alternatives ............................................................................ 3-3
3.2.2 Recommended Alternative ............................................................................. 3-3
4.0 Proposed Improvements .......................................................................................4-1
4.1 Roadway Cross-Section and Alignment ..................................................................... 4-1
4.2 Right-of-Wa�� and Access Control .............................................................................. 4-1
4.3 Speed Limit .................................................................................................................... 4-3
4.4 Design Speed ..................................................................................................................4-3
4.5 Anticipated Design Exceptions ................................................................................... 4-3
4.6 Intersections/Interchanges .......................................................................................... 4-3
U-3467 Environmental Assessment May 2015
ix
4.7 Service Roads ................................................................................................................. 4-4
4.8 Railroad Crossings ......................................................................................................... 4-4
4.9 Structures ........................................................................................................................ 4-4
4.10 Bicycle and Pedestrian Facilities .................................................................................. 4-6
4.11 Utilities ............................................................................................................................ 4-6
4.12 Landscaping ....................................................................................................................4-6
4.13 Noise Barriers ................................................................................................................ 4-6
4.14 Work Zone, Traffic Control and Construction Phasing ......................................... 4-6
5.0 Environmental Effects of Proposed Action ..........................................................5-1
5.1 Natural Resources ......................................................................................................... 5-1
5.1.1 Biotic Resources ............................................................................................... 5-1
5.1.2 Waters of the United States ............................................................................ 5-5
5.1.3 Rare and Protected Species .......................................................................... 5-12
5.1.4 Soils ..................................................................................................................5-15
5.2 Cultural Resources ....................................................................................................... 5-17
5.2.1 Historical Architectural Resources .............................................................. 5-17
5.2.2 Archaeological Resources ............................................................................. 5-18
5.3 Section 6(�/4(� Resources ........................................................................................5-18
5.3.1 Section 6(�} ......................................................................................................5-18
5.3.2 Section 4(f} ......................................................................................................5-18
5.4 Farmland .......................................................................................................................5-20
5.5 Social Effects ................................................................................................................5-21
5.5.1 Neighborhoods/Communities .................................................................... 5-21
5.5.2 Relocation of Residences and Businesses .................................................. 5-22
5.5.3 Environmental Justice ................................................................................... 5-23
5.5.4 Bicycle and Pedestrian Facilities .................................................................. 5-24
5.5.5 Recreational Facilities ....................................................................................5-24
5.5.6 Other Public Facilities and Services ............................................................ 5-25
5.6 Economic Effects ........................................................................................................ 5-27
5.7 Land Use ....................................................................................................................... 5-27
5.7.1 Existing Land Use and Zoning .................................................................... 5-27
5.7.2 Future Land Use ............................................................................................ 5-28
5.7.3 Project Compatibility with Local Plans ...................................................... 5-30
U-3467 Environmental Assessment May 2015
x
5.8 Indirect and Cumulative Effects ............................................................................... 5-30
5.8.1 Analysis of Indirect and Cumulative Effects ............................................. 5-31
5.9 Flood Hazard Evaluation ...........................................................................................5-33
5.10 Traffic Noise Anal��sis ................................................................................................ 5-34
5.10.1 Introduction .................................................................................................... 5-34
5.10.2 Traffic Noise Impacts and Noise Contours .............................................. 5-35
5.10.3 No Build Alternative ..................................................................................... 5-37
5.10.4 Traffic Noise Abatement Measures ............................................................ 5-37
5.10.5 Noise Barriers .................................................................................................5-37
5.10.6 Summary ......................................................................................................... 5-38
5.11 Air Quality Analysis .................................................................................................... 5-38
5.11.1 Introduction .................................................................................................... 5-38
5.11.2 Attainment Status .......................................................................................... 5-38
5.11.3 Mobile Source Air Toxics (MSA� ............................................................. 5-39
5.11.4 Summary ......................................................................................................... 5-46
5.12 Hazardous Materials .................................................................................................... 5-47
5.13 Construction Impacts ................................................................................................. 5-48
5.14 Summary of Social, Economic, and Environmental Effects ................................ 5-49
5.15 Conclusion ....................................................................................................................5-50
5.15.1 What Are the Next Steps in the Project Development Process? ........... 5-50
5.15.2 Project Schedule ............................................................................................. 5-51
6.0 Comments and Coordination ................................................................................6-1
6.1 Public Involvement and Outreach .............................................................................. 6-1
6.1.1 Newsletter .........................................................................................................6-1
6.1.2 Project Webpage .............................................................................................. 6-1
6.1.3 Public Meeting .................................................................................................. 6-1
6.1.4 Public Hearing .................................................................................................. 6-2
6.2 Agenc�T Coordination .................................................................................................... 6-2
6.2.1 Early Coordination Meetings ......................................................................... 6-2
6.2.2 External Scoping Meeting .............................................................................. 6-2
6.2.3 Local Officials Informational Meeting ......................................................... 6-3
6.2.4 Weddington Town Council Meeting ............................................................ 6-3
6.2.5 NEPA/Section 404 Merger Process ............................................................. 6-3
U-3467 Environmental Assessment May 2015
xi
7.0 List of References and Technical Reports ............................................................7-1
Appendix A — Figures
Appendix B— Federal, State, and Local Correspondence and Coordination
Appendix C — Relocation Reports
List of Tables
Table 1-1. Current Estimated Costs for U-3467 ........................................................................1-2
Table 2-1. Summary of Roadway Segment Level of Service .................................................... 2-5
Table 2-2. Summary of Intersection Delay (seconds) and Level of Service ........................... 2-6
Table 2-3. NC 16 Crash Data Summary from Lochaven Road to NC 84 ........................... 2-13
Table 2-4. NC 84 Crash Data Summary from NC 16 to Waxhaw-Indian Trail Road ....... 2-14
Table 2-5. Facility Crash Rate Comparison ............................................................................... 2-15
Table 4-1. Major Drainage Structures Recommendations ........................................................ 4-5
Table 5-1. Terrestrial Community Types and Anticipated Impacts ........................................ 5-1
Table 5-2. Anticipated Forest Impacts ........................................................................................ 5-3
Table 5-3. Characteristics and Anticipated Impacts for Study Area Streams ......................... 5-7
Table 5-4. Characteristics and Anticipated Impacts for Other Surface Waters ..................... 5-9
Table 5-5. Characteristics and Anticipated Impacts for Jurisdictional Wetlands ................ 5-10
Table 5-6. Federally-Protected Species for Union County ..................................................... 5-13
Table 5-7. Soils in the Study Area ............................................................................................... 5-16
Table 5-8. Historic Architectural Resource Effects ................................................................. 5-18
Table 5-9. Prime, Statewide, and Unique Farmland Soils Anticipated Impacts .................. 5-20
Table 5-10. Anticipated Residential, Business, and Non-Profit Relocations ....................... 5-22
Table 5-11. Indirect Land Use Effects Screening .................................................................... 5-31
Table 5-12. Floodplain/Floodway Impacts .............................................................................. 5-34
Table 5-13. Noise Abatement Criteria .......................................................................................5-36
Table 5-14. Predicted Traffic Noise Impact Summary ............................................................ 5-36
Table 5-15. National MSAT Emission Trends 1999 — 2050 for Vehicles Operating on Roadways
Using USEPA's MOVES2010b Model .............................................................................. 5-40
Table 5-16. Average Daily VMTs for Rea Road Extension/NC 84 ....................................... 5-44
Table 5-17. Underground Storage Tanks in the Project Area ................................................ 5-47
Table 5-18. Summary of Environmental Effects ..................................................................... 5-49
U-3467 Environmental Assessment
xii
May 2015
Figure 1.
Figure 2A-G
Figure 3.
Figure 4.
Figure 5.
Figure 6.
Figure 7.
List of Figures included Appendix A
P�oject Vicinity
Environmental Features
2012 Annual Average Daily Traffic — No Build
2035 Annual Average Daily Traffic — No Build
2035 Annual Average Daily Traffic — Build
Preliminary Alternatives
Typical Section
U-3467 Environmental Assessment
May 2015
This page was intentionally left blanl�.
U-3467 Environmental Assessment
xiv
May 2015
1.0 DESCRIPTION OF PROPOSED ACTION
This chapter provides a general overview of the project and a broad summary of the actions that
took place prior to the Environmental Assessment.
What do we propose to build and where? What actions led up to the Environmental
Assessment? How much will the project cost if constructed?
1.1 General Description
The North Carolina Department of Transportation (NCDO'I� proposes to extend Rea Road
(SR 1316) from NC 16 (Providence Road) east to Twelve Mile Creek Road (SR 1341)/NC 84
(Weddington Road) on new location (relocate NC 84), and widen e�sting NC 84 to Waxhaw-
Indian Trail Road (SR 1008) in Wesley Chapel. The project is approximately 4.3 miles long. The
project stud�� area is shown on I'igure 1 in Appendix A.
The current Draft NCDOT 2016-2025 STIP provides funding for this project. The current Draft
STIP includes $8,700,000 for right-of-way acquisition in Fiscal Year (F� 2017 and $31,900,000 for
construction in FY 2019.
1.1.1 Historical Resume and Project Status
Rea Road Extension was included in the April 1992 Thoroughfare Plan for Union County, North
Carolinc� as a Proposed Major Urban Thoroughfare between NC 16 and NC 84.
In 1994, the boundary of the Mecklenburg-Union Metropolitan Planning Organization [MUMPO,
now Charlotte Regional Transportation Planning Organization (CRTPO)] was expanded to include
western Union County. The MUMPO Thoroughfare Plan Map included the Relocation of NC 84
(Rea Road Extension) as a proposed faciliry.
MUMPO approved its 2015 Long Range Transportation Plan (LRTP) in 1995. The NC 84
Reloca�ion Project (Rea Road Extension) was ranked number 66 out of the 107 ranked projects in
the LRTP.
The Feasibility Study prepared for the proposed Rea Road Extension in 1996 recommended Rea
Road Extension be constructed between NC 16 and NC 84 as a four-lane divided, curb and gutter
facility on a 100-foot-wide right-of-way to match the recommended cross-section of the then-
proposed Rea Road (STIP Project U-2506) west of NC 16.
A Location and Environmental Screening Report (I'resnell Associates, Inc., April 1999) was
prepared for the proposed NC 84 Relocation between NC 16 and Twelve Mile Creek Road. The
study did not evaluate widening existing NC 84. The proposed typical secuon was idenrified as a
four-lane divided, curb and gutter facility on a 100-foot wide right-of-way to be consistent with the
then-proposed Rea Road to the west of NC 16.
The proposed project is included in current transportation planning documents (see Section 2.2.2).
The CRTPO 2040 Metropolitan Tran.rportation Plan includes U-3467 in the Horizon Year 2025�2030
Fiscally Constrained Roadway Projects lists as a four-lane roadway with a median, wide outside
lanes and sidewalks from NC 16 to Waxhaw-Indian Trail Road.
U-3467 Environmental Assessment May 2015
NEPA/Section 404 Merger screening was conducted on September 17, 2012 with the Federal
Highway Administration (FHWA), US Army Corps of Engineers (CJSACE), and NC Department
of Environment and Natural Resources - Division of Water Resources (NCDENR-DWR). It was
agreed the project would follow a modified process, with a joint Merger Team meeting for
Concurrence Points 2A (Bridging Decisions and Alignment Review) and 4A (Avoidance and
Minimization) after the public hearing.
A project scoping letter announcing the start of U-3467 project development and environmental
and engineering studies was mailed out to federal, state, and local agencies in November, 2012. An
External Scoping meeting was held on November 14, 2012. Representatives from NCDOT,
FHWA, USACE, US Fish and Wildlife Service, US Environmental Protection Agency, NCDENR-
DWR, and NC Wildlife Resources Commission participated in the meering. Minutes of the
November 2012 project scoping meeting are included in Appendix B.
1.2 Cost Estimates
Two build alternatives are currently under consideration for U-3467. Current estimated costs
based on the project's preliminary designs are shown in Table 1-1.
Table 1-1. Current Estimated Costs for U-3467
Implementation
Phase Alternative A2 Alternative C2
Construction $31,352,000 �31,049,000
Right-of-Way
Acquisition $15,250,000 �15,225,000
Utiliry Relocation �797,000 $797,000
Mitigation �1,082,000 �2,252,000
Total $48,481,000 $49,323,000
U-3467 Environmental Assessment
1-2
May 2015
2.0 PURPOSE OF AND NEED FOR PROJECT
This chapter explains why improvements to the transportation system in the project area are
proposed and why they should be implemented.
What purpose will the project serve and why do we need the project? What are the
existing conditions? What benefits would the project provide?
2.1 Purpose of Project
The purpose of the proposed Rea Road Extension project is to improve the mobility and
connectivity of Weddington Road (NC 84) in the project study area.
2.2 Need for Project
■ Traffic volumes in 2035 are expected to exceed capacity on NC 84 in the project area.
Vehicles traveling west on existing NC 84 to Rea Road must follow a circuitous, or "dog-leg",
route. Currently=, westbound traffic on NC 84 must turn left onto NC 16, travel approximately
0.75 mile, and then turn right onto Rea Road.
NC 84 carries high traffic volumes as a major connection between southwestern Union County
and southeastern Mecklenburg Counry and the City of Charlotte. Travel demand between
Monroe/Union County and I-485/Charlotte remains high and other parallel routes are very
congested. In addition, the project's Demographic Study Area (DSA) experienced an 82.9 percent
increase in population between 2000 and 2010, a relatively high rate of growth compared to a 62.8
percent increase for Union County as a whole. In the eastern half of the study area, which includes
the Village of Wesley Chapel, there was an over 200 percent increase in population for the same
time period.
The proposed project is included in the Western Union County Local Area Regional
Transportation Plan as NC 84 Relocation (Rea Road Extension). The Plan ranks U-3467 as the
No. 1 High Prioriry Recommended Thoroughfare Plan project.
The proposed project would provide a more direct link between western Union County
and Charlotte/Mecklenburg County; it would provide an alternate route to I-485 and
Charlotte, enhancmg regional travel optlons. The proposed project would provide
additional capacity on NC 84 in the project area.
Other Desirable Outcome / Secondary Benefit
Crash data for the period between May 1, 2010 and April 30, 2015 indicate the crash rate for
NC 84 in the project area exceeds the statewide average crash rate for similar facilities. The most
prevalent crash pattern along the corridor is rear end crashes, which is generally a symptom of
congestion rype issues. It is anticipated that a four-lane divided facility should address the
predominant crash patterns currently present along the corridor. The area around the intersection
of Waxhaw-Indian Trail Road and NC 84 met the 2012 Highway Safety Improvement Program
(HSIP) "frontal impact" and "last year increase" warrants.
The proposed project would include improvements that can be expected to result in a safer
facility.
U-3467 Environmental Assessment May 2015
2-1
2.2.1 Description of Existing Conditions
2.2.1.1 Functional Classification
Functional classification is the process of grouping streets and highways into classes according to
the character of service they are intended to provide. Based on the North Carolina Functional
Classification System, the classifications of the roadways in the project area are as follows:
Minor Arterial: Rea Road, NC 1 C and NC 84
Major Collector: Weddington-Matthews Road and Waxhaw-Indian Trail Road
Local: All other roads, including Twelve Mile Creek Road, Deal Road, Lester Davis Road, and
Antioch Church Road
2.2.1.2 Physical Description of Existing Facility
Roadway Cross-Section
NC 84 has multiple cross-secrions
within the project area. It is
generally a two-lane roadway, but
becomes a three-lane section with
a two-way, left-turn lane east of
Twelve Mile Creek Road.
Between Weddington-Matthews
Road and NC 16, NC 84 is a four-
lane facility with a raised concrete
median.
Within the project area, Rea Road
is a four-lane divided facility with
curb and gutter.
Horizontal and Vertical
Alignment
,� - ------
� ��
_ � �
R ��'.
=.F _ �..
�. � � � .� > ,
- -� . ,.4�r� 1;r1.��^h�__�,, _. , . ,�.,_'i��-� ^ _..
� . - �- -- -, - _ i�
-�, .
��` - , - -
: -,�:.
>« -
I ooking ER.rt at NC � 6 fro�n Kea Road
NC 84 is a curvilinear roadway on rolling terrain with areas of limited site distance.
Right-of-Way and Access Control
There is no control of access along NC 84 or Rea Road in the project area. The existing right-of-
way width on NC 84 in the project area is generally 60 feet, but wider in some locations. The
e�sting right-of-way width on Rea Road is approximately 100 feet according to Union County GIS
data.
Speed Limit
The posted speed limit on NC 84 is 45 miles per hour (mph) through most of the project area, but
reduces to 35 mph from just east of Weddington-Matthews Road to NC 16. The posted speed
limit on Rea Road within the project area is 45 mph.
U-3467 Environmental Assessment
���
May 2015
Intersections/Interchanges
There are numerous intersections along NC 16 and NC 84 in the project study area. All of the
intersections are at-grade. Many of the intersecrions are entrances to residential subdivisions with
only one access point. There are nine major road intersections in the project study area, five of
which are signalized. All of the unsignalized intersections have stop sign control on the side street,
with the exception of one intersection with a roundabout These nine intersections are listed from
west to east and are shown on Figures 2A through 2G in Appendix A:
■ NC 16�Rea Road (signalized)
■ NC 16/NC 84/Weddington United Methodist Church Driveway (signalized)
■ NC 84/Weddington-Matthews Road (roundabout)
■ NC 84/Cox Road (unsignalized)
■ NC 84/Twelve Mile Creek Road (signalized)
■ NC 84�Dea1 Road�Hollister Estates Drive (unsignalized)
■ NC 84/Lester Davis Road/Southbrook Community Church Driveway (unsignalized)
■ NC 84/Antioch Church Road (unsignalized)
■ NC 84/Waxhaw-Indian Trail Road (signalized)
Railroad Crossings
There are no railroads in the project study area.
Structures
The following major stream crossings are located in the project study area:
■ Crossing of Mundy Run under NC 84, with a six-foot by three-foot reinforced concrete box
culvert (RCBC) (Figures 2B and 2C).
■ Crossing of an unnamed tributary to Mundys Run under NC 84, with a six-foot by seven-foot
RCBC (Figure 2D).
■ Crossing of Culvert Branch under NC 84, with a two-foot by seven-foot RCBC (Hydraulic Site
3, Figure 2F�.
■ Crossing of West Fork Twelvemile Creek under NC 84, with a three-barrel 11-foot by 12-foot
RCBC (Hydraulic Site 4, Figure 2F).
■ Crossing of an unnamed tributary to West Fork Twelvemile Creek under Shannon Woods
Lane, with a 72-inch corrugated metal pipe (Figure 2F).
Sidewalks, Bicycle Lanes, and Greenways/Multi-Use Trails
NC 16 has sidewalks on both sides of the road starting at the Rea Road intersection and continuing
north through the project study area. There are marked crosswalks on all three approaches to the
NC 16/Rea Road intersection. There are marked crosswalks with pedestrian crossing signals on all
four approaches to the NC 16/NC 84 intersection.
NC 84 and Waxhaw-Indian Trail Road have sidewalks for a short distance adjacent to the
commercial development at the intersection. There are marked crosswalks with pedestrian
crossing signals at three legs of the intersection.
There are no sidewalks along Rea Road in the project area. There are no e�sting bicycle lanes or
greenways/multi-use trails in the project study area.
U-3467 Environmental Assessment May 2015
2-3
Utilities
Water and sewer service within the project study area is provided by Union County� Public Works.
According to the Union County Utilitie.r Map (updated December 4, 2008), there are water mains
along the entire length of many of the major roads within the project study area, including NC 84,
NC 16, Rea Road, and Waxhaw-Indian Trail Road. Sewer mains cross existing roads in several
locations.
TheYe are overhead utilities along e�sting Rea Road, NC 16 and NC 84. Power poles line NC 84
and switch from side to side depending on roadway curvature, shoulder widths and distribution of
service. However, oveYhead utilities along much of NC 84 are located within a utility easement
that parallels, but is not immediately adjacent to the roadway. A high voltage power transmission
corridor crosses NC 84 at Weddington Optimist Park.
Additional utilities located along the length of many of the roads in the project area include buried
cable television and telecommunication cables, as well as natural gas pipelines.
2.2.1.3 School Bus Usage
Weddington High School, Weddington Middle School, and Weddington Elementary School are all
located on the northern side of NC 84 between Twelve Mile Creek Road and Deal Road.
According to Union County Public Schools, a total of 72 bus trips per day access the high school
from NC 84. The middle school and elementary school are accessed from Twelve Mile Creek
Road and have 78 and 34 bus trips per day, respectively, some of which use NC 84.
2.2.1.4 Traffic Carrying Capacity
A Traffic Capacity Analysis Report (VHB, October 2013) was prepared for the proposed project.
Using 2012 and 2035 traffic
forecasts prepared by NCDOT, � �
the traffic capaciry analysis The relationship of travel demand compared to the
evaluates project-area roadway
segments and intersections for
2012 Existing Conditions, 2035
No Build Conditions, and 2035
Build Conditions for the
proposed project. The traffic
forecasts are shown on Figures 3
through 5 in Appendix A.
Existing Traffic Volumes
roadway capacity determines the level of service (LOS)
of a roadway. Design requirements for roadways vary
according to the desired capacity and level of service.
Six levels are used, ranging from "A" to "F". LOS "A"
indicates no congestion while LOS "F" represents more
traffic demand than road capacity and extreme delays.
LOS D indicates the capacity of a roadway at which the
public begins to express dissatistaction.
The 2012 average annual daily traffic (AAD'I� on NC 84 between NC 16 and Waxhaw-Indian Trail
Road ranges from 14,800 vehicles per day (vpd) between Cox Road and Weddington-Matthews
Road to 18,900 vpd between Antioch Church Road and Weddington Optimist Park East Driveway
(see Figure 3). The 2012 AADT on NC 16 ranges from a low of 17,400 vpd to the south of Rea
Road, to a high of 2C,800 vpd to the north of NC 84. The 2012 AADT on Rea Road is 12,600
vpd.
The estimated 2012 truck percentage along NC 84 through the project area is four percent (three
percent duals and one percent tractor trailer, semi-truck [TT-ST']). The estimated 2012 truck
percentage along NC 1 C to the south of NC 84 is six percent (five percent duals and one percent
U-3467 Environmental Assessment May 2015
TT-S'I�, and this percentage decreases slightly to five percent (four percent duals and one percent
TT-S`I� to the north of NC 84. The estimated 2012 truck percentage along Rea Road is six
percent (five percent duals and one percent TT-S'I�.
Existing Levels of Service
Table 2-1 shows the existing I.OS for the roadway segments analyzed. The eastern section of
NC 84 between the proposed Rea Road Extension and Waxhaw-Indian Trail Road operates at an
unacceptable LOS E under existing conditions.
Table 2-1. Summary of Roadway Segment I.evel of Service
Roadway Existing 2035 No 2035 Build
Segment From To Conditions Bu�d Alternatives
(2012) A2 and C2
NC 16 Rea Road NC 84 B C C
Proposed
NC 84 NC 16 Rea Road D E D
Extension
Proposed Waxhaw-
NC 84 Rea Road Indian Trail E F C
Extension Road
Proposed
Rea Road NC 16 NC 84 N/A N/A A
Extension
Table 2-2 shows the delay and LOS for existing AM and PM peak conditions at the 12
intersections analyzed in the project study area. For signalized intersections, the delay and LOS
shown are for the overall intersection. For unsignalized intersections, the delay and LOS shown
are for the intersection approaches under stop sign control. As shown in Table 2-2, there are no
signalized intersections operating below LOS D under existing conditions. However, there are five
unsignalized intersections with at least one stop sign controlled approach operating below LOS D
under e�sting conditions, three of them in both the AM and PM peak conditions.
U-3467 Environmental Assessment May 2015
2-5
Table 2-2. Summary of Intersection Delay (seconds) and Level of Service
2035 2035 Build
Existing Alternatives
Existing Conditions No Build
Intersection Name' Intersection (2012) � and C2
Controlz Delay in seconds (LOS)
AM PM AM PM AM PM
NC 16/Rea Road Signalized 27.6 35.8 42.7 96.4 473 43.5
�C) �) �D) �F) �) �)
NC 84/NC 16/Weddington United Signalized 36.5 29.7 62.9 32.6 322 31.1
Methodist Church Driveway (D) (C) (E) (C) (C) (C)
NC 84/Weddington-Matthews Unsignalized/ 45.0 34.1 18.8 40.1 9.7 11.4
Road Roundabout3 SB (E) (D) (C) (E) (A) (B)
NC 84/Cox Road Unsignalized SB 20.0 17.5 36.9 25.6 20.2 17.4
�C) �C) ��) �) �C) �C)
26.9 27.4 78.4 95.2 22.1 19.3
NC 84/Twelve Mile Creek Road Signalized �C) (C) (E) (F) (C) (B)
27.0 * * * 11.3 273
NC 84/Weddington HS West Drive Unsignalized SB �� �� �� �r� �g�4 �C�4
57.4 54.1 * *
NC 84/Deal Road/Hollister Estates N�
Drive Unsignalized ��� �� �� ��� A1 10.4
SB � )4 �)4
(F) (F) (F) (F)
NC 84/Sourhbrook Community Unsignalized SB 26.0 29.7 97.0 131.2 11.1 11.1
Church West Drive (D) (D) (F� (F) (B)' (f3)'
42.0 40.2 * *
NC 84/Southbrook Community NB
Church Fast Drive/Lester Davis Unsignalized �E) (E) (F) (F) 14.5 212
Road SB 40.8 53.4 * * (B)4 (C)4
��) �� �� �F)
NC 84/Antioch Church Road Unsi nalized SB 156.3 103. * * 9.6 �.1
g �� 1 �F) �� �� �A)4 (A)4
NC 84/Waxhaw-Indian Trail Road Signalized 40.3 31.8 96.8 53.9 41.7 40.6
��) �C) �� �) ��) �)
Rea Road Extension/NC 84 Future Signalized NA NA NA NA 22.2 20.5
(C) (C)
1 E�sting intersections are listed from west to east, as shown on Figures 2A through 2G.
z I'or signalized intersections, delay and I,OS shown are for overall intersection.
For unsignalized intersections, delay and LOS shown are for intersecrion approaches under stop sign control; SB -
southUound approach, NB - northbound approach.
' Roundabout was completed in September 2013 at Weddington Road (NC 84)/Weddington-Matthews Road intersection as
part of Project U-5325. Design Year 2035 delay and LOS for both Build and No Build conditions are for overall intersection
with roundabout in place.
4 Highlighting indicates that traffic signal is required for 2035 Build Conditions with both alternatives for intersection to
operate at an acceptable LOS regardless of additional intersection and/or roadway seb ent improvements implemented with
the proposed project alternatives. Delay and LOS shown are for overall intersection with signal in place.
s Southbroolc Community Church West Driveway will be right-in/righe-out only for 2035 Build Conditions with both
alternatives.
*Delay greater than 250 seconds.
U-3467 Environmental Assessment May 2015
���
Future Traffic Volumes
The 2035 No Build Conditions traffic forecast (see Figure 4) represents the future traffic volumes
in the project study� area without the construction of the proposed project. The 2035 Build
Conditions traffic forecast (see Tigure 5) represents the future volumes with the proposed Rea
Road Extension in place with either Alternative A2 or C2.
Under the No Build Conditions, 2035 AADT on NC 84 between NC 16 and Waxhaw-Indian Trail
Road ranges between 19,400 vpd (between Cox Road and Weddington-Matthews Road) and
27,300 vpd (between Antioch Church Road and Weddington Optimist Park East Driveway). The
2035 AADT on NC 16 ranges from 23,700 vpd south of Rea Road to 34,800 vpd north of NC 84.
The 2035 AADT on Rea Road is 20,000 vpd. The estimated 2035 truck percentages for NC 84,
NC 16 and Rea Road are the same as for 2012 Existing Conditions.
With the construction of the proposed project, 2035 AADT c�n NC 84 between NC 16 and
Waxhaw-Indian Trail Road ranges from 13,400 vpd (between Cox Road and Weddington-
Matthews Road) to 28,300 vpd (between Antioch Church Road and Weddington Optimist Park
East Driveway). The 2035 AADT on NC 16 ranges from 23,700 vpd to the south of Rea Road, to
34,800 vpd to the north of NC 84. The 2035 AADT on Rea Road is 23,200 vpd to the west of
NC 16 and 11,400 vpd to the east of NC 16. The estimated 2035 truck percentages for NC 84,
NC 16 and Rea Road are the same as for 2012 Existing Conditions. The estimated truck
percentage for Rea Road Extension is four percent (three percent duals and one percent TT-S'I�.
In comparison to 2035 No Build Condirions, the 2035 Build Conditions forecast indicates traffic
volumes will increase by appro�mately 1,000 vpd on the eastern section of NC 84 in the project
study area as a result of the proposed project. However, traffic volumes will drop substantially on
the western section of existing NC 84 as traffic is diverted to the new roadway. In addition, 2035
traffic volumes on existing Rea Road to the west of NC 16 will increase with the completion of the
proposed project in comparison to the No Build Conditions forecast as a result of through traffic.
Future Levels of Service
Table 2-1 shows the Design Year 2035 LOS for the roadway segments analyzed under No Build
and Build Conditions. As shown in Table 2-1, the eastern section of NC 84 between the proposed
Rea Road Extension and Waxhaw-Indian Trail Road will operate at I.OS F under 2035 No Build
Conditions, and the western section will operate at an unacceptable LOS E. The target, or
measurable goal, for LOS improvements on NC 84 is LOS D or better under 2035 Build
Conditions. Under 2035 Build Condirions there would be substantial improvements in LOS for
the NC 84 roadway segments analyzed. In addition, the proposed Rea Road Extension would
operate at LOS A.
Table 2-2 shows the delay and LOS for Design Year 2035 AM and PM peak conditions at the 12
inteYsections analyzed for the No Build and Build Condirions. For signalized inteYsections, the
delay and LOS shown are for the overall intersection. For unsignalized intersections, the delay and
LOS shown are for the intersection approaches under stop sign control. Currentl}� unsignalized
intersections that will require a traffic signal under 2035 Build Conditions with both Alternatives
A2 and C2 for the intersection to operate at an acceptable LOS are highlighted. The delay and
LOS shown for these future signalized intersections are for the overall intersection with a traffic
signal in place. The Southbrook Community Church west driveway will be right-in/right-out only
for 2035 Build Condirions with both alternatives.
As shown in Table 2-2, under 2035 No Build Conditions, traffic operations degrade considerably
U-3467 Environmental Assessment May 2015
2-7
without any improvements in place. All 11 eXisting intersections in the study area operate at
unacceptable LOS E or F during at least one peak period. Under 2035 Build Conditions, there
would be substantial improvements at these intersections.
2.2.1.5 Airports
There is a small private airport with one paved runway located within the Aero Plantation
subdivision. The entrance to the subdivision is located on NC 84 (see Figure 2E). The airport is
located at the southeYn end of the subdivision, over one-half mile south of NC 84 and outside of
the project study area.
2.2.1.6 Other Highway Projects in the Area
There are no other highway projects currently under construction in the project study area.
2.2.2 Transportation and Land Use Plans
2.2.2.1 NCDOT State Transportation Improvement Program
The Draft 2016-2025 STIP includes the following projects in the viciniry of U-3467:
■ B-5243 — Replace Bridge No. 258 on Indian Trail Road (SR 1008) over South Fork Crooked
Creek. The Draft STIP includes funding for construction in FY 201 C.
■ B-5791 — Replace Bridge No. 224 on SR 1301 (Marvin Road) over Twelvemile Creek. The
Draft STIP includes funding for right-of-way acquisition in FY 2020 and construction in
FY 2021.
■ U-5769 — Widen NC 16 (Providence Road South) to multi-lanes from SR 1316 (Rea Road
Extension) to SR 1321 (Cuthbertson Road). The Draft STIP includes funding for right-of-way
acquisition in FY 2022 and construction in FY 2024.
■ U-4714 — Widen John Street — Old Monroe Road (SR 1009) to multi-lanes from Trade Street
(SR 3448 — SR 3474) in Mecklenburg County� to Wesley Chapel — Stouts Road (SR 1377) in
Union County. The Draft STIP includes funding for right-of-way acquisition beginning in
FY 2021 and construction beginning in FY 2023. Funding is not currently proposed for Phase
C right-of-way acquisition or construction.
Roadway improvements in the project area were completed in September 2013 under NCDOT
project U-5325. The project constructed a roundabout at the NC 84/ Weddington-Matthews
Road (SR 1344) intersection and relocated the NC 16/Weddington Church Road (SR 1317)
intersection (completed October 2012).
2.2.2.2 Local Transportation and Thoroughfare Plans
Charlotte Regional Transportation Planning Organization (CRTPO)
The Charlotte Regional Transportation Planning Organization (CRTPO) is the federally designated
Metropolitan Planning Organization (MPO) for the Charlotte Urbanized Area, which includes the
Rea Road Extension project area. Due to the growth of the Charlotte Urbanized Area, and the
subsequent expansion of the MPO planning area boundary, the CRTPO was established in 2013 in
place of the former Mecklenburg-Union MPO (MUMPO). Future updates to MPO plans and
U-3467 Environmental Assessment
f►�:3
May 2015
programs will be performed by CRTPO. CRTPO has the following plans in place to guide
transportation planning in the MPO region:
CI�TPO 2040 Metropolitan Tran.rportation Plan (MTP) (Apri12014) — The CRTPO 2040 MTP
includes the proposed project on its horizon year 2025 and 2030 fiscally constrained roadway
projects lists. "Rea Road/Marvin School Road (NC 84)" is included as U-3467 A/B on the
horizon year 2025 list as a new four-lane roadway with median, wide outside lanes, and
sidewalks from NC 16 to Twelve Mile Creek Road. "Weddington Road (NC 84)" is included
as U-3467C on the horizon year 2030 list as widening from two to four lanes with median,
wide outside lanes and sidewalks from Twelve Mile Creek Road to Waxhaw-Indian Trail Road.
One additional project in the study area is also included in the fiscally constrained project list
(2025). "Providence Road South (NC 16)" between Rea Road and Cuthbertson Road is
described as a widening project from two lanes to four lanes with median, wide outside lanes,
and sidewalks.
2004 Mecklenburg-Union Metropolitc�n Planning Organi�ation Thoroughfare Plan (Updated as of March
21, 2012) — The 2004 MUMPO Thoroughfare Plan includes the proposed Rea Road Extension
as a Proposed Major Thoroughfare.
Mecklenburg-Union Metropolitan Planning Organi�ation 20�2-20�8 Tran.rportation IynproveynentProgram
(TIP) Qul�r 20, 2011) — The MUMPO 2012-2018 TIP includes a financially constrained list of
transportation projects that the MPO and NCDOT plan to undertake over the next seven
years. All projects receiving federal funding must be included in the TIP. Approved MPO
TIP's are incorporated directly, without change, into NCDOT's STIP.
C1�ZP0 Draft Co�nprehen.rive Tran.rportation Plan (May 2015) — The CRTPO Draft Comprehensive
Transportation Plan (CTP) is a multi-modal transportation plan that ultimately will replace
CRTPO's existing Thoroughfare Plan. The Draft CTP includes "Rea Road Extension
(relocate NC 84)" as a recommended boulevard on new location between NC 16 and NC 84.
Existing NC 84 from the new location tie-in to Waxhaw-Indian Trail Road, and beyond the
study area, is listed as a boulevard that "needs improvement". The new location portion of the
proposed CTP alignment for Rea Road Extension is on appro�mately the same alignment as
Alternative C2 (see Section 3.1.4.4). The Draft CTP recommends bicycle accommodations,
sidewalks and a multi-use path along the proposed project. The Draft MUMPO CTP
Pedestrian Map also indicates that six existing roads in the project study area need improved
pedestrian facilities. The following is a list of these roads, along with their recommended
pedestrian facility improvements:
— NC 16 south of Rea Road — sidewalks
— Rea Road west of NC 16 — sidewalks and multi-use path
— NC 84 east of Rea Road Extension — sidewalks and multi-use path
— Waxhaw-Indian Trail Road — sidewalks (to the north and south of the existing sidewalks)
— Lester Davis Road — sidewalks
— Billy Howey Road — sidewalks
Other Regional Transportation Plans in the Project Area.
1�e.rtern Union County LocalArea Begional Tran.rportation Plan (LARTP) (MAB, NovembeY 2009) —
The LARTP is a multi-modal plan that attempts to balance the needs of various modes of
transportation, including vehicles, bicycles, pedestrians, and transit, within western Union
County, including the Rea Road Extension project area. The local planning jurisdictions within
U-3467 Environmental Assessment
2-9
May 2015
the Rea Road Extension project area adopted the LARTP. The projects and recommendations
developed as part of the LARTP feed directly into the LRTP and CTP. The plan recognizes
the NC 84 Relocation (Rea Road Extension) project to construct a four-lane boulevard on new
location between NC 16 and NC 84 as the top ranked high priority project. The new locarion
portion of the proposed I,ARTP alignment for the Rea Road Extension is on approximately
the same alignment as Build Alternative C2 (see Section 3.1.4.4). The second highest priorityT
project in the plan is the widening of NC 84 to the west of the Rea Road Extension to a four-
lane boulevard. The recommended cross-sections include sidewalks and on street bicy�cle lanes
along the proposed project.
■ The Union County Conaprehen.rive Tran.rportation Plan (NCDOT, February 2012) is a long range
multi-modal transportation plan that covers transportation needs through 2035 for the rural
portions of Union County� outside of the area included in the 2004 MUMPO Thoroughfare
Plan. The project study area is completely within the area covered by the 2004 MUMPO
Thoroughfare Plan.
Carolina Thread Trail Master Plan for Union County and Participating Municipalitie.r (September 2011)
— The Carolina Thread Trail (CT'I� initiative is an effort to encourage 15 counries in the south-
central piedmont of North Carolina, including Union Counry, and the north-central portion of
South Carolina to create an interconnected trail system that will preserve and increase the
quality of life within the local communities. The CTT Master Plan for Union County presents
a conceptual route for trails throughout the county to receive the CTT designation. The
closest proposed CTT is within the Village of Wesley Chapel to the east of the project study
area.
2.2.2.3 Land Use Plans
The Town of Weddington, North Carollna Land Use Plan (April 8, 2013) states "there are a
number of critical road improvements scheduled in the Weddington viciniry over the next few
years, the most important being the construction of the Rea Road Extension (known as the
realignment of NC 84)."
The Village of Wesley Chapel Land Use Plan (December 8, 2003) includes policies and goals to
limit the majority of planned non-residential development to strategic nodes on NC 84. The plan
states dYiveway access onto NC 84 should be limited.
The Village of Wesley Chapel Comprehensive Parks and Recreation Plan (updated January
18, 2011) notes that as the Carolina Thread Trail develops its recommendations for an
interconnected trail system for Union County, the Village also will e�plore ways to promote
desired pedestrian connectivity within the Village.
The Union County, North Carolina 2025 Comprehensive Plan (October 18, 2010) notes two
areas in the pYoject study area are projected to experience significant circulation and congestion
issues:
Intersection of Rea Road/Providence Road: NC 16 will continue to be a major north-south
commuting route. The ongoing widening improvements will increase the road's capacity,
which will in turn increase the volume of traffic on the road and at key intersections.
Intersection of NC 84/Waxhaw-Indian Trail Road: NC 84 will continue to be a major east-
west route, connecting NC 16 with downtown Monroe and US 74. Waxhaw-Indian Trail Road
will increase in importance as a north/south route. This intersection is projected to experience
U-3467 Environmental Assessment
May 2015
significant traffic volumes.
The Union County2006Parks and Recreation Comprehensive MasterPlan Update
(December 2006) includes a proposed multi-use trail within the project study area that would
follow exisdng Rea Road to the west of NC 16, continue along the proposed Rea Road Fxtension
to NC 84, and then follow NC 84 to the east of the study area. Union County noted the inclusion
of sidewalks and wide outside lanes for bicycles would meet the intent of the County's desire to
serve pedestrians and bicyclists along this corridor (personal communication, September 2014).
2.2.3 System Linkage/Travel Time/Access Needs
2.2.3.1 Existing Road Network
Major roadways in the project area include Rea Road, NC 1C, and Waxhaw-Indian Trail Road. Rea
Road is a major connecting route between western Union County and the City of Charlotte. Rea
Road has an interchange with I-485 approximately five miles northwest of the proposed project.
arlolle L'in.ir�lr�s
��7�trnnal �ir�crr.
� I �.:: i
iqgi
�,
�
�_
�h
� sil
�'�xl — PinevF+�e
�
. , �:. . r:.
r `l f_'?�1
+i+r� I��1'I —
i SE.^; I
I �] � l'v' r I�:: �
�� y
=; � ; _
,.,� i`�:ri'i
�;;si
�
M�t#,3�ews
Skallinr�s
L'ak.c !-'�Ek
In�ian 3raf,:
i lf�j
4°seddir.gl€rn
r i=_is � j��,• U-3467 _�tdesl�p• �,h;:p�l
�—�� � •..i�i..
F��4rvin
U-3467 Environmental Assessment
Exi,rtin� Boad Netzvork
2-11
�
I 2.Ifl'Ir^{s'
� �::: i ;
rFa',
— F,�+.r.�nroe
iZ3�1
May 2015
NC 16 runs north-south at the western end of the project area and provides another major
connecting route to I-485 and the City of Charlotte to the north, as well as a connection to NC 75
and the Town of Waxhaw to the south. NC 16 connects with I-485 at an interchange
approximately 2.7 miles north of NC 84. I-485 and NC 75 between Monroe and South Carolina
are designated corridors in the North Carolina Strategic Highway Corridors system. Waxhaw-
Indian Trail Road is located at the eastern end of the project area and runs north-south, providing
a connection to the Town of Indian Trail and US 74 to the north and the Town of Waxhaw to the
south.
2.2.3.2 Commuting Patterns
NC 16 and NC 84 are major commuting routes between southwestern Union County and the City
of Charlotte/Mecklenburg County�, where over half of the workers in the project study area are
employed.
2.2.3.3 Modallnterrelationships
Public Transportation
The project study area is not currently served by mass transit. Union County Transportation
provides demand response transportation services for Union County residents.
Rail Service
There are no freight or passenger rail service providers in the project area.
Motor Freight Service
There are no freight distribution facilities in the project area.
Air Service
There are no major public or private airports in the project area. There is a small private airport
with one paved runway located just south of the project area within the Aero Plantation
subdivision.
2.2.4 Safety Operations
Traffic crash data were obtained for NC 16 and NC 84 within the study area for the five-year
period between May 1, 2010 and Apri130, 2015. The data for NC 16 includes crashes that were
reported from Lochaven Road (SR 1318) to NC 84. The data for NC 84 include crashes that were
reported from NC 16 to Waxhaw-Indian Trail Road. Table 2-3 details the specific locations where
five or more crashes were reported as well as the corridor-wide totals along the NC 16 corridor.
As shown in the summary table, the predominant collision type along the NC 1 C corridor was rear-
end crashes. Rear-end collisions generally indicate overall congestion issues. These rypes of
collisions occur mainly in areas where there is frequent "stop-and-go" traffic or at locations where
vehicles may stop suddenly or slow to turn. The intersection of NC 16 and Rea Road had the
highest overall number of collisions with 27 total crashes reported. The most common collision
type was rear-end collisions, accounting for 59 percent of crashes at this intersection. The NC 16
and NC 84 intersection had the second highest number of collisions with 21 total crashes reported.
U-3467 Environmental Assessment May 2015
Table 2-3. NC 16 Crash Data Summary from l.ochaven Road to NC 84
Crash Type
Location along
NC 16 Corridor / Ran Total
Traffc Control Rear Left- �imal Side Object Angle Other Off �ght-
End Turns Swipe Road Turns
Lochaven Road / 6 0 0 0 1 0 0 0 2 9
Unsignalized
North of Lochaven 3 0 3 0 1 0 0 1 0 8
Road / Unsignalized
Rea Road / Signalized 16 2 2 3 0 2 1 0 1 27
North of Rea Road / 5 0 1 1 0 0 0 0 0 7
Unsignalized
Lenny� Stadler Way / 4 0 2 2 0 0 0 0 0 8
Signalized
North of Lenny
Stadler Way / 5 1 2 0 0 0 0 0 0 8
Unsignalized
NC 84 / Signalized 13 3 0 3 0 1 1 0 0 21
Other Crash
Locations / 6 0 4 1 0 0 0 0 0 11
Unsignalized
Corridor-Wide Total 58 6 14 10 2 3 2 1 3 99
Note: Crash data is for period from May 1, 2010 to Apri130, 2015.
Table 2-4 details the locations where five or more crashes were reported as well as the corridor-
wide totals along the NC 84 corridor.
U-3467 Environmental Assessment
2-13
May 2015
Table 2-4. NC 84 Crash Data Summary from NC 16 to Waxhaw-Indian Trail Road
Crash Type
Location along NC 84
Corridor / Traffic Ran Total
Control Rear Left- �imal Side Object Angle Other Off �ght-
End Turns Swipe Road Turns
NC 16 / Signalized 27 1 0 4 1 1 1 0 1 36
Haxris Teeter Driveway 2 1 2 1 0 0 0 0 1 7
/ Unsignalized
Weddington- Matthews � 1 1 12 1 4 2 0 2 32
Rd. / Unsignalized
Twelve Mile Creek Rd. 12 6 0 1 1 1 0 0 0 21
/ Signalized
East of Twelve Mile
Creek Rd. / 12 0 1 0 0 0 0 0 0 13
Unsignalized
Weddington HS Ent. / 4 2 0 0 1 0 0 0 0 7
Unsignalized
West of Deal Road / 2 0 1 0 2 0 0 0 0 5
Unsignalized
Deal Road / 3 1 0 0 0 1 1 0 0 6
Unsignalized
East of Deal Road / 2 0 0 0 4 0 0 0 0 6
Unsignalized
Lester Davis Road / 3 1 0 0 0 2 0 0 1 7
Unsignalized
Wese of Antioch
Church Rd. / 4 0 0 0 1 0 0 0 0 5
Unsignalized
Antioch Church Rd. / 13 3 0 1 0 1 0 1 0 19
Unsignalized
East of Antioch Church 2 0 2 0 1 0 0 0 0 5
Rd. / Unsignalized
Harris Teeter-Village
Commons / 6 5 0 2 3 4 0 0 1 21
Unsignalized
Waxhaw-Indian Trail 15 10 0 1 0 3 2 1 3 35
Rd. / Signalized
Other Crash Locations 40 7 14 5 15 4 2 4 1 92
/ Unsignalized
Corridor-Wide Total 156 38 21 27 30 21 8 6 10 317
Note: Crash data is for period from May 1, 2010 to AprIl 30, 2015.
U-3467 Environmental Assessment
May 2015
As shown in the summary table, the intersection of NC 84 and NC 16 had the highest overall
number of collisions with 36 total crashes reported. The most common collision type was rear-
end collisions, accounting for 75 percent of crashes at this intersection. The signalized NC 84 and
Waxhaw-Indian Trail Road intersection had the second highest number of collisions (35) with the
most common type also being rear-ends. The unsignalized NC 84 and Antioch Church Road
intersection had 19 crashes, with the most common rype again being rear-ends. This is particularly
high for an unsignalized T-intersection of two-lane roadways. The lack of left-turn or right-turn
lanes and skew angle likely contribute to the number of collisions at this location.
Table 2-5 compares the crash rates for NC 16 and NC 84 to similar corridors statewide. NCDOT
provides calculated rates for facility types based on data collected statewide. For the purpose of
comparison, both corridors are classified as undivided, two lane, rural NC routes. However, since
NC 16 was recently upgraded to a fouY-lane divided facility, the statewide averages for similar four-
lane divided facilities are listed as well. During the five years studied, there were no fatalities along
either NC 16 or NC 84.
The faciliry-wide crash rates for NC 16 are higher than the statewide average for similar facilities.
This corridor recorded above average crash rates for all crash rates examined, except fatal crashes.
Similarly, the facility-wide crash rates for NC 84 are higher than the statewide average for similar
facilities, with the exception of the fatal and night crash rates.
Table 2-5. Facilit�T Crash Rate Comparison
Total Fatal Non-Fatal Night Wet
Roadways Crash Crash Injury Crash Crash
Rate Rate Crash Rate Rate Rate
NC 16 between l.ochaven Road 329.77 0.00 63.29 11C.59 46.63
and NC 84
NC 84 between NC 16 and 284.15 0.00 62.75 64.54 45.72
Waxhaw-Indian Trail Road
Statewide Rural North Carolina 170.45 1.70 51.58 68.70 22.84
Routes (2lanes, undivided)'
Statewide Rural North Carolina g639 0.46 25.62 36.13 10.86
Routes (4lanes, divided)'
Note: Crash data is for period from May 1, 2010 to April 30, 2015. All crash rates per 100 million vehicle miles
traveled.
� 2010-2012 statewide crash rates for rural North Carolina routes.
2.3 Benefits of Proposed Project
The proposed project includes capacity improvements to improve overall traffic congestion, as
well as improvements at key intersections to improve intersection operations. The proposed
improvements are expected to provide a safer facility as a secondar�T benefit by reducing the risk of
collisions.
U-3467 Environmental Assessment May 2015
2-15
This page was intentionally lett blank.
U-3467 Environmental Assessment
May 2015
3.0 ALTERNATIVES
A range of alternatives were reviewed for the proposed project. This chapter summarizes
alternatives that were considered and eliminated, and the alternatives that were carried forward for
detailed study. The alternatives carried forward for detailed study are shown on Figures 2A
through 2G in Appendix A. Preliminary `Build" alternarives shown on Figure 6.
What alternatives were considered for the project?
3.1 Alternatives
3.1.1 No Build Alternative
With the No Build Alternative, no transportation improvements would be made beyond routine
maintenance. This alternative assumes that fueure traffic would utilize existing roads and typical
sections. The No Build Alternative would not improve the mobility and connectivity of NC 84 in
the project study area. The No Build Alternative does not meet the Purpose and Need for the
proposed project and was eliminated from further consideration.
3.1.2 Alternative Modes of Transportation
3.1.2.1 Travel Demand Management
Travel Demand Management (TD1V� involves programs to encourage travelers to use alternatives
to driving alone, and, in some cases, to encourage tYavelers not to travel at all. A major purpose of
TDM is to reduce the number of single-occupant vehicles on the road during peak travel periods
when roads are most congested. These programs can include van/car pools, flexible work
schedules, telecommuting programs, and park & ride lots. The proposed project does not include
any TDM measures. TDM improvements alone would not increase capacit�r or improve levels of
service enough to prevent failing traffic conditions in the future design year 2035, nor would it
improve system connectivity. The TDM Alternative does not meet Purpose and Need and was
eliminated from further consideration.
3.1.2.2 Mass Transit
The project study area is not currently served by mass transit. The CTPs developed by CRTPO
and Union County do not include any recommended public transportation improvements within
the project study area or surrounding areas. A mass transit alternative would only minimally
address mobility and would not improve connecrivity in the project area. In addirion, it would not
be a reasonable alternative because of dispersed residential areas and employment centers, and
diversity of trip origins and destinations. The Mass Transit Alternative does not meet Purpose and
Need and was eliminated from further consideration.
3.1.2.3 Transportation Systems Management
Transportation Systems Management includes low-cost strategies to improve traffic flow and
eliminate botdenecks. Such improvements are typically implemented to maximize the efficiency of
the existing roadway network, such that major widening projects and new roadways are not
U-3467 Environmental Assessment May 2015
3-1
necessary. These measures can include ramp lengthening, construction of auxiliary lanes,
constructing new interchanges, improved signing and lane markings, and improved shoulder
illumination. TSM impYovements alone would not increase capacity or improve levels of service
enough to prevent failing trafiic conditions in the future design year 2035, nor would they improve
system connectivity. The TSM Alternative does not meet Purpose and Need and was eliminated
from further consideration.
3.1.3 Improve Existing
The "improve e�sting" alternative (Alternative B) would widen existing NC 84 to a four-lane
median divided roadway from just east of the roundabout at Weddington-Matthews Road
(SR 1344) to Waxhaw-Indian Trail Road. Alternative B would provide additional capacity on
NC 84 in the project study; however, it would not to improve system connectivity=. The "improve
exisring" alternative does not meet Purpose and Need and was eliminated from further
consideration. Alternative B was shown at the June 2013 public meeting.
3.1.4 New Location (Relocate NC 84) Alternatives
Two new location alternatives extending Rea Road from the current intersection of Rea Road and
NC 16 to existing NC 84 appro�mately 0.35 mile west of Twelve Mile Creek Road (relocation of
NC 84) were developed for the proposed project (Alternatives A and C). Options for both of the
new location alternatives were developed to minimize potential impacts to wetlands (Alternatives
A2 and C2).
From the point where the new location alternatives tie to e�sting NC 84 west of Twelve Mile
Creek Road to the project terminus just east of Waxhaw-Indian Trail Road, best-fit widening is
proposed. The best-fit widening approach widens NC 84 to both sides of the existing roadway.
The proposed alignment varies between symmetrical widening and widening north or south of the
existing roadway as needed to minimize potential impacts to land use and important environmental
features.
3.1.4.1 Alternative A
Alternative A begins appro�mately 0.12 mile west of the existing Rea Road/NC 16 intersection.
From NC 16, Alternative A extends on new location to the east approximately 1.52 miles to tie
into existing NC 84 appro�mately 0.40 mile west of Twelve Mile Creek Road. Alternative A then
follows existing NC 84 to just east of Waxhaw-Indian Trail Road, a distance of approximately 2.67
miles. The total length of Alternative A is approximately 4.31 miles. Alternative A was shown at
the June 2013 public meeting. Alternative A meets the Purpose and Need of the proposed project.
However, Alternative A was eliminated from further consideration because it would result in
approximately 0.39 acre of additional wetland impacts and approximately 351 more linear feet of
stream impacts than Alternative A2.
3.1.4.2 Alternative A2
Alternative A2 is a variation of Alternative A that was developed to minimize potential wetland
impacts. Alternative A2 begins approximately 0.12 mile west of the existing Rea Road�NC 16
intersection. From NC 16, Alternative A2 extends on new location to the northeast, then curves
southeast to follow the same alignment as Alternative A. The new location portion of Alternative
A2 is approximately 0.04 mile longer than Alternarive A as a result of the alignment shift to reduce
U-3467 Environmental Assessment May 2015
K��
wetland impacts. The total length of Alternative A2 is approximately 4.35 miles. Alternative A2
meets the Purpose and Need of the proposed project and was retained for further study.
3.1.4.3 Alternative C
Alternative C begins approximately 0.12 mile west of the existing Rea Road/NC 16 intersection.
From NC 16, Alternative C extends on new location to the east following the same alignment as
Alternative A for appro�mately 0.08 mile. Alternative C then turns southeast, roughly paralleling
Alternative A to the north. The new location portion of Alternarive C is approximately 1.73 miles
long. Alternative C ties into e�sting NC 84 appro�mately 0.33 mile west of Twelve Mile Creek
Road and then follows e�sting NC 84 to just east of Waxhaw-Indian Trail Road. The total length
of Alternative C is appro�mately 4.35 miles. Alternative C meets the Purpose and Need of the
proposed project. However, Alternative C was eliminated from further consideration because it
would result in approximately 0.5 acre of additional wetland impacts and approximately 0.1 acre of
additional pond impacts than Alternative C2.
3.1.4.4 Alternative C2
Alternative C2 is a variation of Alternative C that was developed to minimize potential wetland
impacts. Alternarive C2 begins appro�mately 0.12 mile west of the e�sting Rea Road/NC 16
intersection. From NC 16, Alternative C2 extends on new location to the southeast, then curves
northeast to follow the Alternative C alignment The new location portion of Alternative C2 is
approximately 0.01 mile shorter than Alternative C. The total length of Alternative C2 is
approximately 4.34 miles. Alternative C2 meets the Purpose and Need of the proposed project
and was retained for further study.
3.2 Alternatives Considered
3.2.1 Detailed Study Alternatives
Alternatives A2 and C2 were selected for detailed study because they meet the project's Purpose
and Need and minimize potential impacts to wetlands. Proposed improvements associated with
Alternatives A2 and C2 are described in Chapter 4.0. Potential impacts to the human and natural
environments that could result from the construction of the detailed study alternatives are
described in Chapter 5.0.
3.2.2 Recommended Alternative
A preferred alternative will be selected after the Environmental Assessment is circulated for agency
and public comment and a public hearing is conducted for the proposed project.
U-3467 Environmental Assessment May 2015
3-3
This page was intentionally left blanl�.
U-3467 Environmental Assessment
May 2015
4.0 PROPOSED IMPROVEMENTS
This chapter provides an overview of the proposed project's principal features as well as other
features that are necessary to support the proposed improvements.
What are the principal features of the project?
4.1 Roadway Cross-Section and Alignment
The proposed typical section for the relocation and widening of NC 84, from the e�sting Rea
Road intersection at NC 16 to Waxhaw-Indian Trail Road, consists of four lanes (two in each
direction) with a 23-foot raised grass median (see Figure 7). A 12-foot inside lane, 14-foot outside
lane (to accommodate bicycles) and a ten-foot berm are proposed in each direction. Mountable
curb and gutter is provided on the inside lanes along the median. Curb and gutter along the
outside lanes is 2.5 feet wide. The typical section includes side slopes of 2:1 (maximum) for all cut
or fill heights.
The inclusion of sidewalks on both sides of the road is pending a cost-share agreement with local
jurisdictions. The ten-foot berm provides sufficient room to allow for five-foot sidewalks, if
desired by local jurisdictions. The Town of Weddington and the Village of Wesley Chapel have
expressed an interest in a cost-share arrangement with NCDOT for the inclusion of sidewalks in
the proposed project (see Appendix B).
4.2 Right-of-Way and Access Control
The proposed right-of-way width is 150
feet. No control of access is proposed;
however, the project is expected to be a
median-divided boulevard-type facility. Changes in access design, such as incorporating
While the addition of a median will not a median or changing a full median opening to
eliminate access to any parcels, it will a directional opening, can reduce traffic
change the way many parcels are accessed conflicts and the potential for crashes.
to right-in/right-out.
U-3467 Environmental Assessment
4-1
May 2015
In addition to median openings associated with intersections (see Section 4.6), the proposed
project includes a directional median opening that allows left-turns into both Weddington
Optimist Park entrances. Traffic exiting the park would be right-out only.
The proposed project will close the two existing entrances to Southbrook Community Church and
provide a new entrance at a proposed four-way signalized intersection at Lester Davis Road.
Access to the Shops at Wesley Chapel Shopping Center and the Village Commons Shopping
Center west of Waxhaw-Indian Trail Road is currendy permitted from both eastbound and
westbound lanes on NC 84. The proposed project will convert access to these shopping areas to
right-in/right-out only.
Weddington High School � , : � ti * .� `, ,�-. � �� �- ��
s�' � � �� �
�� :, ; �ti. � �+ � +
A detailed school traffic stud�� � ' t•� ,,��p � � � ; '* � ' � � ,�
was conducted for Weddington '�A �►�.��`+�r' ��';� *� Y� �' � \ , �
High School [Final Traffic � ��� � � �`�� '��' � ���� ;�
�
'� �- �� � v� ,'�k��� �
As.re.r.rnaent - i�eddington High ` � �� �' � ' � ; ,� ' ' ,, • �'�� � �
School (VHB, 2014)]. � �` +�° � �#�, k � -� :�;� �`�r � .
. �,� - '` '' �,' '�- r
The preliminary design for the ��, �.�,'�� ��' ;, �``'�;�% � �� �•nr���� k,��
' ` � ;�
proposed project incorporates '`'���' r.c �� ,V ^�,;`�. _ � ' -��
.a a ' � r; . y ` ° "�€, °
recommendations from the � '� � f �''`` � ', .. ` ,,,r"f ti'�� � �� �.f�: '•
school traffic study. In �'� ; � . :, �'`�-� *` �, �� , - -;.;:� ���
.�
accordance with these �� � �'" � � �`�. 7 ' ' � , �'
�� �ti �-, � �Y r,�'!"'
.�r '
recommendations, the central �� `'� `�` F,� '�L1 ' �'�"' °' �
.. . �' . �, ••'�9
access drive currently utilized ;'�_ �'�� � ;]J.1}A{' . M `��
h �xt �itil'�� �
by buses will be closed. = �'� �� -- -� - �j�' � y
Dedicated right-turn lanes and i�eddington High School
signals are proposed at the
western and eastern (student and staff/carpool) entrances to reduce backups and improve traffic
flow on NC 84. Left turns will be permitted into the school from NC 84; however, the access
drives will be right-out only. NCDOT will continue to coordinate with Weddington High School
through the project development and design process.
�,rt CEINNlC J ' j � ��
]`� � _
i
. . .. . � � ' _ -.�
R
I
�: : y
J � , � ■
`� _
n=� � �• � �t ' '_. . � __
`_-.�,.�`�--�-__ . , �B din9 ar��Rd
, _ - ���---� ' . �
-_; -- -- ---- -: --- - __ = � _ - _ - � ,
- �
_ _ _ __ .
. _ ___ _
�, _ _ �� _ . ,X
__
� --- - =�__��---� --_- - -- - -__ - _
-- , . . �-� _ __ -__ �� r_ ----- -
. • � sxre�-r �r,a� - . L- �•�_- =
` ASSffi artci�r r-
�iy �._ �� `'�� ��"�.�'�a1S� . � Nr.._ , - � �, .
U-3467 Environmental Assessment
4-2
UNIDN CDIII7Y .
May 2015
4.3 Speed Limit
The proposed posted speed limit is 45 mph.
4.4 Design Speed
The proposed design speed is 50 mph.
4.5 Anticipated Design Exceptions
There are no anticipated design exceptions associated with the proposed project.
4.6 Intersections/Interchanges
No interchanges are proposed as part of the project. All existing and proposed intersections will
be at-grade. There are no e�sting cross streets or proposed intersections along the new location
portion of Alternatives A2 and C2 between NC 16 and NC 84. The proposed project includes
signals at the following intersections:
■ NC 16 and Rea Road - The existing three-way signalized intersection would be converted to a
four-way signalized intersection, with dedicated left-turn and right-turn lanes and two through
lanes at all approaches.
■ Rea Road Extension (relocated NC 84) and existing NC 84 - Alternatives A2 and C2 include a
new signalized "T" intersection where Rea Road Extension ties into existing NC 84 west of
Twelve Mile Creek Road.
■ Twelve Mile Creek Road and NC 84 — The existing signal will be retained. Two through lanes
and a dedicated right-turn lane are proposed on NC 84 at this intersection. Dedicated right-
turn and left-turn lanes and one through lane are proposed on Twelve Mile Creek Road.
■ Weddington High School driveways and NC 84 — Signals are proposed at the eastern and
western entrances to Weddington High School. The driveway to Grace Baptist Church will
form the fourth leg of the western school entrance intersection. Left turns will be permitted
into the church and school from NC 84; however, these access drives will be right-out only. A
bulb-out is proposed adjacent to eastbound NC 84 at the signalized eastern school driveway
signal for westbound traffic wanting to make a U-turn. Dedicated right-turn lanes into both
school entrances are proposed.
Dea1 Road, Hollister Estates Drive and NC 84 — A signal is proposed at this intersection. The
preliminary design plans for Alternatives A2 and C2 include left-and right-turn lanes, and two
through lanes on westbound NC 84. A left-turn lane, through lane and combined through-
right lane are proposed on eastbound NC 84.
Lester Davis Road, Southbrook Church entrance and NC 84 — A signal is proposed at this
intersection. The proposed project realigns the Lester Davis Road intersection with NC 84
slightly to the west to eliminate the skew in the existing intersection. The eastern driveway of
Southbrook Community Church is shifted slightly to the west to remain aligned with Lester
Davis Road.
Antioch Church Road and NC 84 — the proposed project realigns Antioch Church Road
slightly to the west at NC 84 to eliminate the skew in the existing intersection. A signal is
proposed at this intersection.
U-3467 Environmental Assessment
4-3
May 2015
■ Waxhaw-Indian Trail Road and NC 84 — This intersection is currenrly signalized, and will
remain signalized with the proposed project. Intersection improvements include an additional
left-turn lane from northbound Waxhaw-Indian Trail Road onto westbound NC 84 and an
additional through lane on westbound NC 84.
4.7 Service Roads
There are no service roads in the project study area. No service roads are proposed as part of the
project.
4.8 Railroad Crossings
There are no railroads in the project study area.
4.9 Structures
A Prelirrtinaz^y Hydraulic.r Study for Environ�nentccl I1nn�act
(Mulkey, September 2013) was prepared for the proposed
project. The preliminary hydraulics analysis identified four
major stream crossings in the project study area associated
with the detailed study alternatives. Alternatives A2 and C2
each include two e�sting crossings and one new location
crossing. Details related to these crossings are included in
Table 4-1, and their locations are shown on Figures 2�
through 2G.
Site 3(Alternatives A2 and C2) is an existing crossing of
Culvert Branch under NC 84. There is currently a single 12-
foot by seven-foot reinforced concrete box culvert (RCBC)
at this crossing. It is recommended that this structure be
replaced with a triple barrel nine-foot by nine-foot RCBC.
Site 4(Alternatives A2 and C2) is an e�sring crossing of
West Fork Twelvemile Creek under NC 84. There is
currently a triple barrel 11-foot by 12-foot RCBC at this
crossing. It is recommended that this structure be replaced
with dual 90-foot-long concrete girder bridges. A floodway
modification may be required for this crossing.
Site 7(Alternative A2) and Site 8(Alternative C2) are close
enough in distance to be considered the same general
hydraulic crossing for Mundys Run. A triple-barrel nine-
foot by eight-foot RCBC is recommended for this new
location crossin�.
U-3467 Environmental Assessment
Site 3
Site 4
Site.r 7 anci 8
May 2015
Table 4-1. l�2ajor Drainage Structures Recommendations
Existing Structure Recommended Structure Stream Impact4 Structure Costs
1 Stream ID / Drainage (linear ft.) /
Site A1t. Wetland IDz Area
(Figure) ID Wetland Impact
(Stream Type3) (sq. mi.) Number, Size, Number, Size, Structure (acres) Recommended
Structure Type (length) Type (length) (vs. Bridge)
3 1@12'x7' RCBC 3@9'x9' RCBC �477,015
A2, C2 Culvert Branch (P) 2.1 195 ft / 0.0 ac.
(2F) (47 fe.) (145 ft) ($891,000)
4 West Fork Twelve- 3@11'x12' RCBC Dual Concrete Girder Bridges
A2' �"2 mile Creek P 10.6 0.0 ft. / 0.0 ac. $802,000
(2F� O (40 ft.) (90 ft. long by 405 ft. wide)
7 Mundys Run (I') 3@9'x8' RCBC �44),940
A2 1.4 New Location 210 ft. / 0.0 ac.
(2D) (128 ft.) (�623,700)
8 Mundys Run (P) 3@9'x8' RCBC �409,023
C2 1.4 New Locarion 189 ft / 0.0 ac.
�z�� �11� ft.� �$g�l,000�
NOTES: Major drainage stYuctures are defined as 72 inches in diameter or greater. Final stsucture sizes will be determined during final design.
� Site numbers correspond to the project's preliminary hydraulic study's site numbers. Some preliminary� h5�draulic sites were avoided during design and are therefore not
included in the table.
� No wedands impacted by proposed structures.
� P = Perennial, I = Intermittent
4 Stream impacts calculated based on slope stake limits plus 25 feet (minus exisring structures).
' Cost estimates are prcliminary and will be updated during final design. Structure costs (non-bridge) include estimated mitigation costs.
U-3467 Environmental Assessment
L'�
May 2015
4.10 Bicycle and Pedestrian Facilities
NCDOT's Co�n�Slete Street.r Policy (adopted July 2009) requires consideration and incorporation of
multimodal alternatives (e.g., bicycle accommodarions and sidewalks) in the design and
improvement of all appropriate transportation projects within a growth area of a town or city
unless exceptional circumstances exist. As discussed in Sections 2.2.2.2 and 2.2.2.3, many of the
transportation and land use plans for the local planning jurisdictions support bicycle and pedestrian
faciliries in the project area, including as part of the proposed project. The preliminary designs of
the detailed study alternatives include 14-foot outside lanes to accommodate bicycles; howeveY, no
designated bicycle lane striping is proposed. The ten-foot berm on both sides of the proposed
typical section provides sufficient room to allow for five-foot sidewalks, if desired by local
jurisdictions.
The Village of Wesley Chapel expressed a desire to have sidewalks included as part of the
proposed project in a May 13, 2015 letter (see Appendix B). At their January 12, 2015 meeting, the
Weddington Town Council adopted a resolution expressing the Town's interest in having
NCDOT include sidewalks as part of the proposed project (see Appendix B).
NCDOT will continue to coordinate with the Town of Weddington and the Village of Wesley
Chapel regarding the inclusion of sidewalks as part of the proposed project within their
jurisdiction.
4.11 Utilities
Utiliries in the project area include water, sewer, gas, cable and telephone. Power poles line NC 84
and switch from side to side depending on roadway curvature, shoulder widths and distribution of
service. There is a large power transmission tower near the roadway on the Weddington Optimist
Park property. Utilities along the project will be Yelocated prior to construction. Moderate impacts
to existing utility infrastructure are anticipated.
4.12 Landscaping
No special landscaping is proposed at this time.
4.13 Noise Barriers
Noise abatement measures are not proposed for this project because they do not meet the feasible
and reasonable criteria within the NCDOT Traffic Noise Abatement Policy.
4.14 Work Zone, Traffic Control and Construction Phasing
The project area will be signed to alert drivers to changes in traffic patterns during construction.
Where widening is proposed, traffic will be maintained on the e�sring road while the new lanes are
constructed. When the new lanes are complete, traffic will be shifted onto the new construcrion
and the existing lanes widened and resurfaced as necessary.
A Transportation Management Plan will be developed in accordance with NCDOT's Work Zone
Safery and Mobiliry Policy. During construction of the project, the work zone strategies, pracrices
and proceduYes that were put into place for the project will be continuously monitored, assessed
and improved. Efforts will be made to provide continuous access to businesses and residences,
while at the same time ensuring work zone safety and efficiency.
U-3467 Environmental Assessment May 2015
C�:
5.0 ENVIRONMENTAL EFFECTS OF PROPOSED ACTION
This chapter provides an overview of the natural and human environmental features within the
project study area. The pYoject's potential effects on resources and people are discussed.
What resources are in the project area? What are the potential effects of this proposed
project to people and the natural environment?
5.1 Natural Resources
Field investigarions were conducted by qualified biologists between May and September 2013 to
assess the e�sting natural environment within the project study area. Details of the methodology
and investigations supporting the information provided in this section are provided in the Natural
Ke.rource.r Technical l�ori (NRTR) (Mulkey, October 2014).
5.1.1 Biotic Resources
5.1.1.1 Terrestrial Communities and Wildlife
Terrestrial Communities
Two primary terrestrial communities were observed in the study area: dry-mesic oak-hickory
forest and man-dominated maintained/disturbed land. These communities cover approximately
932 acres, which include approximately 388 acres of dry-mesic oak-hickory forest and 544 acres of
maintained/disturbed land. Five other terrestrial communities were observed and are described
below. Terrestrial communities in the study area may be impacted by project construction as a
result of grading and paving of portions of the study area. Anticipated impacts to terrestrial
communities by detailed study alternative are summarized in Table 5-1.
Table 5-1. Terrestrial Communiry Types and Anticipated Impacts
Anticipated
Community Type Total Acres in Percentage of Im acts (acres)
Study Area Study Area
A2 C2
Maintained/Disturbed Land 544.5 483 75.1 71.5
Dr -Mesic Oak-Hickory� Forest 387.9 34.4 28.5 32.0
Mesic Mixed Hardwood Forest 76.9 6.8 11.5 11.3
Cutover/Early Successional 62.6 5.6 6.3 7.3
A riculture/Pasture 37.4 3.3 4.0 4.2
Pine Plantation 17.8 1.6 0.0 0.0
Piedmont/Low Mountain
Alluvial Forest 0.8 <0.1 0.0 0.0
Total 1,127.9 100.0 125.4 126.3
U-3467 Environmental Assessment May 2015
5-1
Main tain e d/Dis turb e d
Maintained/disturbed areas are prevalent throughout the study area in places where the vegetation
is periodically mowed, such as roadside shoulders and residential lawns. The dominant vegetation
in this community is comprised of mostly of vines and low growing grasses and herbs, including
fescue, shrub lespedeza, clover, heal-all, wild onion, plantain, broomsedge, goldenrod, Virginia
creeper, common ragweed, poison ivy, dandelion, Japanese honeysuckle, and henbit. Dominant
shrubs include Chinese privet and pokeweed. There are wetlands included in this communiry
classified as headwater forest and non-tidal freshwatcr marsh using the North Carolina Wetland
Assessment Method (NCWAN� classification.
Dry-Mesic Oak-HickoryForest
The dry-mesic oak-hickory forest typically occurs on mid-slopes, low ridges, or upland flats on a
variety of upland soils (Schafale and Weakley, 1990). The forest is dominated by white oak,
northern red oak, pignut hickory, mockernut hickory, yellow poplar, red maple, sweet gum, and
loblolly pine in the canopy. The shrub and sapling layer is dominated by sourwood, red maple,
flowering dogwood, American holly, and eastern red cedar. The herbaceous layer is sparse with
common species consisting of heartleaf and ratdesnake plantain. There are wetlands included in
this community classified as headwater forest NCWAM classification.
Mesic Mixed Hardwood Forest
The mesic mixed hardwood forest community exists along slopes and in ravines, in well-drained,
somewhat acidic soils (Schafale and Weakle��, 1990). Dominant species in this community include
American beech, red maple, yellow poplar, and northern red oak in the overstory, and flowering
dogwood, Chinese privet, and Christmas fern in the shrub and ground layers. There are wetlands
included in this community classified as bottomland hardwood forest, floodplain pool, and seep
using the NCWAM classification.
Cutover/Early Successional
The cutover/early successional community consists of areas that have been logged within five
years and are in early forest succession. Small loblolly pine, sweet gum, red maple, and yellow
poplar are common pioneer tree/sapling species. Other dominant species include common
greenbrier, blackberry, Japanese honeysuckle, broomsedge, and goldenrod. There are wetlands
included in this community classified as headwater forest using the NCWAM classification.
Agriculture/Pasture
The agriculture/pasture communiry is scattered throughout the study area. This communiry
includes land used to sustain livestock and is comprised of grasses and herbs similar to those in the
maintained/disturbed community such as fescue, clover, wild onion, broomsedge, common
ragweed, goldenrod, and henbit.
Pine Plantatron
The pine plantation community occurs intermittently throughout the project study area and is
characterized mostl�� by planted loblolly pine in the overstory, along with sweet gum and red maple
in the sapling/shrub layer. Dominant shrubs, herbs and vines that also occur in this community
include blackberry, common greenbrier, Virginia creeper, and Japanese honeysuckle.
U-3467 Environmental Assessment May 2015
Piedmont/LowMountain Alluvial Forest
The piedmont/low mountain alluvial forest community, which occurs along river and stream
floodplains on various alluvial soils, is only found in one location in the study area. This
community is dominated by red maple, sweet gum, ��ellow poplar, and green ash in the canopy.
Species present in the sapling and shrub layer include saplings of the canopy species, as well as
eastern red cedar, musclewood, redbud, flowering dogwood, Chinese privet, common greenbrier,
and multiflora rose. The herbaceous and vine layers contain more grasses, especially Japanese
grass, sedges, Christmas fern, Virginia creeper, and muscadine. There are wedands included in this
community classified as headwater forest using the NCWAM classification.
Terrestrial Wildlife
Terrestrial communities in the study area are comprised of both natural and disturbed habitats that
may support a diversiry of wildlife species (those species actually observed are indicated with *).
Mammal species that commonly use forested habitats and stream corridors found within the study
area include species such as eastern cottontail*, raccoon*, white-footed mouse, gray squirrel*,
Virginia opossum, beaver*, gray fox, woodchuck, striped skunk, coyote, and white-tailed deer*.
Birds that commonly use forest and forest edge habitats include the American crow*, blue jay,
Carolina chickadee*, northern cardinal*, Carolina wren*, northern flicker, downy woodpecker*,
tufted titmouse*, mourning dove, northern bobwhite, barred owl, Cooper's hawk, red-shouldered
hawk*, American robin*, eastern phoebe*, northern mockingbird*, red-bellied woodpecker*,
white-breasted nuthatch, wood thrush*, and yellow-rumped warbler. Birds that may use the open
habitat or water bodies within the study aYea include eastern bluebird, red-tailed hawk*, mallard,
great blue heron, wood duck, Canada goose*, red-winged blackbird, and turkey vulture*. Reptile
and amphibian species that may use terrestrial communiries located in the study area include the
green tree frog*, eastern box turtle*, eastern fence lizard*, five-lined skink*, black racer, brown
water snake, copperhead, eastern king snake, rat snake, rough green snake, and spring peeper*.
Fragmentation and loss of forested habitat may impact wildlife in the area by reducing potential
nesting and foYaging areas, as well as displacing animal populations. Forested aYeas pYovide
connectivity between populations, allowing for gene flow, as well as a means of safe travel from
one foraging area to another. The anticipated impacts to forests from the detailed study
alternatives are summarized in Table 5-2.
Table 5-2. Anticipated Forest Impacts
Alternatives
A2 C2
Porest Impacts (acres)' 399 43.2
� t''orest impacYs include the tollowing terrestrial communines:
Dry-Mesic Oalc-Hickory Forest, Mesic Mixed Hardwood Forest,
Pine Plantation, and Piedmont/Low Mountain Alluvial Forest.
U-3467 Environmental Assessment
5-3
May 2015
5.1.1.2 Aquatic Communities
Aquatic communities in the study area consist of both perennial and intermittent piedmont
streams, as well as still water ponds. Perennial streams in the study area could support banded
water snake, eastern mosquito-fish, redear sunfish, pumpkinseed sunfish, warmouth, and redbreast
sunfish. Intermittent streams in the study area are relatively small in size and would support
aquatic communities of crayfish and various benthic macroinvertebrates. Pond habitats could
support bluegill, bullhead catfish, bullfrog*, snapping turtle, yellowbelly slider*, and southern toad.
5.1.1.3 Invasive Species
Four species from the NCDOT Invasive Exotic Plant List for North Carolina were found to occur
in the study area. The species identified were Chinese privet (Threat), multiflora rose (Threat),
Japanese grass (Threat), and Japanese honeysuckle (Moderate Threat).
NCDOT's BMPs for the management of invasive plant species will be followed, which will comply
with Executive Order 13112. NCDOT follows guidelines set forth in the Inva.rive Exotic Plant.r of
North Carolina Manual (NCDOT, 2008) for BMPs. Management will be primarily done with
herbicides identified in the NCAgricultural Che�eical.r Manual (NCSU, 2015), which lists treatments
provided by North Carolina state law. When necessary, equipment sanitation requirements will be
included to prevent soil with seeds and vegetative parts from spreading the invasive species. All
state and federal rules for transporting and disposing restricted, contaminated, or quarantined
material are also included in the management protocol.
5.1.1.4 Summary of Potential Biotic Community Effects
Anticipated biotic community impacts by alternative as shown in Tables 5-1 and 5-2 were
calculated based on the proposed roadway widening slope stake limits plus an additional 25 feet.
Impacts are based upon preliminary design and could change during final design.
TempoYary fluctuation in populations of animal species that use terrestrial areas is anticipated
during the course of construction. Slow-moving, burrowing, and subterranean organisms will be
directly impacted by construction activities, while mobile organisms will be displaced to adjacent
communities. Habitat reduction can occur when project construction affects undisturbed areas
surrounding an existing man-dominated environment. When this occurs, competitive forces in the
adapted communities will result in a redefinition of population equilibrium.
Aquatic organisms are very sensitive to the discharges and inputs resulting from construction
activities. Impacts usually associated with in-stream construction include increased channelization
and scouring of the streambed. In-stream construction alters the substrate and impacts adjacent
stream-side vegetation. Such disturbances within the substrate lead to increased siltation that can
clog the gills and feeding mechanisms of benthic organisms, fish, and amphibian species. The
populations of these organisms are slow to recover and may not do so once a stream has been
severely impacted.
During the construction stages of the proposed project, appropriate measures will be taken to
avoid spillage of construction materials and control runof£ Such measures will include an erosion
and sedimentation control plan, provisions for disposal and handling of waste materials and
storage, stormwater management measures, and appropriate road maintenance measures.
NCDOT's Be.rt Manageanent Practice.r for Protection of Surfczce 1�ater.r (BMP-PS� and sedimentation
control guidelines will be enforced during the construction stages of the project. Long-term
U-3467 Environmental Assessment May 2015
�'�!
impacts to water resources may include permanent changes to the stream banks and temperature
increases caused by the removal of stream-side vegetation.
5.1.2 Waters of the United States
Water resources within the project study area are part of the Catawba River Basin (US Geological
Survey (USGS) Hydrologic Unit 03050103). There are 28 jurisdictional streams (Table 5-3), 15
jurisdictional ponds (Table 5-4), and 24 jurisdictional wedands (Table 5-5) in the project study area
(see Figures 2A through 2G). All of the jurisdicrional streams identified within the project area
have been assigned a primary water resource classification of "C".
Jurisdictional areas identified in the project study area were initially verified by the USACE and
NCDWR on April 14, 2014. Additional delineations were conducted as a result of the field
verification meeting. Those jurisdicrional features were veYified during a second site review on
June 19, 2014. A copy of the Preliminary Jurisdictional Determination letter is included in
Appendix B.
5.1.2.1 Streams and Other Surface Waters
Mundys Run, Culvert Branch and West Fork ,� ,. ��; �,ti` • , �
Twelvemile Creek account for the named streams in �i--Y ,-�`� ������ ='`� ��"`"� �����
� F ' '�. ., �
the project study area. Unnamed tributaries (UTs) to `�"� ',� � 4. "`'�" ,.,•; M�
the three streams are found throughout the study area. �; � '.�, ` , ' ; , � ���^� -. . ' �� '
Mundys Run flows southeast through the western �� " f ' ' `', �i ' � ' � � ���� r •
��,�'. t- � � :
i;.,: - • . - -, . ,,,,�4,: �'' � ,:� a
portion of the study area (see Figures 2A through 2F). �' � •_ ������
.��� ` ?
Alternatives A2 and C2 cross the stream at Hydraulic . � - ;y'1��=�, ;w �. \� � "'�- �. `'! :.
Sites 7 and 8, respectively. ;..�:'� r� �`� �� � � , -�--• ---- � ��' ,�
Culvert Branch flows southeast in the central to eastern ��+� `� �
; ����,,� .' �..
portion of the study area (see Figures 2A and 2F). ;,t"t�," ' �.: ,.. �
�,_ ._-;;�'� , Y; � .
Alternatives A2 and C2 cross Culvert Branch at ;'t�' :" ' '"� .�'�•. �- �
Hydraulic Site 3. �-�'� ` -� � - �� ��"���'� �
West Fork Twelvemile Creek flows southwest in the Mundy.r Kun
eastern portion of the study area (see Figures 2A and
2F). Alternatives A2 and C2 cross West Fork Twelvemile Creek at Hydraulic Site 4.
Culvert Brancb
U-3467 Environmental Assessment
��",
I�e.rt Fork Tivelvelnile Creek
May 2015
A total of 28 jurisdictional streams, including 20 intermittent streams, five perennial streams, and
three streams with both perennial and intermittent reaches, were delineated in the project study
area. Table 5-3 summarizes the physical characteristics of study area streams, as well as the
anticipated impacts to these streams by detailed study alternative.
The project occurs within the Catawba River Basin, which is protected under provisions of the
Catawba River Buffer Rules administered by NCDWR. However, Catawba River Buffer Rules
only apply to the Catawba River mainstem below Lake James and along mainstem lakes from and
including Lake James to the South Carolina border. Therefore, streams in the study area are not
subject to Catawba River Buffer Rules.
Point source dischargers throughout North Carolina are regulated through the National Pollutant
Discharge Elimination System (NPDES) program. There are no NPDES sites within or near the
project study area.
There are no High Quality Waters (HQ�, Outstanding Resource Waters (OR�, or water supply
watersheds (WS-I or WS-II) within one mile downstream of the study area. There are no North
Carolina 2014 Final 303(d) listed streams for sedimentation or turbidiry, and no benthic and/or
ambient water quality monitoring sites within one mile and downstream of the study area. There
are no designated NC Wildlife Resources Commission (NCWRC) trout waters, anadromous fish
waters, or Primary Nursery Areas (PNA) within one mile downstream of the study area. Union
Counry is not a designated trout county. The National Marine Fisheries Service (NMFS) has not
identified any streams within the project study area as an Essential Fish Habitat. There are no
streams within the study area designated by the USACE as a Navigable Water under Section 10 of
the Rivers and Harbors Act.
U-3467 Environmental Assessment May 2015
�'�:
Table 5-3. Characteristics and Anticipated Impacts for Study Area Streams
Anticipated Impacts3
DWR Index Best Use Bank Bankfull Water Channel Stream Length in Study (linear feet) by Alternative
Stream Name, ID Figure No. Class Hei ht ft. Width ft. De th in. Substratel Velocity Clarity T e2 Area hnear ft.
g � ) � ) p �� ) YI� � � ) A2 C2
UT to West Fork Twelvemile Creek, S11 2G 11-138-1 C 1 1-2 1 Sand Slo�� Clear I 1,099 237 237
UT to West Fork Twelvemile Creek, SB 2F 11-138-1 C 3-5 4-6 4-12 S/S/B Moderate Slightly Turbid P 1,356 0 0
West rork Twelvemite Creek 2F 11-138-1 C 7-10 12-15 6-24 Cobble Moderate C1eaY P 1,362 0 0
UT ro Wesr Fork Twelvemile Creek, SD 2I', 2G 11-138-1 C 1-2 3 1-2 Silt Slow Slightly Turbid I 75 0 0
Culvert Branch 2F 11-138-1-1 C 3-4 6-14 1-3 S/S/G/C Slow Slighdy Turbid P 966 189 189
UT to Culvert Branch, SF 2F 11-138-1-1 C 0.2-1 1-2 1-2 Sand Moderate Clear I 123 0 0
UT to Mundys Run, SG 2D 11-138-1-2 C 3-4 8-12 12-24 S/S/G/C Moderate Clear P 1,262 0 0
I 691 0 0
Mundys Run 2B, 2D 11-138-1-2 C 1-4 2-12 2-24 S/S/U/C/F3 Moderate Clear
P 5,311 211 190
UT to Mundys Run, SI 2B, 2C 11-138-1-2 C 6-7 4-C 3-6 Sand Slow Clear P 4,560 0 0
UT to Mundys Run, SJ 2B, 2D 11-138-1-2 C 1-3 2 1-2 Sand Slow Slighrly Turbid I 68 0 0
UT to Mundys Run, SK 2D 11-138-1-2 C 3-4 3-5 4-10 S/S/G/C Slow Clear I 2,441 76 0
UT to Mundys Run, SL 2D 11-138-1-2 C 3-4 3 0-1 Sand N/A N/A I 54 0 0
I 654 0 0
UT to Mundys Run, SM 2B, 2D 11-138-1-2 C 3 3-4 2-6 Sand Moderate Clear
P 1,172 0 0
UT to Mundys Run, SN 2D 11-138-1-2 C 0.5-1 2-3 3-4 Sand Slow Clear I 195 0 0
UT to Mundys Run, SO 2B 11-138-1-2 C 5-6 3-4 2-5 Silt Slow Clear I 453 0 0
UT to Mundys Run, SP 2B 11-138-1-2 C 2-3 2-3 2-5 Sand Slow Slightly Turbid I 1,251 0 228
UT to Mundys Run, SQ 2B 11-138-1-2 C 3-5 2-3 4-10 S/S/C Slow Slighdy Turbid I 1,399 0 0
UT to Mundys Run, SR 2B 11-138-1-2 C 2-4 3-4 3-6 Sand Slow Slightly Turbid I 659 0 344
UT to Mundys Run, SS 2B 11-138-1-2 C 2-4 3-5 3-5 Sand Slow Clear I 3,005 414 870
UT to Mundys Run, ST 2C 11-138-1-2 C 4 4 3-6 Sand Moderate Slightly Turbid I 446 0 0
UT to Mundys Run, SU 2C 11-138-1-2 C 2 2-3 3-6 Sand Slow Slighdy Turbid I 776 0 0
I 571 0 0
UT to Mundys Run, SV 2B 11-138-1-2 C 3-5 4-5 6-10 S/G/C/B Moderare Slighdy Turbid
P 899 0 22(
UT to Mundys Run, SW 2D 11-138-1-2 C 3-4 4-5 0-1 S/G/C/B Moderate Slightly Turbid I 1,163 0 0
UT to West Fork Twelvemile Creek, SX 2G 11-138-1 C 0.5-1 2 3-5 Sand Moderate Clear I 396 0 0
UT to West Fork Twelvemile Creek, SZ. 2G 11-138-1 C 1 2 4-6 Sand Moderate Clear I 305 110 110
UT to Mundys Run, SAA 2E 11-138-1-2 C 1 1-1.5 2-3 Sand Slow Clear I 896 0 281
UT to Mundys Run, SAB 2D 11-138-1-2 C 1 1 2-3 Sand Slow Clear I 117 0 0
UT tio Mundys Run, SAD 2D 11-138-1-2 C 3-5 3-4 2-3 Sand Slow Clear I 622 160 258
TotalIntermittent 17,459 997 2,328
Total Perennial 16,888 400 605
Total 34,347 1,397 2,933
� S/S�B — silt/sand�bedrock, S�S�G�C/B — silt/sand�gravel�cobble�bedrock, S�S�G/C — sIlt/sand�gravel�cobble, S�S/C — silt/sand�cobble, S/G�C�B — sand/gratirel�cobble/bedrock
2 P-Perennial, I-Intermittent
3Impacts are calculated based on slope stake limits plus 25 feet.
U-3467 Environmental Assessment
5-7
May 2015
U-3467 Environmental Assessment
This page was intentionall�r left blank.
F�
May 2015
Fifteen ponds were identified within the study area. All of the ponds appear to be man-made.
Table 5-4 summarizes the approximate size of each pond, as well as the anticipated impacts of the
detailed study alternatives. If the pond is directly connected to a jurisdictional stream or wetland,
the name of that feature is also indicated in Table 5-4.
Table 5-4. Characteristics and Anticipated Impacts for Other Surface Waters
Connected Anticipated
Pond ID Figure Appearance Feature Map `�ea Impacts (acres)Z
ID' (acres)
A2 C2
PA 2G Manmade N/A 1.15 0.00 0.00
PB 2G Manmade SB/WB 0.62 0.00 0.00
PC 2E Manmade N/A 0.38 0.00 0.00
PD 2E Manmade N/A 1.81 0.00 0.00
PF 2D Manmade SN/WM 1.15 0.00 0.00
Varda Lake 2C Manmade N/A 1.58 0.00 0.00
PG 2B Manmade N/A 0.35 0.00 0.00
PH 2B Manmade WN 0.27 0.25 0.00
PI 2B Manmade SP 0.83 <0.01 0.00
PJ 2C Manmade SG 0.87 0.00 0.00
PK 2C Manmade ST 0.27 0.00 0.00
PL 2G Manmade N/A 0.09 0.00 0.00
PN 2B Manmade SV 2.14 0.00 0.00
PO 2B Manmade SV 1.05 0.00 0.00
PP 2E Manmade N/A 0.20 0.00 0.00
Total 12.76 0.25 0.00
i N/A indicates connecrion to a jurisdicrional feature locaeed outside of the study area.
� Impacts are calculated based on slope stake limits plus 25 feet.
5.1.2.2 Wetlands
A total of 24 jurisdictional wedands were identified within the study area. USACE wedand
delineation forms and NCDWR wetland rating forms for each site are included in the NRTR.
Table 5-5 summarizes wetland classification and quality rating data, as well as the anticipated
impacts to study area wetlands by detailed study alternative. Descriptions of the terrestrial
communities found at each wetland location are presented in Section 5.1.1.1. Wetlands are present
in all terrestrial communiries in the study area except for the agriculture/pasture and pine
plantation communities.
U-3467 Environmental Assessment
May 2015
Table 5-5. Characteristics and Anticipated Impacts for Jurisdictional Wetlands
NCDWR Acres in �ticipated
Wetland NCWAM Hydrologic Impacts (acres)'
Figure Wetland Study
ID Ratin Classification Classification �ea
g A2 C2
WA 2G 12 Headwater Forest Riparian 0.05 0.00 0.00
WB 2G 12 Headwater Forest Riparian 0.08 0.00 0.00
WC 2F, 2G 18 Headwater Forest Riparian 0.17 0.00 0.00
WD 2F 10 Headwater Forest Riparian 0.08 0.00 0.00
WE 2F 18 Non-Tidal �parian 0.01 0.01 0.01
Freshwater Marsh
WF 2F 49 B�ttomland g�parian 0.62 0.00 0.00
Hardwood Forest
WG 2C 18 Headwater Torest Riparian 0.10 0.00 0.00
WI 2D 45 �ottomland g�parian 0.55 0.00 0.00
Hardwood Forest
WJ 2D 8 Seep Riparian 0.02 0.00 0.00
WL 2D 8 Headwater Forest Riparian 0.02 0.00 0.00
WM 2D 16 Headwater Forest Riparian 0.23 0.00 0.00
WN 2B 18 Headwater Forest Riparian 0.46 0.08 0.00
WO 2B 12 Headwater Forest Riparian 0.02 0.00 <0.01
WP 2B 24 Headwater Forest Riparian 0.46 0.00 0.00
WQ 2B 20 Headwater Forest Riparian 035 0.00 0.00
WR 2C 23 Headwater Forest Riparian 0.17 0.00 0.00
WS 2C 22 Headwater Forest Riparian 0.13 0.00 0.00
WT 2B 12 Headwater Forest Riparian 0.01 0.00 0.01
WU 2G 10 Headwater Forest Riparian 0.10 0.00 0.00
WV 2B 14 Headwater Forest Riparian 0.06 0.00 0.00
WY 2D, 2E 14 Headwater Forest Riparian 0.30 0.01 0.10
WZ 2C 28 Headwater Forest Riparian 0.31 0.00 0.00
WAA 2B 4 Headwater Forest Riparian 0.23 0.00 0.00
WZZ 2D 23 Headwater Forest Riparian 0.11 0.00 0.00
Total Riparian 4.64 0.10 0.12
Total Non-Riparian 0.00 0.00 0.00
Total 4.64 0.10 0.12
� Impacts are calculated based on slope stake limits plus 25 feet.
U-3467 Environmental Assessment
5-10
May 2015
5.1.2.3 Summary of Potential Waters of the United States Impacts
Anticipated impacts to streams, wetlands and other surface waters [as shown in Tables 5-3 through
5-5] are based upon preliminary design and could change during final design.
Construcrion activities for the proposed project would include the construction of a new bridge
and replacing and extending e�sting culverts. The construction activities associated with the
project will strictly follow NCDOT's BestMccnage�nent Practice.r for Con.rtruction and Maintenance
Activiiie.r (BMP-CMA) and Protection of Surface i�Yater.r (BMP-PS�. Sedimentation control guidelines
will be strictly enforced during ehe construcrion stages of the project.
Primary sources of water quality degradation in urban and developed areas are non-point sources
of discharge, which include surface water runoff and runoff from construction activities. Short-
term impacts to water qualiry from construction-related activities include increased sedimentation
and turbidity in nearby water resources. Long-term impacts include substrate destabilizarion, bank
erosion, increased turbidity, altered flow rates, and possible temperature fluctuations within the
channel due to removal of streamside vegetation.
5.1.2.4 Avoidance, Minimization and Mitigation
Section 404 Avoidance and Minimization
Detailed Study Alternatives A2 and C2 were designed to minimize impacts to resources. However,
it is not feasible for the proposed project to completely avoid impacts to the Waters of the US and
still meet the purpose and need of the project. NCDOT will attempt to avoid and minimize
impacts to streams and wetlands to the greatest extent practicable in choosing a preferred
alternative and during final design. The following avoidance and minimization measures have been
incorporated into the proposed project:
■ The new location alignments of Alternatives A2 and C2 were designed to avoid the confluence
of tributaries to Mundys Run.
Alternative A2 was developed as a variation of Alternative A to minimize potential wetland
impacts. Alternative A2 includes an alignment shift near the western terminus that would
eliminate impacts to Wetland WP and reduce impacts to Wetland WN. As a result, the total
wetland impacts with Alternative A2 are reduced by approximately 0.39 acre and stream
impacts are reduced by 351 linear feet. Pond impacts are increased by 0.16 acre with
Alternative A2.
Alternative C2 was developed as a variation of Alternative C to minimize potential wetland
impacts. Alternative C2 includes an alignment shift near the western terminus that would
eliminate impacts to Wedands WN and WP, reducing total wetland impacts by approximately
0.50 acre. Alternative C2 has no pond impacts compared to Alternative C, which has 0.10 acre
of pond impacts. Alternative C2 increases stream impacts by 710 linear feet.
■ Intersection improvements at NC 84 and Shannon Woods Lane were designed to avoid a
major hydraulic crossing of an unnamed tributary to West Fork Twelvemile Creek.
■ Intersection improvements at NC 84 and Lester Davis Road were designed to avoid a major
hydraulic crossing of an unnamed tributary to West Fork Twelvemile Creek.
U-3467 Environmental Assessment
May 2015
■ Widening associated with the roadway improvements will be performed within the existing
right-of-way to the maximum extent possible to minimize the amount of impacts to
undisturbed areas.
Other Avoidance and Minimization Measures
■ Proposed improvements along NC 84 and Lester Davis Road in the vicinit�� of Dogwood Park
were designed to avoid impacts to the park.
Avoidance and minimization measures were incorporated into Alternatives A2 and C2 to avoid
an adverse effect to historic properties.
The widening portion of the proposed alignment varies between symmetrical widening and
widening north or south of the exisring roadway, as needed, to minimize impacts to land use
and important environmental features.
Compensatory Mitigation
The purpose of compensatory mitigation is to replace the lost functions and values from a
project's impacts to Waters of the United States, including wetlands. NCDOT will invesrigate
potential on-site stream and wetland mitigation opportunities once a preferred alternative has been
selected. Off-site mitigation needed to satisfy the federal Clean Water Act requirements foY this
project will be provided by the NCDENR Ecosystem Enhancement Program (EEP) in accordance
with the "North Carolina Department of Environment and Natural Resources' Ecos�stem
Enhancement Program In-Lieu Fee Instrument", dated July 28, 2010.
5.1.2.5 Anticipated Permit Requirements
The proposed action will require the following environmental regulatory permits pursuant to
Secrion 401 and 404 of the Clean Water Act of 1977, as amended:
A Section 404 Permit from USACE is required for any activity occurring in water oY wetlands
that would discharge dredged or fill material into Waters of the United States and adjacent
wetlands. Due to the size of the project and potential impacts an Individual Permit (IP) may
be required. The USACE holds the final discretion as to what permit will be required to
authorize project construction.
A Section 401 Water Qualiry Certification from NCDWR is required for activities that may
result in discharge to Waters of the United States to certify the discharge will be conducted in
compliance with applicable state water quality standards. The Section 401 Water Quality
Certification will be required prior to issuance of the Section 404 permit.
5.1.3 Rare and Protected Species
Some populations of fauna and flora have been, or are, in decline due to either natural forces or
their inability to coe�st with humans. Federal law (undeY the provisions of Section 7 of the
Endangered Species Act [ESA] of 1973, as amended) requires that any federal action likely to
adversely affect a species listed as federally protected be subject to review by USFWS or NMFS.
Prohibited actions which may affect any species protected under the ESA are outlined in Section 9
of the Act.
U-3467 Environmental Assessment May 2015
5-12
Species identified as Endangered, Threatened, or Special Concern (SC) by the North Carolina
Natural Heritage Program (NCNHP) list of rare plant and animal species are afforded state
protection under the State Endangered Species Act and the North Carolina Plant Protection and
Conservation Act of 1979.
5.1.3.1 Federally Protected Species
As of March 25, 2015, the USFWS lists three federally-protected species for Union County (Table
5-6). A brief descriprion of each species' habitat requirements follows, along with the Biological
Conclusion rendered based on survey results in the study area. Habitat requirements for each
species are based on the current best available information from referenced literature and�or
USFWS.
Table 5-6. Federally-Protected Species for Union County
Scientific Name Common Name Federal Habitat Biological
Status' Present Conclusion
I�t.rrnigona decorata Carolina heelsplitter E Yes No Effect
Bhu.r n2ichauxii Michaux's sumac �; Yes No Effect
Heliantbu.r .rchaveinit�ii Schweinitz's sunflower E Yes No Effect
� E — Endangered
Carolina heelsplitter
Biological Conclusion: No Effect
The Carolina heelsplitter was historically known from several locations within the Catawba River
and Pee Dee River systems in North Carolina and the Pee Dee River and Savannah River systems,
and possibly the Saluda River system, in South Carolina. In North Carolina, the species is now
known only from a handful of streams in the Pee Dee River and Catawba River systems. The
species exists in very low abundances, usually within six feet of shorelines, throughout its known
range. The general habitat requirements for the Carolina heelsplitter are shaded areas in large
rivers to small streams, often burrowed into clay banks between the root systems of trees, or in
runs along steep banks with moderate current. The more recent habitat where the Carolina
heelsplitter has been found is in sections of streams containing bedrock with perpendicular
crevices filled with sand and gravel, and with wide riparian buffers.
Mussel surveys were conducted for the project between August 6 and August 28, 2013 by qualified
biologists. Nine stream reaches were surveyed, including multiple secrions of West Fork
Twelvemile Creek, Mundy's Run, and Culvert Branch. Only three freshwater mussel species were
documented. Based on relatively poor habitat quality, extremely low mussel taxa diversity and
abundances, and isolation of the surveyed stream reaches from known occurrences, the mussel
surveys determined that the project will have no effect on Carolina heelsplitter. Additionally, a
review of North Carolina Natural Heritage Program (NCNHP) records, updated January 2015
indicates no known Carolina heelsplitter occurrence within one mile of the study area.
U-3467 Environmental Assessment
May 2015
Michaux's sumac
Biological Conclusion: No Effect
Michaux's sumac, endemic to the inner Coastal Plain and lower Piedmont, grows in sandy or
rocky, open, upland woods on acidic or circumneutral, well-drained sands or sandy loam soils with
low cation exchange capacities. The species is also found on sandy or submesic loamy swales and
depressions in the fall line Sandhills region, as well as in openings along the rim of Carolina bays;
maintained railroad, roadside, power line, and utility rights-of-way; areas where forest canopies
have been opened up by blowdowns and/or storm damage; small wildlife food plots; abandoned
building sites; under sparse to moderately dense pine or pine/hardwood canopies; and in and along
edges of other artificially maintained clearings undergoing natural succession. In the central
Piedmont, it occurs on clayey soils derived from mafic rocks. The plant is shade intolerant and,
therefore, grows best where disturbance (e.g., mowing, clearing, grazing, periodic fire) maintains its
open habitat.
Suitable habitat for Michaux's sumac, consisting of open, sandy or rocky upland woods, is present
in the western portion of the project study area in the form of a large cutover and a long power
line right-of-way paralleling NC 84. Additionally, maintained open roadsides are located
throughout the project study area. Surveys were conducted by qualified biologists throughout
areas of suitable habitat on September 23-24, 2013. No individuals of Michaux's sumac were
observed. A review of NCNHP records, updated January� 2015, indicates one historic record of
Michaux's sumac within one mile of the study area. This occurrence was lase surveyed for in 2004
and no stems were found.
Schweinitz's sunflower
Biological Conclusion: No Effect
Schweinitz's sunflower is endemic to the Piedmont of North and South Carolina. The few sites
where this rhizomatous perennial herb occurs in relatively natural vegetation are found in xeric
hardpan forests. The species is also found along roadside rights-of-way, maintained power lines
and other utility rights-of-way, edges of thickets and old pastures, clearings and edges of upland
oak-pine-hickory woods and Piedmont longleaf pine forests, and other sunny or semi-sunny
habitats where disturbances (e.g., mowing, clearing, grazing, blowdowns, storms, frequent fire)
help create open or partially open areas for sunlight. It is intolerant of full shade and excessive
competition from other vegetation. Schweinitz's sunflower occurs in a variery of soil series,
including Badin, Cecil, Cid, Enon, Gaston, Georgeville, Iredell, Mecklenburg, Misenheimer,
Secrest, Tatum, Uwharrie, and Zion, among others. It is generally found growing on shallow sandy
soils with high gravel content; shallow, poor, clayey hardpans; or shallow rocky soils, especially
those derived from mafic rocks.
Suitable habitat for Schweinitz's sunflower, consisting of field edges, edges of upland oak-pine-
hickory woods, and utility rights-of-way, is present in the western portion of the study area in the
form of agricultural field edges, a long power line right-of-way paralleling NC 84, and cutover areas
of oak-pine-hickory woods created by forestry activities. Additionally, maintained open roadsides
are located thYoughout the study aYea. Surveys were conducted by qualified biologists throughout
areas of suitable habitat on September 23-24, 2013. No individuals of Schweinitz's sunflower were
U-3467 Environmental Assessment May 2015
5-14
observed. A review of NCNHP records, updated January 2015, indicates no known Schweinitz's
sunflower occurrence within one mile of the study area.
5.1.3.2 Endangered Species Act Candidate Species
As of March 25, 2015, Georgia aster (Sylnphyotrichumgeorgianum) is the only Candidate species listed
by USFWS for Union County�. Although suitable habitat for this species is present within the
stud�� area, a review of NCNHP records, updated January 2015, indicates no known occurrence of
Georgia aster within one mile of the study area.
5.1.3.3 Bald and Golden Eagle Protection Act
Habitat for the bald eagle primarily consists of mature forest in pro�miry to large bodies of open
water for foraging. Large dominant trees are used for nesting sites, typically within one mile of
open water.
A desktop-GIS assessment of the project study area, as well as the area within a 1.13-mile radius
(1.0 mile plus 660 feet) of the project limits, was performed prior to field investigarions in May
2013 using 2013 color aerials. Numerous water bodies, including large ponds, impoundments, and
a named lake, were identified. A survey of the project study area and the area within 660 feet of
the project limits was conducted during field investigations with no occurrence of bald eagle
observed. Additionally, a review of NCNHP records, updated January 2015, revealed no known
occurrences of this species within one mile of the project study area. Due to the lack of observed
nests, known occurrences, and minimal impact anticipated for this project, it has been determined
that this project will not affect this species.
5.1.4 Soils
The study area lies in the central piedmont physiographic region of North Carolina. Topography
in the project vicinity ranges from gently rolling hills to moderately flat, well-defined stream valleys.
The elevation ranges from appro�mately 550 feet above mean sea level at Culvert Branch near the
center of the study area to approximately 720 feet above mean sea level near Weddington in the
northwest corner of the study area.
The process of soil development depends on both biotic and abiotic influences. These influences
include past geologic activities, nature of parent materials, environmental and human influences,
plant and animal activiry, time, climate, and topographical position. The Union County Soil Survey
identifies 16 soil types within the study area (Table 5-7).
U-3467 Environmental Assessment May 2015
Table 5-7. Soils in the Studv Area
Soil Series Mapping Drainage Class Hydric Status
Unit
Appling sandy loam, 2-8
percent slopes ApB Well drained Non-hydric
Badin channery silt loam, 8-15
percent slopes BaC Well drained Non-hy�dric
Badin channery silty clay loam,
2-8 percent slopes, eroded BdB2 Well drained Non-hydric
Cecil gravelly sandy clay loam,
2-8 percent slopes, eroded CeB2 Well drained Non-hydric
Cecil gravelly sandy clay loam,
8-15 percent slopes, eroded CeC2 Well drained Non-hydric
Chewacla silt loam, 0-2 percent
slopes, frequently flooded ChA Somewhat poorly� drained Hydric*
Cid channery silt loam, 1-5 CmB Moderately well and Non-hydric
percent slopes somewhat poorly drained
Colfax sandy loam, 0-3 percent CoA Somewhat poorly drained Hydric*
slopes
Georgeville silty clay loam, 2-8
percent slopes, eroded GfB2 Well drained Non-h��dric
Goldston-Badin complex, 2-8 GsB Well drained to Non-hydric
percent slopes excessively drained
Helena fine sandy� loam, 2-8
percent slopes HeB Moderately well drained Hydric*
Secrest-Cid complex, 0-3 Moderately well and *
percent slopes ScA somewhat poorlv drained Hydric
Tatum gravelly silt loam, 8-15 TaC Well drained Non-hydric
percent slopes
Tatum gravelly silty clay loam,
2-8 percent slopes, eroded TbB2 Well drained Non-hydric
Tatum gravelly silty clay loam,
8-15 percent slopes, eroded TbC2 Well drained Non-hydric
Zion gravelly loam, 2-8 percent
slopes ZnB Well drained Non-hydric
* Soils which are primarily non-hydric, but which may contain hydric inclusions.
U-3467 Environmental Assessment
5-16
May 2015
5.2 Cultural Resources
This project is subject to compliance with Section 106 of the National Historic Preservation Act of
1966, as amended, and implemented by the Advisory Council on Historic Preservation's
Regulations for Compliance with Section 106, codified in 36 CFR Part 800. Section 106 requires
federal agencies to take into account the effect of their undertakings (federally-funded, licensed or
permitted) on properties included in or eligible for inclusion in the National Register of Historic
Places and to afford the Advisory Council a reasonable opportunity to comment on such
undertakings.
5.2.1 Historical Architectural Resources
A historic architectural resources survey was conducted for the proposed project in November
2013 pursuant to Section 106 of the Narional Historic Preservation Act. In a July 2014
memorandum, the North Carolina Historic Preservation Office (HPO) concurred that two
properties within the project's Area of Potential Effects (APE), John Walker Matthews House and
Howard House, remain eligible for listing in the
National Register of Historic Places (NRHP).
HPO also concurred that one new property,
Jacob Allen Deal Farm, is eligible for listing in
the NRHP.
The potential effect of the proposed project on
historic architectural resoutces was evaluated in
accordance with Section 106 of the Historic
Preservation Act at meetings on September 2,
2014 and September 30, 2014.
It was determined Detailed Study Alternarives
A2 and C2 would have No Effect on the John
Walker Matthews House at the September 2,
2014 effects meeting. Although the properry
falls within the Area of Potenrial Effects, there
will be no work performed in the vicinity of the
property.
The preliminary designs for Detailed Study
Alternatives A2 and C2 were revised to avoid
impacts to Howard House. HPO concurred
there will be No Adverse Effect to the propertyT
with the condition that construction fencing
shall be erected at the back of the ditch line. No
work shall take place in, and no utilities shall
encroach into, the historic boundary.
_,. _., . -._ �
� �����
� .:� h�a
�M� --. _ �
7r°r" .-��' �� x , � 5. w
�,'� � q�- „.. ��
,�x."�-� ���`* `�� , . ,R� ,�.�.,.�"�t v. nr. �e. .
Hozvard House
�� _���������,
The preliminary designs for Detailed Study
Alternatives A2 and C2 were revised to minimize �� -�
impacts to Jacob Allen Deal Farm. HPO Jacob Allen Deal Farm
concurred there will be No Adverse Effect to
the property with the condition of a 25-foot buffer from the historic boundary, delineated by
U-3467 Environmental Assessment
May 2015
construction fencing erected at the back of the ditch line. The fencing shall extend 500 feet from
each access drive, or to the property boundary, whichever is closer.
Determinations regarding the detailed study alternatives are summarized in Table 5-8 below. A
copy of HPO's October 28, 2014 concurrence form is included in Appendix B.
Table 5-8. Historic Architectural Resource Effects
Effects Determination
Historic Properry and Status
A2 C2
John Walker Matthews House
No Effect No Effect
Determined Eligible 1996, Remains Eligible
Howard House
No Adverse Effect No Adverse Effect
Determined Eligible 1996, Remains Eligible
Jacob Allen Deal Farm
No Adverse Effect No Adverse Effect
Determined Eligible
5.2.2 Archaeological Resources
In a November 30, 2012 memorandum, HPO indicated they would provide comments regarding
archaeological resources after a preferred alternative is selected. Based on the size of the study
area, and given the presence of a previously recorded archaeological site within the study area,
HPO noted it is likely a comprehensive archaeological investigation will be recommended.
5.3 Section 6(f)/4(f) Resources
5.3.1 Section 6(f)
There are no Section 6(� properties in the project area.
5.3.2 Section 4(f)
Section 4(� of the US Department of Transportation Act of 1966 specifies that publicly owned
land from a public park, recreation area, wildlife and waterfowl refuge, and all historic sites of
national, state, and local significance may be used for federal projects only if there is no feasible
and prudent alternative to the use of such land (23 CFR 774.3(a)(1)) and the project includes all
possible planning to minimize impacts to 4(� lands resulting from such use (23 CFR 774.3(a)(2)).
Weddington Optimist Park is a privately-owned 52-acre park located on the northern side of
NC 84 just west of Lester Davis Road (see Figure 2F). The eastern section of the park is owned by
the Weddington Optimist Club and the western portion is owned by the Wesley Chapel-
Weddington Athletic Association (WCWAA). The proposed project will impact approximately
0.8 acre of Weddington Optimist Park property and approximately 1.8 acres of WCWAA property,
U-3467 Environmental Assessment
5-18
May 2015
including ball fields adjacent to NC 84. Impacts to this Yesource are not subject to Section 4(�
requirements because this park is privately owned.
Dogwood Park is located on the
southeast corner of the NC 84/Lester
Davis Road intersection in the Village of
Wesley Chapel (see Figure 2G). The
park is a Section 4(� resource because
the properry is owned by the Village of
Wesley Chapel and operated as a public
park. The detailed study alternatives
share a common alignment along NC 84
adjacent to Do�nvood Park. The
preliminary design widens NC 84 to the
north to avoid impacting the park
property. There will be no construction
or right-of-way impacts to the park.
Siler Presbyterian Recreation Park is a
,
� �_;
��: x �
�=. . �+* � , ,�
R ���-- �
�
� �'`�� '�"�I
�,_ _ .. ..5:
�� {�, i . �.
Dogavood Park
small privately-owned recreation area on Siler Presbyterian Church property located in the
northeast corner of the NC 84/Waxhaw-Indian Trail Road intersection (see Figure 2G). Use of
the facilities must be approved by the church office. Impacts to this resource are not subject to
Section 4(� requirements because this park is privately owned. Siler Presbyterian Recreation Park
will not be impacted by the proposed project.
John Walker Matthews House, Howard House and Jacob Allen Deal Farm are subject to
Section 4(f} requirements because they have been determined Eligible for the NRHP. No work
will be performed in the vicinity of John Walker Matthews House. The HPO found the detailed
study alternatives would have No Effect on the property on October 28, 2014.
The preliminary designs for Detailed Study Alternatives A2 and C2 were revised to avoid impacts
to Howard House. Construction of the proposed project would result in no impacts to the
property. NCHPO determined Alternatives A2 and C2 would have No Adverse Effect on
Howard House on October 28, 2014 with conditions.
The preliminary designs for Detailed Study Alternatives A2 and C2 were revised to minimize
impacts to Jacob Allen Deal Farm.
Alternative A2 will impact 0.2 acre of
the property and Alternative C2 will
impact 0.56 acre of the property. On
October 28, 2014, NCHPO determined
Alternatives A2 and C2 would have No
Adverse Effect on Jacob Allen Deal
Farm with conditions.
Federal law (SAFETEA-LU Section
6009(a)) amended Section 4(� to
simplify the processing and approval of
projects that have only de rnini�ni.r impacts
on lands protected by Section 4(�.
Under the new provisions, once the
U-3467 Environmental Assessment
A de lniniJni.r impact is one that, after taking into
account any measures to minimize harm (such as
avoidance, minimization, mitigation or enhancement
measures), results in either:
i� Section 106 finding of no adverse effect or no
historic properries affected on a historic property;
or
■ A determination that the project would not
adversely affect the activities, features, or
attributes qualifying a park, recreation area, or
refuge for protection under Section 4(�.
May 2015
US Department of Transportation (USDO'I� determines that a transportation use of Section 4(�
property results in a de �ninimi.r impact, analysis of avoidance alternatives is not required and the
Section 4(� evaluation process is complete (FHWA, 2014).
As identified on the October 28, 2014 Concurrence Form for Assessment of Effects (see
Appendix B), FHWA intends to use HPO's concuYrence as a basis for a de �nini�ni.r finding for
Jacob Allen Deal Farm, pursuant to Section 4(f}.
5.4 Farmland
It is anticipated the proposed project will impact soils that are recognized as important farmlands
by the US Department of Agriculture, Natural Resources Conservation Service (NRCS)
(www.nc.nres.usda.gov/�rograms/soilsurveti/pYimefarmland.html). Table 5-9 shows the
anricipated prime, statewide, and unique farmland soils impacts with the detailed study alternatives.
State construcrion projects that receive funding from federal sources are directed to consider
impacts to important fa�mlands under the Farmland Protection Policy Act (FPPA). State agencies
are directed to consider impacts to farmlands under North Carolina Executive Order 96,
Preservation of Prime Agricultural and Forest Lands.
As required by the FPPA, a preliminary screening of farmland conversion impacts in the project
area was completed. Part VI of the NRCS-CPA-106 form was completed and a total score of 7
out of 160 points was calculated for both alternatives (see Appendix B). Since the total site
assessment score does not exceed the 60 point threshold established by NRCS, farmland
conversion impacts may be anricipated, but are not considered notable. No other alternatives
other than those already discussed in this document will be considered without a re-evaluation of
the project's potential impacts upon farmland soils.
Union Counry adopted a Voluntary Agricultural District Ordinance on September 21, 2009. There
are no Voluntary Agricultural District properties in the project study area.
Table 5-9. Prime, Statewide, and Unique Farmland Soils Anticipated Impacts
Alternative
A2 C2
Prime, Statewide, and Unique
Farmland Soils (acres) 62.4 63.7
There are active agricultural fields (each less than 20 acres) located on both sides of NC 84 where
the proposed alignment transirions from new location to existing NC 84. These fields are directly
adjacent to NC 84 and the eastern boundaries of the Aero Plantation and Weddington Hills
subdivisions. The proposed project would result in appro�mately 3.5 acres of right-of-way
impacts to these agricultural fields. No active crops were observed in the fields during a site visit
on March 16, 2012. The two fields do not have the same owner and there did not appear to be
any access across NC 84 between the two fields.
An additional agricultural field is located to the northeast of Southbrook Community Church, and
is part of a collection of agricultural parcels totaling approximately 90 acres. This field is separated
U-3467 Environmental Assessment May 2015
5-20
from NC 84 by an approximately 400-foot forested buffer and is accessed from Antioch Church
Road.
5.5 Social Effects
5.5.1 Neighborhoods/Communities
There are several cohesive residential subdivisions in the project study area, as shown on
Figures 2A through 2G. Major resources in the project study area that contribute to community
cohesion include the Weddington
Schools campus, Dogwood Park,
Weddington Optimist Park, and
three shopping centers (Weddington
Corners, Shops at Wesley Chapel,
and Village Commons). Weddington
Optimist Park hosts numerous
athletic events throughout the year
that draw people from the
community and surrounding areas.
Several community events are also
��
;���.
�T ..�� i •'+ i ` ��rt- +c�v s_
, �. �, ���� ,, � �� '�
�ti.
_ . � � � - = .r-rr�
held at the park throughout the year. Village Cornmons Shopping Center on NC 84
Weddington Corners at the western
end of the study area, along with Shops at Wesley Chapel and Village Commons at the eastern end
of the study area, include grocery stores, restaurants, banks, medical offices, and a variety of other
services that are used by the community on a daily basis. Shops at Wesley Chapel also hosts
Wesley Chapel's annual Fall Heritage Festival, held the first Saturday in October.
The proposed project is not expected to separate or isolate existing residential subdivisions, isolate
portions of the community, create a barrier between residents and community facilities, or cause
interruption in community cohesion or interaction. It also is not expected to adversely affect the
community resources discussed above that contribute to communityl cohesion, although impacts
will occur to Weddington Optimist Park where properry along NC 84 will be reduced because of
right-of-way requirements associated with the proposed widening.
The proposed project would change the
character of the existing faciliry from a rural
two-lane road to a divided four-lane
boulevard. There would be changes to the
viewshed at the western end of the project
where the roadway would be constructed on
new loca�ion through existing wooded areas.
These changes to the viewshed would be most
likely to impact the residents of Stratford on
Providence and Abelia Estates.
U-3467 Environmental Assessment
»y r`�' � ! f��: �`
���. ,,kN,� 4 � � .;1
� ��' �� �'��1�
_+ ',,,,�s *� � " ��v . '�
,�� I �+ rk•r ' ,!i..
�` � }µ4. ,.y#� ..f� �y i �r r ��'� � .� ��
Q �
I �� �S� ` ' ` _ � �
���� ... . �
�
i '��� �., •,�,� - � . y ,
� � ..� '���
. .,>,,,;a. -.+^ ._,�ac.�,�rar���... a ..
;n �: .�,� . . .:._
v,.. __� �_...v _._. _ .,�:�. � _
May 2015
5.5.2 Relocation of Residences and Businesses
The proposed project is expected to result in the displacement of five residences, one business and
one non-profit (Table 5-10). Copies of the relocation reports for Alternatives A2 and C2 are
located in Appendix C.
Table 5-10. Anticipated Residential, Business, and Non-Profit Relocations
Alternative
A2 C2
Residential Relocations 5 5
Business Relocations 1 1
Non-Profit Relocations 1 1
Total 7 7
The relocation program for the proposed action will be conducted in accordance with the Federal
Uniform Relocation Assistance and Real Propert�� Acquisition Policies Act of 1970, as amended
(Public Law 91-646), and�or the North Carolina Relocation Assistance Act (GS-133-5 through
133-18). The program is designed to provide assistance to displaced persons in relocating to a
replacement site in which to live or do business. At least one relocation agent is assigned to each
highway project for this purpose.
For Residential Displacees:
It is the policy of NCDOT to ensure comparable replacement housing will be available prior to
construction of state and federally-assisted projects. No person will be displaced by NCDOT's
State or Federally-assisted construcrion projects unless and until comparable replacement housing
has been offered or provided for each displacee within a reasonable period of time prior to
displacement. All attempts will be made to find decent, safe, and sanitary replacement dwellings
within the financial means of the residential displacee. NCDOT offers the following relocation
assistance to residential displacees:
■ Replacement Housing Payment for Owner-Occupant Displacees
■ Rent Supplement Payment for Tenant Displacees
■ Relocation Moving Payments
■ Advisory Services
I.,ast Resort Housing is a program used when comparable replacement housing is not available, or
when it is unavailable within the displacee's financial means, and the replacement payment exceeds
the federal/state legal limitation. The purpose of the program is to allow broad latitude in
methods of implementation b�r the State so that decent, safe, and sanitary replacement housing can
be provided.
U-3467 Environmental Assessment May 2015
5-22
Non-Residential Displacees:
Displaced Businesses, Farms, and Non-Profit Organizations are eligible for the following
relocation assistance:
■ Relocation Moving Expenses
■ Reestablishment Reimbursement up to the maximum Federal amount
■ Searching expenses up to the maximum Federal amount
■ Business Fixed Payment up to the Federal maximum (in lieu of the items above)
■ Advisory Services
No relocation payment Yeceived will be considered as income for the purposes of the InteYnal
Revenue Code of 1954 or for the purposes of determining eligibility or the extent of eligibility of
any person for assistance under Social Security Act or any federal law.
These relocation benefits are only available to persons lawfully present in the United States.
Based upon the preliminary relocation study performed for this project, NCDOT anticipates that
special relocation services will not be necessary. The project will not cause a housing shortage,
additional housing programs will not be needed, and replacement housing within financial means
will not be an issue. I.ast Resort Housing may need to be considered. Business services will still
be available after the project is complete, and suitable replacement business sites are available in
the project area.
5.5.3 Environmental Justice
Title VI of the Civil Rights Act of 1964 protects individuals from discrimination on the grounds of
race, age, color, religion, disability, sex, and national origin. Executive Order 12898, Federal
Actions to Address Environmental Justice in Minority Populations and Low-Income Populations,
directs that "each federal agency make achieving environmental justice part of its mission by
identifying and addressing, as appropriate, disproportionately high and adverse human health and
environmental effects of its programs, policies, and activities on minority populations and low-
income populations." Special populations may include the elderly, children, the disabled, low-
income areas, American Indians, and other minorit�� groups. Disproportionately� high and adverse
effects on minority and low-income populations are defined as adverse effects that are:
■ Predominantly borne by a minority population and/or low-income popularion, or
■ Will be suffered by a minority population and/or low-income population and are appreciably
more severe or greater in magnitude than the adverse effects that will be suffered by the non-
minority population and/or non-low-income population.
To assess social aspects associated with the proposed project, a field review and review of
demographic information, available through the US Census Bureau, were performed. The
demographics of the Census Tract Block Groups in which the project corridor is located
(Demographic Study Area) were obtained, as were the demographics of Union Count�� and North
Carolina.
The 2010 Census data does not indicate a notable presence of minority or low income populations
meeting the criteria for Environmental Justice within the Demographic Study Area (DSA).
Minoriry or low income communities were not noted within the project study area during the site
U-3467 Environmental Assessment May 2015
visit, which is supported by input from local planners. The 2010 Census data indicate the
population of the DSA is approximately 88.5 percent white. Black or African American persons
comprise approximately 5.5 percent of the population within the DSA, 11.7 percent in Union
County, and 21.5 percent in North Carolina. The Hispanic or Latino population within the DSA,
at appro�mately 3.9 percent, is less than half of the Hispanic or Latino populations for Union
County (10.4 percent) and North Carolina (8.4 percent).
The Census data (American Community Survey 5-year Estimates 2006-2010) indicate
approximately 1.7 percent of the population within the DSA live below the poverry level. This is
substantially less than the percentage of the population living below the poverty level within Union
County (8.5 percent) or North Carolina (15.5 percent).
As noted in the Relocation Reports in Appendix C, none of the five residences anticipated to be
relocated as a result of the proposed project are owned or rented by minority individuals. The
anticipated relocation of a commercial building will impact two tenants: one business and one non-
profit The business and non-profit both have ten employees, including two minorities each. One
of the five residential relocatees fall within the $15,000 -$25,000 income level, with the other
relocatees in the �50,000 and over income leveL No driveway control of access is proposed for the
project and changes in access to homes and services are not anticipated.
In accoYdance with Title VI of the Civil Rights Act of 1964 and Executive Order 12898, it has
been determined that the proposed project would not directly, or through contractual or other
arrangements, use criteria, methods, or practices that discriminate on the basis of race, color, or
national origin, nor would it have a disproportionate effect on minority or low-income
communities.
Public outreach activiries have extended to the entire study area. A project newsletter was mailed
to propert�T owners within the study area in June 2013, and a public meeting was held at a local
school in the project study area on June 25, 2013. Additional public involvement and outreach
activities, including a project newsletter and public hearing, are planned.
5.5.4 Bicycle and Pedestrian Facilities
The inclusion of sidewalks in the proposed project would improve conditions for persons with
mobility issues and improve overall pedestrian safety along NC 84 in the project area. The
provision of 14-foot outside lanes to accommodate bicycles would improve safety for cyclists
along NC 84 in the project area.
5.5.5 Recreational Facilities
Dogwood Park is the first community park in the Village of Wesley Chapel. It is located on the
southeast corner of the NC 84/Lester Davis Road intersection (see Figure 2G). Some park
facilities, including a fishing pier, an amphitheater, grilling areas, and walking and biking trails,
opened in July 2014. Additional amenities within the park are still under development. There will
be no construction or right-of-way impacts to the park.
U-3467 Environmental Assessment May 2015
5-24
Weddington Optimist Park is a privately-
owned 52-acre park facility located on the
northern side of NC 84 just west of Lester
Davis Road (see Figure 2F). The portions
of Weddington Optimist Park adjacent to
NC 84 include soccer fields, an unpaved
parking area, a tee ball field, and a baseball
field, which are located approximately
45 feet from the e�sting edge of pavement.
The park has two access points to NC 84
and can geneYate notable vehicular traffic,
especially= on weekends when there are
games and tournaments.
,` � �
' : �j z_ .
�
- - ti..� �-�
, ;� 4
- - � - �-:`-�.���w'�����
The eastern section of the park is owned by I�ieddi�aaton Optimi.rt Park
the Weddington Optimist Club and the
western portion is owned by the Wesley Chapel-Weddington Athletic Association (WCWAA).
The proposed project will impact approximately 0.8 acre of Weddington Optimist Park property
and appro�mately 1.8 acres of WCWAA property, including ball fields adjacent to NC 84.
Siler Presbyterian Recreation Park is a small privately-owned recreation area that is part of the
Siler Presbyterian Church property located in the northeast corner of the NC 84/Waxhaw-Indian
Trail Road intersection (see Figure 2G). Use of the facilities must be approved by the church
office. Siler Presbyterian Recreation Park will not be impacted by the proposed project.
5.5.6 Other Public Facilities and Services
There are numerous public facilities and services in the project study area, including public and
private schools, a daycare, churches, and government facilities. These facilities are shown on
Figures 2A through 2G in Appendix A and are described below. Unless noted, impacts to these
faciliries and services are not anticipated.
Weddington Town Hall is located at NC 84 and Weddington-Matthews Road (Figure 2C). In
addition to Weddington staff, the Town contracts with the Union County Sherif�s Office for three
Deputies who are stationed at the Town Hall.
The Village of Wesley Chapel Town Hall is
located on NC 84 just east of Waxhaw-Indian
Trail Road (Figure 2G). Wesley Chapel
Volunteer Fire Department Station 26 is
located on the eastern side of Waxhaw-Indian
Trail Road, just to the south of the Billy
Howey Road intersection.
There are no US Post Offices or EMS stations
in the project study area.
Weddington High School, Weddington Middle
School, and Weddington Elementary School
are located on the northern side of NC 84
between Twelve Mile Creek Road and Deal
U-3467 Environmental Assessment
�-
� -
_ -��..�e �e'�"�„�� �� �"l �_�..._�
� � ,��- � � .�,� � A� �'��` p�
,. � �- ; '��"�,., .r� �
��
� .�
p , y 3':�:s�� _
� �
*���: „�pt�^���-. ' �
x
,� .'���z.,�� ✓i�,..�. . .... ,er ... :��.N
IWeddington Higb Scbaol
May 2015
Road (Figure 2F). The proposed project incorporates recommendations from the Weddington
High School Traffic Assessment discussed in Section 4.2.
Chesterbrook Academy is a private daycare facility located on the northeast corner of the NC 84
and Cox Road intersection (Figure 2D).
Several churches are located within the project study area:
First Baptist Church of Weddington is located on the western side of NC 16 at the Lochaven
Road intersection (Figure 2B). An addition to the e�sting church facility is currently under
construction. The proposed project will result in right-of-way impacts to church property
along NC 16.
■ According to the Planner/Zoning Administrator for the Town of Weddington, there are
preliminary plans for a church near the NC 16 and Old Mill Road (SR 1320) intersection
(Figure 2B). Alternative A2 crosses the southern portion of the property.
The Weddington United Methodist Church campus is located on NC 16 at the NC 16/NC 84
intersection (Figure 2C). Church facilities include the sanctuary, Weddington Christian
Preschool, the Family I.ife Center, and Weddington Christian Academy on the western side of
NC 16. The church offices and cemetery are located on the southeast corner of the
NC 16/NC 84 intersection. The church also has a facility, the Hemby House, located on the
eastern side of Weddington-Matthews Road just north of NC 84.
■ Grace Baptist Church of South Charlotte is located on NC 84 across from Weddington High
School (Figure 2F). A signal is proposed on NC 84 at the Weddington High School eastern
driveway/Grace Baptist Church driveway intersection. Property from Grace Baptist Church
will be required for right-of-way and easements along NC 84.
All Nations Chrisrian Fellowship is located on the northern side of NC 84 adjacent to
Weddington Optimist Park (Figure 2F). Property from All Nations Christian Fellowship will
be required for right-of-way and easements along NC 84.
Southbrook Community Church is
locaeed on the northern side of NC 84 at
the Lester Davis Road intersection
(Figures 2F and 2G). The detailed study
alternatives widen NC 84 to the north in
this area to avoid impacts to Dogwood
Park, a Section 4(fl resource. Property
will be required for right-of-way and
easements from Southbrook Community
Church, resulting in the loss of parking
spaces adjacent to NC 84. Preliminary
design plans for the detailed study
alternatives close the two existing
entrances to the church and provide a
new entrance at a signalized
intersection with Lester Davis Road.
,�-- �- — -
--� �— - -
�i
� ` , "'
� �E
_ _;,�.T �� _.=�
�
f,�t�a,, .:''"""'�o`"Y"` _ +- _ , .
�- ,�j� ? ���fi;i .w: � a:>+� � -:*Yb - ' �� �
�;�� -�1.` . . �.�,� � __ : _ _ _ . x_ �� _ .
Southbrook Church parking lot arljacent to NC 84 (looking zvest�
■ Siler Presbyterian Church is located on the northeast corner of the NC 84 and Waxhaw-Indian
Trail Road intersection (Figure 2G). Siler Cemetery is located on the eastern side of Waxhaw-
U-3467 Environmental Assessment May 2015
5-26
Indian Trail Road, just to the south of the Billy Howey Road intersection. Property will be
required for right-of-way and easements from Siler Presbyterian Church, resulting in the loss of
parking spaces adjacent to NC 84 and Waxhaw-Indian Trail Road.
5.6 Economic Effects
There may be some economic benefit during construction of the project due to increased revenue
for businesses providing services to construction crews. Conversely, businesses could temporarily
experience minor decreases in revenue resulting from construction traffic or decreased access
caused by construction activiries. However, since most of the businesses in the project area are
destination businesses that are not dependent on drive-by traffic, it is not likely they will experience
notable impacts either during or after construction.
Property values may increase in the western portion of the study area where new or improved
access to developable land is provided. A decrease in value to some properties could be possible
along e�sting NC 84 where the roadway is widened because of potentialloss in aesthetics, increase
in noise, or partial tal�ing of some properties.
5.7 Land Use
5.7.1 Existing Land Use and Zoning
5.7.1.1 Existing Land Use
Land use in the project study area consists largely of residential subdivisions and undeveloped land,
with some commercial, institutional, agricultural, and recreational uses.
Land in the vicinit�� of the proposed new location portion of the project is mostly undeveloped.
The Hunter Farm property on the west side of NC 16 just north of NC 84 is managed by the
Catawba Lands Conservancy (CLC). CLC is a non-profit, local land trust that permanently
conserves and manages land for public benefit Hunter Farm is a 48-acre farm that allows visitors
to pick their own strawberries and also provides a learning experience about farm life and activities
for school children. Adjacent to Hunter Farm is the Weddington Tract, an additional 2.3-acre
farmland tract that is also managed by CLC.
E�sting land use along NC 84 within the project study area includes commercial development at
the western and eastern ends; the Weddington Schools complex between the Twelve Mile Creek
Road and Deal Road intersections; the Weddington Optimist Park recreational complex to the east
of Deal Road; Dogwood Park to the east of Lester Davis Road; scattered small pockets of
agricultural fields; numerous residential subdivisions; and, some undeveloped land. Several
churches are interspersed among the other land uses along the NC 84 corridor.
The Weddington Corners shopping center is a strip center with outparcels located in the northeast
quadrant of the NC 84/NC 16 intersection. The shopping center is anchored by a Harris Teeter
grocery store and includes other smaller businesses, such as a gas station/convenience store, a
bank, a family medical practice, a dentist office, and several restaurants.
The Shops at Wesley Chapel shopping center is a strip center with outpaYcels located in the
northwest quadrant of the NC 84/Waxhaw-Indian Trail Road intersection. The Village Commons
shopping center is located in both the southwest and the southeast quadrants of this same
U-3467 Environmental Assessment
May 2015
intersection. Shops at Wesley Chapel is anchored by a I.owe's Foods grocery store and also
includes a Walgreen's pharmacy. Village Commons is anchored by a Target store and a Harris
Teeter grocery store, and also includes a CVS pharmacy and a YMCA. The YMCA and the
adjoining business, an AT&T retail store, are expected to be relocated as a result of the proposed
project. Both shopping centers include restaurants, banks, medical offices, and a variety of other
businesses. Phase II of Village Commons to the east of Waxhaw-Indian Trail Road is still under
development and is expected to include approximately 360,000 square feet of commercial space at
full build-out.
5.7.1.2 Existing Zoning
Town of Weddington
The Town of Weddington has a zoning ordinance (adopted Apri18, 1987, as amended through
March 13, 2006) and a corresponding zoning map (updated December 10, 2012). Most propert��
within the Weddington portion of the project study area has a zoning designation of Residential
Conservation District (R-CD) or Single-Family District (R-40), both of which require a minimum
lot size of 40,000 square feet. The portion of the Aero Plantation subdivision within the project
study area has an R-80 Single-Family District designation, which requires a minimum lot size of
80,000 square feet. The Weddington Brook subdivision on the southern side of NC 84 near
Weddington High School is zoned Residential Established (R-E), which is intended for areas that
have been annexed and do not conform to other Town zoning districts. The Weddington Schools
complex is zoned as an Educational District (E-D). The e�sting commercial development at the
corner of NC 84 and NC 16 is zoned as General Business District — Conditional Zoning [B-
1(CD)], Local Shopping Center District — Conditional Zoning [B-2(CD)], and Mixed-Use District
(MX). According to the Town's zoning ordinance, the Town intends to use conditional zoning for
future retail, commercial, and business development.
Village of Wesley Chapel
The Village of Wesley Chapel has a zoning ordinance (February 12, 2007) and a corresponding
zoning map Qune 14, 2011). The shopping centers and businesses at the NC 84�Waxhaw-Indian
Trail Road intersection are zoned either Local Shopping Center District (B-2), General Business
District (B-1) or Office-Institutional District (O-I). The remaining land within the Wesley Chapel
portion of the project study area is zoned for single-family residential use in the R-40 Single-Family
District, which requires a minimum lot size of 40,000 square feet.
Union County
The project study area includes some pockets of unincorporated land that are within the
jurisdiction of Union County. The Union County, North Carolina Land U.re Ordinance (May 7, 2001,
last updated August 31, 2008) regulates development in Union County. According to the Union
County Zoning Map (December 4, 2008), all of the County parcels wiehin the project study area are
zoned for large lot, single-family residential (R-40) with a minimum lot size of 40,000 square feet.
5.7.2 Future Land Use
Land use and development in the project study area is guided by land use plans and ordinances
adopted by the Town of Weddington, the Village of Wesley Chapel, and Union Counry.
U-3467 Environmental Assessment
5-28
May 2015
5.7.2.1 Town of Weddington
The Toavn of i�eddington, North Carolina Land U.re Plan (April 8, 2013) states that "single-family
subdivisions are the preferred land use type; residents continue to show limited interest in having
additional commercial development in the town." Land use policies presented in the plan include:
limiting development in designated 100-year floodplains, wetlands, and along natural waterways;
retaining the character of the community by ensuring that new residential development consists of
single-family homes; and, prohibiting medium- and high-density residential development and large-
scale commercial development that could create potential traffic and safery problems. The plan
also includes a goal to retain a single business center within the town at the intersection of NC 16
and NC 84. The plan indicates increased development pressure is occurring along NC 16 within
the Town as a result of the road's recent widening. It also states "there are a number of cYitical
road improvements scheduled in the Weddington vicinity over the next few years, the most
important being the construction of the Rea Road Extension."
Atherton Estates is a planned single-family subdivision located on the north side of NC 84 just
east of Weddington-Matthews Road (see Figure 2C). Phase I of Atherton Estates, consisting of
23 lots adjacent to NC 84, has been approved by the Town of Weddington and is already under
construction. The entire planned development, consisting of 1301ots on appro�mately 170 acres,
has not yet been approved by the Town. Entrances to the subdivision are proposed off of NC 84,
Cox Road, and Weddington-Matthews Road.
Preliminary applications have been submitted to the Town of Weddingron for three additional
planned residential subdivisions (totaling appro�mately 340 acres) in the project study area.
However, final plans have not been approved and permits have not been issued. These planned
subdivisions are shown on Figures 2A through 2G and include the following:
Crown Estates at Lochaven is a proposed 18-lot single-family subdivision in the western
portion of the project study area just south of the Stratford on Providence subdivision. This
subdivision would be accessed from NC 16 via l.ochaven Road.
The Woods subdivision is currently planned as a 204-1ot single-family subdivision on 265 acres
in the western portion of the project study area. This is the largest tract of available land in the
project study area. The portion of the Rea Road Extension projece proposed on new location
would pass through, and provide access to, this proposed subdivision. The developer has
petitioned Union County for sewer allocation to the proposed development.
■ Sugar Magnolia is a proposed 12-lot single-family residential subdivision located on the
southern side of NC 84 at Cox Road.
5.7.2.2 Village of Wesley Chapel
The Village of T�e.rley Chapel Land U.re Plan (December 8, 2003) includes policies and goals to limit
the majoriry of planned non-residential development to strategic nodes on NC 84, which is the
primary gateway through Wesley Chapel. The plan states that community retail development
should be located at the intersecrion of NC 84 and Waxhaw-Indian Trail Road, and that driveway
access onto NC 84 should be limited. According to the plan, the standard housing type will
continue to be single-family residential at densities of appro�mately one unit per acre, except in
the viciniry of preferred non-residential nodes.
U-3467 Environmental Assessment May 2015
The Village adopted a Flood Damage Prevention Ordinance (amended September 2009) that
requires a Floodplain Development Permit for construction or alteration of any structures in the
100-year floodplain.
5.7.2.3 Union County
The purpose of the Union County, North Caralina 2025 Coynprehen.rive Plan (October 18, 2010) is to
serve as a guide to decision-making on a variety of planning issues, including transportation and
land use. The 2035 horizon �Tear for the proposed Rea Road Extension project is beyond the
planning horizon of the County's comprehensive plan. However, this plan is becoming outdated
and Union County is in the process of updating it. The Future Land Use Map included in the
County's comprehensive plan calls for low density residential development (0 to 1 dwelling units
per acre) in most of the unincorporated portions of the project study area.
Union County's Land Use Ordinance requires a minimum 30-foot vegetarive buffer for
development activities along all perennial waters. The County's Flood Damage Prevention
Ordinance applies to land within the 100-year floodplain and requires a Floodplain Development
Permit for any development activities.
Union County is designated as a Phase II County for implementation of federal Phase II
stormwater management requirements. This means the county is required to have a post-
construction stormwater management program and obtain a Phase II National Pollutant Discharge
Elimination System (NPDES) permit. In Union County, the post-construction stormwater
management ordinance is included as Sections 261 through 267 of the County's land use
ordinance. The ordinance includes requirements for drainage, runoff control, and riparian buffers
(30-foot streamside buffer on intermittent and perennial streams, with an additiona120-foot upland
buffer on perennial streams). The Town of Weddington and the Village of Wesley Chapel are
Phase II exempted municipalities.
5.7.3 Project Compatibility with Local Plans
The proposed project is consistent with the various uses and plans that exist for the project study
area.
5.8 Indirect and Cumulative Effects
An Indirect and Cu�nulative Effect.r Screening l�eport was prepared for the proposed project in June 2013.
In addition, a Comnaunity Characteri.rtic.r Keporl was completed in July 2012. Additional details of the
methodology and analysis supporting the information and conclusions provided in this section are
provided in these reports, appended by reference.
The North Carolina Department of Environment and Natural Resources, in 15A NCAC 1C .0101
Confor�nity zvith North Carolina Environmental Policy Act, Statement of Purj�o.re, Poliey and Scape, defines
"Cumulative Effects" as those effects resulting "from the incremental impact of the proposed
activity when added to other past, present, and reasonably foreseeable future activities regardless of
what entities undertake such other activities." Cumulative effects can result when activities taking
place over time are collectively significant, even when individually those activities are minor. The
Code defines "Indirect Effects" as those effects "caused by and resulting from the proposed
activity although they are later in time or further removed in distance, but they are still reasonably
foreseeable."
U-3467 Environmental Assessment May 2015
5-30
5.8.1 Analysis of Indirect and Cumulative Effects
5.8.1.1 Indirect Land Use Effects Screening Results
The evaluation of certain indicators helps to determine the potential for land use change induced
by transportarion projects. These factors include scope of project, change in accessibility,
forecasted population and employment growth, available land, water and sewer availability, market
for development, local public policy, and notable environmental features. The relative ratings of
these factors determine whether or not a Land Use Scenario Assessment needs to be completed.
The Indirect Land Use Effects Screening Tool is shown in Table 5-11 and summarized below.
Six of the nine categories in the screening matrix reflect a moderate to high level of concern for
indirect and cumulative effects potential. The three categories that reflect a high or moderately
high level of concern are forecasted population growth, water and sewer availability, and market
for development. The population of the study area is expected to grow at an average annualized
rate of two to three percent through 2030, which is a higher rate than is projected for Union
County and the state, and makes population growth of higher concern. Water and sewer
availability is of higher concern because water service, provided by Union County Public Works, is
generally available throughout the study area. Sewer service is provided in the eastern half of the
study area and there are plans to extend service to portions of the western study area as part of the
development of the proposed Woods subdivision. Finally, the market for development is of
higher concern because there is ongoing development in the Village Commons commercial center
at the easeern end of the study area and at Dogwood Park, and several residential subdivisions are
either planned or already under construction within the western study area, along with a proposed
church.
Table 5-11. Indirect Land Use Effects Screening
Forecasted Farecasted Waterl Notable
Scope of Change ir� Available [�larkexfor Fublic
�opulation Employroent Sevrer Enr�ironmental Result
Project Aecessibilitjr ��a� �rawth Lar�d Rvailability ��uelopment Poliey Features
Rating�
�H�s
; 1� minute � 3°�o annuai SuGstant�al # SaaD* A�� serwces De�eiopment F�rgez€�d �r
rrla�Gr Nev�, �ra�e1 tims populat�on af New Jabs Acres of ex�sGng 1 actnn[y 5�mgen[ �� 7hreateneci
�oeatian SaV,ngs growth Expected Land avadable abundar�� ����'�€� F�asaurce
More ni.�r�;���r-_m�nt
Concern
— __ ___ -- . _----
� �
------ X X --
X 3C X
. ..�.,..-..-__. _ ...___,_.___.-._.. . . . ..��f�f.�.. Ind,retl SCenanO
1 ._ _______ � . � x _
A,:st+s.�menl N'pf LiL:.a.lp
Less �
P!6 '�0 Sl.fVICe �L'�nrr_
Concsrn ��P� L�m�te� �Yj(11f��
tJn tr:,.�I t�m� pnpulapon V�Q new Jo�s a�ailable Qevelopment �E�iriEa�nt,
L ir'ruir:r� Land ariCOr���i +TFri 13�
_„vsr�r�_ growrth or �ar,tab Las��s now or m actnnry lack;�ng �rnw,th
�'� ����� declme Avaialble future m�o+�qem�r�t I���I pmY[+r.tic�ri
U-3467 Environmental Assessment May 2015
5-31
The scope of the project, change in accessibility, and forecasted employment growth reflect a
moderate level of concern for indirect and cumulative effect potential. The scope of the project is
of moderate concern because the majority of the project is widening an e�sting roadway. The
change in accessibility is of moderate concern because the project will provide a more direct link
between eastern Union County and Charlotte/Mecklenburg County while opening up new land for
development; however, travel time savings as a result of the project are estimated to be less than
five minutes. Forecasted employment growth is of moderate concern because the project area
primarily consists of residential uses, with the exception oi the commercial centers at both ends of
the study area. The average annual rate of employment growth in the area covered by the
Centralina Workforce Development Board (WDB), which includes Union County and several
surrounding counties, is projected to be 1.8 percent between 2006 and 2016. Employment growth
in the study area is expected to be approximately 1.5 percent annually through 2030, which is
slightly less than the WDB average based on the residential nature of the study area, but taking into
account the continued expansion of the shopping centers at the eastern end of the study area.
Approximately 845 acres in the study area are available for development, and there are already
plans for development on 340 acres of this available land. Based on current land use plans and
zoning ordinances applicable to the study area, any development on available land in the study area
will likely be single-family residential on large lots.
Public policy� and notable environmental features are also of low concern with regard to the
indirect effects of this project. The Town of Weddington and the Village of Wesley Chapel have
zoning, subdivision, and environmental ordinances, as well as land use plans, to regulate
development within the study area. In addition, Union County has a comprehensive plan and land
use ordinance to regulate development in unincorporated areas of the study area. The proposed
project crosses three streams, but there are no 303(d)-listed streams for sediment or turbidity, or
protected or critical water supply watersheds within the study area. Union County, the Town of
Weddington, and the Village of Wesley Chapel also have ordinances to protect natural
environmental features. They all have policies to limit development in designated 100-year
floodplains, wetlands, and along natural waterways.
5.8.1.2 Indirect Land Use Summary
The purpose of the project is to improve the mobility and connectivityT of NC 84 in the project
study area. NC 84 is a major connecting route between western Union County and the City of
Charlotte/Mecklenburg County, where over half of the workers in the project study area are
employed. Access to major roadways is not a major limiting factor for development in the study
area, but the capaciry of NC 84 through the study area is projected to exceed capacity by 2030.
The availability of public water service is not a limiring factor for development, but access to public
sewer service is currently a limiting factor in the western portion of the study area. As noted in
Section 5.7.2.1, there is a proposal to extend sewer service to the proposed Woods development,
which may expedite development of available land in the western portion of the study area.
The project is expected to reduce travel times (by less than five minutes) and the new location
portion of the project will provide new access to parcels in the western porrion of the study area,
including the proposed Woods development The new connection of NC 84 to Rea Road has the
potential to alter travel patterns, particularly in the western portion of the study area, since it will
provide an alternate route to I-485 and Charlotte via Rea Road. Development projects in the study
area are not necessarily dependent upon construction of the project since the available land and
proposed subdivisions in the study area have access to existing roadways. However, development
U-3467 Environmental Assessment May 2015
5-32
of available land in the western portion of the study area, particularly the proposed Woods
development, would likely benefit from the increased exposure and access provided by the new
location portion of the project.
5.8.1.3 Water Quality Statement
There are three named streams within the project study area, two of which are crossed by the
e�sting alignment of NC 84 and one that will be crossed by the new location portion of the
project. There is potenrial for direct or indirect impacts to water resources as a result of the
proposed project. However, use of best management practices during construction, such as
NCDOT's BMP-PSW, will minimize direct water quality impacts. Direct natural environmental
impacts are addressed programmatically through avoidance, minimization, and mitigation actions
consistent with agreements with environmental resource and regulatory agencies and will be
further evaluated by the NCDOT Natural Environment Unit during pYoject permitting.
Indirect effects, in the form of changes in land use, will be mitigated by eXisting development
regulations such as ordinances that limit development in designated floodplains and require
riparian buffers along streams (see Section 5.1.2.4). The project is located in an urbanizing area
where growth and infill development are planned for, and anticipated by local governments. The
proposed project is in accordance with local plans and will support planned growth and
development through increased network connectivity. All present and future projects within the
project study area must be consistent with localland use plans and development ordinances.
5.8.1.4 Conclusion
Based on the information analyzed, there is a lower level of concern for indirect and cumulative
effects potential as a result of the proposed project Therefore, further examination of indirect and
cumulative effects is not likely to be warranted.
5.9 Flood Hazard Evaluation
Union County participates in the National Flood Insurance Regulatory Program. As discussed in
Section 5.1.2.1, the preliminary hydraulics analysis for the proposed project determined there are a
total of four major stream crossings associated with Detailed Study Alternatives A2 and C2, with
each including two existing crossings and one new location crossing. The following is a summary
of the flood hazard evaluation foY each of the major stream crossings associated with the proposed
project:
Site 3(Alternatives A2 and C2) is an e�sting crossing of Culvert Branch under NC 84
(Figure 2F). The stream crossing is in a FEMA limited detailed flood study area in a Special
Flood Hazard Zone AE.
Site 4(Alternatives A2 and C2) is an existing crossing of West Fork Twelvemile Creek under
NC 84 (Figure 2F). The stream crossing is in a FEMA detailed flood study area in a Special
Flood Hazard Zone AE. This is the only proposed crossing over a stream with a published
floodway�, and a floodway modification may be required at this site. NC 84 is proposed to be
widened from two lanes to a four-lane divided faciliry at this stream crossing. Bascd on the
preliminary hydraulic analysis of this site, it is recommended that the e�sting culvert be
replaced with dua190-foot-long concrete girder bridges.
U-3467 Environmental Assessment
5-33
May 2015
Site 7(Alternative A2) and Site 8(Alternative C2) are close enough in distance to be
considered the same general hydraulic crossing of Mundys Run (Figure 2D). These new
location stream crossings are in a FEMA limited detailed flood study area in a Special Flood
Hazard Zone AE.
In accordance with Executive Order 11988, the Hydraulics Unit will coordinate with the
NC Floodplain Mapping Program (FMP), the delegated state agency for administering FEMA's
National Flood Insurance Program, to determine the status of the project with regard to
applicabiliry of NCDOT's Memorandum of Agreement with FMP (dated Apri122, 2013), or
approval of a Conditional Letter of Map Revision (CLOMR) and subsequent final Letter of Map
Revision (LOMR).
This project involves construction activities on or adjacent to FEMA-regulated streams.
Therefore, NCDOT Division 10 shall submit sealed as-built construction plans to the Hydraulics
Unit upon complerion of project construction, certifying the drainage structure(s) and roadway
embankment located within the 100-year floodplain were built as shown in the construction plans,
both horizontally and vertically.
Further detailed analysis will be required during final design to adequately address all of the
impacts associated with the floodplain at each site. Table 5-12 shows the anticipated floodplain
impacts with the detailed study alternatives. There are no properties that have been acquired with
FEMA funds in the project study area.
Table 5-12. Floodplain/Floodway Impacts
Alternative
A2 C2
100-Year I�loodplain and
Floodway Impacts (acres) 7'2 7'3
5.10 Traffic Noise Analysis
5.10.1 Introduction Noise is generally defined as unwanted sound.
The magnitude of noise is usually described by It is emitted from many natural and man-
its sound pressure. Since the range of sound made sources. Highway traffic noise is
pressure varies greatly, a logarithmic scale is usually a composite of noises from engine
used to relate sound pressures to some e�haust, drive train, and tire-roadway
common reference level, usually the decibel interaction.
(dB). Sound pressures described in decibels are �
called sound pressure levels and are often defined in terms of frequency-weighted scales (A, B, C,
or D). The weighted-A decibel scale is used almost exclusively in vehicle noise measurements
because it places the most emphasis on the frequency range to which the human ear is most
sensitive (1,000-6,000 Hertz). Sound levels measured using a weighted-A decibel scale are often
U-3467 Environmental Assessment May 2015
5-34
expressed as dBA. Examples of noise pressure levels in dBA are a jackhammer at 120 dBA, a
garbage disposal at 80 dBA, a window air-conditioner at 60 dBA, and a dripping faucet at 30 dBA.
In accordance with Title 23 Code of Federal Regulations Part 772, Procedures forAbate�nent of
Highzvay Traff c Noi.re c�nd Con,rtructzon Noi.re (23 CFR 772) and the NCDOT Traffic Noi.re Abate�ent
Policy (July 2011), each Type I highway project must be analyzed for predicted traffic noise impacts.
In general, Type I projects are proposed State oY FedeYal highway projects for construction of a
highway or interchange on new location, improvements of an existing highway which substantially
changes the horizontal or vertical alignment or increases the vehicle capaciry, or projects that
involve new construction or substantial alteration of transportation facilities such as weigh stations,
rest stops, ride-share lots, or toll plazas.
Traffic noise impacts are determined through implementing the current Traffic Noise Model
(TN1V� approved by the FHWA and following procedures detailed in 23 CFR 772, the NCDOT
Traffic Noi.re Abaternent Policy, and the N CD OT Traffic Noi.re Analy.ri.r and Abatenaent Manual. When
traffic noise impacts are predicted, examination and evaluation of alternative noise abatement
measures must be considered for reducing or eliminating these impacts. Temporary and localized
noise impacts will likely occur as a result of project construction activities. Construction noise
control measures will be incorporated into the project plans and specifications.
Details of the methodology and analysis supporting the information provided in this section are
provided in the Tra�c Noi.re Analy.ris — Propo.red SK 13 �6 (Kea I�oad� Fxten.rion frorn NC 16 (1'rovidence
Koad� to SK �008 (Indian Trail-1�axhcz�ar Koad� completed in January 2015.
The NCDOT Traffic Noise Abatement Policy requires a traffic noise analysis be completed for
each project alternative for each of the activity categories listed in Table 5-13.
5.10.2 Traffic Noise Impacts and Noise Contours
The maximum number of receptors predicted to become impacted by future traffic noise is shown
in Table 5-14. The table includes those receptors expected to experience traffic noise impacts by
either approaching or exceeding the FHWA Noise Abatement Criteria or by a substantial increase
in exterior noise levels. Alternative A2 is predicted to impact a total of 8 receptors. Alternative C2
is predicted to impact a total of 7 receptors. Both alternarives are predicted to impact the front
section of the athletic fields at Weddington Optimist Park closest to NC 84.
The maximum extent of the 71- and 66-dB(A) noise level contours measured from the center of
the proposed roadway is 20 feet and 105 feet, respectively. This information should assist local
authorities in exercising land use control over the remaining undeveloped lands, so as to avoid
development of incompatible activities adjacent to the roadway within local jurisdictions.
U-3467 Environmental Assessment May 2015
Table 5-13. Noise Abatement Criteria
Noise Abatement Criteria (NAC)
Hourly Equivalent A-Weighted Sound Level (decibels (dB(A)))
Activity
Activity Criterial Evaluation Activity Description
Category Leq(h)2 Location
l.ands on which serenit5� and quiet are of extraordinary significance and
A 57 Exterior serve an important public need and where the preservation of those
ualiries is essential if rhe area is to continue to serve its intended ur ose.
B3 67 Exterior Residential
Active sport areas, amphitheaters, auditoriums, campgrounds, cemeteries,
daycare centers, hospitals, libraries, medical facilities, parks, picnic areas,
C� 67 Exterior places of worship, playgrounds, public meeting rooms, public or nonprofit
institutional structures, radio studios, recording studios, recreation areas,
Section 4(fl sites, schools, television studios, trails, and trail crossin s.
Auditoriums, day care centers, hospitals, libraries, medical facilities, places
D 52 Interior of worship, public meeting rooms, public or nonprofit institutional
srructures, radio stiudios, recordin r srudios, schools, and television studios.
E3 72 Exterior Hotels, motels, offices, restaurants/bars, and other developed lands,
ro erties or activities not included in A-D or F.
Agriculture, airports, bus yaxds, emergency services, industrial, logging
F, maintenance facilities, manufacturing, mining, rail yards, retail facilities,
shipyards, utilities (water resources, water treatment, electrical), and
warehousin .
G -- — Undeveloped lands that are not permitted.
i The Le��,� Activity Criteria values are for impact determination only and are not design standards for noise abatement measures.
�The equivalent steady-state sound level which, in a stated period of time, contains the same acousdc energy as the rime-varying
sound level during the same time period, with Ley�,� being the hourly value of Le9•
� Includes undeveloped lands permitted for this acuvit�� category=.
Table 5-14. Predicted Traffic Noise Impact Summar��
Alternative
Impact Description
A2 C2
Impacted Receptors llpproaching or Exceeding FHWA 6 6
NAC' for Activiry Category B
Impacted Receptors Approaching or Exceeding FHWA
NAC' for Activiry Category C 1 1
Substantial Noise Level Increase 1 0
Impacts Due to Both Criteria2 0 0
Total Impacts Per 23 CFR 772 8 7
� Per TNM 25 and in accordance with 23 CFK 772 (refer to Table 5-13). No impacts are anticipated for Activity
Categories A, D, L:, F or G.
� Predicted traffic noise level impact due to exceeding NAC and substantial increase in build-condirion noise levels.
U-3467 Environmental Assessment
5-36
May 2015
5.10.3 No Build Alternative
The Traffic Noise Analysis also considered traffic noise impacts for the No Build Alternative. The
No Build Alternative is anticipated to experience similar noise conditions as the existing scenario.
Existing noise levels range between 42 dB(A) and 66 dB(A).
5.10.4 Traffic Noise Abatement Measures
Feasible and reasonable noise abatement measures for reducing or eliminating the traffic noise
impacts were considered for all impacted build-condition traffic noise receptors. The primary
noise abatement measures evaluated for highway projects include highway alignment selection,
traffic system management measures, buffer zones, and noise barriers. For each of these measures,
benefits versus costs, engineering feasibility, effectiveness and practicability, land use issues, and
other factors were included in the noise abatement considerations.
The detailed study alternative alignments were selected based on their abiliry to meet the purpose
and need of the proposed project and minimization of impacts to people and natural resources.
As a result, alignment modifications are not a likely source of noise abatement and are not
recommended.
Traffic System Management Measures such as prohibition of truck traffic, reduction of the speed
limit below the existing and proposed speeds, or screening total traffic volumes would diminish the
functional capacity of the major thoroughfare and are not considered practicable.
Buffer zones are typically not practical and/or cost effective for noise mitigation due to the
substantial amount of right-of-way required, and would not be a feasible noise mitigation measure
for this project. In addition, had they been feasible, the associated costs would exceed the
NCDOT policy for reasonable abatement cost threshold per benefitted receptor.
5.10.5 Noise Barriers
Highway sound barriers are primarily constructed as earth berms or solid-mass wa11s adjacent to
limited access freeways that are in proximity to noise-sensitive land use(s). To be effective, a
sound barrier must be long enough and tall enough to shield the impacted receptor(s). Generally,
the noise wall length must be eight times the distance from the barrier to the receptor. For
example, if a receptor is 200 feet from the roadway, an effective barrier would be approximately
1,600 feet long — with the receptor in the horizontal center. On roadway facilities with direct
access for driveways, sound barriers are typically not feasible because the openings render the
barrieY ineffective in impeding the transmission of traffic noise. Due to the requisite lengths for
effecriveness, sound barriers are typically not economical for isolated or most low-density areas.
However, sound barriers may be economical for the benefit of as few as one predicted traffic noise
impact if the barrier can benefit enough total receptors — impacted and non-impacted combined —
to meet applicable reasonableness criteria.
Consideration for noise abatement measures was given to all impacted receptors in each of the
future build alternatives. However, noise abatement measures are not recommended for this
project. Noise abatement along NC 84 was determined not to be feasible due to site access
constraints where the driveways of each property and other side streets were located such that a
noise barrier would not be able to be constructed to adequately provide the required abatement.
U-3467 Environmental Assessment
May 2015
Abatement along the new location portion of the project was determined to be feasible, but not
reasonable because the noise reduction design goal of 7 dB(A) would not be met and the 2,500 ft�
per benefitted receptor limit would be exceeded due to the low-density development.
5.10.6 Summary
The Traffic Noise Analysis presents a preliminary analysis of traffic noise impacts and
consideration of noise abatement measures for feasibilitv and reasonableness in accordance with
the NCDOT Traffic Noise Abatement Policy. Based on this preliminary study, traffic noise
abatement is not recommended and no noise abatement measures are proposed. A final
determination of noise abatement measures will be made upon completion of the project design,
the public involvement process, concurrence with NCDOT policy, and FHWA approval.
In accordance with NCDOT Traffic Noise Abatement Policy, the Federal/State governments are
not responsible for providing noise abatement measures for new development for which building
permits are issued afte� the Date of Public Knowledge. The Date of Public Knowledge of the
proposed highway project will be the approval date of the Finding of No Significant Impact. For
development occurring after this date, local governing bodies are responsible to insure that noise
compatible designs are used along the proposed facility.
5.11 Air Quality Analysis
5.11.1 Introduction
Air pollution originates from various sources. Emissions from industry and internal combustion
engines are the most prevalent sources. The impact resulting from highway construction ranges
from intensifying existing air pollution problems to improving the ambient air quality. Changing
traffic patterns are a primary concern when determining the impact of a new highway facility or the
improvement of an existing highway facilityr.
The Federal Clean Air Act of 1970 established the National Ambient Air Quality� Standards
(NAAQS). These standards were established to protect the public from known or anticipated
effects of air pollutants. The most recent amendments to the NAAQS contain criteria for sulfur
dioxide (SOz), particulate matter (I'1V�, carbon mono�de (CO), nitrogen dio�de (NOz), ozone
(03), and lead (I'b).
The primary pollutants from motor vehicles are unburned hydrocarbons, nitrous oxides, carbon
monoxide, and particulates. Hydrocarbons and nitrogen oxides can combine in a complex series
of reactions catalyzed by sunlight to produce photochemical o�dants such as ozone and NOz.
Because these reactions take place over a period of several hours, ma�mum concentrations of
photochemical o�dants are often found far downwind of the precursor sources.
A project-level qualitative air quality analysis was prepared for this project (Air�uality Analy.ris for
U-3467, June 2014).
5.11.2 Attainment Status
The project is located in Union Counry, which is within the Charlotte-Gastonia-Rock Hill
nonattainment area for ozone (03) as defined by the US Environmental Protection Agency (EPA).
The area was designated marginal nonattainment for 03 under the 2008 eight-hour ozone standard
on July 20, 2012. Section 176(c) of the Clean Air Act Amendments (CAAA) of 1990 requires that
U-3467 Environmental Assessment May 2015
5-38
transportation plans, programs, and projects conform to the intent of the state air quality
implementation plan (SIP). The current SIP does not contain any transportation control measures
for Union County. The Charlotte Regional Transportation Planning Organization 2035 Long I�ange
Transportation Plan (LRTP) and the 2012-2018 Transportation Improvement Program (TIP)
conform to the intent of the SIP. USDOT made a conformity determination on the LRTP on
May 2, 2014, the STIP on May 2, 2014, and Union County projects from the STIP on May 2, 2014.
For the portion of the project area located in Union County, the projects from the 2035 LRTP
conform to the intent of the SIP. The current conformity determination is consistent with the
final conformity rule found in 40 CFR Parts 51 and 93. There are no significant changes in the
project's design concept or scope, as used in the conformiry analyses.
5.11.3 Mobile Source Air Toxics (MSAT)
5.11.3.1 Background
Controlling air toxic emissions became a national priority with the passage of the Clean Air Act
Amendments (CA.AA) of 1990, whereby Congress mandated that EPA regulate 188 air toxics, also
known as hazardous air pollutants. The EPA has assessed this expansive list in their latest rule on
the Control of Hazardous Air Pollutants from Mobile Sources (Federal Register, Vol. 72, No. 37,
page 8430, February 26, 2007), and identified a group of 93 compounds emitted from mobile
sources that are listed in their Integrated Risk Information System (IRIS)
(http://ww�v.epa.gov/iris/). In addition, EPA identified seven compounds with significant
contriburions from mobile sources that are among the narional and regional-scale cancer risk
drivers from their 1999 National Air Toxics Assessment (NATA)
(http://www.epa.gov/ttn/atw/nata1999/). These are acrolein, benzene, 1,3-butidiene, diesel
particulate matter plus diesel exhaust organic gases (diesel P1V�, formaldehyde, naphthalene, and
polycyclic organic matter. While FHWA considers these the priority mobile source air toxics, the
list is subject to change and may be adjusted in consideration of future EPA rules. The 2007 EPA
rule mentioned above requires controls that will dramatically decrease MSAT emissions through
cleaner fuels and cleaner engines. According to an FHWA analy�sis using EPA's MOBILE6.2
model, even if vehicle activiry (vehicle-miles travelled, VM'1� increases by 145 percent as assumed,
a combined reduction of 72 percent in the total annual emission rate for the priority MSAT is
projected from 1999 to 2050, as shown in Table 5-15.
U-3467 Environmental Assessment May 2015
Table 5-15. National MSAT Emission Trends 1999 — 2050 for Vehicles Operating on
Roadways Using USEPA's MOVES2010b Model
i
r.�
�
Ivl IVIlul1 �
Ivl I�I �VI � lYl
C�, i.�����v�5
�� ���.. .:... � I
L
1
�v�, �,� v��,�Y� �;,
L �u�l �,� L L�� � � L �v� � �� L �.1 L J ��..�.J �.� L �:�J � L �u�4 �,.� L �..� �� L ��� � �.S
`���P
— —�M'f��1T f�;���f�tf�,�ler��
C}i���l Pfv1 — Fc�rrr�t�l�i�f��t�i� �cr�l�ir-�
— 5�r�zer7e = E3�atti��iier-�� — F��I�ac�°clics
Note: Trends for specific locations may be different, depending on locally derived
information representing vehicle-miles travelled, vehicle speeds, vehicle mix,
fuels, emission control programs, meteorology, and othex factors.
Source: EPA MOVES2010b model runs conducted during May — June 2012 by
FH W A.
U-3467 Environmental Assessment
5-40
May 2015
5.11.3.1 Motor Vehicle Emissions Simulator (MOVES)
According to EPA, MOVES improves upon the previous MOBILE model in several key aspects:
MOVES is based on a vast amount of in-use vehicle data collected and analyzed since the latest
release of MOBILE, including millions of emissions measurements from light-dury vehicles.
Analysis of this data enhanced EPA's understanding of how mobile sources contribute to
emissions inventories and the relative effectiveness of various control strategies. In addition,
MOVES accounts for the significant effects that vehicle speed and temperature have on PM
emissions estimates, whereas MOBILE did not. MOVES2010b includes all air toxic pollutants in
NATA that are emitted by mobile sources. EPA has incorporated more recent data into
MOVES2010b to update and enhance the quality of MSAT emission estimates. These data reflect
advanced emission control technology and modern fuels, plus additional data for older technology
vehicles.
Based on an FHWA analysis using EPA's MOVES2010b model, as shown in Table 5-15, even if
vehicle-miles travelled (VM'1� increases by 102 percent as assumed from 2010 to 2050, a combined
reducrion of 83 percent in the total annual emissions for the priority MSAT is projected for the
same time period.
The implications of MOVES on MSAT emissions estimates compared to MOBILE are: lower
estimates of total MSAT emissions; significantly lower benzene emissions; and significantly higher
diesel PM emissions, especially for lower speeds. Consequently, diesel PM is projected to be the
dominant component of the emissions total.
5.11.3.2 MSAT Research
Air toxics analysis is a continuing area of research. While much work has been done to assess the
overall health risk of air toxics, many questions remain unanswered. In particular, the tools and
techniques for assessing project-specific health outcomes as a result of lifetime MSAT exposure
remain limited. These limitations impede the ability to evaluate how potential public health risks
posed by MSAT exposure should be factored into project-level decision-making within the context
of NEPA.
Nonetheless, air toxics concerns continue to be raised on highway projects during the NEPA
process. Even as the science emerges, we are duly expected by the public and other agencies to
address MSAT impacts in our environmental documents. FHWA, EPA, the Health Effects
Institute, and others have funded and conducted research studies to try to more clearly define
potential risks from MSAT emissions associated with highway projects. FHWA will continue to
monitor the developing research in this field.
NEPA Context
NEPA requires, to the fullest extent possible, that the policies, regulations, and laws of the federal
government be interpreted and administered in accordance with its environmental protection
goals. NEPA also requires federal agencies to use an interdisciplinary approach in planning and
decision-making for any action that adversely impacts the environment. NEPA requires, and
FHWA is committed to, the examination and avoidance of potential impacts to the natural and
human environment when considering approval of proposed transportation projects. In addirion
to evaluating the potential environmental effects, we must also take into account the need for safe
and efficient transportation in reaching a decision that is in the best overall public interest. The
U-3467 Environmental Assessment May 2015
FHWA policies and procedures for implementing NEPA are contained in regulation at 23 CFR
Part 771.
Consideration of MSAT in NEPA Documents
FHWA developed a tiered approach with three categories for analyzing MSAT in NEPA
documents, depending on specific project circumstances:
1. No analysis for projects with no potential for meaningful MSAT effects;
2. Qualitative analysis for projects with low potential MSAT effects; or
3. Quantitative analysis to differenriate alternatives for projects with higher potential MSAT
effects.
For projects warranting MSAT analysis, the seven priority MSATs should be analyzed.
(1) Projects with No Meaningful Potential MSAT Effects, or Exempt Projects
The types of projects included in this category are:
■ Projects qualifying as a Categorical Exclusion under 23 CFR 771.117(c) (subject to
consideration whether unusual circumstances e�st under 23 CFR 771.117(b));
■ Projects exempt under the Clean Air Act conformity rule under 40 CFR 93.126; or
■ Other projects with no meaningful impacts on traffic volumes or vehicle mix.
For projects that are categorically excluded under 23 CFR 771.117(c), or are exempt from
conformity requirements under the Clean Air Act pursuant eo 40 CFR 93.126, no anal�rsis or
discussion of MSAT is necessary. Documentation sufficient to demonstrate that the project
qualifies as a Categorical Exclusion and/or exempt project will suffice. For other projects with no
or negligible traffic impacts, regardless of the class of NEPA environmental document, no MSAT
analysis is recommended. The types of projects categorically excluded under 23 CFR 771.117(d),
or exempt from certain conformity requirements under 40 CFR 93.127, does not warrant an
automatic exemption from an MSAT analysis, but they usually will have no meaningful impact.
However, the project record should document the basis for the determination of "no meaningful
potential impacts" with a brief description of the factors considered.
(2) Projects with Low Potential MSAT Effects
The tyTpes of projects included in this category are those that serve to improve the operations of a
highway, transit, or freight without adding substantial new capacity or without creating a facility
that is likely to meaningfully increase MSAT emissions. This category covers a broad range of
projects.
We anticipate that most highway projects that need an MSAT assessment will fall into this
category. Any projects not meeting the criteria in category (1) or category (3) below should be
included in this category. Examples of these types of projects are minor widening projects; new
interchanges or replacing a signalized intersection on a surface street; or projects where design year
traffic is projected to be less than 140,000 to 150,000 annual average daily traffic (AAD'I�.
For these projects, a qualitative assessment of emissions projections should be conducted. This
qualitative assessment would compare, in narrative form, the expected effect of the project on
traffic volumes, vehicle mix, or routing of traffic and the associated changes in MSAT for the
project alternatives, including No Build, based on VMT, vehicle mix, and speed. It would also
discuss narional trend data projecting substantial overall reductions in emissions due to stricter
U-3467 Environmental Assessment
5-42
May 2015
engine and fuel regulations issued by EPA. Because the emission effects of these projects typically
are low, we expect there would be no appreciable difference in overall MSAT emissions among the
various alternatives.
In addition to the qualitative assessment, a project-level air quality analysis for this category of
projects must include a discussion of information that is incomplete or unavailable for a project
specific assessment of MSAT impacts, in compliance with the Council on Environmental Quality
regulations (40 CFR 1502.22(b)). This discussion should explain how current scientific techniques,
tools, and data are not sufficient to accurately esrimate human health impacts that could result
from a transportation project in a way that would be useful to decision-makers. Also, in
compliance with 40 CFR 150.22(b), it should contain information regarding the health impacts of
MSAT.
(3) Projects with Higher Potential MSAT Effects
This category includes projects that have the potential for meaningful differences in MSAT
emissions among project alternatives. We expect a limited number of projects to meet this two-
pronged test. To fall into this category, a project should:
Create or significandy alter a major intermodal freight faciliry that has the potential to
concentrate high levels of diesel parriculate matter in a single location, involving a significant
number of diesel vehicles for new projects or accommodating with a significant increase in the
number of diesel vehicles for expansion projects; or
Create new capacity or add significant capacity to urban highways such as interstates, urban
arterials, or urban collector-distributor routes with traffic volumes where the AADT is
projected to be in the range of 140,000 to 150,000 or greater by the design year;
And also
■ Proposed to be located in proximity to populated areas.
Projects falling within this category should be more rigorously assessed for impacts, including
completion of a quantitative analysis to forecast local-specific emission trends of the priority
MSAT for each alternative, to use as a basis of comparison. This analysis also may address the
potential for cumulative impacts, where appropriate, based on local conditions. How and when
cumulative impacts should be considered would be addressed as part of a project-level air quality
analysis. If the analysis for a project in this category indicates meaningful differences in levels of
MSAT emissions among alternatives, mitigation options should be identified and considered.
This project falls under Category (2) because it is intended to improve the operations of a highway,
transit, or freight without adding substanrial new capacity or without creating a facility that is likely
to meaningfully increase emissions, and the Design Year traffic is not projected to meet or exceed
the 140,000 to 150,000 AADT criterion.
5.11.3.3 Qualitative MSAT Analysis
A qualitative MSAT analysis provides a basis for identifying and comparing the potential
differences among MSAT emissions, if any, from the project alternatives. The qualitative
assessment presented below is derived in part from a study conducted by FHWA titled A
Methodology for Evaluating Mobile Source Air Toxic Emissions among Transportation Project
Alternatives, found at: www.fhwa.dot.gov/environment
/airtoxic/msatcompare/msatemissions.htm.
U-3467 Environmental Assessment May 2015
For alternatives in this proposed project, the amount of MSAT emitted would be proportional to
the vehicle miles traveled, or VMT, assuming that other variables such as fleet mix are the same for
the alternative. Because the VMT estimated for the No Build Alternative is less than the Build
Alternatives, higher levels of MSAT are expected from the Build Alternatives compared to the No
Build.
As shown in Table 5-16, the estimated daily VMT would increase by 22 percent with the Rea Road
Extension Build Alternatives, primarily because of the alternatives' distance length and traffic
volumes. Thus, while MSAT emissions would increase because of the longer NC 841ength and
changing local traffic patterns with Rea Road Extension Build Alternatives, the potential local
impact of MSAT's would be reduced.
Table 5-16. Average Daily VMTs for Rea Road Extension/NC 84
2035 Alternative 2035 Average Increase in VMT Over
Daily VMT No Build Alternative
No Build Alternative NC 84 95,853 N/A
Build Alternatives (A2, C2) 117,040 22%
Rea Road Extension
The additional travel lanes included as part of the proposed Rea Road Extension (relocate NC 84)
and the proposed widening of e�sting NC 84 in the project area will have the effect of moving
some traffic closer to nearby homes, and businesses; therefore, under each alternative there may be
localized areas where ambient concentrations of MSAT could be higher under Build Alternatives
than the No Build Alternative. However, the magnitude and the duration of these potential
increases compared to the No Build Alternative cannot be reliably quantified due to incomplete or
unavailable information in forecasting project-specific MSAT health impacts. In summary, when a
highway is widened, the localized level of MSAT emissions for the Build Alternative could be
higher relative to the No Build Alternative, but this could be offset due to increases in speeds and
reductions in congestion (which are associated with lower MSAT emissions). Also, MSAT will be
lower in other locarions when traffic shifts away from them. However, on a regional basis, EPA's
vehicle and fuel regulations, coupled with fleet turnover, will over time cause substantial reductions
that, in almost all cases, will cause Yegion-wide MSAT levels to be significantly lower than today.
Regardless of the alternative chosen, emissions will likely be lower than present levels in the design
year as a result of EPA's narional control programs that are projected to reduce annual MSAT
emissions by over 80 percent from 2010 to 2050. Local conditions may differ from these national
projections in terms of fleet mix and turnover, VMT growth rates, and local control measures.
However, the magnitude of the EPA-projected reductions is so great (even after accounting for
VMT growth) that MSAT emissions in the study area are likely to be lower in the future in virtually
all locations.
In summary, under the Build Alternatives in the design year it is expected there would be reduced
MSAT emissions in the immediate area of the project, relative to the No Build Alternarive, due to
EPA's MSAT reduction programs.
U-3467 Environmental Assessment
5-44
May 2015
5.11.3.4 Incomplete or Unavailable Information for Project-Specific
MSAT Health Impacts Analysis
In FHWA's view, information is incomplete or unavailable to credibly predict the project-specific
health impacts due to changes in MSAT emissions associated with a proposed set of highway
alternatives. The outcome of such an assessment, adverse or not, would be influenced more by the
uncertainty introduced into the process through assumption and speculation rather than any
genuine insight into the actual health impacts directly attributable to MSAT exposure associated
with a proposed action.
EPA is responsible for protecting the public health and welfare from any known or anticipated
effect of an air pollutant. They are the lead authority for administering the Clean Air Act and its
amendments and have specific statutory obligations with respect to hazardous air pollutants and
MSAT. EPA is in the con�inual process of assessing human health effects, exposures, and risks
posed by air pollutants. They maintain the Integrated Risk Information System (IRIS), which is "a
compilation of electronic reports on specific substances found in the environment and their
potential to cause human health effects" (EPA, �v��w.epa.gov/iris/). Each report contains
assessments of non-cancerous and cancerous effects for individual compounds and quantitative
estimates of risk levels from lifetime oral and inhalation exposures with uncertainty spanning
perhaps an order of magnitude.
Other organizations are also active in the research and analyses of the human health effects of
MSAT, including the Health Effects Institute (HEI). Two HEI studies are summarized in
AppendiX D of FHWA's Interirn Guidance Update on Mabile Source Air Toxic Analy.ri.r in NEPA
Docu�nent.r. Among the adverse health effects linked to MSAT compounds at high exposures are;
cancer in humans in occupational settings; cancer in animals; and irritation to the respiratory tract,
including the exacerbation of asthma. Less obvious is the adverse human health effects of MSAT
compounds at curxent environmental concentrations (HEI,
http://pubs.healtheffects.org/view.php?id=282) or in the future as vehicle emissions substantially
decrease (HEI, http://pubs.healtheffects.org/view.php?id=306).
The methodologies for forecasting health impacts include emissions modeling; dispersion
modeling; exposure modeling; and then final determination of health impacts — each step in the
process building on the model predictions obtained in the previous step. All are encumbered by
technical shortcomings or uncertain science that prevents a more complete differentiation of the
MSAT health impacts among a set of project alternatives. These difficuldes are magnified for
lifetime (i.e., 70 year) assessments, particularly because unsupportable assumptions would have to
be made regarding changes in travel patterns and vehicle technology (which affects emissions rates)
over that time frame, since such information is unavailable.
It is particularly difficult to reliably forecast 70-year lifetime MSAT concentrations and exposure
near roadways; to determine the portion of time that people are actually exposed at a specific
location; and to establish the extent attributable to a proposed action, especially given that some of
the information needed is unavailable.
There are considerable uncertainues associated with the e�sring estimates of to�city of the various
MSAT because of factors such as low-dose extrapolation and translation of occupational exposure
data to the general population, a concern expressed by HEI
(http://pubs.healtheffects.org/view.php?id=282). As a result, there is no national consensus on
air dose-response values assumed to protect the public health and welfare for MSAT compounds,
U-3467 Environmental Assessment May 2015
and in particular for diesel PM. EPA (��ww.epa.gov/risk/basicinformation.htm#g) and HEI
(http://pubs.healtheffects.org/getfile.php?u=395) have not established a basis for quantitative risk
assessment of diesel PM in ambient settings.
There is also the lack of a national consensus on an acceptable level of risk. The current context is
the process used by EPA as provided by the Clean Air Act to determine whether more stringent
controls are required in order to provide an ample margin of safety� to protect public health or to
prevent an adverse environmental effect for industrial sources subject to the ma�mum achievable
control technology standards, such as benzene emissions from refineries. The decision framework
is a two-step process. The first step requires EPA to determine an "acceptable" level of risk due to
emissions from a source, which is generally no greater than appro�mately 100 in a million.
Additional factors are considered in the second step, the goal of which is to maximize the number
of people with risks less than one in a million due to emissions from a source. The results of this
statutory two-step process do not guarantee that cancer risks from exposure to air toxics are less
than one in a million; in some cases, the residual risk determination could result in ma�mum
individual cancer risks that are as high as approximately 100 in a million. In a June 2008 decision,
the U.S. Court of Appeals for the District of Columbia Circuit upheld EPA's approach to
addressing risk in its two-step decision framewoYk. Information is incomplete or unavailable to
establish that even the largest of highway projects would result in levels of risk greater than
deemed acceptable.
Because of tihe limitations in the methodologies for forecasting health impacts described, any
predicted difference in health impacts between altexnatives is likely to be much smaller than the
uncertainties associated with predicting the impacts. Consequently, the results of such assessments
would not be useful to decision-makers, who would need to weigh this information against project
benefits, such as reducing traffic congesrion, accident rates, and fataliries, plus improved access for
emergency response, that are better suited for quantitative analysis.
5.11.3.5 MSAT Conclusion
What we know about mobile source air to�cs is still evolving. As the science progresses FHWA
will continue to revise and update this guidance. FHWA is working with stakeholders, EPA, and
others to better understand the strengths and weaknesses of developing analysis tools and the
applicability on the project level decision documentation process.
5.11.4 Summary
Vehicles are a major contributor to decreased air quality because they emit a variery of pollutants
into the air. Changing traffic patterns are a primary concern when determining the impact of a
new highway facility or the improvement of an existing highway facility. New highways or the
widening of e�sting highways increase localized levels of vehicle emissions, but these increases
could be offset due to increases in speeds from reductions in congestion and because vehicle
emissions will decrease in areas where traffic shifts to the new roadway. Significant progress has
been made in reducing criteria pollutant emissions from motor vehicles and improving air quality,
even as vehicle travel has increased rapidly.
The project is located in Union Counry, which complies with the National Ambient Air Quality
Standards. The Rea Road Extension project is not anticipated to create any adverse effects on the
air quality of the Union County attainment area. This evaluation completes the assessment
U-3467 Environmental Assessment May 2015
5-46
requirements for air quality of the 1990 Clean Air Act Amendments and the NEPA process, and
no additional reports are necessary.
5.12 Hazardous Materials
Geographic Information Systems
(GIS) data was reviewed in October
2012 to identify known sites of
concern in the project study area. A
search of the appropriate
environmental agencies' databases
was also performed to assist in
evaluating identified sites. Seven
Hazardous materials are any materials that may have a
harmful effect on humans or the natural environment.
Examples of potentially hazardous materials and waste
sites include service stations, regulated landfills,
unregulated dump sites, salvage yards, industrial sites,
and aboveground and underground storage tanks.
sites presendy or formerly
containing petroleum underground storage tanks ([1STs) were identified within the project area
(see Table 5-17). In addition, two sites regulated by the Resource Conservation and Recovery Act
(RCRA) as hazardous waste generators were identified. Figures 2A through 2G show the locations
of these sites.
Table 5-17. Underground Storage Tanks in the Project Area
UST Anticipated
Site Type Location Facility Property UST/Properry Impact� / Comments
ID No. Owner �sk
206 Providence Matthews Heating oil UST,
1 UST Rd. (NC 16) N�`� Pro er �ary Maethews PCS / Low UWI 36104
13801 Weddington ]erry Pressley, Active gas station &
2 UST Providence Rd. ��-�34467 Center Pressley Stores, PCS / Low convenience store,
Inc. GWI 8505 and 9945
13633 Weddington Weddington
Former gas Station /
3 UST Providence Rd. 0-008145 Shops Associates PCS / Low Current shopping
center, GWI 6551
Former BCS Ferrari
4 UST 13601 N�A Weddington M Squared PCS / Low Tractor / Current
Providence Rd. Activity Center Holdings, LLC clubhouse, GWI
27343
5900 block of Wesley Chapel Site now Walgreens,
Earnhardt-Price PCGW /
5 UST Weddington N/A Retail GWI 27933, closed
Monroe Rd. Investors, LLC Family, LLC Low out 2007
6320 Active gas station
Market Villa�e Commons
6 UST Weddington 0-036876 �,xpress Branch II LLC PCS / Low and convenience
Monroe Rd. ' store, UWI 36733
213 Waxhaw- Registered farm
7 UST Indian Trail Rd. �-�02276 Doug Plyler Plyler Family LLC PCS / Low tank, closed 1990
� Petroleum Contaminated Soils (PCS), Petroleum Contaminated Groundwater (PCG�
U-3467 Environmental Assessment May 2015
Both detailed study alternatives may impact Sites 5 and 6, as well as one site identified as a
hazardous waste generator. Preliminary site assessments to identify the nature and extent of any
contamination will be performed on these sites prior to right-of-way acquisition.
CVS Pharmacy, located in the southeast quadrant of the NC 84/Waxhaw-Indian Trail Road
intersection, is regulated by RCRA as a conditionally exempt small quantity generator of hazardous
waste. Based on the preliminary design for all of the preliminary build alternatives, a small amount
of property along NC 84 at this site is located within the proposed right-of-way. It is anticipated
that this site would have a low impact to the proposed project.
No landfills or other geoenvironmental concerns were identified in the project area.
5.13 Construction Impacts
Impacts from ground disturbing activities will occur during construction within the project right-
of-way. Examples of activities related to construction include: clearing and grubbing; traffic
maintenance; bridge construction; utility construction; and roadway paving.
Short-term construction impacts associated with the proposed project may occur in the areas of
water qualiry, natural resources, noise, and air quality. A temporary peak in local spending from
contractors and construction workers would be a benefit during construcrion of the proposed
project. Since construction operations would be limited to the time needed to complete the
project, both benefits and impacts to resources would be considered temporary. Potential
construction-related impacts can be minimized by� adherence to the following established
construcrion methods:
All materials resulting from clearing and grubbing, demolition, or other operations will be
removed from the project, burned or otherwise disposed of by the contractor. Any burning
will be done in accordance with applicable local laws and ordinances and regulations of the
North Carolina State Air Quality Implementation Plan (SIP) in compliance with 15 NCAC
2D.0520. Care will be taken to ensure burning will be done at the greatest distance practical
from dwellings and not when atmospheric conditions are such as to create a hazard to the
public. Burning will be performed under constant surveillance.
■ Measures will be taken to reduce the dust generated by construction when the control of dust
is necessary for the protection and comfort of motorists or area residents.
The major construction elements of this project are expected to be earth removal, hauling,
grading, and paving. General construction noise impacts such as temporary speech
interference for passersby and those individuals living or working near the project, can be
expected particularlp from paving operations and from earth-moving equipment during grading
operations. Noise construction impacts during project construction are of short duration and
transmission loss characteristics of surrounding wooded areas and other natural and man-made
features will moderate the effects of intrusive construction noise. Such noise will be limited to
daylight hours as much as possible.
Provisions will be taken during construction to prevent erosion, sedimentation, and
construction damage to forested areas outside of the right-of-way and construction limits.
Trees outside of the construction limits should be protected from construction activities to
prevent skinning tree trunks by heavy equipment, exposing roots, and smothering trees from
fill dirt around the base.
U-3467 Environmental Assessment
�;
May 2015
Strict adherence to the sedimentation and erosion control plan will be required, including
limiting areas and duration of exposed earth and stabilizing exposed areas as quickly as
possible.
■ Traffic service in specific areas of the project may be subject to brief disruptions during
construcrion. Measures will be taken to maintain the flow of traffic. Access to residenrial and
commercial areas is expected to be maintained during project construction.
5.14 Summary of Social, Economic, and Environmental Effects
Table 5-18 summarizes the environmental effects of detailed study alternatives A2 and C2. The
proposed project is not expected to cause substantial adverse impacts to the human, natural or
physical environments.
Table 5-18. Summary of Environmental Effects
Build Alternatives
Impact Category'
A2 C2
Natural Resources Impacts
Federally-Listed Species PYesent in Study
Area No No
100-Year Floodplain and Floodway Impacts
7.2 73
(acres�
Delineated Wedand Impacts (no.
3/0.10 4/0.12
crossings/acres)
Delineated Stream Impacts (no. crossings/
linear feet) 8/1,397 11/2,933
Delineated Other Surface Water Impacts 0.25 0.00
(acres)
Forest Impacts (acres) 39.9 43.2
Human Environment Impacts
Residential 5 5
Business 1 1
Relocations
Non-Profit 1 1
Total 7 7
Low Income/Minority Populations Present No No
Schools2 1 1
Recreational Areas�Parks3 1 1
Churches4 2 2
U-3467 Environmental Assessment
May 2015
Table 5-18. Summary of Environmental Effects continued
Build Alternatives
Impact Category'
A2 C2
Cemeteries 0 0
Historic Sites 2/No Adverse Effect' 2/No Adverse �ffects
Section 4(� Impacts 1(de lninirni.r) 1(de rninimi.r)
Traffic Noise Impacts (receptors) 8 7
Physical Environment Impacts
Prime, Statewide, and Unique Farmland Soils 62.4 63.7
(acres)
Underground Storage Tanks�HazMat Sites 3 3
Preliminary Cost Estimates
Construction $31,352,000 �31,049,000
Right-of-Way Acquisition $8,685,000 �8,666,000
Utiliry Relocation �797,000 $797,000
Mitigation $1,082,000 $2,252,000
Total Cost �48,481,000 $49,323,000
� Impacts are calculated based on slope stake limits plus 25 feet.
� Current access to Weddington High School will be changed as a result of the proposed project.
3 Right-of-way impacts, including impacts to recreaeional fields, will occur at Weddington Oprimist Park.
4 Parking spaces will be impacCed at Southbrook Community Church and Siler Presbyterian Church as a result of the
proposed project.
s No Adverse Effect with conditions identified in Section 5.2.1.
5.15 Conclusion
5.15.1 What Are the Next Steps in the Project Development Process?
Based on the current project schedule a public hearing will be held in 2015 following FHWA
approval of this document. Comments received at the hearing will be �eviewed by the NCDOT
and will be incorporated into the project as feasible and practicable. Before the final
environmental document is approved a decision will be made determining whether the project will
cause significant environmental effects. If there are no significant environmental effects then the
Finding of No Significant Impacts (FONS� decision document will be prepared. If there are
significant environmental effects, then a higher level planning document will need to be developed.
Based on the level of impacts discussed in this document, a FONSI is anticipated. The flowchart
below from A Ciii�en'.r Guide to the NFPA, Having Your T�oice Heard (Council on Environmental
Quality, 2007) illustrates the NEPA process:
U-3467 Environmental Assessment May 2015
5-50
i"h� � r��e��
t. �tyency (dentifies a Ne��� tor �:e�i�n
and D��Jelnps a P��np�sal
2.11re Fn+Jirc�nmental Ftf�rts �.ikely
ti� f3e Si���ifiicant?
I�� YES
3. Frr�posed Ar,tion 5. Signifir���t
is Descril�ed in Enviranrn�r�tal
i�ger�y Cat�g�rical �[) �treets Unc�rtain r�r
Exclusir�i� [GF} hJc�,Igency i�F
Y� � YES
4. Does �he Propc�sal
Havc. Extr��c�rciin�ary�
Cir�umst�ncesT
fSJ �
Decisir�n
6. G)e�r�lc���
Enti�iron�ne€atal
rr�S,sssss�n�,r�t
1,1..I"Y��1J�JEi.� I3���I��.
li�vnlver�7e�it m tli�
Ex�er�� F`r��ctic�E:�l�
Siyr�ifi�;�rr�
�€�viro�i€n�ntal
Eff�;cts?
N�
7. [��indir�g i�fi N�s
Signifir,ant Im�ar,t
YI=S
8. Sic�nifi�ant
En4 iro€�rnental
Efi�cis �Jlay c�r
'�,'il! Dccur
� �_.._.._..�..
�. �J�tice �rt
intent [r� pr��a re
Ln��ir�nmen�al In�pac
5tt�te€nerrt (CI�)
1�J. Pu�l€c Sco�ing
ar��i A_�;�;r��ir�ife
Pu�iic Invc�lve�€ent
11. [)raft �_!�
12 F`u�lic PLv�i��n
and Com�ent and
;1}���rc��riate f'u�lic
ImJc�l��e�nent
t3. Final EIS
1 �. F'u61ic
�+v�3ilahilit}r r�t FEIS
15. Re,card of
lier,isir�n
i�nplem���t�ti�n with f�9oniti�rir�g as Pr�vide�9 i��tl�e [)ecisi�n
'`Si�nifiea.r�€� �x�cr� car�cu�trssi�ar¢ees ��� infcrrnaiiot2 r�:te��c€t2i te ere�i�rot2rrreni�ai eancerns or
subst�ntsr�l ch�ngcs in the propased ncti�,�� ti�:ct �re rete:�arzf #r� environra�er�tai enrtcer�rs rnay
��Eer.e.�.sifafe +�rP�araiion of a��up7>,�:tr�e_nini T:;75 fcGlnzi�ing �ifher t��e draft or fitaat I;�IS or tFfe
Record� of D�czston fCEQ NEP�FI Regutr�tions, 4�U C.�.R. § 15C)2.3fc)).
5.15.2 Project Schedule
The current schedule shown in NCDOT's Draft 2016-2025 STIP includes purchasing property for
the roadway right-of-way in 2017 and starting construc�ion in 2019.
U-3467 Environmental Assessment
5-51
May 2015
This page was intentionally left blanl�.
U-3467 Environmental Assessment
5-52
May 2015
6.0 COMMENTS AND COORDINATION
This project was coordinated with appropriate federal, state, and local agencies and the public.
This chapter describes the public involvement and agency coordination that has taken place for the
proposed project. Planned future public involvement acrivities and agency coordination are also
discussed.
How has the public been or how will they be involved with this project?
6.1 Public Involvement and Outreach
6.1.1 Newsletter
A newsletter was mailed to citizens on the project mailing list in June 2013. The newsletter
announced the June 25, 2013 public meeting and provided background information on the
proposed project.
6.1.2 Project Webpage
A project website (www.ncdot.gov/�rojects/ReaRoad) was developed in 2013 to make project
mapping, newsletters, and other project information available to the public. The website also
provides contact information for project representatives. NCDOT mailed a postcard to citizens
on the project mailing list in December 2013 announcing the launch of the project website.
6.1.3 Public Meeting
NCDOT conducted a public meeting on June 25, 2013 at the Weddington Middle School Cafeteria
in Matthews, North Carolina. In addition to the newsletter announcing the workshop, NCDOT
issued a press release on June 7, 2013. The purpose of the meeting was to provide information to,
and receive feedback from, the public on the proposed project. Information presented included
the project's study area, Purpose and Need, and preliminary alternatives.
Appro�mately 60 community members attended the meeting. Public meeting participants
included residents, business owners, elected/appointed officials, and media representatives.
Citizens had the opportunit�� to submit written comments and questions at the meeting or via mail
and e-mail after the meeting. A total of 13 written comments were received. Most citizens
indicated a prefeYence that the western end of the project extend from eXisting Rea Road on new
alignment rather than widening existing NC 84. Many citizens also indicated support for sidewalks
and bicycle accommodations. The public's main concerns were how the raised median would
impact the ability to turn left and impacts to individual properties.
Information presented at the public meeting and public comments may be viewed at the Project
Development & Environmental Analysis Unit, Century Center Building A, 1010 Birch Ridge
Drive, Raleigh.
U-3467 Environmental Assessment
6-1
May 2015
6.1.4 Public Hearing
NCDOT will conduct a public hearing for the proposed project to review the detailed study
alternatives and Environmental Assessment with the public, and receive their comments. Formal
notices will be included in local newspapers a minimum of 30 days prior to the public hearing.
Additional notices for the public hearing will also be sent to persons on the project mailing list.
6.2 Agency Coordination
How have government agencies been or will be involved with this project?
6.2.1 Early Coordination Meetings
Early coordination meetings were held in July 2012 with representatives from Union County, the
Town of Weddington, and the Village of Wesley Chapel to discuss the proposed project and
receive input. Representatives from the local jurisdic�ions indicated the project was important
locally.
6.2.2 External Scoping Meeting
A project scoping letter announcing the start of U-3467 project development, environmental, and
engineering studies was distributed to federal, state, and local agencies on November 9, 2012. The
letter requested recipients supply information that would be helpful in evaluating potential
enviYonmental impacts of the project and invited them to the external scoping meeting held on
November 14, 2012. An asterisk (*) next to the name indicates that either a written response was
received, or an agency representative attended the meeting. A summary of the external scoping
meeting is included in Appendix B.
■ Federal Highway Administration*
■ Federal Emergency Management Agencv Regional Office
■ US Environmental Protection Agency*
■ US Army Corps of Engineers, Wilmington District*
■ US Fish and Wildlife Service*
■ US Forest Service
■ NC Department of Administxation
■ NC Department of Agriculture
■ NC Department of Cultural Resources, Division of Historical Resources, State Historic
Preservation Office*
■ NC Department of Environment and Natural Resources
- Division of Water Resources*
Natural Heritage Program*
NC Wildlife Resources Commission*
■ Loca1 Agencies
- Charlotte Regional Transportation Planning Organization
- Union County
- Town of Weddington
- Village of Wesley Chapel
U-3467 Environmental Assessment
6-2
May 2015
6.2.3 Local Officials Informational Meeting
NCDOT conducted a local officials informational meeting on June 25, 2013 at the Weddington
Middle School Cafeteria in Matthews, North Carolina. An invitation was mailed to local officials
inviting them to attend the meeting. The purpose of the meeting was to provide informarion to,
and receive feedback from, local officials on the proposed project.
The local officials informational meeting was held from 2:30 to 3:30 p.m. and was attended by siY
representatives from Union Counry, the Village of Wesley Chapel, and the Town of Weddington.
A formal presentation on the proposed project was given, followed b�� questions and comments.
A variety of topics was discussed during the comment session, including: current and future
development within, or adjacent to, the project area; current and future traffic operations; project
cost and timeline; project prioritization; and anticipated project design details. Meeting attendees
noted they would not be supportive of an Improve E�sting Alternarive.
6.2.4 Weddington Town Council Meeting
NCDOT representatives met with the Weddington Town Council and staff regarding the
proposed project at a Special Town Council Meeting on August 19, 2013. In addition to Town
and NCDOT representarives, a number of citizens were also in attendance at the meeting.
NCDOT Division 10 requested a meeting with the Town of Weddington to obtain feedback on a
potential project alternative that was noted by former Weddington Mayor Nancy Anderson and a
citizen at the June 2013 public meeting. Subsequent to the public meeting, the project team
obtained information indicaring that on March 9, 1999 the Weddington Town Council voted to
recommend the alignment identified as Alternative 4C in the NC 84 Kelocation, froyn NC �6
(Providence Boczd�, to Ttvelve Mile Creek Koad, Union County, Location and Environ�nental Screening �ort
(I'resnell Associates, 1999) to the Charlotte Regional Transportation Planning Organization
(formerly Mecklenburg-Union Metropolitan Planning Organization [MUMPO]). MUMPO
endorsed the 4C alignment as the preferred alignment for the proposed project on March 17, 1999.
The new location portion of Alternative 4C is on appro�mately the same alignment as Detailed
Study Alternative C2.
6.2.5 NEPA/Section 404 Merger Process
The NEPA/Section 404 Merger process is an interagencyT procedure integrating the regulatory
requirements of Section 404 of the Clean Water Act into the NEPA decision-making process. A
NEPA�Section 404 Merger screening meeting was conducted via e-mail on September 17, 2012
with the project's Co-Team I.,eaders: NCDOT, FHWA, USACE, and NCDENR-DWR. The Co-
Team Leaders determined the project would follow a modified Merger process with a joint Merger
Team meeting for Concurrence Points 2A (Bridging Decisions and Alignment Review) and 4A
(Avoidance and Minimization). This meeting will be held after a public hearing has been held for
the proposed project.
The agencies represented on the U-3467 NEPA/Section 404 Merger Team are:
■ Federal Highway Administration
■ US Environmental Protection Agency
■ US Army Corps of Engineers
■ US Fish and Wildlife Service
U-3467 Environmental Assessment
6-3
May 2015
■ NC Department of Transportation
■ NC Wildlife Resources Commission
■ NC Department of Environment and Natural Resources, Division of Water Resources
■ NC Department of Cultural Resources, State Historic Preservation Office
■ Charlotte Regional Transportation Planning O�ganization
U-3467 Environmental Assessment
May 2015
7.0 LIST OF REFERENCES AND TECHNICAL REPORTS
*Atkins. March 2015. Community Impact Assessment.
*Atkins. June 2013. Final Indirect Screening Report, TIP U-3467, WBS 39019.1.1.
*Atkins. July 2012. Community Characteristics Report.
Centralina Council of Governments. December 2003. Village of Wesley Chapel Land Use Plan.
Charlotte Regional Transportation Planning Organization. May 2015. Draft Comprehensive
Transportation Plan.
Charlotte Regional Transportation Planning Organization. Apri12014. 2040 Metropolitan
Transportation Plan.
*Kimley Horn. January 2015. U-3467 Traffic Noise Analysis.
Federal Highway Administration. Feb 2015.
htt�:/ /environment.fhwa.dot.gov/4f/4f�olic�.as�#determine
MAB. 2009. Western Union County Local Area Regional Transportation Plan.
Mecklenburg — Union Metropolitan Planning Organization. July 2011. 2012-2018 Transportation
Improvement Program.
Mecklenburg — Union Metropolitan Planning Organization. March 2010. 2035 Long Range
Transportation Plan.
Mecklenburg — Union Metropolitan Planning Organization. 2004. Thoroughfare Plan, Updated as
of March 21, 2012.
Mecklenburg — Union Metropolitan Planning Organization. 1995. 2015 Long Range
Transportation Plan.
*Mulkey Engineers and Consultants. October 2014. Natural Resources Technical Report.
*Mulkey Engineers and Consultants. September 2013. Preliminary Hydraulics Study for
Environmental Impact.
*New South and Associates. May 2014. Eligibility Evaluarion for Rea Road Extension from
Providence Road (NC 16) to Waxhaw-Indian Trail Road (SR 1008).
North Carolina Department of Transportation. December 2014. Draft STIP FY 2016 — 2025.
North Carolina Department of Transportation. August 2014. NCDOT Current STIP.
*North Carolina Department of Transportation. June 2014. Air Quality Analysis for U-3467.
*North Carolina Department of Transportation. Apri12014. Geotechnical Alternative Evaluation
Report for Planning.
*North Carolina Department of Transportation. September 2013. Freshwater Mussel Survey
Report.
*North Carolina Department of Transportation. January 2013. Traffic Forecast Supplement for
U-3467.
U-3467 Environmental Assessment
7-1
May 2015
*North Carolina Department of Transportation. October 2012. Hazardous Waste Materials Sites
Review Memorandum.
*North Carolina Department of Transportation. May 2012. Traffic Forecast for U-3467.
North Carolina Department of Transportation. February 2012. Union County Comprehensive
Transportation Plan.
North Carolina Department of Transportation. 2012. Invasive Exotic Plant List for North
Carolina.
North Carolina Department of Transportation. July 2011. Traffic Noise Abatement Policy.
North Carolina Department of Transportation. July 2011. Traffic Noise Analysis and Abatement
Manual.
North Carolina Department of Transportation. April 2011. Conformity Analysis and
Determination Report for the Metrolina Area.
North Carolina Department of Transportation. July 2009. Complete Streets Policy.
North Carolina Department of Transportation. July 2007. Work Zone Safety and Mobility Policy.
North Carolina Department of Transportation. August 2003. Best Management Practices for
Construcrion and Maintenance Activities.
North Carolina Department of Transportation. Apri12001. Policy and Procedures Manual.
Chapter 28, Part 1.
North Carolina Department of Transportation. October 2000. Pedestrian Policy Guidelines.
North Carolina Department of Transportation. March 1997. Best Management Practices for the
Protection of Surface Waters.
North Carolina Department of Transportation. 1996. Feasibility Study.
North Carolina Department of Transportation. April 1992. Thoroughfare Plan for Union
Counry, North Carolina.
North Carolina State University. College of Agriculture and Life Sciences. January 2015.
NC Agricultural Chemicals Manual.
Personal Communication. 2014. Telephone correspondence with Mr. Joe Lesch, Union County
Planning Department, on September 25, 2014 regarding a proposed mulri-use path.
Presnell and Associates. April 1999. NC 84 Relocation, from NC 16 (Providence Road) to
Twelve Mile Creek Road, Union County, Location and Environmental Screening Report.
Schafale, M.P. and A.S. Weakley. 1990. Classification of the Natural Communities of North
Carolina: Third Approximation. North Carolina Natural Heritage Program, Division of Parks and
Recreation. NCDENR. Raleigh, NC. 325 pp.
Town of Weddington. February 2015. Town Council Meeting Minutes, January 12, 2015.
p. 15-17.
Town of Weddington. Apri12013. The Town of Weddington, North Carolina Land Use Plan.
Town of Weddington. December 2012. The Town of Weddington Zoning Map.
U-3467 Environmental Assessment
7-2
May 2015
Town of Weddington. April 1987. Zoning Ordinance. Amended through March 2006.
The Trust for Public Land. September 2011. Carolina Thread Trail Master Plan for Union County
and Participating Municipalities.
Union Counry. December 2011. Comprehensive Water and Wastewater Master Plan, Union
County.
Union County. October 2010. Union County, NC 2025 Comprehensive Plan.
Union County. September 2009. Voluntary Agricultural District Ordinance.
Union County. December 2008. Union County Zoning Map.
Union County. December 2008. Union County Utilities Map.
Union County. August 2008. Union County, NC Land Use Ordinance.
United States Census Bureau. Accessed October 2013. DP-1 Profile of General Population and
Housing Characterisrics: 2010.
United States Census Bureau. Accessed October 2013. 2006 — 2010 American Community
Survey, 5-year estimates.
United States Department of Agriculture, Soil Conservation Service. 1996. Soil Survey of Union
County=, North Carolina.
United States Fish and Wildlife Service. March 2015. Endangered Species, Threatened Species,
Federal Species of Concern, and Candidate Species. Union County, NC.
Village of Wesley Chapel. January 2011. Village of Wesley Chapel Comprehensive Parks and
Recreation Plan.
Village of Wesley Chapel. September 2009. Village of Wesley Chapel Flood Damage Prevention
Ordinance.
Village of Wesley ChapeL February 2007. Zoning Ordinance.
Village of Wesley Chapel. December 2003. Village of Wesley Chapel Land Use Plan.
*VHB Engineering. October 2014. Final Traffic Assessment — Weddington High School,
Weddington, NC.
*VHB Engineering. October 2013. Traffic Capacity Analysis.
* Available for review at the NCDOT Project Development and Environmental Analysis Unit,
Century Center Building A, 1000 Birch Ridge Drive, Raleigh, NC.
U-3467 Environmental Assessment
7-3
May 2015
This page was intientionally left blank.
U-3467 Environmental Assessment
7-4
May 2015
A end ix A
pp
Fi ures
g
U-3467 Environmental Assessment May 2015
!'^A���� ���►L'�
�►r�M.,, 1 �,► ��'��
�►y��"iw • �I�L i�����
„���►.,{►��rc�
r�t��rir�.�/Li,���llt�ll�`���'��
-.- � -. *��#`
�
�,�ar�afte
�+, .:.
+�� ,� � F ^-;
i_�KLEri;' � A. �zre:"�I r,, _ •` t` �'rn` r
' �! �
�:'' '`` � ����o����� '
<: ��.. �,
�
, ._ ,;.,, ,;, ,
�. 3CG
�•°$12��10�5 ': , _ti� ..� � .
�' IndranTFai9 �� � �°s ,
' . W'etltl �k;�r � '
'r' •��4- Manroe �
�� z�x,
'� '
''� ���+ ]� 'µ� i.�;.�°, iil S'S:fT�'i•..�.�.1
Y, i 1
������ , .'.
� + � Project Vicinity �
� u *. �y ` , �
Jr, � ir �� .
Figure 1
Project Vicinity
SR 1316 (Rea Road) Extension, NC 16 to SR 1008
(Waxhaw-Indian Trail Road)
NCDOT STIP Project No. U-3467
Union County, North Carolina
P�OF t.f.U0.Tfi �qRG
M � North Carolina
* *
� o Department of Transportation
Fp 4P
�EHt OF TR 0.T�SeO�
_„ . — �i �.�' �.� �'� �t � . � � ' ?v. � 5� � . �. � :
SR 1316 (REA R�AD) EXTENSION, NC 16 T❑ SR 1008 ; , ' . _ ;, ; _ _. �. :;: _ �_ _; '+'
�_ •=. ..
;- �� ���',�E�,.
A ea�f& Ma aatedArearitage Q Pnvatel Owned Park ' ��"' • , � � , _ . � r��^_ ' � r # .
(WAXHAW-INDIAN TRAIL ROAD)g TIP NO. U-3467 � }�'y,.. - � ;' �F��P :� l', � �.: � �-d,� �j����� . ��'� ���� sr:...�������
,i
Q Study Area Y +� �r �' �� � t r �
� Publicly Owned Park • �, 7��.. _ ��
� Map Book Grid � Proposed Development '._• � � " �, � . y ,• ,����s ;, � ;,y;{•
O Business . 84
— Alternatives Floodplain g School � � •` � ',' � � �, �� �� �` �� ._ � �,
Cut/Fill Limit Delineated Wetland {} Subdivision ? . � � -: « I � '� h � *`� . - -
�� John Walker _x .
� ' Town of Weddington Delineated Waterbody �� Emergency Facility ��' o �
��`:�'�" K �'� ,�,��Matthews House � Wqq ��;;��
Delineated Stream � Church � , +
Town of Wesley Chapel 'R' � k, `'�':�,r� ' � .� : ;
- � Underground Storage Tank ttt Cemetery = ' � -
:x,t _ ._ '' "
�- Roads � Historic Property . , ' ,+� � ' � r
� HazardousWaste �� 1� �" '� -� h
3�E Existing Traffic Signal � �. � � y
� H draulic Site "'E , '� r �; *
���� Government Facilit � y • � � �,'� ��•� * � y�, �
: Proposed Tra�c Signal Y yyq ( � �' y��
Natural Heritage Element � Hazardous Waste � Hydraulic Structure ���I ��,� r
` * �
� Occurrence y' + d + �.;. - f � t�- y'r � -��c
+ y
. . �` . �
o ioo zoo aoo soo aoo �."'�� �'d� r y ' .� ��:!�, � =�'IAf��� l b�'. y� i�--��� ��, ���t y��
Feet � ��p � y (,. ��� � I� _ �� �K �1 r ' Q � � z ^�j .
� ��i m�n i000 Fae� � P i J� . � � +��•�'�.', . y. �r►�l n ' � 'Y � � Jj � � f '�. � � _. . _ _
nnav a�eParea_vmizoi5 f. . .. t, � .i'� . . . ���� � � � f! n., �71� � J '�� � �. . � � �� ��r_ _ ,�
oar� so�r�e: Ncoor Nc Hao u��o� co��ry Nc o�emap a�a NHa , y ?} .
n.enaiimaeerv:Ncoorzaiz �f'- ' 0 [? 0 0 �Y� � . � i-- �� � F'�ti �' �r
; y .; �� yy f � � ��
,. � . d� r r�� �r � �,� � ,t , � , �� '� �,� .
+., 4 � .. � �1i "' �
i a , J' �'" �' +
- � ,� , '` � r 4 , � . � , � , _ � }�b _
, � {� _, r, "..: n'.dC. d.� , � ;��sf� •���}�� ���, , . +' . ]� , � '- � N /7 � ,jt ' . `�: _
, . . .� � , 't�t t . . r �:+ . � . � _ 4`. �'� LJ r'wM i� =�Y�� y� :�` 1 <;'� � ,r; }y.� � . � , 11 W
• ' � �Rr4, y�, :r.' � � �'.'l� � 7 .�wy't•1.��.f1 f #' 4 ��? '� �Fe ,` S i �e�q A,. � , �
� ' _ :r '>. . - e .: � � 1 � �,r ' e � t"� �; .- � y d �, a . p - � �. � � � � � -��'„'�
�k ! ` �'� �� (,�.�;�., � � . . . . : �s �'-•� .. � .'r. - i ;' � 'ro�,,, � e;: T a.b',�.�i j . ,. . .
�,, T ������ijp�+ p ,' � (/�{j , a
.. ' ��' �a ca� - r.� � I. �, _. . ��%'�:'.rs�- �- J+' _,";' . ., ��.�A�'�� yi � !� r �,{. ir':�.�11Y � I,�y �+., ¢
fi �� � d � n ��� „} . , . , .. �.. #;.'Y'-�� e i' r. I � � � y � � � �1 �: �� { r�+�., 's �i "�, . - .. ' '.� ,,, ' , �'1�, � _�� � • Y
�_ ,
� ,�, �S� �I,��� '; �,/ �,'I ''�.�..I , . . {.�,r' � . N}t - # I ' !J
$ ' � ' � '�� . . : �. , ; ' : � �- .� _ _ �, .;� , _
� � .. � � .. � , � � f -" �''r: F ,d �� , ,�; ' ` * t �� �
•� �5
� �}
, , 1
� ..
, �-4�r
, J
� • % . ,y�
. � � ' • ...�d. �,r ... .a�,, - ' . � � - . .., . �`�1 ..� "�: 'ti .T ���' � / �/ �'•.��'" �'� �: .0 "� 6�'�
/ F � � V �' � '�,,, .��� / . � I
�.� . ' � .,y�, � , ,�j� . � .
_ �' � - � �' � � # �, � . I � "^ti Y � .,,„ ,� e
�� � k .� �� `� �� �%v � � ',� ♦ f �, y } Ca, ��, {r � �-.., S {,�' y� _ , `
I �f ".t!. � �, �� .x{ rl ,r�� � �r � �'aP �y� - , . ,�., " ." - r. � � , �>' �
:. k� � _ 'r � ����' �i� �.�� ; - y� . '�� .�r ] �K�i 'f �� ,�1� � /',� e.��� '1��,�� �� _ �rl.
, ., , .
�.
, l:
�}'., � .i, �. �� v. �� 1- - _ ",� y�-�,. . ,"t � r
�� � . _ -- - �� ��. ,_� � . . . ! � .. . . � � �,' I ,�; '' � F',����. � � 'tl ��'1 4 � I :� S' . � �lj.." � .:(�,��'- '+�'i-; � . ,i .
''�� / �a� ��, a . �. �I, � }' ��: "��.�i� �i.���� _�..�;�'� �s `,,, /'►i �:.. ;� � ��!" r'� ,i� �a: '?� 'I
� , � ; � �'��►,e' � � y. _ ,,, . . - _ r - p=.we ��. � i�' �.. Il'' . . t��' ,9' 1,•:i � • �� Y-� ' .:'4
. . � _
_ .
i .^ . ' .
. .�. �
� �. �' :' �. .�
.
. � . . � ..h1,` . � ' � �� . . �3. _� i '�° y�y�', ?Y1'-� d�f�.t.�ti� °e- ;i� .�p.. _i � f -_d� N� �`r.� �� l:i���+� '�i � . . :�r �,� �_r�. t��
. „�
��..; - . ,-�
„�.. �j� - . � �'%,'�;, .; l� � � �� o..��- �.�,
d, �'� , r E�� �jjt�,� ;� ����5 � ��' , y.._ �; � F� ,r�, ,
� � - �
. ��$
. . , � . � : " � ; ` -n , ., �� 'i^ -.�k l
_ � � . _
,
-- • �
i �j
�# �
-'-- m � .. r�.s� - � r. 'l!� / ,�}� .��,t �ir ;� �� . . . : r� .4"�l�°�' ,75.1��W' � r �'3. i �F.'� :+� + "�+
� �.��- ' - 1 d, � � -. . �.. _ , , , ,�. . . : :1. �� i . ,.. '. � . �CSA' "7i+." ` yL'-{ f . / + , ,�,j K 11�1 .1 � .^1 i "� �.,
. . ' ,
,Q' a
, -X'� . - : � .- �r �'�`�, � � �`�: ; 1 j� ,',`��-,�. .�+�'�a�aan► itir'�',r �1 �, ' `d„ �� :r ,��3 � ; � ,pr `i } -
.
- - - - - �.'�rP. � -_ -,• � :. . .� .Y�,�,i'+� � � _. ,..1 � � , .�� :L �, , � ; �... i�r� ,# ��;v23R.�S�� �'@.6 r. ¢� � � � t}�'i. � a N'( i. • � r.�, '�. ��+�; �� � r.':
- : �. - ,, ; � L�. „ �,, .�n, �) �'1e' J,.a^: '�� � .,?f�'j . � ��y�P�� � �
. �� �. �- . - -� �f' `'}�.�� .� � �. ,,,t .A'' �f. ��'y�� `t l . •���• 1� :1 ��
-�-, •.: _ "- . . - . �' - r.= _ .-; '. � ; . _ � i,{ . ':�,: � 1.a� �t' - - i��� � ��.�J � �., t.
� �� �. -�.�, .. . . , r, ' ••� �,, j ..i..� : � Fc� � ►.. , . .:' ��� x• � ,� yy:.:. R.- ��'. .� ,t.. r r � ' °� .f'... �� ;
:�,.� -�,- _
_ _- _,. - ' ..
� ' �
'
.
_, ,, : _ �`.,. ,, ,. ,,ez 1 %, � . h�: , ; , .: , �� ,7�; . . � a,; � '�'' . � ���► a � . � ' � y ;� �° � !1 S .4. �r' d„
�
,-�
, �� ;._ � g , �; �- �p�p �+4.: . ,.� 'S� j.,
' . • w � �� � ����1����.� 'u �'�'.r ' �..� �� VVr + 'a�� `�4. � �� F �sy � �r,.� :7i :.+. ♦ � �� �Z �� R���
. ._. . � -._ . . g � ', ',,. :
_ � . � .., , �.: . - . � �; ,�,5,` � � .
� � '�- = �+ � , ,;--r' " ''� � , ' ' ' � y, 3� i�'� �' �
� + 0 �, ;' t e �
�:� �' "-`�!'. •,� ,� � �r �,r' 1' l • � �:�( ,�,,. [�' '1 .. r`� �,,�,� t �a,,�,�`�', ,jly, ,:y, + . .
� �J . �, +� �.. � -;. � ' .' �p���-.�'�� �..} *J"mt �� , � y � gt�` � 'Y���'� r . . , �:r t�^� < l�E � • •
f ' ` _ - .
� - .a �;+"' i ' � f , "� ., � � � +. �. . - . � ���. � � :;'y�r °i�;�. .r4 � �'rt_ � . �Y�• i � � .
�f � 4 .�. �
g y ''
v
.. � . -, , . .. .
.
�
: H br
�
WN
} �:.r.M. p !�-�1c .: #�,, � �� ' ���.�.��'�� _, �i'+ ��t.� �. �� ;�,, �� �� e
.
� .�` y
. : - �y '
.
�'� � [�
. .. �-� �,
� i� � � . ;. �.:., A� :. � �� '�'+� ".+� 1 "�,YT�' _ ' ... _.�yj�V ' � l: ���. �yV�l, ♦ _
� � :
.
�� a , ��"r4.K:_ ,° ,�� � r � R. p .� � s q� , � 1�b o e y�{�{�`� o o" - o , ���k .r.
, i ,,� :�.; � ; , ,: 1:�s ; , �,{I��q. : � � ��i ti ���j 7 .
.- � �,f � �' � �� - < �� y + y� �'�i'!� ,�j.y , i�" y��? �%/t /� i � ;�,� .. �� �V� , 1 . . . '' �- ���`� i�,�'i�
�'a. `'1 . f�• >. ,�`� • ^;`Jk'.ae.'� ,#,�`y�. .� y -x l�^Y„ �' ,6 ,R�*, ,��. �f,��.. i�r
l.'�, � �¢ 1� rw,�,�� j �',�u ` f jI _ - �,. ��py+'- � _ , � �i � � t � � ;;i .r y,.
� �.,� - i �J�' � �. � �;�,.. �s ��,' y� � !� �'�" �'+'� �4'
y, ' � j p,♦ a i. �: �. s� ' Y . % � yi . # ,:4 �Sri"! g 't _ �'t �i ' �,�C 5 � �i� {'`�'''� n 71�
'�/, -i+�1t_. - "�'r` �`'�`+�� �'� � yp� �i.��.o- i�„� .� ��� , t.- �� � •pa,{ �y,�•5.�. ^a
- l ' �;,`�' . ;- ��� .'n . r: �r +rYj,�, .�t y , '',i � - ,/�,T �','�` � 0�.. �x� +:�;:� �. ♦ .. � t' � - Ri 1'� . rrs.�;,i �
� �'� D� � �.i i`�� �� YY 1 �. ��7 p� it. N�t„ � 1^ ��J� '� . '�Y �'�q ,f� R
� l 3".' �� � -� . `e ',,,i. � r - . {� ''.f �. ! 'i�� �t, _ � A1' f�l j,'It � Hr �^ � `�" . �t. � ' -:� -'� 4ai i .�. . ..�' . . y,: . : �: y�`� � .
.i ,. i ',�Q�_ .j' j . .( _., �_a� .t � . �',e.��4�s'P-��� . � - t• �4�±.�� �i �.� i c�' �r:- '"���� - ��- �' '��r5��. �f �'^,� '��..
�-� � ..f�i y�", -.l`F ' . . . .�'� � �<f ' �.�f b�ti1 0�� cr "h:,, � .��. I ."i.-�, -� �'. �... � ���. �� 4 �.a
. .i.,,
, ; �/��,1 . . � �C ��f�aSf b� ;n:� � �! . .Tf t� . , . . � y� i ',����' 4 � � �
' �� _ . p �. l�a" �, . '�� � �� f .� 1' . {� �f'.T � .�i,�
� .� V' :� {�.J�. 3 � ..''wr �� ' i � - . ` L � . � � . �'. 4 � ,`� _
��-� l: ..:�it ;� • I . '�-� •. 'f �I� v�� �7Ce� •i. , �{ �w S�k' r�
i . F:.. �-y ?".:� � 'k', \�,. l • �� � � ''' .
. .
' :'_ � _ �, ��, . � � . � �y� ' , : ., �
' � ' ' � . �, � . ..E : . . -,'." y r . �. a ,�y l r. �,7i ` .:;a .. .. a � .�' ! T'.. 1 � . � ,.. ' � . .
°�°'+^ - - �"*ty: i _ �, ,,L.;���.� i � �r"` `r :�t� "'-��= , �, �: rF'=�,r: {�t� �'. c
� �hrr + �� :.3r , ;r`_; k ' ,: • `. � . � : � x+yh '�'` ; � e.. ; r � a.,:
:.
, , , ,
.
' � �'% � 1
; .
.
. . -- !�
.
A �0 I
, ,1
. � , �
_ . r
� �I. i ` ,�
� " ,..� �. i' _4.
•,. - , ,� ��+, ^�. ti, , . r��� h �;�� �:� ;r � ��.�� `��`.'�`" � .� ;� ,: � � _ , ,,. t .�� ��'a.
. „r - �y, �{�`' ,�i
;;� • �� , ��� : ,'� .( !`�'�.• #_ =.-� , , :;': .'`:'�,''� �{ f��� �'� .4s �N `K.- ,tia ,�t� 'x� .�i � ' :���.. e�aRi � '°. '''� I�r . .d-:. � , '�i� ��r i :`�7'� .
� r �. i... .� �J �-�.�. �`.. .i' .,�,. ���.--5 .-�rc "d. �%`4`�.� �lfEi;�a � �„r 7��4'�'�.� ��ty� _v�`= 'i. ''a` � `{ ��a Y�'
- '�' =' _ m s T�' `.`"�tsi '�+�'� h� a � . � , r .s� . .� n: f _�; l,� ,'.�
, ,
- , .,� �
s >>, . _
t : , .. , . �, �
�, �M . : �_. 'r�',� � . �_•:� �� I ;�.� - '� � fi•�ih;� ,:� .: �.. , . ' -..../d �r '�. ��,.. - " 11'7'4'.., s'�- 'r :•� t�� . �;.. �t ._+�a�aiw�.�„s � � -- ���a' x - :� .�rF" 13.�.�'
, • V�`r�
� . - � :,� ,� '. �� .. ,�:<-+Cu���.�: s; � _r t� l.+i�, �i ;'A n: ri4 ",� �.rl` �/ ,.� °���:r�.- ' - .. '�- 1 .i ��t�
�� . . ._+� . ,I M �. � ��, s� '�'},: "�� R.+..+r`.���. ";Lv„' ,,,r,-v. t' �.�• _ -_ ,�-..:,��a.�x. .3.
. , �� . -_ . "---� ��'�� �, " f` � - : �-i" �d �r�`t� �,� � r � ' �� �..�ic,..y , .'����5.+� � t+.r > W� y ;�r:! �' � < ` 7 �vg ' i� � '� � � i
.
_ � � T
�+ �� . �� t� ,�� -� � ♦ �y� _ . � . . � - �. .'.�L� ' h.y -�' w N.y � _ _�-�{ �°���i: t '�:,. � ,.�``.� '�:� - -� _ :� :J..f � r.. �,`"i`i.:i.' s. �'�'�r�.,_• :71�-
_ ...+�., ,,, d I� __ L� ���� � ar " Cb<. ?n.':1.�" -a�.��� 'h ;°T �� f' £.r .�' S - - �! �61` "�
� - .t.� F �•i--! . fi'. �r^ � .� ��,. •�l� ?F�,tb. �l, ,,� �M; � i � f r �+T'. �'zr
=77 . . .,p � . tl,y� .��. �.. - . ���r � ��i`��`^ + •as -
,�. -- - .'� _ .�. � . �F.: �,�i'� �I{..� .:� ���_'`C#!1{� ,i :'�r,y�. �L ��. �:'t�. 'J' �'9�'
e u ' _ r . . , - ` ��hg�i', ��, � '� ��.� �.�.�,y�.�q�,y �ti.�rr � `;s � �}`' �- �rl�d,� ttt' t d. `
_ �y � ' C ��8..� . i • 4�., t'�1, w3. '�I' �'�am, �3w�..',..,�7 - ��!'�,-,Y ���L..�. T �. �
. _,
' _
� '
;.' ,
.
� i p.�,
i e .. ' :. . � -
�� �y v..
. , . . . � ' � + -
� {
�,
. � ,`� � „ .. . ' ��J�I�i_U.f ���.. � G . U y' � - � �� "� � .'.U-. .F, t`7 iF' , : ,t ; � +ma� .�r '�'�Lh.;�� � ��� - �� / ��';leJ ��.
,
"-' ' s :�i� �� �., '� `r�F �,. �r.�+3��a "'1e, s"E i _ .�4-•:
.,',r-��-, ..,� . _.. .�i�11..�i{IIVs ):P�� �� . . -� t� ��.� .- ':�',p�. - Tyi •`i"�.�fS�Ji.- , �.i = � A.'.�Cc`}i�. s .����6J�A;v
,�, "�; t . . w 4 `.ti "� 'i , s3E:�`T� �iF'SdS�,Y - � � �r �r . • V �. -
' ' `__...,..- .
. ' 'y - " �' -_ _ _. - __ . � . � '--y' .;s • , . v � � � " � `��_ �. .=IF.S . •. ,r -� . _ . - lvx,' �� - ����:.rriYi�,� - _ f1 ��lc
�1 M: -. . . ..� .
�.�14„. .. . . --,�°��;.�,., 16 -�.� � �:✓ , -.:�,._. .... .�;�, �,����.- t., � 7"��_�,.;�-., r,M`f�,,b a-�'� _�-..- L��.�.ftEi4..` ._ {-�..t:'_'�1`�?. � .i��i_�>L'S.,a2Jrs�6:PJ�l�n%ir•-ri' cr.a
,� y,
., :. ' _' a , � (f . ► - -T A . � .- �, i�l'.G�J'
� ..-#rf. . ���� >� ��•�•" �` ."�..�.,�� :. .,;� !,: _ . :r, � 'Y',_.. . - - - _.. ,.. _�.
�� J i �,Y
. � . ,"f� .. ��`- ' �� . e� .3. . `" ,l�., �t a t. -�F� �`�:� 't' � ��� n�. ��,�. i �r.e � � E ` '� ;�`si' �", ; e
� � �, ,� y � . ; a "�; w,� � j, f^' �' [lf�
� � -- � .r � ,�d ' p' � .�� � " �� f ,�C9 � � ����:p1; , }:��v�,•) �� i K�' t y � �� 1� : yf,� � � : i � A � : ���'�
�. � � � '`1, '±' ' ,A �
„
r q '.�.-- z� � .�� ri Y �j�(7 �� * Y.. C`• � s r��
_ y t v ��M `. y � � r ; �. y �' l�J O�t,� � �..,yy « g.L : - '� � ;a' �� ' Y f�'� � �
� � - �
. ,� ,� �, �
.
„ .
ti.
, � � ° ,
� � �� `� � /� '1� -
.i.. •. �' �• ' � �5.��: .:°� . M Vr.� �� .. . - y�5:,,:� �� �� �� ��� �'�'11 � !J�
F - o �j�- .,1 � 4�� ��.T. �� WV - J a9� - .s -�'?SC �.� '� �� •� � c'; � �r. ,� 1
, ��� o . 0 � '�ull`���� `.: . . � r, e . , #�;. ' : . �_ ` � ., � . �;' w _ - . , � -. '�•�� . ��
, . .� -, 1,� ,� � E .
' '� i °,
�, � , � � y�
� t,; �}�7`ri l� �S �.�. � i � � �.
�V � � � ��a,'�k4• - 'l.�4+,��d/!� �II� � �Xr ��L � � •�! " � -- .. . _ . -� .
_
r .
r.
.
!
�
• ; � : e � ri ' > : J� . � ,"�.e+t � �rfi,R`4 d:! " . - t r ,..,.
.
� _ � . . 3, , � Howard House �� �� �� :_ , ' .�<,� '' ;,: .,a , �i - �,�--
�_ - . :�� -��._.. -.�� .�. '.. �'•. .y .- . ..,. , . ,• . e`� . t�� R' �� � .4- .f_, ..r �� � ,r... yl.�...6.r-�Jz�:i fr , . . _ . `_
. d';�' � � �' �.
�. � "� K^ , �'�"� �''u� �� 'n a __ �; x ��' ��., � ��'�i�} .��� S . ± . ". � I .
. i:.
F� . .. . , . t r �
, � � � � � �!r .� i�. ._�,�. ,,' � .,� �' ''�� . � �� �-. �
� ,
�
� . s , � _ ��
,
� �� . . .� �� , ; _ . 3 � : . �
. . � � �� � t , � _ � . .- ,, . ' . . � FYt ,� 1., � n�` j _ � t� 1{� .
3:� � Y + �. D Q �?. 4 .. �C� '��' �
� � .
� ' '� .
..
* . . t . .. �V �-� �� � i .. wv. s 4'�R t� .
� J
�,. , � , f, -'y _ - � �---.. ,� ' ?Y � �``
: _
a :
�
. .. � `
�'� ' ` _ c. _ _
.�. ) .. '��i. i �, , � , � ' , 1.: _. �� , .�� 1 7� . ,��:, y ,,: �t i{ j. l�L� r..F .rw'i
�� _
� �
1
, � � ' -�.
. �s
�
f: � _ .t,�, � fY.. i.�� } � .. n. � � ` : - ... .�.�r � . + � . . s:t�. 4':..Y� � ��� "�,� � � � `�` . rt J . . . -
� �. ;p::- � `. ' `^' . ' �**w� �. � 61., ,.,�,�. � •� •q .� � ��ip1� .,�•' '��� '��� . ?^�`'" .✓, ,.
.
�:� �� �: . • t v
`
: � �]C . . s"
s . . . -. ,. :. . . . y
�i . �'+'
!l� .,
w} , ��^� � ��� �. � 1� � i. ��� �. �'.�� i _� ti; r.. �� ,r.H.� . . "� t.' __r. L p�� � b',�.�t + J '�3r
., � � . , .- 1 �. .'- •, -` . ' ; _-�. � � :
"�'"'"!*�s �' .-: , ' �►� � � : .. _: : , � �� . ' � M
y �, � � �. � .�.r.tat • � r ' ,,,a a,,, - ,�'F .'t... .,�- � � .��,-� �` 4 df:
� _.: - . . . .,:;''� . � � .. � � , . ,. . .� _. .. � ., �.ie F' N+ . � - �: _ �,.Y �, _ �,� C`4�� .
f �
.
� Environmental Features �, �► I�i� . "'��.,�,;� !�1' . � �.� � �,��� ,: - '���fi] ��� d�C , �'x ., �, �:�, r� �5�
.. � � ����
� _ � � ,� .
..,s , . . _ � _ � .,���„�� ►,.t. �� �6;..: ' �,�'� 's � : ��� :�r` _ � � s�
` ` '• `
d . o � , a "Q = o
�i�" NCDOT STIP Project No. U-3467 � � �" '
§ :�� � ��' `� •� '� ` <��� i� �.� - '. F�gure 2B
- Union County, NC '�` � � � F � ,-'�—
_ ' � � �� ,�,. ,Y, ��,;
i "
�,:- �h � , . :. ,:. . . � � � -_ -. �:lf.. ,� 4 , , �4�1 , . ', . �.. _ ti; � p . i , ..� .
r'� �'`• "' �� "r`� �' � , � '" , I� Zr �: 'tl SR 1 31 6(REA ROAD) EXTEN510N, NC 1 6 TO SR 1 008
r�. "" �, ��: �� � ,. ��
a �- - .- � . � - .- ��, 4. .,� u . � �w�.. •� r . � � , � * �
� ,. �►1!'', . y,� Ir'.r � .. ` � lt . , �-" #�_ �� Y .�''.. +� � �� __ � % .. r'' -�� �" (WAXHAW-INDIAN TRAIL ROAD) TIP NO. U-3467
. ✓ Y � ..". �A�,����i r ' y ' �'t'M� T .. ��+ "� ��T.,,. . 1�
, K� . �
f " ^ ! " �;r ; ; 4 `_ � + ,� y �P � , +• �� �y . ` Significant Natural Heritage Q Privatel Owned Park
� � � y� `� . �� �` : � . , `.ry • ' �r� � <. s+,�' . Q StudyArea Y
� � . ' . .-_ . . . � � . f ,� .f ,. , . � ' ' a ' Area & Mana ed Area
, ,� � , �} � 1 "t'H-. �t.s�, ,; g p Publicly Owned Park
,� •v
y ��� , r., ya� � r� � J, � � ,��, k ..a _ s �� �•a a� .�.
r % � � {';,' :. � � '�y ��� �''� ` � :,1�, ;.�� r �� ., a r �'y� a ,�' { .�,,,� � � Map Book Grid � Proposed Development O Business
�� ' �� � `• � r, L ''-'�' : � '� �'I' ^�`�� , .��� � � ' u h i .i' � ' ,� f dr., �^ — Alternatives Floodplain
� }'r �' �r +��;, a �i �� � ��,- . � a; �:��d�r .�, f! !� , R. .;� �Ji i. j.. ,i _ g SCh001
�
�, -� , . '
:�
� - c �, : 5 ,�,. � �I e Delineated Wetland
` + ,,,,.'`.,� � ::. ' st', yr �,. �`i� �, �� �t *� � , n: �. y f �„S�:`� �:� CuUFill Limit _— _ i} Subdivision
� ' �, _ �� � �
� , ` ,
R ` �a` w' �_ ' �3 . � � �r' � ``�. M� � ��"�� " � } �fi � <1��''� . ,-4�d Town of Weddington Delineated Waterbody Emergency Facility
, �
. • ,� � � � ;�`
_, �.:-r , , , � � :� � : . � ,,. - . . . . , _, . ��, �. �:
,�
� �. , .. , ,.. � :
,,� ;. -�. _, - v - ,�j� - -
s ` � - . a , �d� � ;.,a� � '�`� � , 3='I ^� �� �r.'. �r > ; . . , y�✓ �. -� �� . Delineated Stream � Church
� i !c ,,
� . � � i
::�� �, _.- a � �� ��" -� �r �� J� y s' Town of Wesle Cha el
�f
. �
�,�7 � � F . ,
. •.4i: .. ,3 .. , , �� V t�.. a . ,� �.� .-� - �. � Y p
' +.*l1 . 1 . .- � . . . _ -- t
, � . . -�. .. . �3 .
�' Cemeter
-n i �' � t t
� t�i 6 . ,� , ;. a - , i ,�� r�a�. � j � �, : " ; , fii . � Underground Storage Tank Y
�` � tl�l `�l , � , , ��y�� ` �`��#, , . ,�,.,� �� � � �`, , .,� ` r; . '� �;` �— Roads is onc o rt
r � ,� . .� �
� • � � Hazardous Waste Y
-, _ _ , s. ,• ,�,
, - ,�, L' 9 � ; �r :. f ' r t : F-s�'� f3,��e`. ; . 'f`�� �� ���..�,� f �� y _ 16 .�.i` Existing Traffic Signal r pe
� � ,� ° %
� �+� . . . ^ s .. � �' ' ` '!,e- , _a � O HydraulicS't
ys � s. � '��r� : +� - �, � � �/�� � .- �1 .a�"' �� !� � -
}
, � , . : . ', l , .,� � ^ s ,��,•`. • � ����� ,>; �. � r .. s . v . ;:. i.1. i . '� ' ¢ F �r _ ."��-:'-: iv�- � ��1 Government Facilit � ,
,, r,+r.S . -, '9° .
� e 1 �. - .� �x '�3 F . ���Y � 3 '� ;. � � r , , ,�af�f' �f.� :-� � .� �� < , r : .E a� ,a , � ��:� . + ,. Y +� N" Y
. , �� j {�c �, . - , � ` ; �� �� Proposed Traff c S gnal
.. ,�,'- I��y�. - � �,._, �,�` . , yg� � ulic Structure
� - � r :' ,E -• � , .. �. �. ��yT� . �• � �. , � �> � `� � +'"' atural Heritage Element � Hydra
�► s,s -.� K� � « rI' ,' r � .� � f� ' r,t�i k�'f` �< .`, ;4 �; r t C � 'r+ �< P��',��p� • 7'-T Occurrence 0 Hazardous Waste
�� �,�� �� . f' t i��, � � . . ���,e '.,:�q � yk����+:� ' Y �• �� � � � �1 '�. 1'��; -.W�
S� �j ;�Pf �,; ;� _�� �� .f :Catawba Lands Conservanc ' � ,� ��.�'� ��u� ' !�' ,;t�. � t �' �.,��,..� �;
��i�}� j'� r�? `` � � � � 3 � ,n, �� �' �j ;''� ,�`' ,�q o ioo zoo aoo soo soo
���"-u`> �1��'� . `,�� ,�r�` �►,;,y � �w « �.,�/�� Easement and Preserve � �_ �' �� �� �; . �, � '�;,r�j .,� :�: �, �: �b��� Fee�
i7� . .ar � • �ii.7y �� ,i•'.� 1 - ..jr ` . � . . . . .-P�: �j` �)/ �'4r�.�i'�¢_ �. , ��%°3�..�>. `�,.� im�n-iomFee�
��. jj'',, � � • �Y � �� . .' , �' � �� ,�} '� � .,� � f . aa MaP PrePared'.2/10/2�15 e
f'p a�� j ,f i� . 4_ A, ,r�� Oa�a Source'. NC�OT NC HPO, Un on County, NC OneMap and NHP
�. r x . P^ �''( t' � . ,� . �:1�� . � .�:., . °�;�.� �.' �'� . �^'-3.� -: v.a�� t�«{ ��� fi � � g y,' •b ' "".!',` . . ���:..2"���t �,'�r��� ne�ai imaeen�. Ncoor zoiz -
l }�„t�,�` �J ����:.t�" `h` '�#�i� ra � ::��# '�� v ,i��2 �` ` pr` & �,�i� �?� ��� �. �' :5:�..�`�'i"" .
�,tl:ti��f'�i�. { 1- ,�'�je -,d� ,Y�,3'" �� � P ,¢., .. � / �{,_- •��. .,y ^.
�
, r .✓ r
� 1;,
� . ,
+'it' � <'�t ., - 'el
, � �` :
� ,�, ., _� ,, . �,. ,.e , � •, ✓,,� .� - . ;;, � fi �� �.
,
,
! � .� .r
.�
j
, _
,_,). , _ ,
�
, ,; , ,
.•s,. . , . .,� _
+� � �. .�,�. � � 3 t-'yw , � !% �, " .. ,,., - d � . 'A��, ', !r�. +^' - -�r'r.:+• - A� , 'YYa E
•, . , . _ � : � - , : �.�, � � . � , , r .� F . �"� �:j :,,: . ��,�''1 �r� ; �' .. � i
, � � , � ( ., , ,. , / . . � . , � � �►� � . °�►'� . ; . � .►" "►` `{,� � -f �' � C, "�' ' , ; Y '!
-} '�' °�� e . � .�+'� ,�� �", , � -� � �+o�"'q, ..�- ��' r" 'i wi.# � .A�, �� +_�' j 4 . 'r,'�' r",! �'
_ .. ; , � �
� �Y i r t
r' . r :
., � r . f� � A,C ,j
. ' ',� 'r 'T�F' � �, }' :� � '�� Y,r....' � ' .., ,!f,y��t� � ,. YY J Mgi.! :.. A�`� i # :T. � �4 r rt "C1 1'� _ :�� - � J � �� ' - . 9 � i �,
•�i ;:� �4 .� ,tiy t ;�, .� '� .. �� . � .� � ¢�. zi � '� ��r .. � .�.r � h L..0 . ti�' 1
.- . . � ; �. . .
,� :r ,� ,�.: �'' i �.. /+ .
'�':� , .��,�f; .�' �'�.�.�.�.. .A'.•�?� '� ..+' .�% ..*`�� . :x<��� �..^kf,�� . sAd� .� ..p.�4� . `-f"� i �� i . .. , _ . �/�
- , -_�. ,. . ,�. .� , j Y : < :...:,,, � y ..;:�.�i�� .: - #-. a,$ t. t�v< ��' ,�1 t ��• , .`� .. ,.,_ . . � �
Y / - _ � . , . . . . . �,. .t�. . .. , ,� � � . . . . �:.r �*�P� . , ,' �;+,� s'. ; .. . ' ,�a. . . �!''' _' �} ' . . . . �; ��.
� �Y
.:;;c . .� r4- • �' :�. r. � �-" � r ��"-,"- E .•�� ._,. ._ , �..� ,:-� P' ... " V�^, ..r tf � �;'� �l .. w "�,�S�h ' "'�r,..,, *_� . + �/
4 .. ,.. �� � ,. .. . :2 . . +l. . �.� �:,: .,.F . x.4 ::, ... � �.. ,##.k �..�:� . `�a i
.. , : , � . -,. - , , •. � � .i �';�r, �r ;> � ri � .; �,� fr , � , r i h
,.
, . +` d - �,� , - f ,� y , ,.-€�: - , � �� �i . } x, , _ ,�' ,;� � ,,
�� � d �i.. ,� - � .f' 1 - , %�. � . .i �y s Y � � ' � � . .
. ': I � - '. `. ' � .C. ,a' " : . ,.....- �. 9,, .w • �i `'-�.. ' . �
� � , ' ;'� 4 v r ��" ' , P � , � S . �i . . � < w . �+ '� . y' � ' '" �,��
. _ . . f - r' �r, _ � .
. �. ,'�� ..i�; ,:., � �� :r. �,' .��, � '�. f �... �. y �.��i . - . � �
'� - n ��' r,�L' f .3. -�'d � �f.d� x �,-� �:��,-� :a5 „�- 9�� ; , �,. �
. �, ' ;�`..:p = �� �#;: `� �z � s ..� ., ,, .0 k, � • :.X �
�; � �,, . L � . �� �;r�r � ,► � � ' # +- �:, _ ,� 4' Y, . ,�. , .
!;l� t�, i, .M,i > ��y �'. s .� ''c.� / _. r �, �t:;'' r,• �
. �
,
� �. . `
� . ,.
. �, : .
_ •
i �� � . ; , s � '- „� , , , �• ' - '
-� . . ., „ �a!"�i ti � - ,.- �. " �.,� , J " .s�. ` ;�. ` rr ; y 5 _ ir.' ,; : - Y� ' . - , , . . . ri
E � .
` ,
��r
/ � ,�" �
k x3'.� i` :4� . �'y �'.. a�
�! . . , ,. . - � � w ,i�� �., d r ,� � �, _ , . . . - ;� < < ,�•� r ' � • t
♦.�. _: . . p .y ' . .,
..� i�. � . -./ si'r'. � . � r �"� '�'r y.�y ' .:,A N' ylk' . �F .... � . ..i�- p.a�;"'�1� :��� � F! ,pf� � .•'.I+� ,J�- - . j+ � I
. ,�: e f y ! ,� ,�' . � . � �f;:.
A � �f �+ �
�- �� , �. . . ,p. ,. ,� ,�' �` ��► .z ; ,� , � ,.. ,, ' ., ' � ;�� �.,,�:
�/� �. � . 7n� '�'rE ,f� ..� F :.-:� �A - � ....�� 4' ,'�> I� � � �,M� _ f p t .lY � �Z� .
' ' ���`.w1r i � �e ' .i - ;2'. ^. � ' .t... �� -,.i i1...dx�� �-�_� ,;, '�.�q .��'� � 1', � �`�iA„ . � �� . .� ��' , �.� � it���• �I%� nl r
� . �
�' .
: � f■ ' � r��7 . . � i:�� l /I T � �'' . . � -.N,�'.� '�` i� � . . S'� �T �! � . �� . - ..r�� �.+ �� -�,-': , � .i i! _
; � �
� y. .
' !' _ . f di�' . ]�� ,,� F +'<�� �� 1L'� K , .: � . �e. ., ..a _ � �� . p p 1 Y � . ��t a �� . � � • f,' "� 1 �.�
v y� ��ii.�'.�, �y� ...".iy'T' ��:f.� T� ':�..'.;, I ��..:. �/ I 1 �� 1'' i•�r��
„
f� ,.: � � ` �� :: �• ���'. �� ' g ' r^''�� f �"' � . � r.�� _��4j. i„�K.1� 1 � �
„- .
} �F �/
ry� ,� n
, � . . � { ' t"
,
'1 � r'�+F: /,'� . ,... l.,�,. —*'f� .. : .. �,� .:. : . . � . ' I. �� a � � i .. c."� eS, 5 ��.. �.• ,-..�tr
`.,-,
4_ r`,, �� t. 'Y -i df` ,� 1 I �� .e .�• / r � .�7 Y �f�� �A ♦!•.
. ne: �
. . ,
� , ,�� , �;..
� r ' � � r y,. ,` �-` F�� ,r .. �'� . �' t � �
. . e� .� . � . `� , �
3 , � . ��, � • P� ,_��.�� ,� ,�' ,= � :, ;� � , k , ,,
�t �,. . .,;. . ... � ,. ,. � ,� .,� � �. �. .... • - ,t 1r' �i� - :i�' r.�,'' �J �,y.
t�. ' - � ; "' ,H ' . �. ♦ - ". • �. ' r'R" - � `+` _ ��� ��_ . ��� . i ,r+: - . . �,�' r � 4k:'� k , y� # � �s4°i
�J.� ��:- . �� . � . � . �4s' �:� j'� . '���� r. / . . '+� r' jrI} �. ,��, e
� .
F.. . �" .- s .; + i
�
• _._ � � ,� . � ;�� ��� ��/1 �.39�r �,;,,,y�,r Y t •� .F' . ;�>r' , r .'L '�,: _ �? y . 4'7 � b . �., � � '��i�
_ , ., � ' _ . .-- -- _ . .� � . .�r , �r , ,y , t`,a . ,..�., a . ,r y
'R, '4 .} O _ r'i � ,�' 8 . ���� ��. . y �' Y.' . '� w ., � 'i'� � �� _
� � � �� �,� �•�. r�� .� ��,� ,'.�`�v '�� � ��r-1�� tiY�� . . ,�+ - q . - i'I � �'t . 1 ,� ,�. �� ��(�•.��
: �
.
` ,. � ,:�-. 1�',y � . .. : ,s w,� - , � r` �� , � � .�'ili
�
,
� � ��:
,� �$. �e /!.r ,R.
" - � � �" '.► �� � �. �,dt ��� . � � r.� . . . .. � !
� � � � �:: � �z �'� Ti�.. „� �i: �� "�. :''s'y ..�i. � F�� . . ° . ° lt,L � �� . y' _ .s� � �, ��
.� •.�r � �� '.. r ��'��� � �" � '� a '� k. , �l' o 0 o a ��- o - o o � ' � f� ,�
�
�-s �
.
� - ..
�/..� #�� ti, *� � ,,�. y.�, . „� • r, + ' t' '.�' � / + c' !�� a _ �1� �_ - . d� r' ' � ' � `.
�a_'� i• � ' ''8, a4'l" . ti � .. � � � rI `� �� �; ,il � $ , L}� � '� ..� _ , I• � ' r,,, t v •
� ,'
���+� . :a,�s'_ � � � � . `fi^ �� ,� � �r...�. _ n o ��a v - o c� I I I I � . f � ' ° +� �;. ,
l. +�, x '.�� ,�.lz�,,.�aje+r,; �-, r �.����1� (� _ _ ; .^� ' y�..
� �� a � y� __._-„ ,� ` t � f [� rmn.� ��1:�4 °,� �`� {�Vu�i c:� Q Grt J �� �;;` , � �� , 1 r �- - �
,� �, �'��f � �` �L �, , ' ,� .
,�� � �,�'+ � �� r� �' - � o �G� �
,
i � y.
• �p '
y �
�/P •L ,,,���/// �,�,7}ry�[ /� �/��yr y� ��.� 1
_ i���� �' �!. A._�'.�r.,�1 � . � � 'f^�r����w.y�'��� �. i=/Itu�AY� _ .� �.`1. —'— �/ - .. .... � ii��.VU.:i���`�C.`l Tw
� F} � � �%
, � c. , � �: . '�. . n:' _ :.. �� �� _
� .e . ` --.. . ��
� � s ...� �-.�. :�� '• w,� s.< �,fl• . - .e �,�V'� / . � - . r ._�.�, � -.-_-. _ . � _ �'i� r'�q.� e�'�`:� ��ul� �''�'� �fl �` .��9}..�},
E�, ��� h.y .� � , ; A�Iy r f '���'� - �� , ' �Y�' ��_ t r `� °"'l'' �,�
��
r r.
, �� t � � �/� ` i
,.
.
-. � -` � , i �S�- � � y , � �
N
,.
.. . .v ,:..:�.. . r �� ,.,, �.c`.r��°�µ -�. � + �.� .1__
� �, r � �, /. +�i. � �� . �,. '�- - - * - - — 7 A� - L:! - _ � � � � . , - . � � �i - �.i�'f/ p�;-
-
..,, . , , f, , . ,�+'
��y t .=
.. .,. . . . � ` �y
. {'�;-` '�., . .t -1.. . .. , , ��I, e,� . I .: ."& ,. :.. .,;.' ;R' � �"'1^L°' .�a . ri�'. - - � �� ..r � . . � �9l
<;
� ry �'}�
6
- �.e�� ....�. ,.. j . ,t� -;-.sy� ... i � �,k. ., � ei. . ' � f-'. "'f.� . ,,J+.: . - 'S . '
:
� i
�
� !�
� „ x � ,, �; �:,�",• 'd' �. , „ . , �'' ,- . . , �. . .� , C' � - ',.; :,' �cF� , �i
_
� :
.�
�.:. ,> r� .{: � �,, 1�'!' , ,, � _ `t'�'fd �- '��' �I , - � , � ,, . :; ��v(' "`�',�':. ���._�« '� �. ,� �� .,, .IW
,sa ` � ,. ; .�, � . � . : . .:� .,1� � : ,, , ; � �,� _ a o v a o - o'o �:.�� ��,d`�, -.; r �,' ? -'�� �
P-�.'*''�� _ .. �. � � �-�. �� i �� y a `t, � d � r ` �,y � - - �� •� 4�L�-��t �� ���,.-.- =�� ie'� �'�'+ �t. � 4i..�+ r�,
�+.C� �" 'i '` - -�� � - a' Yr:.'y +.� ��-� . � . ��' .fr. a � � 4 : +t. t,+ ` 'r .akl ^ �-��{�t� �i��„ t� � �• � j,; � ��•, i .� �F
- ,
. _
. � �� � � ' �� -�� ? }
�j � �. , .
� �[ � ; � , . .. ' � .�.. '' ' � Ry ; � i ,, s. �l '�:i �'{ • ---- , �,i� . - ,r } y �', �.. y ,
,. �`?�� r� �� �% _ u�L� Jrt! _ __ t r--,1� .,� � _ .� �,��� ��, t,; r, ��,-'�,�' � r�,
, '
,�
.- � `F'°
�.. �.: .... ;}F.s.�;...�_._ � -i._^ _ _....� _ ,M . .��' p �%e ee,+ . . �-'> I al. � } i 'l, � .R ��( f
�, • , , � -- - ,,,_ - ._ _ . _. _:__. ��$T?_ � i i �d,?tY • � �. �.' � }, '
. �
j. , _ � �_ , , -_-fr�,, 3� s,� _'.,�, - �9-q4 � �r r� y .,a �+
,
.
r
.
�
n
_ � � . I v � /�,� , %�
� , , ,� "` .,: ��—�---. __... _ . _ . . .. ..�-. -. "-- _:�.,�F: � _._ _ _-_ . , . .. �r�. _, • s! �.(� i'� / °'"" ;f• .'� . �- '�' ` ♦�/ jp, Y �'! •
. � �� f . 1 �. . � . L !�{ � ��:,.�lf + I � '`r." Y ��d 4., � ��'� �.�: � �� 4 �, .,,.�5 i6,°.�� Y�:
„
N `� � is � '+:tJ M ;,°•C'�' r��.. � `,r� r• .lC` v�_ J`f�I, .� � � �,� � .� l�, pP
; ... ,�.. � ,
;
f
j If i � ♦ � r
+ , ..i � /r�. f o 1 .. r� j� #' . � �" � �J _ �y� ,,�, � �('f � r
, , � ,
(�;�] , , p .I,,. ; � ;..,. t t h,
� , � .. _, .1 � • ' �- �1.- 1G,". � �O �4 '6 fl �.' �'�:�:� Cr�. � �' 4 [V] '!J`�i � � ' M (,:. .- r y�� +r '� �`� 4 � . `�t - - - `� � �{� �t ,� ,�a�
� � y��. ,� -`�.� � . '�,-. - rk?`����� �'��G! � rJ . . ., � � •l• :.',�. _ ;'4 - _ ��r. . 4 •� ' ♦. �. � �y j F , ;'� �R.'
CV" f I , .. ' -`■ i� �`i �'�--i% "� .+ �'�i��: �r,��►.s`
� �., .� r ll UU� il'��J�.�i�A, • i�. � �� ',• , - -- �� � . ,y +� " "� s _ � "4 � .
� � i�.:. f� ��� � 1 t r� / � � � � � �'. y �(t .�
r �; . ��'� y -�� �, �� t� � � r ��., � �� . . *� y '+v ,�y � . , �i�� � q����,Y -'�.� ; � ��:�� 'r�.�fs\ � /, . ,'. 1'n �'.�. J ''� • i' � � ' ��'.
,�� { �� �{�,�,�n_ - ,�y �' W R g � f, a � �r, .�51, ,R�a;" ;j � ,�- '" �t;� _ � , ,. � � �
,Ft �1''y^'0 o c+ �•o o � a ,., �` �; �:`° �: 1 .� - �y 'Y - �., ,r+;
i.',� � LM1:PK�� V li � �.`JlS �, , e � _ h ♦ f � - - - .i � 1'e �
i,, �� r { i�0 - �r �� �r , '�3��'� �Q�. t` `� t .
�� � � .;�Y`, . 1R- . a� �i'����i . -�� . � - `y� � -=�,� �, u,;i,'�. , � �� ar��, �'F'� �,�,-y,� �- ��4,- ��'e f w �• ,. �� �'�:. a� �' -
� � --�. � .:, .. �.�..�' .- u :,� �~li'` ` ��� S',�' .t�.,.,i�C • �� �k o. ^t!i'r�f�,a� n:
� ��� !..,� �� �'' +" �' ,, -�+�1. �' �fi"K;' ,,��` � '1','1�'�" �, '� ',�,�„�,� ,.� �'' '�i ,�, r + .��,' �
� - . . . Ly. .�� . - .�:�� ,�h � , I� ,f�� 'i � .y��` � `F N"�:���{ :� �rA�i;�,� f�� ,u �II
��. .Y. .- , , ,�J j
' `l�''�oCf -� 4 ��� .�i.-����• t�_. _S . �P. - �, rq� J:'.�� ;. � :' -,i.I .A., ,-�„ '► .--�'s.x!�.� �2',f.�.J�1�.-��'';�- .- �vl�v��~�,A�' �"}}',t�,"i�t:ry"X ''�+' aj��
� � �L {
�� ",;��-� F: �k , i:' _ - � ����:^�: �.. �. � �i' F�., �� s ,���-� � ,��' �g�� '-�..� � -:yCi -'�.�,, "�".T a : } i�'Ke �' ,p� I":.
- �: � � �,i h � ��} ':J,' ,(e��P \ '� ���y{ ik .4"� l �, �, y,�v.ty�j .. �� �
- �*� �a �sl - i' k, F`� y � ��:� - `Y.�' .� .aJ -
�„
� � �, 1. ,:� � _V t� 4.�J� ,,,'S1=,• �R �
, :`
: . ,
.
`��- wl
. , .
,, � ' � �
f ,/�'p �:� � N � r � '"�4C: ; , ,'a� :r '� '� � ,�y,�� v � ��,Y '�. , �'. �� :,� ' ; ;+� � g '�° { �,{��.� �c , , ,
# C' - ��i"-' � N ?}�� i ;Y y %� '� S„� va - ��s �,!^:'dr �j'' �,,,�x , : `� 'k P r � V i
� "�� a4�', �1� '4 •� �r.lrr _ .:""'�, I�' T.> \ ,.r . .�� a'�' '�}� . , _ ,w l'',
; r.., P' S � �' � � , �
r.. �Y�-" . '.�. �T } •,y 1�1�','��F '•R ..� '�r �;. .'' °. �� �,n. .i?��. 'f _� 'y', r
�s �;'> Y� - k.X ,'S �tti T `� ^�i ��'t«: `�. ��Ey. �!%�� / ,.� '!� � _ `�A��,� y ys"�r ;� •� ��.r,.
y
. . '
,, .
� ^.
- � .,:. -� . � : ,.
� � . . � - �.� .. t� . . � :,
- � :r - •� . -- — }�ti + ��� �::;Y, :� � , . � , .x��� �? .,: �,;�� p,, .���
�. a � ,� � ; �, ';`; r �-' '."r'� - �+;�. ;�`:�.•
`k�� - . F�> �.� . . �� i� '.'i'�.,e�'..
- �`w ?�- �. .� % �
. /' r 1 1�� j� ryy
�_�'.` .f A.R , /'���/� 1
j I �i�., f '�. � �'ft +e . . ' IF� G :! y� �� .
'•� . ���- �� �.� �: � - . .._ ^'4 . ��i " ..)� . +
�
/ 1
y .
�f' !
i�
" .�^
�,.
�,
�, � ,. /
. Y .; y . .. . . o ' ' ;.:' y ,.. "�• • � , },., yG". � �a' ; � I}'r _� ♦�".. �; ' �y p y�+ M1 �'. �
;� � � � - i! 'j.*'. I l �-�@ � y� . ^ �` +. "� r �,� -�;,.
?/� _ . . ��
y� t -,� 11... _ �.� P. �. r �_��'�-.��,_. ���,,�� _ ,�; �. 2� � �k; .t+r .��.{ r; �;r
+�.' �':�.'. �. _ �. - `;,,�s, � !, , � j �:-' �� r-�,k - . � ..�, i ^'; 84 „j, � ti.
f � �`°�� .� ..'` `� �•.'�3�
w� ' J ..l�� �". .- �., �._ ��-�-- "�- t � q `, � _ u �. � � � � 'v; � �' ' �' ' � a
4 �
.
�;-
o` .'�n.. ._ y,.,.y .� .... v �._�.� �� i .,�,; .. � ��� � - � • . . . ' ' � • } � .��, q,
�
;
� �
_ ;
." ' '
- _ f � :;�17 .l�, � � '�r'i _ t.f . . . C '4. �.,1�• .. � F•- ':� ��� � �`'�+.
: , . , ; .,. , ; � . an
. !
, . ' - . : '� ,' C ' 'J e � �' . � � _ .
.
r
:
g�� , ,
�j. . . ,,4 � y,'�i- �. .'�� -�'��' t � . ` �� f : ��vc.� � , �, �ti . �,A '< �m� / *y�
'�'f� �x �'' �" s� - :��M"�r� .�� 'J �! s'��� � . . � . ' �� ,''n ...,"li •.s7F� l.�p '#J � �'1yi���_,_
� �f � f . .;�:: � . . . ~ �'
.r' �, � � I i ��; h, A� ,� ,� , ..Y � ,,: �,,� ' '��� � a� " ;Q�i'
��. .� �. - �,♦ Qr,�.. �� � ��� Jr - . ;' , . . .\� , i.f o .�. ��7�
.
i , � I'
- � .. � � : a.,
�. .
; ��' ��, #' � �, .��'��� �.�' �'� j� ' � : �� ! - � �! ��, � ; , . - • �
� ; �. f �a, �: � �
. ' • +
. ; � . ., . I � , _. +�
\. ., � : r' . �- �;f �'`... i� .� �9� . ; ' . -� .� . '��,e' .' - ..;. ,-:.. ; f �: � .,, � '.,i'. , 4� � ��� i ♦ �,� - I�. � -y .. '�� � �� ��
� A '�. " � � W �7
y .. .. . .��� , .._ ..�I � �, �y � , < ..� . . } �l'3' 1' - - � i >1 �a. �.
+ lj�' � Y� `1. �;
}e "{ �r aj �.� �' �e �t' � r 4;� �" +� �� 'b ��' °
,. .
� .
.. . ,
,:: _ .. • ,` • �- ' ' i • ` t' ; ��;� ,;� , , � . .; : �r• - %t:^� y, �s"; .,. ' h:^ , . � j y 4�
Environmental Features a� ; � WZ � �^ �* :, ���.€ �� ��-���,: , -!�� �r ; �� ��
�°. � �� _ {� • "�t` �.` _ '�•�. x ,`� ,,'�s� `:"�- � C at: �� � yg ,� , ,'N'e
�i�' NCDOT STIP Project No. U-3467 9.€ � � , - "� ���� � , A ��
� � , , . _ �;� . � � �
- Union County, NC - _ _,s�� �_ Figure 2C
� � `��r ' •
� f .; ��� �„�'�� �- :� �� � :�� . � �� _� ��..���:
1� t _ �"i�,�} � '� r� •_ ,�- �+�� ��J-'►��t�i,��'-. ��
� . .
. �
Y� i � .� �� ' ` �.� ' �,.�,�
,v^', � sW ,� � ������ �i�+. � r, �� � ! X,
� d � ' /+� �,.° � a '"*' • r� ��t`+�°��"'�'
� � � ��,; a ` Y�' �.� ; ' r � � `* i � �' �' � �'� `� r'�
� � {.'` �pII: . T.R _ �.��� f' !�.-I��` ��� �.� �y��f��@.
.'� ,
k , . 4 , � � r • ��
r � • � %�� _ , � "'-,� ' ¢i ; ,
,� �i � ,.�- � �",�i-Jti
. '`�%�'?y /f '� ,', ��; ri�rt'``����,�,,�' F' „
��"' � �'"+ � , ,,,� r �� ,+�,�; ����,� .�
wr ��'Y • ��. �� � ~ .�, ,���.�.� �.;.. ���`�.
i� A"��` �.a� ,;��.� �'T 5'` ��� r�i �. _ }
�' .�' `����i -.,�r��*''�'►'I;'i-; =�_'� �°'��.'�� .1:�� � "_ .
r ``'`'� _ . �',p , i f��' . r
'��,% .�,. d"'�i�. "! � +�.��,� . '��r'
i 7 � � ' _ ' �',.-1�'" a�
r � ��:',
N�' W I �. 1�i�11L.,°� �� � ; r
� � ���� � ' . x_ .� ��� '...`_.` ., .. �_�_ ldjJ,.'
d�f :�
� F � �
q� r -��!��f,� •r ., ,, � �,�;'� t�
_ � .:,. -�- �,`�.
:�� _ �.,� , t
�; , ". ' � ;, ;r t, v�,:
� •� \i� 1, b � J�^'r'
Y Y \�� E,I�-�, I4.
f 1 :� �
, �, ' �� '� ���� �� :,� -
� f • r �i + 1 ��. .���t.
�I� .� �,`,��. ,; .�
�, , _ - - .
. ,�, ���' ';•�, '., ..�, r � ' �,: `. � SR 1 31 6(REA ROAD) EXTEN51oN, NC 7 6 To SR 7 008
r��f
�1 *�� _ �>;7�;.+�' ���_ �R �- J. ��.�'�� ,� � -''� (WAXHAW-INDIAN TRAIL ROAD) TIP No. U-3467
�."� � �'„� ' ,R r�,:.:
`�� �: � � .' ^'�,j ,"� Q StudyArea Significant Natural Heritage Q Privately Owned Park
�. . � � �f ,�': � � _ ` � .
Area & Managed Area p P u b l i c ly O w n e d P a r k
�' �� �% � , y ,� � _ � _ � Map Book Grid � Proposed Development
,� , O Business
��' ' ��� � fp i 6 .� '{ — Alternatives Floodplain g School
k�A .'r @
�j� y�% ,� �� l r �'�`- Delineated Wetland
'� .,� r, -�r+ � Cut/Fill Limit iT Subdivision
� a t` �� " - - Delineated Waterbod
� � Town of Weddington y � Emergency Facility
�'!� f � � ,, r ' ,� ' �q � �x" - Delineated Stream � Church
- ,7,� . � , i _ ��, F __ _ Town of Wesley Chapel
�` '�,. � ' ,�, ;
-� ' s =�� �- Roads � Underground Storage Tank ttt Cemetery
�,.." �� � ! �,; _ � Hazardous Waste � Historic Property
�E Existing Traffic Signal
'�" _ %,r�''� O H draulic Site
r' .,� -��.r ,� � i : Proposed Traffic Signal '!" Government Facility y
� •� �� ' �, � , H draulic Structure
� , , ,,,,��yr � ,;' ;; „� � Natural Heritage Element � Hazardous Waste � y
+��� j a ' Occurrence
, ' �
`� ,,�+ "':� � = o ioo zoo aoo soo soo
��.. �. t1 � Feet e
�� � � ji. -� l�� � al�� �� � j��-. ii��n=i000Fee�
� "�� �, R� � � i� �' .- Map Preparetl'. 2I1�I2�15 pala Source'. NC�OT, NC HPO, Union CounTy, NC OneMap antl NHP
�/ �� e4r Dr 1 �' Aenallmagery�.NCDOT2012
,p..,�; . .�`, . .��� � - �s. ,�: —
"�;�� J' 3 � � 1 r� t s.,�i `
*,` ..� y: � ?'� ;�p' r--.�--�_ � _ � � . ��)'1 �" �'^1 �1a.�?i' s.Y - Y� . .��.„ :
` "�' ^ ,. ., ' r`F �� _
� � �3 � F�; -•. .. _. � _ -� •s__ I � 1-.� ~�-�+.�4 +' +'•.�
J� � q j� r 1 "� - � . �"�, �,y�'�� � � m' / � t
�
.
; �� � ��� ' 4 . ^ _
. r � .. �.�. t .
� �.
� • i: �� F+'-� , � �S� �
� li �y�
. .
� =y
f v. . � rl. � q+' . . ,i `"' - � �iT
_� ��
,
. _ .
� �� ,�,
�. y �`,- � �
I �T.�.... � .. • �....# �, i� pt � , �t .;: � �� � -;�' � , � � i �`.,��°"S �� � � 1� � � _ '��.
�,"� =�. � ,o- t,���� f. �r rt �=� �. �a��- a���` ` _ `�` � �,�
� � �� ��� • A� ``. � �.,� ; � . � k .
�� _
� a � : , - � � � �.�' � �' , �' '�' � ' � ��' �>
' "�'' ' �' �,, ,�' ,�f . ' / �Ar ,� .�.�*�
' ' � � � a '�I . �• � .r ,. � �� . 'w.�� � J 1 . 't• - � - -
...3 �t.�'�
� � ` � ,�s�•. r� ,,, � �, ,��,_. ���
._ ��� �.� �' � �W �.� . � �}� . .,. � ��, _ �A , ����,�: . _ .. ;�,�.� -. � , �Y: ► � �
_ t, z., .. , ��.�F- . , . . _
, .vf �� r .'.:""lll.� �'� r y'� � '� d ��-�'-�:.6• , : ' J ' . i,.. �i "4G s `. "�,,t�, - �" :� A,
, ,. •
+
• , . . . . .
� � {�, !. ,, , _ . ,fi; ' / 1 :- ,r aF r., a f �';; : �4�
.�. �., � � �„ `� - - ,° � � `a o o a c� o � ��� �l �'�
. �/yr,.a . � j�;�
�.. �. �. � i� }t 4. j,.• ,� .. . ilf :'�� R ...§ : 1t'��/y � .� . �v . � . � i; : � �. �^�� ,1 r t / d r, r'�"' A - � i�e*
�.. �- _ :p *' �
.�
: .. ,�
,
��F �
�,� � .: � r;. . .- . � • '�w:� .�.a.i.�.� . �_,, � . . , ,. ��. , �, _ ir - - '�� ��'' F�� . ..,h , +p ;��"a^:..
, ?w
� -� � � , ,y ... , �2 . � - r .�' '", , � f` �} . , `r� .r �'' ,' !Y� �..
,. '' � .� . 11��. -:-
, .} .i'. - . .'i SF Y�'. � �. ��.�� ' -r ' . . i . i � _- ��`�. �4�. - �.' ' � - '� :>fY`��r` f�o�
,
_
:
..
_ .
) �� , . '
` i
1 r. " r., .���r,' .�.. �, .. ��.("K ,, , " '..,' �� ! , , .< ��� � � .�� r
..�s .F .� .',.
.
� � ' '
�
r �
.
q � ,�
• . . �,.,,,• . . _ : ' - , .
" . „i '� . 4 f�r. } .� �-., ,. � � �,...' .-,: \' � ._. ` .. ., �1 A� .�'.}' . � � 4.
4� �� „ .. � ���1 ��
r � � '�dJ�li��Yy �' ,�'+�"14 �, �� '�,' �•r� �5��� r� ' ;:7 . � A ,;� _ �1 � � .. �. '�.+ � . .. � . � �,,�.','� � �-.}� � ' _ ; , � � �
' rj +,�r, , . � ��"�" ' � ,,�= .J ; � .; �� ;�° � , � - ! � '� _ - �� � r �� � ��� ¢ �
. ,
r
, •
� �' w �.� 1 �
,. ,
.
. E�
. f(� u, ,.� ..
m ,. , • •
, ,,
�
, ,% �r � �
, "
� �l,l.+��� ; ���, w ,�.�; .,-'..� '"'. , • �-.. ° ' ,N.�T.�q1 ,�:��� •,,�•1 }`i�i.',, , ' �" ��� � I;�L�'1, �, ' ,4�,- �� : ��.. �i',,, - 'p.. •.: ,t�a.� -
�,[+� �* �,,,�.rr,
��. ^�1.��"r �,,+k'^ "!�h{j`y r"" v+4; 1:'��,.�:t, WJ 1 I '� � �� A r�cy,��t �'� SFF � r �.
� / _ .
.
,
; . .
��i , `' �
,. � ;, _
. , „ �.
. , . ...
�:..' s: � ' -i'';�' , , e i�.; � �E, ^ ,., , _ ,,.�;� �;r � ;{ / � r , . �j Y�i - . �,, _ � � � .
T a�y �� � , � . � ": .
',�'" `"4 ^� �� �n7� J�it " � ' _ y �, , � � � ���
„
.
a, y .. c , � y,r, ' 0 0 4 � i , � ,. . ' r `, � . J ' �, t � rl "11� i, ^ , ' _ � �;`:'� �V� � - �� ` , : y� +' .
.. ,
r M� �.ti�::+a n.� '� �.�. �p-•'.;� -� . �' , "� �. �'. j( i� 'r ..i � "{ , ' .�....��r�.I, � �=� -
F�.� �+� � ��'� .- .�a .... .:. ,:,��r� , '�.' „ � 4�.^ r.. 4`�- t, ''e!s i. 'K� , ����F�.�- . �
_
� IM+VIk �.I�I� �1
e �, �� ��o a n 0 �� � 'iA � �:,1), .� .`��, ��' -e. a`, t' ' 4 . r in •�` ji �-
� � ��� 'I _� �y � f, C. , Y •� ,
�,: � , ;��,, _`, �� �' i , � , , : ; • :; , . , J.
'� � . �i.', !''•7�r 4 1�, � ,�t i ;� �
� � . _
�
� . ..
,
.
x,+_. r �. �
, , .,
,
; . .
; 'r-
+r. � 1 % n. 7�,
,
,
' � �
�.
. - . . � � . .
.� �r y� r
. . . . ,
4 �y, , , . ,.. . , . r�.: : . , r �, � I - •r ;� � , �l, � ' : � � � • � ��
„+,� >_� ul1,� .Y� _ .% � t/ �. ,4 '�'1 -rt"c�/ '��. d � � �"� ��
#�: a ..:,q' �Z� �+, �^: ' • ,' '.•,
_f-} /�� -�.� i . '•� i
r. .. +���- ..` ..� . -; , .. . . �'i �`"i '��'. � . � ' `.;. . .-. ... ; ; . . ' "J,_ ' /�'4 . . i: yl . _ ' �,. .�, y
_
,
, •�. 1 � -
.� � i� r' r (� ;� .
��..:. _ �{_ i .' �;.� ,� b, �.4t€�,� ; ,-,}�'� ;- ���.j �"�•-'�-y .�`�: _ . _ . ' ' , � yFr - arF }.r..� ,i� _ 'to. . , -
y ���� ,� , z: � � , � '' `�� ;. ��� �� � , . p. � ;'� �r .
N � �� �. ..,n�� �li7,i,�_ � � ;n _�,�: , . 1 �'1� >+�� �(-�'� `� � ' i� �. . � •1 , y�� , ; � .y �`�� .+'L-,'/76�=��n . �� `i. 'i ,+/.. ,_. "� � � �:�.� �:��0,` ... �., , 1( .-,
'+ �� .. ��' � J.v � t . . .. a . � J or 1 /P .t`s , . '�' �-� 1 F•'C��' � ,.! � - � � - _ � � � �
� . ;.., f. N �I ��1 r ��.lu.^ ,�'� �'7fy� ;�i.r ,. . � " . � . i i t..a 'r � �p .�{} o -- ' ■. *� � p. �;,� . . �. ' i'{�
��., � �, � ;:}.�.� .,,��:'. ,' ,.�. ,., py .a �t� �.,♦ . . . , *,. �9 �.AS - � ?� .�` .f,. ��. ��
,, ����i . ��" � _ �a " , � Y �'i. �''�t, - - - ` ,'`� ., ; � -
� - _ � �w} .i 1�n , . . . . �P' '�,t{ i(, � �� � � - ♦� � q},1���' d. . � r. . � � y� Y
M�?' a �� �'tih 'k�i; (f� .1 � � r . '� � , f,� i
�'' (� /�+. `�� i � �i� '}-,� , , '.� '�4 .•�-.. �+`` :� er , . � �'S�' � .� i•1
i �•� 'd,� ,q� �"'.�i ..w�' _ �.. . . . ,. � . -a'���..�. ;.� `5,�`�,. � -} , � r�.4� �r
�f5 +� ��/ 4 '�`.'' ,r�� i . � r'�.�� � _ s-7 . � �i}-o� "� *�...� • � �,�� 1
- � � � - ,� ... . ��� Si��f .. i . ! 'v, ,,��,. ` � ��, � '�`. ���, , �. � - � � . • ti 't _ �'�-. . l���. ',f'
��"f'. . � ',r� .i.��' '\' ��� . . . . . "l.. . . Y' �y �� '�.. .�, �.� - �,'.,
� . . . . , , . . - , . � _ _ , � __
.
� ; r��: ,� .� -� +�':. •'-.�.a, -'a . ' y� :�- . y!l....� � .. �i� '�� 0 �0 m _ . '�.' - �� �� r . %� �,s'� YI ��t
� I
�p �j�p ,Y.I''�.,�_I} ''�'`.Iwt�r --�. � ✓,��':� '.' . ��'I �=�*� ���5 . r: �'. v }?, � _ � � �.f :ei ���_,%.(:
y �' ' %'1� �;.'".�! +4i �7+fj�. . l r , ;- , . . s!" � e� ,�� �:� `�'
� � ;��y�
� � i3�
, . . .
ti 1
. � G y
.. . , -r. f . 'i4 •��� �Af, � ... _.,;' ''�f'h,- � .I1 '- . � � � . �� d '� ' ' 0 �0 0 Q +�,�� . ��a a� � - ;�:1b :, � Yd" i�
� . ,� _ ,. � _ .. � - .
' � ti1' � ' � Tl i. � .� 1i 14 . i � . �'�., �� ��•f � .^J. . .. r , . � "�!i`�•
�{ ' . ' , . , �a ' �'c'' �r ' � " ' £ l. � ,q�..
.,
,�
.ti I . � r�� . ' � ' +� ' ; �'` �' "' � • -- �wi � ' . �Iy� y,�,�y, _ - ,'A c >3
� ' p , : - �' ,
.� � �- � �.-_, .,, � , : w. y. . ; , .� ,i ..,� !'I � ,a, ,,r, ; , �";�
�.r . , •,,.�. � .. + i�.�� �44,. _q �=_I, . � nl.
,
, . �� � /:, � I i . .. �
� �� t x' { + ' +r � ec/ �� �� 1 � ^�'J?r . i 4 9 Y � �' ` ��� � � a �� z � �' �q��� I� �
��- t� �` . .. � . . �'" �. �• . , � . . . :^�' : r �j. .:'. $ �v� - . � . - . .. . - '.�r I
rj ����.'�J`�� r� � >� �,gt ,�� :s' ,� �. _ yt.r���i��fa. vl..,� '�. � � _ y�'��.. ..�a� N.�N,ti;x,�
��"�ar � � pp •�;:��. li�,; �`.' . �r �, y; .{ `u' ���� t � �� J � �2t - �'NI�w ,
�� - �+ WIVI r�, /y' / � - ` r: �a � �t`.�• , � � , -,p- I� s� �4 - fi� -�� 1�.
,
P Ak -�r.--.�y, --� ` 7 J �fe 7 ;�li' � « +, `' MTi -.�: ` � a ` � � ` }r,• + � } � - S i.� � + �� � � J` . .�.. . . J. .i� ,Pr�l "11' 1 �' - ,. Y'7 � �.. . � 1
�� � ���-- �.�%'wlte �.= • ' •�no�_•,r � ' : a �6r�.'��-� : �: . , :-. . ,��'i l��G��.fA����{��,}�'"�'y .,� x„`'C ���[��+I�t _F,[ (: - .� ' Y��,'.�'r��
.
�$¢ _�,Y- ^�. .,�►� ,,.�'►t'.' .,�5. ,, c -:�+ -, - _ ,: . - � �• b, i �� _ s�. �,y-� F'4 ��! �i ".�'..� j-'�i�"��J9kf� 1� w��. ,� � 'Ti
f� y� , . "n ti
'� g`� �f `' g,
IS +�;� K� 4� a. �; �. '" ,r '� - , �..� � . � ,'�'. •�¢ �,., �, G , w r ��� � _ '�d'^�4T� �. � .,� .z- � -�'� �e
� � � �! _ '�,,� I � � .. � :a � ,+ � T`�_ � •�' ."�'� �` � ,j� ��G , t ,����� v ,�'
�in r< +.� ?�s`; ,, `�'� �e W L y �-, r r• � }.. �r _ � � f� : L'�� �� r y�b' _ _ , :�.,ir i iRr. I} �.' '�� ..�'
iy� .,;, _ -'#' _ ?'�=L^.'� .A.i �p ` � '�'h � A!�'i - . -. -i I ♦ - i�7.;�. .-y� � "! - 'ci " ��1,1 � �4-!'r (,� /' . . � �.i�,:�
`�'� "�''s4f f�eq � . .F .. _ _. . . . . -`y.L:, .��� b �;� a, �r. a'Jy� ''�n�}�� . - ��+,. a.
�r, �K`, ��'t�,�s .Q.. 1 ra�QelCw.o ..,r.� _ _ _.. _ . . . . . ,�. .7" t�Sl-i� f �J� y"Y>A.;�. �� �," +
.1 �7�, �il • - ^'� �. Ft ��� '� .�J�l ��
�i'► I s, Y n _ s � n.>� fi, -1�.. ��
. .
p:: .:f' r � ,c �` �
. , , ., , j�
.
� . _ ., .•.
. r
., � . ..;
.
. i .. f �i,i... � ��.
�« .; �.. �;.. ,�_...��� �`�y_�, .. ,�t -,--� ,. ..,'' .�' ,''�.. :. '� - - _- ..x ,} „�,. :�l�v, j�� pr ��•� +�r�� �o 'r, 't
' , ! .,, r
a . !_,. , 2 �1/ �, : �"•,'., �5 't�.. n ��, .•t. .. " �``4` ris, r . �7 i? g !f. ``s •3"'t,�,,ye�,� ,�, . ,. . w-(= fi
a. �� � � ,. ... .. + .�+�' . -. � r -=�-�.t . - � ,�. . r . 7f'�,. .r t� ♦ n l �J' ��.' .l "� -
_.
, y:-. y . -. .� .�., '.�.� ,� ,.-. � -: -.a �.Eia� � :. ;'%'.r � � �� -"��-�,�� ��R . . .M'1� �.�_ . .
.� .,�'�� ��� � : St � 7�.. . . .x � � . s . ,
, r � � r - ;%�' :.. . .. � � -: ;: . . -: , S.. , ,� , , , ts . � '.w��r. 4 .�r'�' �Y «i *� �r ;J'"�S ,� �
�' . .. �, ,�i.. r �,�.. q. ..,,� ,. � . :�+. :_k��. t�° .,�,.>� �� 3'�.,� � ..Mr" . `� '� <<)".''� 4' .�^ �#'��� �. _�r ..�f: f .
�... .� . : � ' . -r �_� � �_ r .�'. .3. -v. 1. .� . �. -_ . ��..,.. ; - .. .t : .. �-:. f .� 1� +.' .� � :i' �t'�! l,., - .
f . , � ,. � ,. , _ l r '�`t _ . . ,._: � .. �. , . ,. � ,. . , ,,.., , �'�-, � . ,, , d y �- y=f �,{', , . �.: t ��.,�
+ . . A . i•1 . �'. � 'C ,1.- _ �w, :7 A . M1_ ,��� � � ,g �� •�.
.�..� . ; �.. ..'!�', ¢ --: ! '.?'�t�' - •��1 �.. :. •����r. "+vyR. , 1���,�_ .� � t�Y�. - t �f .1� .'41��
.r� ,?�1� f ��.. •: � �P.. '� . ,, ,.1 l !�,, ,3Rh''�l' '+� �'' - i; ��:. � -�1`�
... , ,.� , `�
.: � . � : . �..: .�, �. � - ' . ,(, • ' � "'� `7r..�j� , , „ - - -�c� F � � p , .
.. t r < {�,f .e-.� ��w� �- - . - '_:3''. ��.b, �6��'7.�. ;{'"�,: F�.,p� . ,
-_. . `� �� - i� 4 � �e.y� E ,.� - ./"3�e� � �l. ! �- ��f. 'k�� Y- "r
- _ �.i - '`iK.,. .i� �"'P�FN #� sT, �.J�� II� - ..�-..�� t i1;..��f'�. •t .
I- [ [R. - . 'J-= '1! �
. C� .��'' �t C•�� ,� "i- .1. '� �l . .
r .1�.; ,'.t`.s - �'. �`` , � �'•p� a . `t � 4. ., ;��
.� .. . �� : � .. /�,
'� �' .>.. ..�� . . . , .}4.
� f
. . , . , . „ ,; . .. , �
� . � ... .. . ,_.
"s. � �e
.
f�� � . �r ],'.e - .t�"�` '. S • �A�'� .
�a . � ... � . � _y . -r ^ ' : ' 'I . . -� ' . . .: .,, � -- ��. ' i'�� - � :t . � _ - - _ S. . S j r d -f ° ,,tl,..
^
. � .�'� p�.�' ���.,e, e� � Y . � �A �'tiF�{ a[�.� � . � .. � I Ii.11� _ . a •r� � l r�r�:] .�K.t,. <�� � y.�� ,�,, I .,� j,�
, . _ y�,
r . � �'�. � . ",.''. , ` ;��� ',''t . �� /"'� �f � .i ` �: �. � -,T '� rj� _���"'�'�, 1 �. .y}, ..�' ',� . . .. ... I ,� ..M. -'i�� ..� r ���..`�
., + . � �., _ -� . T:: f ..y;1 :S.
, •. ,� � , ,, -.. �.ht : +,. .. '� .a� , � � ,. , j����� � -.m � �. �i� � i' i . �� j� � k; '� • - �
,; _
� � i �a fli� �., aa.�.ia � ?J'.�. r / yr. .C�(� r - k �c. ,.,, -iil. �.,��:•: 9' 3 .s�-:� ♦ y :j y►-:f'�
°' ..,��r.. _. .. ' ..,,, , v . �' _ .. . .-_.�,,, �•: _ . ...�. ... �; _ - - .- .� �If.,� �-�. - f, R*!r, - __i -i� -
. n. +y
n. . ,a �. , , ;: � .. • ,,, r,����, �• ,�.�� , t� ��, .�.�;# y. , .� �tn ., .,, �„��' •.
�
��.._ '' , ; $I f@ 8 �'.- ' � r . �' ", a ����'. . 'S�4 'r; ' '�s �,+' k u., 'k + ' � � ! ;
� r �' , :r F:. _ ��r, ',� g �i `� , � i s+i' ,.
� ,, _ ,« $ +. R`-� �
,r -� ;} �c, , `tti�:��: ,,, �� �, e�. ,�' �i�' � �
, �L
� ,,. , �
. .
�_
. � , ' , . .,
�, '�['�,.t
, . < , ,. _ :� . ,
i fi
,'t
- r � � _ � 1 , - . , � - �i�- ! c r '� „� , , , i'�t Y -, �.`� �i, '+,J � ~ '�f, r ' •� �l, w 4, . �'�� �i+ T� � �rj � ,,'
crt , ,�. iji ! � r - ;ig � w� � ti; , � «,4,. , �l� �r ."�' -��f � . , • fiy _ "'�'�S" � '
� r`. 4. �. ' q i .!' �.s��a � f "� � �4, ;a'S � j, � } J ♦ . a . I.:�'�.'�„-l"�1,1 � 1. 4 .� J . 4r �_1.'.
, - �. r � , s � < �� - :1 9 �; , �'' �e y F- p
�` " .!�
w� e.?�; � ;� rr` _ � :l I �ii� � `.'� y N a ;� � _ �i �, .yi',� . . i �,[' ��f �,1� '� ;' �" r�, -•`,,;y; '� �y'� I �
1. .� y/�y � �� #,J 9 _;1 6� 4). sY • �� �' / .�` ',� ,w 7��°'i�'�,.� , �� ^,.f � � �'. yS t �1 ��,
:�YY � ' � � ���.. �_ _ . .�!'�7t �� � �.�y„�t.r I ��� �,�� y��'r,.r. •�, � i
Environmental Features t�., N �°`' �� WY ,,• �'��', �. �,;:,�' � r,��- r�•4��� '�' T� •� "' � t d � b, � ,_�''r,. � �" .r��
� -.�` r.�!,����'�' � ^� ;�"� -.�'�i' f:✓ -�� � � _ +.+- . .r� . p �),: !
�i�' NCDOT STIP Project No. U-3467 �� �e� �• "�.�� � �{ • :� �� •� � '� �` = _' � Fi ure 2D
§ "���'�,s :��. �-a' �.. �-_ � < �:c�.` `' , �, , 'r.l , ,�..; '�,�'v'�.��,�.Y g
-- Union County, NC - �"�;�: _ ��„' '� -.w,� ��,�:. �:���.-.,�,�•.t,�, ����-L,_� �, �w
- ,';� � ' : � "� � ;�1!6 . � �� .,� . � a���-�, , � ,�� '� ,y.,� �+r''�';� i�?
'!'�, r ..� �I�f � . - 'a`�y � . ..l %'. YW I - ,jf• - ___ ..� �_' � 1� � }: fy � � _ J'
'v, .�Y.' ^', r _.�r, C9�i►. ✓"2t.. 'F� ir� k: :,s'1' '�--.��..,� � �.: .�`:�. ��<�.
� . . � . .
� � �-�
-a;;.s, . .. ... �,. �. :', �� , �'_, �- - � _ ,� :� -, . - ,.� . _ �vY , ' . - ;,ka". .�' :."'^��s - =�� .z f+/'^,�n'. � �: • :i�>> .• Ve<-'� s �?a: - ' T.,�� ,^'.a�. ' u.*'�an -
r
�5. � - '�""" . -
. . , : �, ,,! �, ,�r� , r �i, %„ : � ; . •r•' ,��,� _ - ' " . _ °,;�'-�, :` � , �, l. ,.,,'�'''�
,� . �.�r . Fv-: � �: � ,� ; - !' 1:�''7 � �'?" �. ,j ;n
�. � � v�
, . �' � � .
, , L_�� , , � . ✓,"��`' �r� , � �. � � r • � � - ,�,
� -t: � �. 1� - ,�: i��� T,�,' '��; � �,' . ,� . � � � � i. �, i��
p . .
.i;�'�i�-'�%�'" '� ` ,j�'P.Y �,. •.t..f� - .��.� . .,,. � -.... . ., #. �_ -.,r� , r� � - w�.� "ri",� � . -� 1� lw.�' �.,y,
�� ..�:.T . �� ..,.,.y.,� M'. ., �f �1� I � - , ���� � [=' - - .� . �' . .����{�.. .� .1
�,: . .,r , w. :4•.: ' . �� � � - i- . � .- � ; / +�' . .� �,��*� r�� �
. � , ��' : , �: � ,,..1/ 9' .� �, � : : : .,J9 . � ; . . . . .. � -!i �� . h. _ -� - 4r �.-.
":. '
;�
, ,.
. . ..� �I' �,,, ...� _ . , �_ d � � �- �... , I i`�" . i . �i• -- _�. �A• �� ,'y.,F� .�+� �. {. '� .�. + .'�
�; :,; :r.. ,. _•r 1;•. t ° . ; _ . � . ,- 't � �. � 84 `C� - o� �' , - , �"'
''
�
�
�.,:�.,�� -u� . � . m .:,.��... +� . ...}�- �. ..F. ..� ,t�n ,� �.�_ ;�-..�, , r��'��v . !' Jm..+`e .,i - - �'-� `*`d}t. "r� - 1���
�. .I_. � ,,,�:r-�F, 'F � � ,- .` � � ^ r �.�'r7, � i . �. . . :-�,. Y � . . �,. ;, �#'a%��.' - ':y . -.a- � � `ax . .�,f .
f� y � . - ,,:I��` �_r'. r ! e ' - ;- ; . . • . . .��` - ` - ...-- �:' ��'� ,{ - �� . �"'�, ._ _ . - �,� __ - _ "�:' y 1�,. � s. �i�. -^�`
w. ,, .�.�. �• �.f. �.. .c� -�1 -�•� _� �..o� ,�. -r � ' �F-�f�'1">� .. .�.� Jy �.
.
� � �
,.,,
•.
,
� a "� � � r �� � ���.
!,. i., a • •�; �!"`r r � .,�(! �; , � :,� , �'�; *, "� d ^ f j.,,,, ,�,�Z
� ;; t �;,� � ���' '�i '�: ��R ,�,:. :� -�; ,� � �, a �� �,; :�� �y�,
. ., .
- . _ r
� , �,, . � -
.
;�� , ;r � . �' .. ., \lr�,. .: , y .� �7�.,.,�, �'� � � - � - � . �- . . .. : . � � f �� ���'i�t � r ''� : , ��i �,eR� � ".=' ��� ' k, � ..r�y'l'� %' ',/
• r
. �_ ,:
�"
, � �
� , ,�,,_,
,�
� :,�°. � ... � 0 [(t]f�C e 0 �` `0�(G�� '�\ . � - y�j��' . � ,7.Y �. + I
.
� � _
�,
� ,
i ,,,-`� a> + � '�,5> ,. �rr � WY � . ,'� �. _ r w � ��. �
� 1 � �
t•�"..i s ^.� . - . - . ,� P ~N R !' Y�`-. K /'
� : , � �, ` �
���t r i „°� , � - - �c,. � L. �. ��" �-� � ;�r'i-�.� �`"S � � �,' �" � ',.'.
K' ��i �,�/��� .�-:' 9A ��g� . . -. . � o� . ` � '� �,:.
� � !f r , �,El � a `"Y( . C \ a . 7 �1G.?� .
s�' �'' . 7 � � . � I � � ��,� r. , d.^ J
�� � `f� J y � ba � r.hs' �� �''� + '� . ��.j� �.r :` � � � ,�.` r' .T `"!�• ' �� .r5`'�� 4 � ' � � �F�
i. l � 6� !. �<' � .1 I�r � ,�. . .l- � ��. � �1�4. .� �..� .�:4 �..
.
�
� .
�: J-�.�, s�i�Ert_ ,. _� ���_ ,'�' - 1� r -_ , �� �"? w 'r' ��� / y 57+� •�.= r �,,,+ % � �
. . s .. 4... . .,, .. ,:.. . _ '� .., �� -_ , . � .i ; J�.7�� ' �, . . �.. y ` ,' 1�" ; , .� ,.. _ . •- �Y
� '
w �� y
, 7 � „ t V, x _ � ',�,' ` � ��j. �I �� �. M �1 F -�
t 1
, r ��� + #S � ^, �r �a, � � i l „ u 'y ��.
v-� � �
. , � �
� �� t-lts a - `' o a v a ` - o ' , r 1�:, �' � n � � ,�7 ; +`
, .
„ . ;
.-
, .-
' a� ll�r��� ` '� i �' � _
:.
, . �
, , ., .r r � _ �
,� .,, : , • ,�,�
_
.
� . , / � �" ' . ,. �� . ; _ -+ Jacob Allen Deal Farm , • 7� , ;. ,��
� , . �� ��, ��t ..
x7 � ' ' �� �� i� . �'�
,
„. � . . ,
„ ,, •
,
,� •.Y. _ ' i'� .. �� � �
� `
00 0 0
� � ., . r � �� - - , ,-, � - �. ,, .
��� . ,
, . r� ., • � � � � .
, , .. .,
;� . .-.. r., �� �.;, j�; ,.- ....,� � ���' a ,�:,i, �. ..-� _.� ' �`? . ���d
` �" � , ��
, .: � r',/� �,� , �.".d_�: .. � � '�� � r�.� .,,. ' e �' : .. �° :
, f ,. +�.� r - . i3 ,�, . - ; �h � � l+�F
,',��F,I�, ;a��: .a r ..."`' :wn- ...,�� .;'J'!�j�� r,�" ' •�- r . „ � , „�. .;� r �' ,� � .�.� . �.l �'�� M' ' .f .�.�. ,'���I* .!/�� ,� �:�,.
r, .. �,. ,� �, F � ��,y ,�p,
�' �_ :�: r ,�, : _�' �,: i�-• 'r ;�. � �► , .�.:t��.��m� `����� s ' ,:�� �' �� ;�{
'�-a�'v.IJ. n'� -- �+. � _,YT.r'/��f' +�� � r �,�C..t;;'. , �' y. c .e �� ��+. r A� -�x� #�:'
�� !��`' .�^l'�, � r+ � ���' � .t4 � �' f , � � �"
,� ' '`r,1N `i I`�� � h! �ry' � - ♦. r.i ��I. .�,4- p�,��;,-.� :�'�e`+W'�' � ` � � y�'�
�} vy'+ � ..1• ������'�- ..,� L J �.'F .�L. �����.."°E�. � �V t., .� �7•;�� ��':�
I ��� ,T i�� �� �Y� ��.� �T,. . �. �@ .�
, �'
.. .
� : s
.
'r
/ R /�
F ,,/
. �r� , , ,r . .. .
��
, •
! ; � ' � +y�.' .;��h # 0 .,.'_ _ � ' .,�i�. �,. � n� : - k �G�` 5'{•. -�i�.�.! r�;., . �i _�' - �..�.- �: rr` ��� �'..
-, ;l ,. . � ,. _ .
,
� � '-,,,. � . � _? _ � Ji:+ r ' � - �� - ' ; f . _ � ' . : � - � � K �
�
�
� . { � , x� } �` ��
, ; � 4 -
r�" � 1 '�'. _A} Y� �.�
• / \
" � � f'� � �l " � r .. � �:'' ��.. �. . . ��' '+�
�
,: n ,:' " . . . �� ` .. .
. i. 'i�,�'. �� � � ,�_ � F
. .. � . . . . ,.. . .
�
_
s �I�
,/� P')- {.'1j �%, f � -`�� f� .a . ��� I, "�i��� •,� �M' . _ i � ^� � / .� g'.
, �� � � �:� � � �,�
� � , ✓ . �, A � , � . r ,�4rF , aGf � �p, '�! �[�ol " '� � o / ��.•. r `�i � � i� �'
' � + �[- M i�'� � , , : '� �, � F ,,• ,r . n : � � ' � '�, y a '� h.
,F`'� ' � / ' � r � � �f �5y „�1�r 6 � U , +vnj � _ , . �� c �
.
V'�� �'� ' � , ; r ' � t� , . �' � � 3�"�
,
I }' �:
,�,_,,� , ' • ,'� � , ' ' , �� , '��` �� �
_ ,�
�t ,, .
�j��' ��,� �'�'� �' a * ka �,� 71 � G� . i� r'`��. #
„y� . � . �, �' ` 'F ��i.� _•'� � . � � -r #,.x� `�' ��_ g � �A'`'h�'...: �' Jr
?"� {.'. � fi�:: .�{j��`. � a� �i4�� S. .�
� ti: � � f • � � _ � �� � 1' � �S ,� -s�' � ! � I . � �'� 5 : <' �i`i?'� ,'�„i i �. � Y � ; "� � �{k �
� . i� �. ' ���. - R' '�� r at 7 '�'i,+�t � ';.{_�:�' '` y �, f„ - � - i' '�.,
. � `
�I ' �,�. . 4�s�... � -�. � . , . , n , �.�,5 : ` _ � �, y, � . tc 3 : . 1� �� �:9J � �.� c/ �
_. . ,, "
.
�
".�
'�r, �u' 't�. �( � ,/� ;G '--.�
t ti . 4. r� ���€ , , �r :a '�f �!�; .;isFr'y '�r `.i' ��. t1 $ �: '"`�t�" � �o� �j� .,, y
>� . ��� �'"'��. ,� % , id,+�,. � 't. � � .�. +l` �*� .}7 ,�,`' F:B ./�: lr'LJ �/p�� - "` f
_ iYfY ��€ ,,y I � � �'' r%•� � � F )� �4: ..� i5 ., j'_' ' �` .
�'� _ - , ' � 4 I i -' � V '1 �� ,]� - r !
� � �_�� '��� .'�'! '� rt. ,f � r .,� � �r�:,k���.^7 °'�r 'r�;���r �a������� � _ ?'� �' ���
, . , � '
� ,� .��r z. . � . ,���y� _
A�' 'I1� �'r ' � � _ , � - !'R����rq.� 1 ';: R � ( �l�, � ���� �-+�� �T' � a S� p.� , � ��. �: ,� _
..f 4� � � �.i :h r. � .����.'4l�j.� +i% �I�jpF� ',kl ,�;���• i' T?3'�:T,i" � ':`1:.�,r,. ,. :� 4R'.• � d,��
r��� .�'� ' � ,�: _ - ��, , _ f � � �' �� ,�• �. ' +�1��',. �i' � �' _ 4
�, ,v �, � �, .� �'• ,�{. �. ..+�.. , . _ . ' . . ^ .^y. , � .. � '* ��.:`: � y'.
y" i �,ur � f , °! ,� � '/ � .s , . , �� r, Y"� � =�,. ,�y �
;`;
.
i a,S 1i� ! �s� . �•" ,d �"? � `i� �r p �, ,�r j^!, v {� �.��,1,�' �y y,i �•� •b �f � �'?
. �' ;� « :_,(r • F7 i's:� �� � � ..�,� m. � �,, •'��.V , 7� 7 F . . �,'. , , . . . }.. J[ . �., 9 ,{,
'h...'.S' �' "1- �: _ � � { � � . ' . 'J .�� r�, ,•'�'. �' yi.. ;�.
�� .. �: / - • �. . ',! � . :' `' .. ;� `' . ;�: /. ,
.:i I Y . i. ,�� . s �_�,9' ,' � � � �4§P', a�� � � 'l..-,
.�� ���1�� .Y'prs,� y� ..� ". r � .Y - Y_ 1 �. • � ' ��'.� ,�y - / �� t . �✓ �'"'��,� . �.�. y �. J.� • •
FJ ' J�u ' '/ , .�'�t• /. . . .�• � �• ` ',l f. - , r.7 - . � i.. _ • •
"�, �l�i .��� "�) �A i�f f" 'A' .. . 'i i . '- �t� �-.1" , i'� , � �^' �i P 1.
, .. . r,. � � ���� r
,M! l� � �' rl� -1� . � , � . . . . .�..3. .l� r�" �./ ;�`�{
• . '� ,, r' ,�.,� . � ;! �` `r.� . , 'w . - �a`� . /� ��� �� � 1 _*l�,+ �'{ ` r..
-�, �y ,R' �� �� ►��;.. , "/ -�.;;r � ,;�:` r` , � rl• .�. '�L,� '�j•�:.+ F r� .•���� �
; .. .
.t�.. -�{,_ .M.� �9 - � i F �'S.��
,.
,�:";, . . r "l. .r Ta', .� A� -f'
r � 7' . ♦ ;R`f Y . +4 � /�A'� J � , . - . J i ' � ' ,,r a �3 . � *. �%
�, ,
,
.� r_ g� �j� r. , ,y }
. , p .
� ' e%' Y
. . . �i
.
, - �, � t .., .... � .. �t,.y .." .. . �'.. :�� � . . ., �i . � .�`�.. .r�J�i.sf - �. • t� -.;� r��'�
_ � � . �( i.. _ . x- •<� :,a � , 'L � - -^._.,` �� .P.r. .)1 �: ��.L. 'i
. �
� �
�`t" ,v f
( �i -s,r e� +, , � - 1'
, ,
�s . �.iY ,�
�•
� F ' �
,
K � - "„S
�.R'C j.` `. ,.. � '� , • .,, � � .�`•• � ;.•h..' '� � � �7' - ! �., . �� :. �, y ' u�.. �t,� r �-1y- �,�5 .��'�� � + y��e.``=;f � ' '�.'. �� /� � �'! yil' 'y� `I'y%�'- �.9r',� ' 'a �
,',.4`.y�+� - . a �`I' !.� (,? j �� '�- f e s �^T' �' f . . _ a d •��f 1 �, ��i .Y�- ��i" _
� _ �,� /.� Y . '��...� .:=L��-__-� �� { I!'f. . �, -� � . t '.,'�:• :��y� i.j(�;.�di'� y "� �.� � n .dE �' . � - �i� �
.I l,�' 1` ��I* ;.��� ��.!' �' ���iiY� ��� ►,..p �
�� , !� L.� . �� ,r�, � . y,. � �?`-��� �rk, +�;� '� �/_� wi � � . " yy: ^ + ���
� .
� , �,/�
f . • �+,�.. . � � _ . . � " ' - t' . ��r _ >� ��. O _ ���
� � � `��. � � ,_ , ,,. . . , , *`1" r. ; ,= , � .� ,1 ,. .
„ , y 0... , � ' `: , . , „ . � � t s"�.
. ''� ' - •- f. '• �'� �� �`�, r�'., �; .., , . � ��;,.
. . . ,_ <.
F' S , , � 1
rjr,. , �.�1 �
, �: . �- a _ , , � � . � ,, ,' 1 .� �:-� .. ' n� �a , .�' ,•
, � "
s . ]�,"� ., ` , , , ' , , ,. ; �N , , � z. ,r � S. �•:�' "�_ ""� .�
�.. - ..
� ,' ' +. e ��. - - �
.� . . „ ,
H � �
�V. , �� . , � �' , . ,, ,, ; : : �,... „� {, , _ -:�. ''�, a ad
P�- ,,,J�.r�;. v: � , �►, .,., � �,;,��, , i"y '1'. -
k'_
�.� * )
Z,
� .' • ` i
r•
' dF` -"� �h -� ? ' - . . � - -- = -�� I . � �� . : .i � . /, .,. }� ,.h ��t,y'� „a�' a r
.
, ,�.{ . _._" .., „� �. ...q� .� , , , ; . . 1 �s�:, ' � . .... �� � (, . � � �,,�
� �• '
�
� � - . . ._- _ -. __._. :,r +.: ,. .. ,,p t.: . � ..., :� ' ' _ ,�e� �pn �
'.. '_. __ . _:' . �, � l
,,� . _. _ N_ , ' . - . , . _.. , -�, � �, �t.7 , ��� �rj��� .,� //� lr'r ��F'�, . ,t ��'. � f
, '� •
-. ,', • , „-.� � � �� � i r,� �� � ��
t�t�, , 1�` '�. ;:. 1�� . ,. . ' - `d. , ,. ., . , '�� r -+ f � ,��� � � �.i3 � , '' a� e �,+.
;
.. S�
; � �,� ;� � ��
� '`c � ��' p���� � :��X :�r�'��m�, ,�. � .��,y�,- : i �•I • ;;., . h a,�t . -
~ Y � , " . , '' .� ' f:' f � _ = :'1 't
� .�� � i � �-;" ��� ` �����
� . . � , ,� S f . ,.� f _. �,. 'is�.'.. � � � ;�p3 _ ` �'`� � � -�r - . ,. .,, Y�;'►A,.-i . r. .�C .�:ir � ^, `i
- ..;1� . i �G - � - .
�' �,", . � r�- ..j� �, I SR 1 31 6�REA Roao) EXTEr�SioN, NC 1 6 To SR 1 008
, � . ' ' �,�� '`,r��'` � {`��" -�� (WAXHAW-INDIAN TRAIL ROAD) TIP NO. U-3467
�' -`+ �� � 1- ' Q Study Area Significant Natural Heritage p Privately Owned Park
� Area & Managed Area i
� - _,�` ` I � Map Book Grid � Proposed Development � Publicly Owned Park
` �*� -, � � � Floodplain O Business
jf1 � � y — Alternatroes g School
'r�f�j'����� � � �,;� �,` .�'�r �µ Cut/Fill Limit Delineated Wetland {} Subdivision
� �
yr- � 4 \ ,� � , �� .� �i , r . � '�:. �� � �_. _ Town of Weddington Delineated Waterbody �? Emergency Facility
,�"," _. y �t� , '� ,, R� � ����' � YT �' i� � � .� . , -- Delineated Stream � Church
� � ��'� .# r � ��- � ' --- - - Town of Wesley Chapel
� . � � � w '�' t��'a � � � �r� �` r�E
� Underground Storage Tank ttt Cemetery E
�. J ; J � ' �' ; � ,, �r� �`,,,:',' r ;� i;k���� , � ��`���` � �� Roads � Hazardous Waste � Historic Property
� , ; ya ;:' ,p. . ,�� 4/ ' ; , . Existing Traffic Signal
i v.,, - � � i , �r.•� ,�r�., '�, � � �a � p� �. ' ' � O Hydraulic Site
,xi � � M ' r"� � � � .r � t ;? ` -0 �t .:1: r � � . Pro osed Traffic Si nal '!" Government Facility
,,,„ ^ v. {_.! l � p 9
'�j c �t • r� � i�1 � #� � « r� + ap, H draulic Structure
`�. �r �' �, �' c y ' ��� � +f k ��7,� � � Natural Heritage Element � Hazardous Waste � y
�" ' 'tv � ; - � UV� . �{�,� �1 4i l�l l�� _ �! Occurrence
� � , ,� , �.,r , �j.,� N � � �lti��� ,�, t, � � 7'i k �,� .
Environmental Features y ' '' { ,�., �:,� S� ��ri�+'�� �' �� � , ��` ° ,°° 2°° '°° 6°° a°°
� Feet e
� _� f y •�t.� ., �� � ,���n ,000Fee� Figure - 2E
NCDOT STIP Projeet No. U-3467 �� � MapP.epa,ed z„o,zo,s oa�so�,�e N�ooTN�HPo ��o��o���yN�o�eMaaa�dNHP
— Union County� NCi r � ', r��aiimaee,� Nworzoiz
� . � ,,� �� ;._, y , `. �tl; :, ' _ -- - - � � � g. -_ - - -
�. . ' .� '' - ai u � � _ � . . M -Aa�i i � �„ '�'l .,`� fy°is �` ff!;��� _ y�r i`$"_�..i�� .L �''`,. � � ��� � 1k��...�' . , .�
A'��i� 3 't' J I..�� ' 0 0 0 0 � 0 01t� 0 0 i i'��.• �<�..i►; i' +-�F� ��<:,�,a 1���., .a� 3� .:�,��1.6_ , 1� � +'_, .�
,.ti . ..
, .�
� a( � ,
r -._ , , f.�1,-r r n � . ::- . . . . .�'�' ,� - .�� �v-���..;_ -t,..,��',� ..:��� .�. � _ � � ��.�� . .
.. _ � j S_ � .... -
+"�__,�,� .r -f . . _ = - ' ' ' .� - 1.;��' y . . . '�'„.�r � =itilF'3,. . . _ .. : ���0 - ��! �` • r � r • { ��,��� �i_ . 1 e* �� .
• � . . ;' •. Q � Q � �. 'v��ll l..11�^��� @ �. � 0 , ��.. � �i. �-A� d' .rs � �� f ii
� � � .�1 ,"� ' . " ` � �� .� '` �1�;� ;,�.E , ' , ^ •'
,
,«� ,� � �,� . �j � � ,
�.� �r � �
��.,v . .j�Y%� . . . ' . . .. � � . LL. � I �,•� . ��t, .. �f .��,i ` '��r'1,T� . _ .'� ..�s ���f r � �'ca
: , i r ,�
� - ` � � j . �. . , Ji� � � _ . _ - � s. ^' s. � 4. � � y� r�,p�-"F � ��� � . - f - � i'�.'. _ -�(�0"' � A � _
t ��,� �� X .r � � � � � �. ' ,�ys� .1 i W �y� �^7 y N : �,.:,'L. 1 � �<t � ��`3� e �- •,�` ���'>• � � �� .
_ �. �
� { �'1 M'' �, .� ' �,,t ' � ; � ' � J � "�' f _ �+� r?t 6� '� ; i` _;i, �' 1 Xµ ,� + � ` k 4 ' r'�
�. {; � r 1 ,I�, , �, 'q;� � :
, � �� � �. _ �. ' : ` , � .' , . ....�+_..., .A �" j� j( d x �' !'� »} �t �. . , ���r
_
� " �1' ` � 4`�'� , � ` ',�':�'� - �� � a� (4(� ,� `�"�' �` r� , ;" �' �' r � ,V �� ��
,/�� � y � '.r'�' y � �y ,+�y . �Pt f ..�L �' - �- �'�} �
, � / � y` . ;! �� 7'�."sr.'�, . ` �,4. � . rr � � . tlt� � � . � ` ':�b�tl� �-, , +�-M v�� . � 7�. ) �J � 7� .ii '�.,T�'jetrJ +" � . r b' ,� f.
' ,{ � . r �
^ � s ' i� � ..�ac �.- • � �y •
�`' f „�} ;+i. ��;,�-/'r .. t9�, J M,k.. �; � 1 '�1' ' i ����?,�� � ��,, � . ��J�'���. �.6 �ti�0 0 0� � ���� � �r� {�• ��bY��,�' ��,�`...�i y - ;�,s:`
" . . _
J� �'+� ,�S # i . .. � � '� � - . ! . , �
' ` « ' ' {
i �� �], � y�� [" ' ..° 1 % . ;�� � .G'� -f . I ' .f�', k . , . , .,.
�r,� �r `.'��^'�'Y '� /. � Msi,_ 'S ��� .� ^ � ,� �,yY'� � ��` . .. �'�� +��'�i �y J''.'.Q�� � . _� �
� yl �. A,= ' �"r. ! � �� }+. .�` _ +�,� _ � - I �' N�.: -..t .�_�'��� �i� {J�i * � r 3 . '� .
��., �, �t' {i r:� _ }.�. � l� .t. ��' t.� �l' ' �i:. -
fi �- �`' � � ,�{. � ti'.} - ,.� �,�: � �'� � ��� i I� n` �� yi -� �
', r _
,.. ., 1�,
, ,�+� �(,�,� ,_,
r �+�6+ ` e , . �}
?'�P�� � . 1 ,
. , � , - y
,�l , 4 , � r . �.
��� : `�'�'� '- • _ !.;� . _ . ,r�' . . �n . f-� �t �� i �...� � d '� - ,.a° � `� 4�`a., �•� i�"L' � 'r�t�. 1 ,i" �I ,-�!�� •�", . �r
f
ts ` � '
. . _ .. � . . .- , , . .
` ..
..
;{ , .
1� ��� y*�� _ � ;, r i aa ,�� .
�� N;• � K �$ � �.•
'. ���; �.,. " — , _ � � '�? �t . � . '4. ��r �`�p�,(� �..'�$.i ��r; + ''y ��r. + � ��� ��. • , I ��
i#� � Y / t�� i�� . � �is. .,C '°� '1. .'r- �,;�'. � s � .��, • . . . 'i,�':. !� : �J` . �7 .Cy� �` � � S ,'��'.�`.� :� � + ��,j�'� ���
F' _ �- �„i� .. }�%: � tr(,�./` �IP. y . . � � t� �%��R '.���. �h .�,., � � . {: '.+T
t �, �, �
��' �`� - •� - :� .i � ' � ;, � , 3,. �+ ,I � +" .t� .;d:1.� , �� '' , . �' � df '; Q sp fi �;
r ,. _
r _ , �
� ./� - �% -
, . ,�1���
r ...
,. -�0��0 �0 t��'UUUTA}�i� ' --" � • � � - -
� �r� _ � i :`.� �-�-. .,. -,�. . � - � . � � �` � Ine��...�.{ ..fi� � �;. .- �i �' y�g � `1� � � � 1 ��!.
- ' �i� � s, ..., .: :+� . .,� . . �1,?'.� F" Tf �.s �� _ F` ��! "�,.�' � 'Y ^.`T' ` � 7. � �s I+f h� '
; �'�; � : _ ��, . '� t � �..} � 46 � _
, E�
, :�
� ���� , . . N�+►+`..`.,,� • ' _x � . -�� ._-., .fl�'.': .�,rt.y'}���,� �F, .:'$�' 1�..� ``�.` ��tl• ..'P w� �+.�.� s � Ri -
�" ,�. �
( .
_, C t
�Y
TM
.. . ;' _ .:. . � � � . e4;. '�� • _ Ll .! .1' -� 1:
� � '�!�
� . �.�-. �.' . . - . _.- 4/..,. ,�.'�j y- :.y ��f• �- rM nl' � ��
-:� ,r� . � .-,.. � _
-.:� .- _ . . _ ��i k ��{�� .�/ � J f I �
j '} � - � � , . . � •} � y:. F , .§ � P ���^ « Y -aci' '. i � r4 � y .r � .� 1r� b
1; . rf' 'r , `� - � � . � � - E � . ,�' '' � - .�
;. � ; � ,•°��� .� -j,, . , -
� .,,� ,--�'�, � �r , ., . , .� ` � •,.�:
� : ,; - . -
: ,. ..
,, ,
} . e r j
� n. < ' � .� , � .. . ,,:'t . `' .�'# „1 .} ;"*�y .� � r T �h"C / '� .�€ t __ „i
, . , j ., �' , ,.+�v: . � �
3� , .. „ . .,� .�' r �f , . �;y� • . , , . � ,.: S' ,, t�'' �, �s,� ,� � ~ q� �
, 1 : ,.
.µ . ,, „-. ., � : � ,.., ;
� �` � �� �� r� . • rE.�.r.� � `. L��' � _ ( .k'. �r�r r,. S +�I"'11 �- � � 4 :-�-.; � ;;� 4.,.
, � _j•' , �.. ±4,�'�:.;1�'�9� � �� i- � � - -. ,� r- � j �k51�-� ,�: y., - � _ , 4 _*w ` 'i1R'� y.; � -
,y� �: , h , J
,+ �`:�1,!" �r,�". �, � . . . `-}�J�_-F r'� J ��- 'i ..r ,r.. ,�, i+; � i _w. .1 � y, _ T'�.,t� ��'- / y�' � i��.
�. . - .. - '•- ' �.
,
_
.�^�� �.�/.� � � .,;. �:,'r .� � �.i .rr .. •��t ;'.�, "�' 'a-�� r+�� }., .L' ,�, ,.�,` 5�fo.�F,u _
,/ . . . . ' .: . . � � - - � ^ ,. % .,� ..l� ti � � ; ,r �, . a � -'- . w i;. , ; " '.. �, - .1
!� , P .fi� f . .�. ' � � . , ' t� jT� - �. • , [eis ��"� : dk`. . 9 � _ ,i f. A+.. N-'3`� . � .�.'�'9r - . -
s i . 9 ' iV 1 �;,, . } �'.3
��`';�; . � � '.r, �$1. �t�,r r, -:� � ar � � � " -
, ,
, / i , l '.'f. N -
, ,
, , , .
, .. ,, ,
,
�
,. _ .
r ,
r 1 r y�,,��, �
5 r ° •�'. d - /. '..• .. ." � .�. 7' ... �: � �.� i � ., - t �.� '� :�� •.� - , � r� ��.
..,n� ti.; .� �. ,�.: t,p. ��- � !�. ,� .[i - � W��.. y . ,�`,�, � � t� .t.'i3:.
k R ` ,� r..�'E, s r � : �" r± ; 'Y"` *! � `� i i . (' �r •,y, . , ! � , -
, . ,
� t;,: �r�' �. _ � b � a . r; '� . , �' �� ��, +� x •F�� - -
� �: � .'� '� � � r ' � � i� ',i� ! � � � � r t
., . , . < ,
, . r •
:F.
. ., , ,.: , . , , .
, ' • ; :
. : . r..�� y�'....r��'i. " . . �, .� •� ����/�l:"�,. .� �,��� :.'�, E .. .6�a'�t'9 .�'': ' •�i���' r�'..'•,��. k�..'�.. � ,:-#� "�„ � .E -
�+ . ,,
• ,.. __ ..� .: . ,
a_: I f -"S. �'{' . . z�;: : sr,r >. . . . � �„7 � r-� '��yf{. f iS / � -. � ^1�{ ��t1}•. # �` } ''Z �' :J` �+ T? 1 S` �
.
..� ,1�, Yi=` h�. _ . �,.,F � I � .: ' .. � � . . . � ...:a� -0� � � •� '• �` s ' � �y f'� n !�� t`' ' . _. , �4..� . . �'': �y.�^ �
�' N , , �' ; t: :. � .. �''_'� ; , � • Ly.
p . yyrt.� �3 � � . a �(' . . 'i .� �•� 4' ! �'� '� �i
� t�� < '� , � � --� , � .�
y , .•. , � * . �.� , . �`. , , a � , , �';� � - ,
, 1 •
�. -�<.� �+... ,. ��.�` ,..; ,� . ., . , .� ,.�,a. , ,d: . �
•. v
. � F
/� � �
�, { �: v . � , x.. � . , . � �, � � . ,
ti �� ' �i
/ / � .. ✓�`-��/�j�^�I1 �}�/�� 1� ���M . ' ..., _ .
� y:': . . ♦ ' . k. I .ai r.
{ � . (�
�� � ? i� h� � X � `�� � . . � � {U� =�+V u��L:.JI=.IJ'll ll i`:� � S. , / � ' 1 4. �d' -��' � i . ,. K� ,� . � �� _
e _
�
: • �
v %�(� ���
.a� . .,, i . . �� �-'.
R �
��' F o fy
f H
� �r ., —� �k` ,H . t,.' . -. � . .ry_ , . � »'��n,�,�, et6 W� �. 1 �'1, k "1'f ,r !1'l]lAl ���ClL411:�1F 11C1 � . _ , �:.
. , ' � 2
,
:�;; , , ' :+S" : _. i� ��=... ....,, '-, . ,ti. . ..... f, . �. �. .. �`�.fx '���; _ t . . O d
�� /� f
„r ��� r \w�,.. . , r� j � � � . . ...�- _ � If"'� �
�r ,_ '� �. "' ,.r � . �' s" , i,�' ��, �-- - ��- "� • _. � �
, +�
. �
,'
�
i' .� s 1
.. . F�:.. ..:F.� , - ��. �.
� ' � �, -fr ' �r� ' 0 0 p m 0 �j' � Q r� " � . ��r � r, - --- �
. °;:. . ,
���:, -,`. ;�� 4 %""� -;C% '. �: �l��'- �'� � '�F !y 4r�� "�' �! �"` A:;.�. `, I, Y �� ,�
--.�;-. i � , .-` � � h
��. '� :.� �� � U� �T � � ' � � "� �{ ` '�"�, �j�
'',:. ` '', ," . ,�. � � � � .,ra J ,;,.._ �, 4 I.,i4 ='ti«i,�'
�� ,�; . � - y� � �` 'N` ' �� �
�� . E �i� � r/ � WF ` ', ° .:L.: N;� �, _ � �-b�� ' ,: � � ,.
� � r ' s•. y, Y� �, �" ��' ,,.. �,a , �,
,,
• .� ,�p� , �. , � . .. Y �'�• �- � -� _ �--- _�.,lf^ � � -- --- "'�� _ ., �,i
4
.., . . . � , � . , � � � _ �s
. ' .. _" ., t �, , � i�t�'l ,� d ' -- f � " .. �r�ll � c- _ _ ' - - ' . ` .*� �
f^ %
,; . ,
a�x.,8:.-���.� , ��a. :'� .. • , � � , , �..... ��' `,, f ,�� ,..s.. ',�� - �s,'�- - .-.�......—..� �7�=- - ---E �--r� R
� .
, : - - • '_- -, .;. ,� • : --._ ,Y'. �F+� ��� - - - - - ' - ,� R1' 1� =ti
J '
• r .rt� I x.} .f�_.�.� .
. .-
.. � � 4�. } � � . _
;�''-���� �'4.�.,. , . ; � .^ .��% . � � . ?_ : � -,: -Ir ,: + �� + 5�.�,!• "3�' j� ��� �-:�p�-�� _ -� '�'�.:-.�-=a�=„�,aR,� �, -- - _ , .
': = - i a �' ' '•.�`, � ��>- ' � !_ • „a-� :. . � c , ; !'F' : � ,� • . 3r �� , �. +•�, t Ar's`t" � �,`�ihJ�.w�,' � $ • s�...� �,�- »..�-- `� � -� �' .� � - -�, ,�—_ '� . _
.
. L
84
� ��..
�tr .• �l..�-
- : �`° - �. � - ..�: � � . „ „ � F : i�t �,4,r� � _ -�,-� '``ti _ n 2- �
. y� , , , .., , _
. . '� ��� . 1,�,. . ..,.. :._: � '�� .�. • .,: . •..: � r v ; - �a� .�� R,~�< . i�1�-� t s - � �t. -
:-
� � � � , ��`
_ - � ��_��-. �,. , � �.,��.� � �
� , �''�.�� .. ! -�t . � � � �, ��`� ' �` . -�� - _F-.� • � .` �. � X.� �- :
�' r "``�..`- =-._ i�_, � � .� , � � � -�� --;�- ' r. i ,�' �.'�� � - F�
♦
= i - �Yn. ' _ �_. ,I� - _ �,nr„�Y16; �.-. �/} � .� 1 - �- �' � �� 1 � � 4:.� � . �n t ��r
�. � .. y . . _ .. . - . _
� r �!. ' ' :: S . , . 1 . _ - � ifi ' :� ' f : [l. ��. �+ � ?i' ./. '-� -
2a
o . � ; y
�, . ; , �-'''�� 4n, . ,� ,� i! �,. „ : � .:'� ,� _ �'��q.�.�'�-^���._�� � %'-E `� ''ih'ft.��:� �:_ - ,'1'' �
� � � �
� —'�', � . . l i.l�`�2'"'� s4�{°, _;r- ° ' �� .- ��� . -#' f � r
r
� -. ...,,. . .. � .. - . -a.� ^ ;. �i✓� .L.�� 4�-,�.-� . . :J• �: � _ � � � �_ `a� � .E
' >
� + ,. , . -.�.' . . . .
,
r.,l
. . ,
-.' _. . ,.�/��� .
, 1' , �
. �. . l�. � ,_P.:a t »
,. , . . = --- ,,,, _, , t . Site 4 -
- - - �'+�� -� � �`' �;� ' !�• r # �e . �. ��'.� � �
,a,r, '�`�-�`�„ .�,,,�. ,� , -- — � ry�ry ,,��- �.
,- UlJ �,, ^ �'1
Y = .: -� ,�_ ---��r .-. , . • . . � _ .�
._. � . .... .'� ��� ~' �-'�''�� . . -`e.
- �'
,� ., � ,. , � _ �:, , ,. : 1- �� ,- Site 3 �,�;' . ' 'i_�r,� ... . � � � �
; s . ,F� , '�, ; , ,�: _ : - � � . : , ., ,, j ,: q r� . _ �_�,; _
' � � � N�1
a ' !
�
i
� �
'�/
�.� � , �<�.� �
; .:�1� ,:��t,- ,:..� __ _ ,.., ;� . v�� ]�-,� ��;� �� �" . �, �^t� ,y __
r
) �; c . .- v.,. �. ,�T , j , 5,�1'. 0 "0 Q �illll L�U'q � 3 .tr r i �
' ,,
-
�'';�'. - .,. �,-_ # - . ; ,.: - , .. ; r �, � �K�''' ;: . r�� .`1lVD _
;_ ,
, , -
. �,.
. : . , �
. , d �c_._, �. _ -a � ��. . 1 ff > q , b a • r i • � �..
r
�
.. �� � � j r� p8� ` �. _ �„ - , f . i r�, " �'l^`.s: � �;:�t,.� .f . � _ r � . . __ ..� �. �� �!r �' � � r
,. �, W .� � ,., :.�. �,, .� � q{ _ .� ��
��.r� . . . _ � �"�� . . ,
�,.�.' , .� �If �.a��,�. - _ �? ,i.�..,'�.� fy ���c °.� � ��' � � � ��+,i .;��
, . ��.,. , . :''9' - . � ��% . � . ' � . ��'� ti � �! Y � -':"� . � f-':.'�
.:
�A .. � '�' --�� ,F - r. I � 0 0' � f� c" - � `..i,�
���. .j; °y r - -, k�, r `#'Yc: � .A�[a�;� � �,�>3 .�;�,- .� ;� ::�
. : , . ,K
r
, � �: ,�
R - ?� J� , i� - � 4 � . . � .a� '"� �,�, ' �, �.�Ar �,. !tl' "�:i�: ��iA''" � �' � � � - J
�
.
.,
� . . : ��I,�! ! . . • ,. ,y � • "�',� t , t � y f � ;• .. ��
�y.
�. ���� l� ��,e �� ���.. � - �.�. .i e� ti- . .4 `�. `5��, �4 ._� r f i{, ��� ��
' .. � {�. . � l �1 . �� _. _ . �t� r-�
��4 � ` : �j'��`n� �Xn�+�c�3 � � � '��, , 3
;
� w - :: ;, . � . .
.;� � . �
� _ , � :' �: � '� � �
� :, • - ' �
�
,,<
+' . . . .• � '� ��4.•'�� 4" ,r•... � k, z.. � .. ,. � � I� ��� t ��- 1 .. .. - ��l.. .:3s�i ' f��.� _ �-� �`�j'� '� ,.
.. g�
,F , ��1 ��, � � � o 0 0 ��j , . �, S9, ' r.: ^ lti;.��.v� � � ' - � r.�. '4�! � '� �j � !� �� -
�:., ... �.. .,�, __`�� . : !�`(� (�,� � ���� ^� .��'���`�. �r � �� -Y $ ����a�, �,�F 7 f ♦� b �' � + � . .
,_ ��'� �' �°' :, . . � t . 7 0 Ill�� �� `7 j i`.-� #,. �' „� !r _.e+ j� C,^ R �, :�g� _ -��� .. .
' � • ti , i � � '� � H`1'�y � ,
� . . ;�.r � _... r, ._ . .. ,, y � V � �� + �� � •�': � , — f� ys,._� t � '�}.e'�'`.. �. r. , : . -.�� 1 ���, ,�• s ".�� .(iv , • 7e�1
,. .� i :, . � � r . � , , r ' , . �. � . � - : � - u'7 `- f : � .. � ' .
� �'._ ,?..f.?a-� . � � . . �,� �� '� . �.,1 �.�1_ �, �.,., J" :,:�� i� �.+, ..; r,_ .�..
� � . ." ` f'�r �� � .,:....�y�D�� -- .s�`. «' �. � . . �`� '.g��� r,C � �"1�• .� � :;..
''' ."� -'� , � �;_ ,. ° f�, � � o ,� t � �� � - a Ad ti• ��, , , _ "d� � �,
;: . . : _ , . , , _ � � , � �. ,. :, � ,,, M `�' �
. � � . - R�' ,4��. r
_„ . �
,� 1 , ; � ._ � �, � . . :�
.
:
„ � . � � w :. _
� . ;s� .
, . ,, .
_ . ,
.� , .
; , . , � � .; � � �� : ., . _ ,A�.�i_ . ✓' ,,. s �; �� , ���,��, � . 't '�, • � x,
.,
�
,, ��, ,� � , ���� , � ����� �-�
a �
/►���. �,: gt,,�� ., J�a ,. + r� q .*',':,, N � _'�'r . �•� - p� ,�,� .SR 1 31 6(REa ROAo) EXTENsioN, NC 1 6 To SR 1 008
�� . , .
. !.t , � . ;� . t• .: �;:.- : � :� :a, �T ...- ., t�G ' . . / <
Y� �
r F_;
'�"� �- � � �-�� ' �WAXHAW-INDIAN TRAIL OAD NO -3467
;aF���J.lf vr � ,� ,� : '� �� :� � '�{ „ f . p�� R ) TI P . U
},`, , ' � t . ,, � ��� �� � � � - aa���
�*�' �'� � x �` ; r,u�'�,�' � ��' ` ^ � � ^ '�' , `4 � � - _ ; , ' � , ;�� • �� � l e ra Si nificant Natural Herita e
� �,, �,� � 1���� y'�� a�� � _ � ,��` ,�y - �, ,, , �i �G Q Study Area Area & Managed Area g � Privately Owned Park
s' '. � �e Pro osed Develo ment � Publicl Owned Park
,� ' r �� '� �,{ °. . 1 f�y�� � ��� ; t � � v ' . : �Y " � ' � � 5 � Map Book Grid � p p y
�n"., �', r , , �F , � t, I, � ,� ` . ' .�kx'�,: / ;�. - \ � °" `0 Floodplain O Business
r �.� '4kI', � v ,r� r .� . � :' + , , �� s ?§ � V — Alternatives g School
'��
,: ` � �,��.
c'; � ��__�� �{� ' � : � "� � �' ' .��� ;� � �, �• -�,� `�'� � . . _ �.,, �; �"l' Cut/FillLimit DelineatedWetland {} Subdivision
, f ,. . -�� M � � � ' •
,
�'' �' � � r � � �� �a . �� ' `� �» -'-1 = - � Town of Weddington Delineated Waterbody �? Emergency Facility
� X `v, f � r f l� _
�.-�"f .'(�r ' �� f�;:�� �` � � ~�. '+�. .'�Pi .� *, „ ,��� �,�.,;1-�w�" � . �i �t� ,�, � ��`. �<'� _�y ;.�r" � .
:� �` ' �,,., , � ���tr � � r• �' 4 , , -- Delineated Stream � Church
�'� '' �, ,.. � y ;;� �y -��'r � 1.` r '':� �+' '_ � ;. � �"i � �, � � 3..� '�: g-�.; •,t ��v„�.4�� ( ; -� ; Ir �- ,, ir' •. �. - - - Town of Wesley Chapel � Underground Storage Tank ttt Cemetery
. , � : , , � r, �r, ' '� .,. „ .-- ..� . y Roads
, ,�, ; '� 'i__ . . , a ; J�� f r, ` Q � _ :, '� �Y --s' , � � � . �� us Waste Historic Property
� I ' ' ' �� '� r .• . �i � +�•:� . � � � � Hazardo
� - �, , � �,v'_ t , - -- f � r� � � ' Existing Traffic Signal
� � - -`- . `�' , . ; ���. $�e�'� h _�i. -, - - 4 r�'� � ��1 O H draulic Site
�.
`:
� , r'. � W � �;' ' : � • ' t� ��� ��' '`= i "`� k �{ .,,� • ' r � i . Pro osed Traffic Si nal Government Facility y
� � �. . e�
�
< . �� f� ' z!^� ; a•,�- r�la" � r yJ r� • I � Y raulic Structure
, <,'> r' . rr. � - - =s{ � �� � , , Y � , 3 . � Ocou renceitage E ement
' � _
ti .4�p � �, � *• 1 �; � Hazardous Waste H d
, ' � : ,.,_ . _ .. . _ �
� : s .` �� _ 'a � �
� �� Environmental Features , � � , ` _� - /�f�� � °
_ �� � � , � �� � . . � Y "� ° .'� ✓ 0 100 200 400 600 SO
',' ►� NCDOT STIP Projeet No. U-3467 � � ` , ,�, � Y � ., / ' '� ,� ' � � � ' Fee1 e
. � � � ' ,,� �' �- .. . _ �
'_ a, , ,���n=,000Fee�
". � �• � .'� y ,._ —_ � ,� _ � ' �`� ,�.i� y,4i�� :�� 4 �3 Map Prepared�. 2/1�/2015 pa�a Source: NCDOT, NC HPO, lln on County NC OneMap antl NHP Figure - 2F
' _"'' � . -�,,,, ' - ,�� . ,- M... _ x•a ��, � Aeriallmagery�.NC00T2012
Union County, NC �. � � �� �r�- � p �, ,�
'�, . �; ,
_ � �.
�
< _
- . :; , y_ _ - � � � . • - -
.\ .,� . ' .t - � �Ff' y d _� j-^y� - a = - ;� 1 -a,W � _ -
, . . - ,. .
/ , ,. . _ _ , ` ;
.� � :cy� . ,; � l� �, ,e' " , , . �j r • ,,�r + y�r�.l :• '1' � .:. ''",.� r ".� ' a� '� ��y,� . �' ,� �, ,��'r'� '1 � �l r - '� "'�i�,�.� �
.,u `. _. �.,.,. �+. , .. ,.,...�„ay • �#: •�.� e 'iY;�..� }�' ,; � �.�; ..Y��.. _ �'�:. �? .i / ,.i?l - t .E .1 - . .,.,= id.^.e�4 Cj - . .
,/ , �i, , � � �• . � , h . . . .�-:. - , . L �"'. r.r r., --z _ .1i �1 t7.�._ a , `� _ _ ,Y _
!.. q e , . :- , , - — - " s: , ,._�_
y � ,t �y �y - l - - s � a�;.-`I, � ' , � � 1. �� �
� �Si ., \� A� S� �.. . � . . �f ; .» .. . " '!} . ���� �p�.A l 'Q,A� :� .
a .�c
�
iJ _
.
' •l �i
. . ' �9� . . ' .
, '�" � . .` r - Wesley Chap .� � _
;
�..,
,
� �
. e � ;. , ��
� , <
,
. ,
.. �. ; � , � , _ �t ,. . � y �'��
, �' 'e� �y �
� � - . � . .�, F'�i�: `Y...' O . . L�' � ,� r � x n.�Yf� i . � �E
� r r y, }�
. :,. ,� . � d .�I', r � ... � ` . .
� � � � � �
�� � . . � R � , � "�, � �..�, -. , r ' . -_ . .i '_ .F_.- ' _ . - =i°rr T�.: ! r;t� •�,. `� a . $� .
�t � _ .. ���N����! # ,�� �',�j � f� y , . .' � � � �q.��i
�� � � pE �' µl, `.;���� . ; �,P .iP .},' "ry�' �'`�f �t �_l �) ep��•�' 'y����;'#�t �`'+ '�
:
� � ., � d;� �[ �' �.}�y f f �5 f ,•!
.. , �
. . ,,
:
��� ' v . ,�� ���� y� �{ .] ' - ' �� ♦Il � '� �� .. � - � y^ �!' ' � �
� ' .r�1� . � , y I'► `\. rh � �* ,� I ,�" y�.�� �,,�7J� ����F�
@" `' p�' �, ' �. , ' - �r };� 9�J[� A.j1 '+vi �'.� ' �T'� �� , . �,� ��t ..ikd .��1% { y�' �
.. � �' 4 + . � �G/�TT�'i!. M ' 1.� : % �y, �� �+? ��Y � . '� � '�� ` � � . I � k''
,: r
•�
� 1
� /
� ; , ,� d a ,w • . i.* e ���'�} r � �i � • � '� ��.
.� ,� �� } ,�5 �,. y�� y� , l .�a n'� �, . �,F� yA''� �`. � y I '�X x#y�y�
�.. -r , '� . . - i�. ��' .•�. '. _ 1 j .'.� . !�i.' � � 4� :.��z� .. ` .T
Y . � V, +,�y� 1 'M L . �i .a. -,i'.��"c6. ' G,�%�'�Rri,��_ . ry�.. .� ,m i ,r� p,�� � i' Yt '+��� Y.' � 9 '� � t �=64�� �� TT ��
�. '�,,1 .!� - �'�� ����� t�� �.r2 ��'+R.. P - '�y.�. A�'.Yw'�f .h.�� i�' �� ;q� � 1r�,� +�' 'M .�� �.
+�• , � , y�,� a,� ' �
�� °�� � ' �,,, , `�r"_ , � n _` . , :_ � r t; ?:cr �,.tla.'; , � �r � c � r "1 ^' ��, � . , ~�y� `� j � _ - t . �� �,
�. , -, :. , �. y �'}' . s 1
� ' � � . ^ , r � �� � '�; ' � �� �` '�' �
V �► � ���� . � �-� . . k�` � �� ' �Y -�i � � . .��.� .! �i "�' : ,. 4.;' y:�. � � ; � -4 �r „ .,�F �i �y ��P!!f r�7,r'�.,,lY' '� � �,1�" ����r r�"���"f �fc t ,;� �'k�� ��� �� •.iry 1 �
�, � . �. � ,.� , . 6N •_
. .. � . - , '.'►' •!! , _. - p ., ` ;l" _ u�,,. x #"^ r �. � �= w' 1,- • '�Y'ti � ' � ' ,� "� ` �_'`' � ;� ��� -
_ � . ; . . , , , - ,' ..,... .� : � " , . � , .r. � .,� ' � . i � c ��w. .N, f . r� � � ' •-.� �. �, �y� R,� -
�' � � _ � , d� � r i Ih .i � ^w � �� � � �' � � k� ��` k' �'! . �� .
. � . � � - � . b� f � . � ..� , . i . � � tr � � r � � �
��+^" {� a�,•r ,� ,t�' ,"� � a '� ' ''�� � L �`�'�i�' '��'r �.1� ;,J�3° -v.�1''�" �, `J ,,�;�* � �� �
� - '
�. .
,
,� '�
�
. .� . ��, "� • � a �'..�" . �>��1` ,.,,,'ti i� � , �� �+ 6� ',`. � _ = r'fi' :�� k.-
� rr
.
. . y r. �;._.#� ,� ,{� �� v.+��li' iyg.. ( '.'1� '��� �R � r _ ,i�_ �i � � T , f�
. i ' �
•
- �� u�?y� ` r , t ,. { , _ _ ' ,. ��.+ .l�rt; .���`�� ��
, �`�!` ,�- �' . �+�' : ` � z� +. � �� � '�; � � �'�,�" � � �: �
, � ;� �, �„ �r , � .<. � _ ,Y.;. �w� � � � ��, :; ` ��_ � � �$, ����.
; �.".;�� q � (I. . 1 ..� �J� _ �e' ,r�+ ��� .�+ .�,� ��yr ' i _
W C � � �+ �* '�f� }� . � t�`
�..i� `' R '� "��i��'� � S �`'� �^ •° � '� �' . ti � 1�' : ' ���"� �+y .,G �.� •� �4 r���`�,i"ka " l v
{,'�( � �'7� 4 .;*.. _ � ! � �_y%' �v✓;.�itj};, ',. k . �� ./ :J1
� -
•4
1 .✓��. �. . . '�F � '.��'�pl.���F,�(y'.,��' ���� "' r{ � . j, �'F �„���i '.�rl� i��191�� g,'$, . - [ . �� 1�{�./� ffl;
� - <� �� 1� ' ' � - R �'p + �. � . ''�f�y 'e� �.. v 5 ��} C;�� :.�.�Y. ��
: ". � .. , , , . •
• � � , y �,� F c '� � � +�� t ti �
a .-a . k, � .-�L1�' .. ' .. � � . �i� H - � � ,y '�,�� ;E,r ° "�' � t i� z s ge� '�+li ,�.
, �
�„ r q1
�. � �:. �.l .t'. ,'� C �• ;� . _. . � .' � Ji�r ..t"^i-,r` �f�� �"a,+ • :�+". �� t � - r��� r _y �.r ;�r -
{ �. . .: : A� . —. � - . .
Pr;� . �'� �� {_:' � , � y�-.� � � . w p ����� - �� . . �,� , fl � ,�,
-�, � �r , - . • � ���. -, . ,,� � � �
..
; � ,ff , c r o�".hL�3�;aoo . :•` � �. �:'f � �� : %?;.
� :a , ',, � „� .�,_, : , - , ', *�'� - �� ° •''4', ,
,
� � ,� . , �= �.. �t , ,.. � . ,;�
-
- � �;,; �,�' � ' � : �J �,; ' ' . :. � s � .�"I - : 4. -�` �:" ;� �,�` *i11�'- �, '. r ' y ;
. �.,1 y
� � ; �. �M1 .� � . �- . ,. . "ti, � ` : . — ,�i ^ - �"'� _ ! - L� 3�,�,� r•�i
� � " � � , • -
. y��r
;i
� ,: � . . ., �I�1. �� , _.. ., i I. � .. �� ..,� �' .. . ,�{ . . . f � � �,�: ��� � �/ ��x%�` � '�i � � a : i- ♦
. N ' '� �;: .� • � ! ; ' � .I!, 'L ,." -� a �� ��- --'� ���_Y�': ; . ' � �i� ""w_ � 'yr! r. �) - .t � �.. �`{:��. '-� '1 �,
+ �
i : s " .w . 1, .� �,� �,:; � r �s� , . , ;� =� _- - �. � ° ,,�° . '��, 'i' 4� • s F.s
•.
_. ; �
� .
. - �. . , . .
�+ � '
_ .���
r:. . ..�. . -. .. . , , .�� . �y
�-,.� -� .�d, �r"`� ::M � F . . . � ei' .. s ' , a y � l�'"''�,�`
_ . I .
� :! -� � 7�'� f� a
Wli � j''Y i� q � t ��ir��,�. _fi�tit� % �""�I J �E r�,, . f �'� I� �! _ "�' r�
�ii - , ,;.: � � �': �; . � .'� ..,�r � � y���� - +. �.,�.. �*,.�i,r �k - yf� ,,�„'.
'4. � � � ���+, s•-�. �,; Ar� � e � .p �. ` 1 �,.� � i �' .e���.� - $�J 1�,}'�"�. �'�. J {� � ..
_ - �� i n li a `. .f : i� .��f�.r•• � �y � �1 '4! � i�2 . ` . ~ . ` �� n�^��;,r'� � . � . . �,c' . 84 ..
� , . . . . . , � _� , , _ .. .. ' .
�. � p �% �t[�.
' � . }�'. , " � +1't f• r� , f'p. � P' P '�Y . � _ .. � .. _ _ _ _ +�_��4 � - � ( �i .
' . $ . , o� �Ft
, ,-
, . , . -
,. ,:- - .. � ��
:�
, ��t .� rt
�> �� �'% ix� 'r.- ' t d 0 D d
_ '. , , i: ri /
� •
. _ t � f
. �
,
� '. ' � '. �.-, � � � �.� w ��' R� • � � � a jp � iY ��,, y> �. �/ '�Y
� j .
� 4 �. . . �� a a � �
,�.}ll. �- . . � WA '.��.1• ta��,,�, �-F��`� . . . �- O�f�� + .j�i _ � �' .
_ Y � � �
.�
. ,� . .� . - a. (�a :�. ,
� `
. ,�,�.� y�,, � Y ,� , � ' , O c,--�, , ,, - ��, >. � :{, � �\
.. , , � -7 , r.. .. ,
��1' �. S3 �'! 0 p R�,utJul! � ��4�� , c� '� # , f � �, �:,1 - �rv � ,i. - �
- ..
(1
,` � o
�y,� r_ r {� 4 .�^ �� :Y :r
.�. . . .1�1 i' �„4 — .'Y.. f'.� Ik =� ` , .""�A� 'j r.� ,� ':ir��m T '�' ' . y �is7�s . . - __�1 'Y �'_ . i, �;�`\,
� �
� ���' P � ' , � {�' �� f ''3'' �, f �y�w�'' L� D o . o � � � �'�',ip� t,�'j;�, _ _ � _ ` �il t� � _�� ;�i
LL. _
ryP, . } �,� � ,. _. . n: � � I ., } � ; '1
,
� a ''. . i ! ' �"'��� � "n� -� "' ]� ' , x--`� � . _ _ - - - � ._.. __ ..-- -- — - -- � � �� �.� ��/ r�
� .
� --e _ .�� _ �_ ���;� _ _ _ _ _ _
z_ e . , ., _- �, =�a -- - s ', _ _ — - ---- �- _ — _ - -
• �', y�
� --r'"�--`-�� _a. -..r .. . .�.eL:f�� . '�� .�� _ , _ _ . .. J _ — .
� ;. '
Y
� _ ,' ,1L�__� � _ _- .r.3;�— �
�
F =3s _ .
_-` � . - _� - . . _ � ,j
. ----.� - . . __ O , r.. ._,.. � - - d}f7'�; . �ti � �
�� � -� :"3��15'��- "_. 1 - ' �, . _ . . .� � �-:'1, F� O �
N �.H �
� �a��l�` [ ' i ' i . .
[�((��/yy�.�, -` ��
�
r _ -��. . _ . . -. . ( � � � . . . r
'��]�_ � � '!
� -��,s .�_.«- � - � ' . �,
-_ � ti
•—� _, . ,. � �`� . e. . . ." I � ,�^�, '.I � � -sa �A nl .' _ ' ��� .
: 5�
, �.� �' � � L �� ,:J 1.�� /. � P 6 . �._ �� �', `� ��„
_ ����--
,� �_ _ _ _
ry , .,,_ .a...fh?��Z�" ���r� � ,r�� ��.�+ � f ,, � v.i� � �a. � ,,, �'� s .
/ � � , � � r-z : . �
' 4� � / a� , ri� . '4 � 's./ I h4� �., _ ._�v.,:..�e4�.-4'-RR? .. . . . �- C .
�f `'� • �. � - � . �r ,� � r "[��-•7 C�i �. =, � w
�� � iin �
t a
F �. � � u� d ti ,
: V.➢ M ,�r, �, '�, \ . . �- � . r . . p � I � � � _ . . - � , ..��� ar;. i ,��1.,:���,.y�,l � ��.5.. +.�►�:
. . , /li_Rl, � Y,' /� —
� ' 1�_ �— _'i f > 4 '.
�
' . �w� _� u k � ° /� :� ..
.. . J ! 1 �f'- —_ i . ; . . R ,'� �^'�
� :
�'�y •
/ rX .. i �i__si� . � ,�. ��. : ,
p . ,r�
/�'l� ��
�i �. � � e'� `� �--�:�s1J i/�i�1L� ' � - - � � 1„ � p" �
. E,
�
� ��
,.
,
�';*t' u �.�� , ; ' _ d a ° � ��� �°- j° ° - � "'�+'�
� , . . „ ��`� . � l�j �.
� �- •:'. . ` . • . ,. . ` . • � � � i U ��A..1J4A1r ���y'—� � . . . � V �^ . ��.y� � ' 1 ♦ � ::.� , � t . � � �O, .� � .
.�$"^�n ��, j t� � r if'� i �� / � � WU M� f ' t ] � � � � . .. __- .�..,�,—,g � q�.9 ��^�.,_�� '��. _ .. . � 4 ..J���F� ~i� J � { �.
� ' �' lJ I � _ Jy1rn1 �.71 `V ;+ ` '�.
�y�,}�� U li' ...7:�73 �
� � � �, + f -'' , 1 �: U U Af� � f ��. , t I ' _ . r �, q,
►- �F° r^�=-- - - .� p� �x_ �� �
. �� r � � � � _ ; � P . :: .. - ���' �,_. ��
a, � - .
�;��,�' ' Qogwc��d Park r ' y �'� . ` ;� �s , �, ; , , � ���. , � � .,, -- , - �;
;„ f ,:
� � � �� �� �,t � , : : � ��� ° , ' � � � � � ' _ � , ,;� �;� �.
- � �`�� �� �� i� � . , � � 3 ; �t _ � .
� � _. � � t i f r1 � � .
. . . 'A, p � � � # '�I `�, � t ` 4 * „ . � , � .s � r �l t-�._r � 1.1- 7E -t M �" .
� YYL7 ! �,i�s � �..�a�M1� Q(y ,.i; �Ir � .:- � (� � - �"P•� ����,'. ,��., '.
j.� '+. �I fg" -. � A �`Y��.. ..� � .L.i..M .r / �- .���.�I' . �P��� ..�
� _ � . ,,: .,. , . ~ . � . . �. � - F, �_ Wes/ey Gh�p�+j _ t f �ti � �
�-t ��3 � -�I' ��� �� ��` 3 � . h f. `� ,�'',�
' -:.. *'�� • aY. � '� � i :.
� `t� i {� Y �. � SR 1 31 6(REA ROAD) EXTENSioN, NC 1 6 To SR 1 008
�z ' n p'! f4 " • Q �''��� '� � �
��� _,�� ��1�1�A���',� ������ � �� ��,���� .�� �WAXHAW-INDIAN TRAIL ROAD) TIP NO. U-3467
�� ` � ,,r�,� " + U ` �, � Q Study Area Significant Natural Heritage p Privately Owned Park
�-.,:. �r" e � � ` ' r � f ��,� ' r , ,- _ - _ Area & Managed Area p Publicly Owned Park
�= y �' ��► ��� � i �" "� � Map Book Grid � Proposed Development O Business
AA� . ,�' ' e� � � �-,`- .r . - a ` - ,' 'ir �r � , _ y � i� �+� — Alut/FiIltLimit Delon�eated Wetland {} Subdolision 'I
,
�i, � , , .
! '�9�+�-+� ` c
� , .' Y ��,a.� ., =,�� ,� , ` � '�y �- % f � ti' ' "� ��� �'� � '' � �_ Town of Weddington Delineated Waterbody �? Emergency Facility
' � R
4 ,,,,,, , k �°"°�' f � � i ? �:� .�� , -- Delineated Stream � Church
��. � � � �` _ �� �`� ; �, a -- � � ,�;�i�` L--- - Town of Wesley Chapel
� ��.,;��..� I - -r-, ,, . ' ,,' �� �� � :� - � � Underground Storage Tank ttt Cemetery
f '. � � . ,-� hF ' � - �' !� ! � ' � 1 �'�' - ,�.� Roads Historic Pro ert
�r, _
� ; �' � = • " - -• � ' � Hazardous Waste p y
. , , - ' , � � , � + �� Existing Traffic Signal
,.. ' , :v
r � r°� � �>, �. � ` _ � { ``�� �- � � ' � � � � � �' ;� O Hydraulic Site
� �._: _ � �i�-0 ia r' i.- k � �!�� GovernmentFacilit
,� + � _ fi �� ,; __ � `�a,. ;� � Proposed Traffic Signal Y
�: ,_ .� .
1 � '� �""' ' 7-� y 7 �" Natural Heritage Element � Hydraulic Structure
� ' �f - _ , . " , ` •• � '�r LJ' � �f �' _ - -�� .� � � Occurrence � Hazardous Waste
�' � � �
� � Environmental Features �'� 1�� ° -
j�� ��g� 0 100 200 400 600 SO
� �..��' ewP'_ Feet
,� I �I �
�i'.'. NCDOT STIP Projeet No. U-3467 �.,,�`� !_�ui4��r,_�� `,1 � ���U.I:"��,�;� � ��� _, �. ��7�� ,t�i� 1 � . ' . � ,���n_,000Fee� '
� ��i�� %��;� d�� �.� �'' Map Prepared�. 2/1�/2015 pa�a Source: NCDOTn,eNC HPO, lln on County NC OneMap antl NHP Figure - 2G
- Union County, NC �'� �'� �` �
� � �aiima9e,��.Nworzoiz
•� � �!� p �,'� � }"
� �
-'::�_
_ . . , - �
��� � � °�r � - c ' = � '�'�
ti� J' •" �` r,�i � _. Y 1='�'�+,_' �
- 3'Y.'�s #� '.. i � ry��� li 4Y , � y, { �� -
. ��' ,� _ � .Y.. . d�. �� � '� G ' .
f "� s � /�� :,� ` -�.
' I .� �:. f T. � i. - ; -� -
� f , � *"�
� �� r��:-� � to� t}t'r.,;�� —
�u l
��'� �„ � �r� �. ��� � � y�� � r 0 a �� � w �
� � _ � �� e,��� . . �� � � �i� +�,�
� __�-
— �_ 1 _ �,�. -.iE��'�'V � Q - _ -
, � J;..r.. i
e �- �
r" ._ �����an, '� �-�
; �
� �-�C, a � � � + , ,
� ,
' t =`' � � N.. -
__ .. _ _ r�µ r� _ �.5�' :.i+� -- z..� _ _ _ - - �_ _ -
�I � '_ _
Note: The inclusion of sidewalks is dependent upon a cost-share agreement with local jurisdictions.
Prepared by: Rea Road (SR 1316) Extension Typical Section
MULKEY From Providence Road (NC 16) to Waxhaw - Indian
Prepared for: �, � Trail Road (SR 1008)
\�.; NCDOT STIP Project Number: U-3467
� � Union Count , NC
� � "� �'� �,•_
_�
.� �
4 ,:
�I � � ,
�. :
<,��� �.
Figure
Not to Scale
Figure Prepared: 2/11/2015 �
A endix B
pp
Fed e ra I, State, a n d loca I
Corres ondence a nd
p
Coord i nation
U-3467 Environmental Assessment May 2015
U.S, ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-201.3-023�1 County: iTnion U.S.G.S. Quad: NC-WAXHAW
NOTIFICATYON OF J[JRISDICTIONAL DETERMINATYON
Property Owner: North Carolina De artment of Trans artation Natural Environment Sectian
Attn: Ms. Erin_ Cheely
Address: 1598 Mail Service Center
Ralei�h. NC, 27699
Telephone Number: 919-707-6135
Size (acres) A,.pprozimatelv 1200 acres Nearest Town Weddin�ton
Nearest Wate�rway Mundvs Run River Basin Lower Catawba
USGS H[TC 3050103 Coordinates Latitude: 35.0091032245903
Longitude: -$0.743885218397
Location description: The pro�ect review area starts alon� Providence Road SautE� (NC Hwv 16), iust south of the
intersection of Blassom Hill Drive with_NC 16 and soutb� to the intersection af NC 16 with Lac�aven Road. and then
extends east/southeast, primar€lv fo[lowin� Weddington Road (Hwy, 84) approximatelv 4.G miles be�ore terminatin�
east of il�e interseciion of Hwv 84 wiEh Waghaw-Indian Trail Road, in Weddin�ton, Union Conntv, Nort�
Carolina.
Indicate Which of the Followin A�:
A. Preliminary De�ermination
X Based on prelimi�ary info�rmiahon, there may be waters af the U.S. including wetlands on the above described project area.
We strongly suggest you have this property inspected to determine the extent of Departzir�ent of the Army (DA)
jurisdiction. To be conszdezed final, a jurisdictional determination must be verified by the Corps. This preliminary
determination is not an appealable action under the Regulatary Program Adrninistrative Appeal Process {Reference 33
CFR Part 331}. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district
for further instruction. A�So, you may provide new information for further consideratzon by the Corps ta reevaivate the
JD.
B. Approved Determi�ation
There are Navigable Waters of the i7nited States withia the above described properry snbject to tiae permit requirements of
Section 10 of the Rivers and Harbors Act an.d Section 4{?4 of the Clean Water Act. Unless the�-e is a change in the law or
our published regulations, this deteru�i.nation may be relied upon far a period not to exceed �ive years from the date of t3us
no�ification.
_ There are waters of the U.S. incIuding wetlands on the above described properiy subject to the permit requizements of
Section 404 of the Clean RTater Act {CWA)(33 USG § 1344). Unless there is a c�ange in the law or our published
regulations, this determination may be relied upon �oz a peziod not to exceed five years from the date o�tti.is notification.
_ We strongly suggest you have the wetlands on your property delineated. Due to the size of your property andlor our
presenf wozlcload, the Corps may not be able to accomplish this wetland delineation in a time�y manner. For a more timely
deliueat�on, you znay wish to obtain a consultant. To be considered �, any delineation must be verified by the Corps.
_ The waters of the U.S. iuncluding wetlands on your project area have been deliuo.eated and the deIineation has been
verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be
reviewed and verified by the Corps. Once verified, this survey will provide az� accurate depiction of all areas subject to
CWA jurisdiction on your property which, provided there is no change in tk�.e law or our published regulations, may be
relied upon %r a period not to exceed five years.
The waters of the U.S. inclnding wetlands have been delineated and sur�veyed and are accurately depicted on ihe plat
signed by the Corps Regulatory O�£'zcial iden.tified beIow on . Unless there is a c�ange in the law or our published
regulations, this determination nnay be re�ed upon for a period no� to exceed five years from the date of tlus notification.
Page 1 of 2
_ There are no waters of t.�te U.S., to include wetlands, present on the above described project area wb.ich are subject io the
permit requirements of Section �04 of the C1ean Water Act (33 USC 1344). U�less tiiere is a claan.ge iun the law or our
published regulations, this determination may be relied upon for a period not to exceed �ive years frozn the date of this
notiizcation.
_ The pmperty is �ocated in one of the 20 Coastal Couniies subject to regulation under the Coastal Area Management Act
(CAMA}. You shoulc� contact the Division of Coastal Management in Morehead City, NC, at {252) 808-2808 to
determine theiz requizements.
Placement of dredged or �ill matexia� withi.n waters of the US andlor weilands without a Department of the Army permit may
constiYute a viotatian o� Sect�on 301 of the Clean Water Act (33 USC § 1311). If yau have any questions regarding tt�is
determination and/or tlxe Co�rps regulatory program, please contact Crvstal Amsch[er at 828-271-79$6 g231 or
C sta1.C.Amsc�[er usace.arm .mil.
C. Basis For Determination: Determination was based on review o�'aeri�l pl�otosraphv. USGS. soils �nd Lidar
naans and observatioos made d�ring the site viset. Wetl�nds met criteria set forth in the Corps I987 delineation
manual and the Eastern Mountaens and Piedmont Region Sunnlement and tributaries were identi�ed usin�
OHWM as observed in the field. Wetlands are adiacent to tributaries and the multiple on-site tr3ibutaries include
Mundvs Run. Twelvmile Creek. and tribut�ries to Tarkill Branch, vc�hich flows into SixmiEe Creek and tri6utaries
to Sigmile Creek itseif which flows into 1�velvemile Creek. Mundvs Run and Cu[vert Branch, w�ich fiow into West
Fork'�velvemile Cree wE�ich flows into Twelvemile Creek and Pric� M'rll Cree which flows into East Fork
�velve�mi�e Creek which flows ento 'hvelvemile Creek. 'h�velvemile Creek flows 'rnto the Catawba R�iver a Section
10 Water.
D. Remarks:
E. Attention USDA Prog�ra� Participants
This defineation/determination has been conducted to identify the limits o£ Co�rps' Ctean Water Act jurisdiction far the
particular site identified in this request. 'I'he delineation/determinarion may not be valid £or the wet�a�ad conservation
provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participaz�ts, or anticipate participation
in USDA programs, you should request a certified weYland determination from tla�e Iocal o£�ce of the Natural Resources
Conservation Service, prior to starting work.
F. Appeals Informat�on (This information applies on[y to approved jurisdictional determinations as indicated in
B. �bove)
This correspondence constitutes an approved jur�sdictional determination for the above described site. If you object to this
determination, �ou may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you wilI find a
Notification of Appeal Process (NAP) fact sheet auad request for appeal (RFA} farm. If you request to appeal this
determination you must subrnit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: rason Steele, Review Of�cer
60 FarsyCh Street SW, Room 1OM15
Atlanta, Georgia 30303-8801
In order for an RFA to be accepted by the Cozps, the Co�rps nnust detennine that it is complete, that it meets the criteria for
appeai under 33 CFR par[ 331.5, and that it has been received by the Division Of�ice within 6d days of t�e date of the NAP.
Should you decide to submit an IREA form, it must be received at tb.e above address by
**It is not necessary to submit an RFA form to the Division Offzce if you da not object to the deterinination in this
correspondence.* *
Corps Regulatory Official:
Date: Sentember 23, 2014 Expiration Date: Sentexaber 23, 201.9
The Wil�ington District is conamitted to providing the highest level of su�port to tlie public. To he�p us ensuze we
continue to do so, please coznplete our Customer Satisfaction Survey, located online at
http://re,gulatorv.usacesurve_y,_coml_
Copy furnished: Mu�key Engineers and Consuitants, Attn: Brian Dustin, 6750 Tryon Road, Cary, �iorth Carolina 27518
U.S. DEPARTMENT OF AGRICULTURE
Natural Resources Conservation Service
FARMLAND CONVERSION IMPACT RATING
FOR CORRIDOR TYPE PROJECTS
PART I(To be completed by Federal Agency) �. uate or �ana tvaivation Kequest
1. Name of Project U-3467 Rea Road (SR 1316) Extension 5. Federal Agency Involved FHWA
2. Type of Project Corridor on new location 6. County and State U111011 COU11�/, NC
PART 11 (To be completed by NRCS) 1 Date Request Received by NRCS 2 Person C
3 Does the corndor contain prime, unique statewide or local important farmland� 4 Acres Irnc
YES ❑ NO �
(If no, the FPPA does not apply - Do not complete additional parts of this form).
5 Ma�or Crop(s) 6 Farmable Land in Government Jurisdiction 7. Amount of
Acres: % Acres:
NRCS-CPA-106
(Rev. 1-91)
Sheet 1 of
in rrr
%
8 Name Of Land Evaluation System Used 9 Name of Local SiteAssessment System 10 Date Land Evaluation Returned by NRCS
PART III (To be completed by Federal Agency)
A. Total Acres To Be Converted Directly
B. Total Acres To Be Converted Indirectly, Or To Receive Services
C. Total Acres In Corridor
PART IV (To be completed by NRCS) Land Evaluation lnformation
A Total Acres Prime And Unique Farmland
B Total Acres Statewide And Local Important Farmland
C Percentage Of Farmland in County Or Local Govt Unit To Be Converted
D Percentage Of Farmland m Govt Jurisdiction With Same Or Higher Relative Value
PART V(To be completed by NRCSJ Land Evalua6on Infom�ation Criterion Relabve
value of Farmland to Be Serviced or Converted Scale of 0- 900 Points)
PART VI (To be completed by FederalAgency) Corridor Maximum
Assessment Criteria (These criteria are explained in 7 CFR 658.5(cJ) Points
1. Area in Nonurban Use 15 2
2. Perimeter in Nonurban Use 10 2
3. Percent Of Corridor Being Farmed 20 0
4. Protection Provided By State And Local Government 20 0
5. Size of Present Farm Unit Compared To Average 10
6. Creation Of Nonfarmable Farmiand 25
7. Availablilit Of Farm Su ort Services 5 C
8. On-Farm Investments 20 1
9. Effects Of Conversion On Farm Support Services 25 �
10. Compatibility With Existing Agricultural Use 10 2
TOTAL CORRIDOR ASSESSMENT POINTS 160 7
PART VII (To be completed by Federal Agency)
Relative Value Of Farmland (From Part V)
Total Corridor Assessment (From Part VI above or a local site
assessment)
TOTAL POINTS (Total of above 2 lines)
1. Corridor Selected: I2. Total Acres of Farmlands
Converted by Project:
5. Reason For Selection:
100 0
� so a
260 7
Alternative Corridor For Segment
Corridor A2 Corridor C2 Corridor C I Corridor D
9 89.7
NOTE: Complete a form for each seament J�ith more than o�e Alternate Corridor
2
2
0
�
�
3
�
0
7
7
4. Was A
0 I 0
0 0
0 p
0 0
Site Assessment Used?
YES � NO �
DATE � ��� IS
NRCS-CPA-106 (Reverse)
CORRIDOR - TYPE SITE ASSESSMENT CRITERIA
The following criteria are to be used for projects that have a linear or corridor - type site configuration connecting two distant
points, and crossing several different tracts of land. These include utility lines, highways, railroads, stream improvements, and flood
control systems. Federal agencies are to assess the suitability of each corridor - type site or design alternative for protection as farmland
along with the land evaluation information.
(1) How much land is in nonurban use within a radius of 1.0 mile from where the project is intended?
More than 90 percent - 15 points
90 to 20 percent - 14 to 1 point(s)
Less than 20 percent - 0 points
(2) How much of the perimeter of the site borders on land in nonurban use?
More than 90 percent - 10 points
90 to 20 percent - 9 to 1 point(s)
Less than 20 percent - 0 points
(3) How much of the site has been farmed (managed for a scheduled harvest or timber activity) more than five of the last
10 years?
More than 90 percent - 20 points
90 to 20 percent - 19 to 1 point(s)
Less than 20 percent - 0 points
(4) Is the site subject to state or unit of local government policies or programs to protect farmland or covered by private programs
to protect farmland?
Site is protected - 20 points
Site is not protected - 0 points
(5) Is the farm unit(s) containing the site (before the project) as large as the average - size farming unit in the County ?
(Average farm sizes in each county are available from the NRCS field offices in each state. Data are from the latest available Census of
Agriculture, Acreage or Farm Units in Operation with $1,000 or more in sales.)
As large or larger - 10 points
Below average - deduct 1 point for each 5 percent below the average, down to 0 points if 50 percent or more below average - 9 to 0 points
(6) If the site is chosen for the project, how much of the remaining land on the farm will become non-farmable because of
interference with land patterns?
Acreage equal to more than 25 percent of acres directly converted by the project - 25 points
Acreage equal to between 25 and 5 percent of the acres directly converted by the project - 1 to 24 point(s)
Acreage equal to less than 5 percent of the acres directly converted by the project - 0 points
(7) Does the site have available adequate supply of farm support services and markets, i.e., farm suppliers, equipment dealers,
processing and storage facilities and farmer's markets?
All required services are available - 5 points
Some required services are available - 4 to 1 point(s)
No required services are available - 0 points
(8) Does the site have substantial and well-maintained on-farm investments such as barns, other storage building, fruit trees
and vines, field terraces, drainage, irrigation, waterways, or other soil and water conservation measures?
High amount of on-farm investment - 20 points
Moderate amount of on-farm investment - 19 to 1 point(s)
No on-farm investment - 0 points
(9) Would the project at this site, by converting farmland to nonagricultural use, reduce the demand for farm support
services so as to jeopardize the continued existence of these support services and thus, the viability of the farms remaining in the area?
Substantial reduction in demand for support services if the site is converted - 25 points
Some reduction in demand for support services if the site is converted - 1 to 24 point(s)
No significant reduction in demand for support services if the site is converted - 0 points
(10) Is the kind and intensity of the proposed use of the site sufficiently incompatible with agriculture that it is likely to
contribute to the eventual conversion of surrounding farmland to nonagricultural use?
Proposed project is incompatible to existing agricuitural use of surrounding farmland - 10 points
Proposed project is tolerable to existing agricultural use of surrounding farmland - 9 to 1 point(s)
Proposed project is fully compatible with existing agricultural use of surrounding farmland - 0 points
� t,�. STA'Ip cxA'
�� M�Y]o. y •y�
�-L�
!J,
¢� �(�'1
W _ _ 9
� "/ ��
�� Q�hM NW �x
North Carolina Department of Cultural Resources
State Historic Preservation Office
Ramona M. Bartos, Administrator
Beveriy Eaves Perdue, Governox
L.inda A. Carlisle, Secretarp
Jeffre}� J. Crow, Deputp Secretaxy
November 30, 2012
MEMORANDUM
TO: Paul Schroeder, Ph.D
Transportation Planning Branch
NC Department of Transportation
FROM:
suBJEc.T
Office of Archives and History
Division of Historical Resources
David Brook, Director
Ramona M. Bartos ������':-„ lY� �� (.�,:^,�.�,it�h.. ��,°�:����,'{fr ..
�)
Rea Road Extension from NC 1 C to SR 1008, Weddington, U-3467, Union CountyT,
ER 12-2134
Thank you for your email of November 14, 2012, concerning the above project.
After reviewing the information provided and based on the overall size of the project our office will await
comments until a preferred alternative is chosen. However, given the presence of a previously recorded
archaeological site (31UN135) situated within the study area, there is a great likelihood that we will
recommended a comprehensive archaeological investigation in respect to this project.
We have conducted a search of our maps and files and located the following structures of historical oY
architectural importance within the general area of this project:
■ John Walker Matthews House (CJN 0249)
■ Thomas-Wrenn House (CTN 0388)
■ Howard Family House (LJN 0831)
■ Weddington School (UN 0418)
■ Weddington Historic District (UN 0829)
■ Weddington United Methodist Church (UN 0419)
■ Jocob Allen Deal House (UN 0097)
■ James Stanhope Delancey House (CJN 0100)
■ Kitty Byrum Price House (UN 0321)
■ Morris Peace House (CTN 0322)
■ James Newton Price Tenant House (CTN 0486)
■ Siler Presbyterian Church (LJN 0491)
SL/DOE/LL
SL/DOE/LL
SL/DOE
SL
SL
SL
Survey
Survey
Survey
Survey
Survey
Survey
DOE: Deter�nined eligible for li.rting in the National Aegi.rter
SL: Placecl on the State Study Li.rt
LL: Local L,andmark or Locally-De.cignated Historic Di.rtrict
Survey: Identified during the �982 Union County Survey by Joe Schuchlnczn
Location: 109 Last Jones Street, Raleigh NC 27601 Mailing Addxess: 4617 Mail Sernice Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599
We recommend that a Department of Transportation architectural historian identify and evaluate any
structures over fifty (50) years of age within the project area, and report the findings to us. The last architectural
survey of Union County was completed in 1982.
The locations of these properties are available on our GIS website: htt�://gis.ncdcr. o� v/h�oweb/.
The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the
Advisory Council on Historic Preservation's Regulations for compliance with Section 106 codified at 36 CFR
Part 800.
Thank you for your cooperation and considerations. If you have any questions concerning the above
comment, please contact Renee Gledhill-Earley, environmental review coordinator, at 919.807.6579. In a11
future communication concerning this project, please cite the above referenced tracking number.
cc: Mary Pope Furr, NCDOT
Matt Wilkerson, NCDOT
North Carolina Department of Cultural Resources
State Historic Preservation Office
Ramona M. Bartos, Administsator
Governor Pat n4cCror}
Secxetary Susan I�luttz
July 2�, 2014
MEMORANDUM
TO: Kate Husband
Office of Human Environment
NCDOT Division of Highways
. ��
FROM: Renee Gledhill-Earley �<=�-���-e--' � -����� �`�' � k� y �,yr �-�` �� {'�
Environmental Review Coordinator
Office of Archives and History�
Deputy Secretaxy Kevin C6exry
SUBJECT: Historic Structures Survey Report, Rea Road Extension from Providence Road (NC 16)
To Waxhaw-Indian Trail Road, U-3467, Union County, ER 12-2134
Thank you for your June 26, 2014, transmittal of the above-referenced report. We apologize for the delay in
offering the following comments.
We concur that the John Walker Matthews House (UN0249) and the Howard House (UN0831) remain
eligible for listing in the National Register of Historic Places under Criterion C, and that the Jacob Deal
Allen Farm (UN1147) is eligible for listing under Criterion A for agriculture and Criterion C for
architecture. Was the intact farm acreage across the road part of the Allen Farm, or was it the Moore Farm? If
the former is the case, it should be included in the National Register-eligible property boundary. The National
Register eligible boundary for each properry should extend to the ditch next to the road - not the edge of the
right-of-way, as all of the farmland and residential rural setting are part of each properry's importance.
We concur with the determination that the following properties are not eligible for lis�ing in the National
Registier:
Matthews-Price House (UN0250/UN1150), which in addition to its having been moved, has also been
altered (1970s porch, new windows, new chimneys, and the interior appears to have lost key features, like the
staircase balustrade).
Hemby House (UN0177at original location/UN1146), which like the Matthews-Price House, has lost
interior integrity. Moved buildings can qualify for their architectural merit, not just because they are the last
resource associated with a person or event
John O. Hunter Farm (UN1145)
Thomas-Wrenn House (UN0388).
Moore House (UN1148)
Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 46171V1ai1 Seroice Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599
We do not concur that the Weddington Methodist Church (UN0419) is eligible for the National Register.
In 1983 it was evaluated as a contributing resource in the Study-Listed Weddington Historic District, not as an
individual building. The 1924 church does not meet Criterion A as it does not represent the 19`t' century�
settlement and development of the town of Weddington and the report does not document the importance of
the church to the community after 1924. In terms of the eligibility of the cemetery, while it contains an area of
19`h century burials and markers, no information is offered in the report about how it qualifies for Criterion
Consideration B for its age, distinctive design features, the graves of persons of transcendent importance, or
from association with historic events.
The Siler Presbyterian Church (UN1149) is not eligible for listing in the National Register under
Criterion C due to the impact of the large non-historic addition attached to its rear corner. Even though the
footprint of the original church building is still discernible, the "courty�ard" effect of the large L-shaped
addition has chan�ed the property's integrity of setting and feeling. While the report notes that the eligible
property is only the 1919 church, it cannot be separated from Honeycutt Hall and the office wing when
evaluating its National Register eligibility. The National Register states that all additions are part of a single
building. This opinion on the church's architectural merit is not related to the much larger buildings to the rear,
as in the eyes of the National Register, the open walkway does not physically connect the church to the office
wing hyphen. Given the above, we believe that there are a number of other Gothic Revival style churches in
this section of the counry that appear to have better integriry than the Siler Presbyterian Church.
The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the
Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR
Part 800.
Thank you for your cooperation and consideration. If you have questions concerning the above comment,
contact Renee Gledhill-Earley, environmental review coordinator, at 919-807-6579 or renee.gledhill-
earle � a,ncdcr.gov. In all future communication concerning this project, please cite the above refeYenced
tracking number.
cc: Mary Pope Furr, NCDOT/HES
Federal Aid #: STP-1316(10) TIP #: U-3467 County: Union
CONCURRENCE FORM FOR ASSESSMENT OF EFFECTS
Project Description: Rea Road Extension from Providence Road (NC 16) to Waxhaw-Indian Trail
Road (SR 1008).
On September 2, and September 30, 2014, representatives of the
� North Carolina Department of Transportation (NCDOT)
� Federal Highway Administration (FHWA)
� North Carolina State Historic Preservation Office (HPO)
❑ Other
Reviewed the subject project and agreed on the effects findings listed within the table on the reverse of
this signature page.
Signed:
r %.. '
Representative, NCDOT
�� � �
�.s--
FHWA, for the Division Administrator, or other Federal Agency
Representative, HPO
�0;2�/'2`+�I
Date
)� �- Z�- � �
Date
1o�Z8�l�
Date
Federal Aid #: STP-�316(l0) TIP #: U-3467 County: Union
Property and Status Alternative Effect Finding Reasons
Property No. 5 It was determined there would be no effect on the property at the
John Walker Matthews House September 2, 2014 effects meeting. Although the property falls within the
Determined Eligible 1996, Alternative A/A2 No Effect Area of Potential Effects, there will be no work performed within the
Reinains Eligible
vicinity of the property.
Property No. 5 It was determined there would be no effect on the property at the
John Walker Matthews House September 2, 2014 effects meeting. Although the property falls within the
Determined Eligible 1996, Alternative B No Effect Area of Potential Effects, there will be no work performed within the
Remains Eligible
vicinity of the property.
Property No. 5 It was determined there would be no effect on the property at the
John Walker Matthews House September 2, 2014 effects meeting. Although the property falls within the
Determined Eligible 1996, Alternative GC2 No Effect Area of Potential Effects, there will be no work performed within the
Remains Eligible
vicinity of the property.
Alternative A/A2 The original design had potential issues with the impact of hydro, utilities,
Property No. 8 Original Adverse Effect and drainage work, as well as access to the property, which could create an
Howard House adverse effect. The alternative impacts 0.25 acres of 5.904 acres.
Determined Eligible 1996, There will be no adverse effect with the minimized footprint and improved
Remains Eligible Avoidance Option No Adverse Effect access. Construction fencing shall be erected at the back of the ditch line.
No work shall take place in, and no utilities shall encroach into, the historic
bounda . There will be 0.0 acres of the 5.904 acres i�n acted.
Property No. 8 It was determined there would be no effect on the property at the
Howard House September 2, 2014 effects meeting. Although the property falls within the
Determined Eligible 1996, Alternative B No Effect
Remains Eligible Area of Potential Effects, there will be no work performed within the
vicinity of the property for this alternative.
The original design had potential issues with the impact of hydro, utilities,
Property No. 8 Alternative GC2 Adverse Effect and drainage work, as well as access to the property, which could create an
Howard House Original adverse effect. The alternative impacts 0.25 acres of 5.904 acres.
Determined Eligible 1996, There will be no adverse effect with the minimized footprint and improved
Remains Eligible Avoidance Option No Adverse Effect access. Construction fencing shall be erected at the back of the ditch line.
No work shall take place in, and no utilities shall encroach into, the historic
bounda . There will be 0.0 acres of the 5.904 acres im acted.
1�'ederal Aid #: STP-1316(10) TIP #: U-3467 County: Union
Property and Status Alternative Effect Finding Reasons
The original design of Alternative A would impact 3.02 acres of 39.79
Alternative A/A2 acres and is an adverse effect on the property.
Property No. 15 Original Option Adverse Effect
Jacob Allen Deal Farm There will be no adverse effect with the condition of a 25' buffer from the
Determined Eligible Avoidance Option No Adverse Effect historic boundary, delineated by construction fencing erected at the back of i
Minimization Option No Adverse Effect the ditch line. The fencing shall extend 500' from each access drive, or to
the properly boundary, whichever is closer. Minimization option will
impact 0.2 acres of 39.79 acres, which will have no adverse effect on the
ro e
The original design of Alternative B would impact 2.78 of 39.79 acres and
is an adverse effect on the property.
Alternative B Adverse Effect
Properly No. 15 Original
Jacob Allen Deal Farm There will be no adverse effect with the condition of a 25' buffer from the
Determined Eligible historic boundary, delineated by construction fencing erected at the back of
Avoidance Option No Adverse Effect the ditch line. The fencing shall extend 500 from each access drive, or to
the properiy boundary, whichever is closer. Minimization option will
impact 0.0 acres of 39.79 acres, which will have no adverse effect on the
ro e
The original design of Alternative C would impact 6.34 acres of 39.79
Alternative C/C2 acres and is an adverse effect on the properly.
Property No. 15 Avoidance Option Adverse Effect
Jacob Allen Deal Farm There will be no adverse effect with the condition of a 25' buffer from the
Determined Eligible historic boundary, delineated by construction fencing erected at the back of
Avoidance Option No Adverse Effect the ditch line). The fencing shall extend 500 from each access drive, or to
Minimization Option No Adverse Effect the property boundary, whichever is closer. Mini�nization option will
impact 0.56 acres of 39.79 acres, which will have no adverse effect on the
ro e
Initialed: NCDOT '�, � FHWA —��� HPO �
FHWA Intends to use the SHPO's concurrence as a basis for a"de minimis" finding for the following properties, pursuant to Section 4( fl:
Alternatives A and C Minimization for the Jacob Allen Deal Farm
TOWN OF
WEDDINGTON
1924 Weddington Road • Weddington, North Carolina 28104
TOWN OF WEDDING'PON
RESOLUTION ADDRESSING SIDEWALK DESIGN
ALONG THE REA ROAD EXTENSION
R-2015-02
WHEREAS, the North Carolina Department of Transportation is considering the extension of
Rea Road from Providence Road to Highway 84; and
WHEREAS, in preparation for the construc[ion of the Rea Road extension, ihe North Caro]ina
Department of Transportation is evaluating its construction planning and design for the road witli
sidewalks; and
WHEREAS, the NoRh Carolina Department of Transportation has inquired of the Town its
interest in including sidewalk design in the construction plans for tl�e Rea Road extension; and
WHEREAS, it is economically feasible for North Carolina Department of Transportation and the
Town to include the sidewalk design in the construction plans at this point rather than to retrofit the road
for sidewalks after the construction has begun; and
WHF,REAS, the North Carolina Department of Transportation has indicated [hat before its
construction of the Rea Road extension with the sidewalks, the Town wil] be provided with an estimate of
the toCal cost of the sidewalk construction and the Town could, at that point, decide against the
construction of the sidewalk with no cost to the Town; and
WHEREAS, contingent upon the Town's ability to opt out of the sidewalk construction, the
Town desires for the NoRh Carolina Department of Transportation to include sidewalk design in the
overall constmction plans far the Rea Road extension.
NOW THEREFORE BE IT RESOLVED that the Town hereby supports the inclusion of
sidewalk design in the overall construction plans for Rea Road conditioned upon the Town's ability to opt
out of the sidewalk cons[ruction once the sidewalk construction estimates are provided and prior to the
Town's entry into a municipal agreement.
BE IT FURTHER RESOLVED that notMng contained in t'�reso �ion shall obligate the
Town to fund sidewalk construction or maintenance along the Rea Roa ex �n n.
/� Adopted this 12°i day of Januarv, 2015.
G 4'
Bill Deter, Mayor
Att
�� � �� L � �
� y S. McCollum, Town Clerk
Pvnsze�so9��i Telephone (704) 846-2709 • F� (704) 844-6372
THE VILLAGE OF l�'�SLEY CHAPEL
Iv1ay 13, 2015
North �arolina �epartment of Transportation
Marshall Edwards, �roject Planning Engineer
Project �evelopment � Environmental Analysis
15�481Viai1 Service �enter
Raleigh, N� 27699-1548
L'ear IVir. Edwards;
The Wesley Chapel V'illage �ouncil, at their November 10, 201� meeting, approved a
motion authorizing funding for sidewalks along NC 84. The motion was to approve the
village's financial contribution to the portion of sidewalk both within the Village
corporate limits and also outside the corporate limits on the north side of NC 84; as part
of the motion #he village will furnish the entire �23,721 to N� DOT no sooner than the
year 2023, as it will fund it in the seven years prior to that time.
If you have any questions about this, feel free to contact �heryl Bennett, V"�llage �lerk or
Bill Duston, Flanning Director at 704 839-0182. Thank you.
Sincerely,
_. � ,
-., , .�
,
_, , t - -- - --___..
.��r =
- t:_:�. _„_ _ __
. .....�.
� �< < <. C • ` � r ✓�' � �„ _ �t=_�
Brad Horvath, Mayor
cc: �heryl Bennett, Clerk
Bill �uston, Flanning Director
64901�eddington Road
l�lesle� Chapel, NC 28104
Phone: 704/ 839-0157
Email: pla�iner@weslepchapelnc.com
MEETING NOTES
To: Meeting Participants
FROM:
DATE:
Liz Kovasckitz, Mulkey Engineers and Consultants
December 12, 2012
• r� u ��c E�
E YV G 1 N 9:� E: I�� 5 & G: f=J N S` L! L7`A N�� 5
s u B� Ec-r: External Scoping Meeting: SR 1316 (Rea Road) Extension, NC 16 to SR 1008
(Indian Trail-Waxhaw Road) in Weddington. Multi-lanes, part on new location.
Union County, NCDOT TIP Project No. U-3467.
An external scoping meeting was held for the subject project on November 14, 2012 in the
NCDOT Structure Design Conference Room. The objecrives of the meeting were to begin early
coordination through the discussion of known information about the project and project area, to
obtain information that would be helpful in evaluating the potential environmental impacts of the
project, and to strategize solutions and next steps in the project development process. Meeting
attendees are listed below. A summary of the meeting follows.
Meeting Participants
Mitch Batuzich
Rick Baucom
J. Derek Bradner
Greg Brew
Monroe Brown
Marella Buncick
Marla Chambers
Erin Cheely
Scott Cole
Carla Dagnino
Thad Duncan
Marshall Edwards
Liz Hair
Jennifer Harris
Herman Huang
Alan Johnson
Liz Kovasckitz
Chris Militscher
Stephen Morgan
Brian Murphy
Stacy Oberhausen
Anil Panicker
Craig Parker
FHWA
NCDOT Division 10 (by phone)
NCDOT Location & Surveys
NCDOT Roadway
NCDOT Utilities
USFWS (by phone)
NCWRC (by phone)
NCDOT PDEA NES
NCDOT Division 10 (by phone)
NCDOT PDEA NES
NCDOT Roadway
NCDOT PDEA
USACE (by phone)
NCDOT PDEA
NCDOT PDEA HES-PICS
NCDENR DWQ (by phone)
Mulkey
USEPA (by phone)
NCDOT Hydraulics
NCDOT Traffic Safety
NCDOT PDEA
NCDOT TPB (by phone)
Mulkey
Mui.kEv lavc. 6750 TRvorr Raao CRHY, E`JC 2751B F❑ 9ox 33127 RALEIGH, NC 27636 PH: 41q-859-1412 FAx� 919-B51-141B WWW.t-fU�KEYINC.COM
U-3467 I:xternal Scoping Meering, 11-14-12
Meeting Participants continued
Michael Reese NCDOT Congestion Management
Jamille Robbins NCDOT PDEA HES-PICS
Paul Schroeder NCDOT TPB
Andrew Topp M/A/B
John Underwood NCDOT Division 10 (by phone)
Meeting Summary
Marshall Edwards opened the meeting and asked for introducrions from the ateendees. Liz
Kovasckitz reviewed the meeting agenda and objectives.
PRESENTATION
Ms. Kovasckitz reviewed a PowerPoint presentation. The presentation summaYized information
contained in the Projcct Data Sheets as well as other project details obtained through a site visit and
meetings with local planners. Ms. Kovasckitz presented an overview of the project, followed by a
brief history of the project, a discussion of the general project need, a review of the preliminary
study area, and identification of known notable features in the study aYea.
Project Overview
Ms. Kovasckitz noted the proposed project is included in the 2012-20�8 NCDOT STIP as U-3467.
The project is located in Union Counry, with part in the Town of Weddington and part in the
Village of Wesley Chapel. The project proposes to extend SR 1316 (Rea Road) from NC 16
(Providence Road) east to Weddington Road (NC 84) on new location. The extension would be
designated as NC 84. The proposed project would also widen NC 84 from the new location segment
to SR 1008 (Indian Trail-Waxhaw Road). The project is appro�mately 3.8 miles in length and is
proposed as multi-lanes, part on new location, with partial control of access.
A federal Environmental Assessment (EA) will be prepared for the project. The EA is currently
scheduled for completion in December 2013, with the FONSI in December 2014. The project has
been screened for placement in the Merger process. A modified Merger process including
Concurrence Points 2A and 4A will be followed.
Ms. Kovasckitz stated the proposed project is broken into three segments. Discussions during the
Internal Scoping Meeting regarding the project as included in the current TIP identified potential
concerns related to project phasing and logical termini. The project phasing is revised in the Draft
2013-2023 TIP as follows:
U-3467 A- From NC 16 to NC 84; construct two lanes on four lanes of right-of-way, with right-of-
way acquisition in fiscal year (F� 2016 and construction in FY 2017.
U-3467 B- From NC 1C to NC 84; construct two additional lanes, unfunded for construction
U-3467 I:xternal Scoping Meering, 11-14-12
U-3467 C- NC 84 to Indian Trail-Waxhaw Road, (widening) unfunded for right-of-way and
construction.
Chris Militscher asked if the NEPA document would cover all three segments. Ms. Kovasckitz
replied that it would. Mr. Militscher clarified the project is proposing phased construction. Mitch
Batuzich noted there should be a clear distinction of terms when describing the project segments
and phasing. Mr. Militscher followed that EPA is fine with the phasing of projects as long as the
NEPA document covered all segments.
Ms. Kovasckitz noted Figure 2 showed other TIP projects in the project area. There is a proposed
roundabout at Weddington Matthews Road and NC 84 (TIP Project U-5325B). Construction is
anticipated after school is out in June 2013. TIP Project U-5325A, which relocated the intersection
of Weddington Church Road and NC 16, was recently completed. TIP Project U-2510A, which
widened NC 16 from I-485 to Rea Road, was completed in 2010 and included improvements to the
NC 84�NC 16 intersection, including a median and dedicated turn-lanes.
Ms. Kovasckitz noted the total estimated project cost included in the Draft 2013-2023 TIP is
$27,411,000.
Pro�ect Histor� and Pur�ose
Ms. Kovasckitz indicated a feasibility study was prepared for the new location portion of the project
in 1996, prior to the construction of Rea Road (TIP Project U-2506). The feasibility study noted the
purpose of this project "....is to eliminate a potential dog-leg between the proposed Rea Road and
NC 84. Construction of this project will eliminate turning movements associated with east-west
traffic along these two roads."
Ms. Kovasckitz briefly reviewed local transportation and land use plans, including the Mecklenburg-
Union Metropolitan Planning Organization (MUMPO) Thoroughfare Plan (November 2004), The
Town of Weddington's Land U.re Plc�n (March 2002, amended through Apri12011), The Village of
Wesley Chapel's Land U.re Plan (December 2003), the Union County 2025 Co�nprehen.rive Plan
(October 2010), and the T�e.rtern Union County Local Area Kegional Tran.rportation Plan (LARTP)
(November 2009).
The LARTP is a multi-modal plan that attempts to balance the needs of various modes of
transportation within western Union County, including the project area. The projects and
recommendations developed as part of the LARTP feed directly into the MUMPO Long Range
Transportation Plan and Comprehensive Transportation Plan. The LARTP recommendations
include a thoroughfare plan that prioririzes roadway projects as high, medium, or low prioriry
projects. The plan recognizes the Rea Road Extension project to construct a four-lane boulevard as
the top ranked high priority project The plan also calls for on-street bicycle accommodations along
the length of the project. Intersection improvements are recommended at four intersections on NC
84 within the project area: North Twelve Nlile Creek Road (SR 1341), Deal Road (SR 1340), Antioch
Church Road (SR 1338), and Indian Trail-Waxhaw Road.
Ms. Kovasckitz stated the purpose of the project is to improve the mobiliry and connectivity of
NC 84 in the project study area.
U-3467 I:xternal Scoping Meering, 11-14-12
General Project Need
Ms. Kovasckitz identified the general project needs as follows:
■ The proposed project is included in the Western Union County Local Area Regional
Transportation Plan [NC 84 Relocation (Rea Road Extension)] as the No. 1 High Priority
Recommended Thoroughfare Plan project.
■ Vehicles traveling west on existing NC 84 (Weddington Road) to SR 1316 (Rea Road) must turn
left onto NC 16 (Providence Road), travel approximately 0.75 mile, then turn right onto Rea
Road.
■ Traffic volumes in 2035 are expected to exceed capacity on NC 84 in the project area.
Ms. Kovasckitz noted NC 84 carries high traffic volumes as a major connection between
southwestern Union County and southeastern Mecklenburg County and the City of Charlotte. Ms.
Kovasckitz reviewed traffic forecast data currently available for the project. Travel demand between
Monroe/Union County and I-485/Charlotte remains high and other parallel routes are very
congested. In addition, the Demographic Study Area (DSA) experienced an 829 percent increase in
population between 2000 and 2010, a relatively high rate of growth compared to a 62.8 percent
increase for Union County as a whole. In the eastern half of the study area that includes the Village
of Wesley Chapel, there was an over 200 percent increase in population foY the same time period.
The propo.red project avould provicle a more direct link beizveen �ve.rtern Union County and Charlotte/Mecklenburg
County; it tvauld provide an alternate route to I-485 and Charlotte, enhancing regional travel option.r. The propo.red
project zvould provide additional capacity on NC 84 in the project arect.
Other Desirable Outcome / Secondar� Benefit
■ The crash rate for NC 84 in the project area exceeds the statewide average crash rate for similar
facilities.
Ms. Kovasckitz reviewed NC 84 crash data for the period between October 1, 2007 and September
30, 2012. She noted the most prevalent crash pattern along the corridor is rear end crashes, which is
generally a symptom of congestion type issues. It is anticipated that a properly designed four-lane
divided facility should address the predominant crash patterns currently present along the corridor.
Ms. Kovasckitz noted the number of crashes at the intersection of NC 1C and NC 84 have
decreased since improvements were made to the intersection as part of the NC 16 widening project.
The area around the intersection of Indian Trail-Waxhaw Road and NC 84 met the 2012 Highway
Safety Improvement Program (HSIP) "frontal impact" and "last year increase" warrants.
The propo.red project avould include i�nprovements that can be e.xpected to re.rult in cz .rafer facility.
Preliminar� Stud� Area
Ms. Kovasckitz reviewed the proposed study area, which extends from NC 16 on the western end of
the project to Indian Trail-WaXhaw Road on the eastern end of the project. The proposed study area
is 600 feet wide along the portion of the project to be widened and extends down the Y-lines 1,000
feet. At the project termini, the proposed study area extends 2,000 feet along the Y-lines, Rea Road
4
U-3467 I:xternal Scoping Meering, 11-14-12
and NC 84. The proposed study area is expanded on the western end to accommodate the TIP and
Feasibility Study alignment, as well as an "improve e�sting" alternative along NC 84.
Stud� Area Overview and Notable Features
Ms. Kovasckitz reviewed the e�sting roadway conditions and notable featuYes in the study area. She
noted existing Rea Road currently terminates at NC 16 in Weddington. Within the project study
area, Rea Road and a section of NC 16 are four-lane divided roadways with curb and gutter. NC 84
is predominantly a rural, curvilinear two or three-lane roadway with narrow, turf shoulders and some
areas with limited sight distance. The speed is 45 mph for much of the project area with reductions
to 35 mph approaching the NC 16 intersection and in the school zone for Weddington High School
from North Twelve Mile Creek Road to just west of Deal Road.
The following intersections are currently signalized: Rea Road/NC 16, NC 16/NC 84,
NC 84/North Twelve Mile Creek Road, and NC 84/ Indian Trail-Waxhaw Road. Turn lanes and
other miscellaneous widening occur at various intermittent points along NC 84 due to traffic
demands created by subdivisions and/or commercial development. Pedestrian facilities, curb and
gutter, lighting, and medians are largely absent along NC 84. Existing pedestrian faciliries are limited
to the area around the Village Commons shopping area at the intersecrion of NC 84 and Indian
Trail-Waxhaw Road, and along NC 16 from just south of Rea Road to north of the project area.
E�sting development in the project area consists largely of residential subdivisions with some
institutional, agricultural, and recreational uses. Commercial development is located at the NC 84
intersections with NC 16 and Indian Trail-Waxhaw Road. Several churches and parks are located
within the project area. Environmental Justice concerns and populations with limited English
proficiency are not anticipated.
Ms. Kovasckitz reviewed the detailed project maps and highlighted notable features in the study
area.
Figure 3B:
■ Two sites eligible for inclusion on the National Register of Historic Places (NRHP): John
Walker Matthews House, Howard Family House.
The Stratford on Providence subdivision is located across from and just south of the Rea Road
intersection with NC 16. It was first developed about ten years aga The developer provided a
50-foot buffer on the back edge of the parcels bordering the potential Rea Road corridor as well
as an easement to tie the proposed Rea Road Extension into a subdivision street (Oxfordshire
Road). It was disclosed to potential home buyers that Rea Road was going to be extended at
some time in the future. However, according to the Town of Weddington Planner, many of the
residents oppose the project. He noted that oveYall, the community thinks the project is
desirable and the project is backed by the majority of the Town Council.
Figure 3C.•
One site eligible for inclusion on the NRHP: Thomas Wrenn House, which currently serves as
Weddington Town Hall.
U-3467 I:xternal Scoping Meering, 11-14-12
Weddington United Methodist Church (LTMC) is located on ehe west side of NC 16 across from
the NC 84 intersection. Several other UMC properties, including a cemetery and a Christian
Academy are also located near the intersection.
Figure 3D:
■ There is an existing NC 84 crossing of UT to Mundys Run. A crossing of Mund��s Run is
anticipated with the proposed Rea Road Extension.
The Woods Subdivision is a proposed 265-acre development located south of NC 84 and east of
NC 1C near the western end of project. The proposed development is within the Town of
Weddington. The proposed Rea Road Extension TIP alignment would be located on, and
provide access to, this property. The developer of The Woods Subdivision has petitioned Union
County for sewer allocation to the proposed development. A local planner noted the developer
has indicated he is willing to donate right-of-way for the new location portion of the proposed
project that falls within the planned subdivision. The sewer allocation requested by the
developer would serve appro�mately 260 lots. The Town of Weddington adopted a resoluuon
in support of this request on March 7, 2011.
Figure 3E.•
There is a small private airport with one paved runway located within the Aero Plantation
subdivision. The airport is located at the southern end of the subdivision, over one-half mile
south of NC 84.
There are active agricultural fields (each less than 20 acres) located on both sides of NC 84
where the proposed alignment transitions from new location to existing NC 84.
The intersection of NC 84 and North Twelve Mile Creek Road is signalized.
Figure 3F.•
Numerous underground utilities were noted along the roadway throughout the project area
including water, sewer, gas, cable and telephone. Power poles line NC 84 and switch from side
to side depending on roadway curvature, shoulder widths and distribution of service. There is a
large power transmission tower near the roadway on the Weddington Optimist Park property.
Weddington Optimist Park is a privately-owned 52-acre facility located in the eastern portion of
the study area. Portions of the park are open to the public; however, it is not a Section 4(�
resource since the park is privately owned and no public entities have a proprietary interest in
the property. The eastern section of the park is owned by the Weddington Optimist Club and
the western portion is owned by the Wesley Chapel Weddington Athletic Association
(WCWAA).
According to the local planner, numerous loads of fill were placed in the floodplain on the east
side of the West Fork of Twelvemile Creek during the creation of the WCWAA Park. Area
residents have stated their opposition to the park, mainly due to the resultant flooding, including
overtopping of NC 84.
Mr. Militscher inquired how the flooding would be attributed to the park, in particular if the facilities
there did not result in an increase in impervious surface. Scott Cole responded he was serving in the
U-3467 I:xternal Scoping Meering, 11-14-12
role of District Engineer when the work was done and it was his understanding park developers
filled in a floodplain without a CLOMR The illegal filling caused the level of floodwaters to rise.
Stream crossings are located along this section of NC 84 at Culvert Branch and West Fork
Twelvemile Creek.
Weddington High School, Weddington Middle School and Weddington Elementary School are
located together in a joint educational compleX. These schools generate notable traffic on
NC 84, especially in the morning. Access for buses and cars to Weddington High School was
noted as a concern by the Director of Facilities for Union County Public Schools since the
school has three entrances on NC 84. According to the Director of Facilities, a total of 80 bus
trips per day access the high school from NC 84. The middle school and elementary school are
accessed from Twelve Mile Creek Road and have 60 and 20 bus trips per day, respectively, some
of which use NC 84. In addition, the car-rider line backs up onto NC 84 in the mornings,
especially in the westbound direction. According to the Town Planner, the Mayor of
Weddington has indicated that safely making a left turn into and out of the schools from NC 84
has been a growing problem.
Figure 3G:
■ A preliminary search of potential hazardous material sites identified two properties in the
southeast quadrant of Indian Trail-Waxhaw Road and NC 84: CVS (conditionally exempt small
generator) and Target (large quantity generator).
■ Siler Presbyterian Church occupies a large parcel on the northeast quadrant of Indian Trail-
Waxhaw Road and NC 84. Siler Presbyterian Recrearion Park is a small, privately-owned
recreation area located on the Siler Presbyterian Church property. Use of the facilit�T must be
approved by the church office.
■ The Shops at Wesley Chapel and Village Commons are located in and around the intersection of
Indian Trail-Waxhaw Road and NC 84 and include grocery stores, restaurants, banks, medical
offices, and a variety of other services that are used by the communiry on a daily basis. There is a
short section of e�sting sidewalk on the north side of NC 84 adjacent to the Shops at Wesley
Chapel.
■ Additional commercial property is being developed adjacent to the shopping area on the
southeast corner of NC 84 and Indian Trail-Waxhaw Road. This development is referred to as
Village Commons II and plans include a new town hall for the Village of Wesley Chapel by late
2013.
■ Proposed Dogwood Park is located on the southeast corner of NC 84 and Lester Davis Road
and would be the first community park for the Village of Wesley Chapel. The Village of Wesley
Chapel owns the 22.6-acre property and plans to develop a passive park that will feature walking
and hiking trails, an amphitheater, and a fishing pier. The Town Administrator indicates ground-
breaking will happen any time.
Ms. Kovasckitz then reviewed the Preliminary Corridor Resources Inventory Table included in the
Project Data Sheets. She noted that although the currently available GIS data layer shows West Fork
Twelvemile Creek as a 303(d) stream, it is not included on the EPA approved 2012 NC Category 5
303(d) list. A call to the DWQ Mooresville Regional Office confirmed West Fork Twelvemile Creek
should not be displayed as a 303(d) stream. Ms. Kovasckitz noted the Catawba River Basin Rules do
U-3467 I:xternal Scoping Meering, 11-14-12
not apply. However, DWQ has indicated work on the west side of NC 16 would be subject to the
Goose Creek Rule. The USFWS Threatened and Endangered Species list for Union Counry
identifies three endangered species. Preliminar�� surveys indicate habitat for Michaux's Sumac (Khu.r
michau.xii� and Schweinitz's sunflower (Helianthu.r .rchzveinit�ii� is present in the study area. Carolina
heelsplitter (La.r�nigona decorate� is also listed for Union County. There are several gas starions in the
study area.
Ms. Kovasckitz presented the potential project alternatives as shown on Figure 4. The green
alignment represents an "Improve Existing" alternative, which would involve a best-fit widening of
e�sting NC 84 in the project area. The white hatched alignment is a general representation of the
TIP alignment It would relocate NC 84 to connect with Rea Road (Rea Road Extension) and
include a best-fit widening from where it would tie in to existing NC 84 to Indian Trail — Waxhaw
Road.
It is anticipated that a boulevard-type facility with partial control of access would be constructed
within a 110-foot right-of-way. The proposed cross section includes a four-lane divided curb and
gutter facility with 12-foot inside travel lanes and 14-foot outside lanes (to accommodate bicycles), a
23-foot raised median and minimum 10-foot berms. The inclusion of sidewalks as part of the
proposed project will be coordinated with the local jurisdictions. There are currently no Safe Routes
to School projects located in the project area.
INPIJT AND DISCUSSION
Mr. Edwards asked meeting participants to provide input from their areas of expertise in regard to
the proposed project.
Input from State and Federal Resource Agencies / NCDOT PDEA
Natural S�stems
■ U. S. Fish and Wildlife Service
Marella Buncick noted the plant surveys will be particularly important for the new location portion
of the project. The ability to potentially avoid listed plants will be an important factor in choosing an
alternative. Mr. Edwards indicated biologists attempted to conduct surveys during the appropriate
window but it was his understanding severe weather had shortened the flowering period. Ms.
Kovasckitz noted potential habitat did exist for the species in the project area. Erin Cheely indicated
there was a Michaux's sumac occurrence less than a mile away, a Schweinitz's sunflower occurrence
less than two miles away and a Carolina heelsplitter occurrence less than three miles away. Ms.
Buncick reiterated it will be important to know if listed species are in the study area and to choose
an alternative that would result in the least impacts to protected species.
■ U. S. Army Corps of Engineers
Liz Hair noted the earlier statement indicating the NEPA document would cover the entire project
(all sections) and construction would be phased. Ms. Hair stated the Corps is fine with that
approach. She asked where the project was in the jurisdictional determination process and if any
wetland and stream delineations had taken place, especially within the new location corridor. Ms.
Kovasckitz noted stream and wedand delineations have not started but given the project schedule
U-3467 I:xternal Scoping Meering, 11-14-12
they would need to start as soon as possible. Information included in the scoping packet was based
on GIS data and general field observations.
■ U.S. Environmental Protection Agency
Mr. Militscher recommended the typical section, currently proposed as a partial control of access
boulevard-type facility, be evaluated to ensure it would provide safe movements at the school
complex. Consideration of a modified typical section, which might include additional turn lanes, was
suggested for inclusion in the project study given the high volume of bus trips associated with the
schools.
■ N. C. Division of Water Quality
Alan Johnson asked if the boulevard typical section was proposed for the entire length of the project
or the new location portion of the project only. Ms. Kovasckitz replied it was sti]1 early in the
process; however, the current thought is to continue the existing Rea Road typical section into and
through the project, both on the new location (NC 84 relocation) and widening portions of the
project. Mr. Johnson asked if NC 84 is relocated, would the e�sting section of NC 84 need to be
widened in the future or would it remain two lanes? Ms. Kovascl�itz noted the recent improvements
associated with the NC 16 intersection and the proposed roundabout are both located along that
segment. Greg Brew stated if an alternative including a new locarion section relocating NC 84 was
selected, then he would not anticipate widening existing NC 84 from NC 16 to where the new
location section tied in.
■ N. C. Wildlife Resources Commission
Marla Chambers noted Twelvemile Creek is home to a number of listed species including three
state-listed mussels (Villosa delumbas, Villosa constricta and Villosa vaughaniana), one of which is a
Federal Species of Concern as well as State Endangered.
■ NCDOT Natural Environment Section
Ms. Cheely indicated she did not have any additional concerns other than the listed species. All
waters within the study area are Class C.
■ N. C. Natural Heritage Program
A representative from the NC Natural Heritage Program (NHP) was not in attendance. Ms.
Chambers noted she received a communication from NHP regarding the species she listed. Stacy
Oberhausen asked Ms. Chambers to forward a copy of the communication to Mr. Edwards.
Human Environment
■ NC Historic Preservation Office / NCDOT Historic Architecture and Archaeology Groups
Mr. Edwards noted email correspondence received from Mary Pope Furr indicated there were no
particular concerns regarding historic architecture at this time. Mr. Edwards noted additional
information regarding historic resources would be requested. [Po.rt Meeting Note: A Nove�nber 30, 20 �2
lneynorandu�n froln the State hi.rtoric Pre.rervation Office provided additional information on a previou.rly recorded
U-3467 I:xternal Scoping Meering, 11-14-12
archaeological .rite �31 UN�35� and .rt�cture.r of histarzcal or architectural iynportance. The �nema noted a
co�nj�rehen.rive archaeological inve.rtigation ynay be reco�nmencled. The memo reco�n�nended NCDOT identify and
evRluate any .rtructure.r over 50 year.r of age in the project area.
■ NCDOT Public Involvement & Community Studies
Herman Huang noted that although the DSA does not meet ehe Department of Jusrice threshold in
regard to I,imited English Proficiency, some speakers of Spanish and a few other European
languages were identified there. This should be considered when planning the public involvement
process. Mr. Huang stated there is a moderate concern regarding indirect and cumulative effects for
the alternative that includes new location (relocation of NC 84) based on the project area's
forecasted population growth. A Land Use Scenario Assessment may be warranted. This will be
evaluated again after an alternative is selected and the preliminary design is available.
Jamille Robbins noted he did not have any special concerns regarding public involvement. Mr.
Robbins anticipates a Citizens Informational Workshop in early 2013 to get feedback from the
public on the study area and alternatives.
Input from FHWA / Division 10 / NCDOT
■ FHWA
Mr. Batuzich stated he did not have any comments: The concerns he identified at the Internal
Scoping Meeting were all addressed.
■ Division 10
Jennifer Harris asked if the Division had any additional information on the proposed development.
Scott Cole noted his understanding from the District Office is a commercial development may now
be under consideration for the property. John Underwood followed that he recently met with the
developer and the concept for the development is now leaning toward mixed use. The developer is
interested in working with NCDOT, both on the location of the road and through the provision of
right-of-way on the property. Mr. Cole noted a recent sketch shows the development's proposed
Main Street intersecting with existing NC 84 as it approaches NC 16. Ms. Harris noted the
configuration shown on the sketch would require traffic to travel through the development to
continue on NC 84. Mr. Underwood indicated he believed NCDOT could work through that with
the developer. He noted the developer indicated it would be important to have a new location
alignment located as close as possible to the southern property boundary closest to Oxfordshire
Road.
Mr. Cole noted NCDOT recently realigned the Weddington Church Road intersection with NC 16
to go around the church property at the western end of the study area. Ms. Harris asked if the
Division thought the study area needed to be expanded. Mr. Cole responded he did not believe
changes were needed to the study area.
■ Roadway Design Unit
Greg brew stated NCDOT is not directing municipalities in one direcrion or the other; however,
wide outside lanes are preferred in lieu of the designated four-foot bike lanes currently included in
10
U-3467 I:xternal Scoping Meering, 11-14-12
the Complete Streets Guidelines. After a decision is made about the type of bicycle accommodations
that will be provided, the presentation of that information to stakeholders and the public should be
very clear. Ms. Harris noted it will be important to make sure everyone is in agreement, particularly
with the schools located along NC 84.
■ Hydraulics Unit
Stephen Morgan indicated some work may be needed at Twelvemile Creek due to the floodplain and
overtopping in this area. Mr. Morgan indicated it would be a good time to coorclinate with the
municipalities in regard to any greenway plans near Mundys Run or Twelvemile Creek, especially as
additional hydro conveyance may be needed at Twelvemile Creek. Ms. Harris asked if there were any
known plans for greenways. Ms. Kovasckitz indicated there were no known plans at this time. She
stated the local planners had a difference in opinion about what the public's opinion would be on
the provision of bicycle and pedestrian accommodations in their jurisdicrions. She noted additional
coordination is needed to make sure everyone is in agreement Mr. Morgan indicated nothing
appears to be out of the ordinary for the project at this time.
■ Geotechnical Engineering Unit
A representative from the GeoTechnical Engineering Unit was not present at the meeting. Craig
Haden provided pre-scoping comments in an October 16, 2012 memorandum to Marshall Edwards.
■ Bicycle and Pedestrian Division
Mr. Edwards indicated he would follow up with Bob Mosher after the meeting as Mr. Mosher had a
scheduling conflict and was unable to attend.
■ Location & Surveys Unit
Mr. Bradner noted the types of utilities located in the project area were mentioned during the
presentation and he had no adclitional comments at this time.
■ Transportation Planning Branch
Anil Panicker stated the Draft Comprehensive Transportation Plan (CTP) shows existing
Weddington Road as a minor thoroughfare with no proposed improvements. The entire length of
the proposed road is shown as a boulevard cross section. Mr. Panicker noted the Draft CTP also
shows a road on new location in the northeast corner of the study area connecting Weddington-
Matthews Road to NC 16 (just north of the study area).
■ Congestion Management
Mike Reese noted the traffic forecasts do not include the proposed development as it was not
permitted at the time nor included in the modeL Mr. Reese noted Congestion Management will
coordinate with M/A/B, who will be preparing the capacity analysis for the project. Rick Baucom
stated the development is still in the concept phase and no official requests or site plans have been
submitted. Mr. Underwood agreed the development is in the concept phase. Mr. Cole noted there
have not been any commitments made to the developer regarding the road network they are
proposing.
11
U-3467 I:xternal Scoping Meering, 11-14-12
Regarding the proposed road connecting Weddington-Matthews Road to NC 16 included in the
Draft CTP, Mr. Baucom indicated he was not sure that would be needed with the roundabout going
in at Weddington Matthews Road and NC 84. Mr. Reese indicated he had been involved in some of
the early analysis and the intent of the connecting road was to relieve congestion on NC 84 between
the proposed roundabout and NC 16. Mr. Underwood noted the proposed road is something the
Town has indicated they would like to see done but it hasn't gone beyond that at this time. Mr.
Underwood agreed that with the construction of the roundabout, it may not be need to be pursued.
Input from Local Government /Others
■ Mecklenburg Union MPO
■ Union County
■ Town of Weddington
■ Village of WesleS� Chapel
Representatives from the local jurisdictions and MPO were not in attendance. Coordination with
local government representatives will continue throughout the project development process.
Mr. Edwards noted a hard copy of the packet would be sent to Merger Team members. The meeting
was adjourned.
CORRECTIONS & OMISSIONS: This summary is the writer's interpretation of the events,
discussions, and transactions that took place during the meeting. If there are any addirions and/or
corrections, please inform Marshall Edwards at medwards(a�ncdot.� or the writer in writing within
seven (7) days.
cc: Richard Black, Union County
Jordan Cook, Town of Weddington
Robert Cook, MUMPO
Renee Gledhill-Early, SHPO
Joshua Langen, Village of Wesley Chapel
Louis Mitchell, NCDOT Division 10
File 2012003.00
12
A endix C
pp
Relocation Re orts
p
U-3467 Environmental Assessment May 2015
EIS RELOCATION REPORT
North Carolina Department of Transportation
RELOCATION ASSISTANCE PROGRAM
� E.I.S. ❑ CORRIDOR ❑ DESIGN
WBS E�EMENT: 39019.1.1 COUNTY Union Alternate A2 of 5 A,A2,B,C,C2 Alternate
T.I.P. No.: U-3467
DESCRIPTION OF PROJECT: SR � 3� 6�Rea ROaCI� EXt2flSlOfl
Type of
Displacees
Residential
Businesses
Farms
Non-Profit
X
X
ESTIMATED DISPLACEES 1 INCOME LEVEL
Owners Tenants Total Minorities 0-15M 15-25M 25-35M 35-50M 50 UP
4 1 5 0 0 1 0 0
O 1 1 O VALUE OF DWELLING DSS DWELLING AVAILABLE
0 0 0 0 Owners Tenants For Sale For Rent
� 1 1 Q 0-20M Q $ 0-150 � 0-20M � $ 0-750
ANSWER ALL QUESTIONS 20-40M Q 150-250 Q 20-40M Q 150-250
Explain all "YES" answers. 40-70M � 250-400 � 40-70M � 250-400
1. Will special relocation services be necessary? 70-100M � 400-600 Q 70-100M Q 400-600
2. Will schools or churches be affected by 100 uP 4 600 uP p 100 uP 25 600 uP
displacement? TOTAL 4 1 25
3. Will business services still be available REMARKS (Respond by Number)
after project? 3. Businesses will still be available in the area.
4. Will any business be displaced? If so, 4. YMCA fitness center & AT&T retail store located as tenants
indicate size, type, estimated number of In (1) structure —$620,000 — Total 5000 sq. ft. storefront.
employees, minorities, etc.
5. Will relocation cause a housing shortage? YMCA — 5000 sq. ft. — 10 employees — 2 minority
AT&T — 2500 sq. ft. — 10 employees — 2 minority
6. Source for available housing (list).
7. Will additional housing programs be needed? 6. MLS, Newspaper, Realtor, Real Estate publications, Internet
8. Should Last Resort Housing be considered?
9. Are there large, disabled, elderly, etc. 8• As required by law.
families? 11. Union County has public housing.
10. Will public housing be needed for project? 12. Based on current market, housing & storefront business
Locations should be available.
11. Is public housing available?
12. Is it felt there will be adequate DSS housing
housing available during relocation period?
X 13. Will there be a problem of housing within
financial means?
14. Are suitable business sites available (list
source).
15. Number months estimated to complete
RELOCATION? 24 months
ht of Wav Aaent
FRM 15-E
Revised 7/7/14
12-17-14
Date
14. MLS, Newspaper, Realtor, Real Estate publications,
Internet
*'`NOTE**
4
0
0
�
5
15
20
• Possible 4-F exchange needed due to proposed
acquisition on 2 balifields owned by Weddington Optimist
Park.
Relocation Coordinator
12/29/14
Date
EIS RELOCATION REPORT
� E.I.S. ❑ CORRIDOR ❑ DESIGN
WBS E�EMENT: 39019.1.1 COUNTY Union
T.I.P. No.: U-3467
North Carolina Department of Transportation
RELOCATION ASSISTANCE PROGRAM
Alternate C2 of 5(A.A2.B.C.C2) Alternate
DESCRIPTION OF PROJECT: SR � 3� 6�Rea ROaCI� EXt2flSlOfl
Type of
Displacees
Residential
Businesses
Farms
Non-Profit
ESTIMATED DISPLACEES
INCOME LEVEL
Owners Tenants Total Minorities 0-15M 15-25M
4 1 5 0 0 1
O 1 1 O VALUE OF DWELLING
0 0 0 0 Owners Tenants
0 1 1 0 o-2oM Q $ 0-150
ANSWER ALL QUESTIONS 20-40M Q 150-250
Explain all "YES" answers. 40-7oM p 250-400
1. Will special relocation services be necessary? 70-100M p 400-600
2. Will schools or churches be affected by 100 uP 4 600 uP
displacement? TOTAL 4
3. Will business services still be available
after project?
4. Will any business be displaced? If so,
indicate size, type, estimated number of
employees, minorities, etc.
5. Will relocation cause a housing shortage?
6. Source for available housing (list).
7. Will additional housing programs be needed?
8. Should Last Resort Housing be considered?
9. Are there large, disabled, elderly, etc.
families?
10. Will public housing be needed for project?
11. Is public housing available?
12. Is it felt there will be adequate DSS housing
housing available during relocation period?
13. Will there be a problem of housing within
financial means?
14. Are suitable business sites available (list
source).
15. Number months estimated to complete
RELOCATION? 24 months
ht of Way Aqent
FRM 15-E
Revised 7/7/14
12-17-14
Date
25-35M 35-50M 50 UP
0 0
DSS DWELLING AVAILABLE
For Sale For Rent
� 0-20M � $ 0-750
Q 20-40M Q 150-250
Q 40-70M � 250-400
Q 70-100M Q 400-600
Q 100 uP 25 600 uP
1 25
REnnarzKs (Respond by Number)
3. Businesses will still be available.
4. YMCA fitness center & AT&T retail store located as tenants
In (1) structure —$620,000 — Total 5000 sq. ft. storefront.
YMCA — 5000 sq. ft. — 10 employees — 2 minority
AT&T — 2500 sq. ft. — 10 employees — 2 minority
6. MLS, Newspaper, Realtor, Real Estate publications, Internet
8. As required by law.
11. Union County has public housing.
12. Based on current market, housing & storefront business
Locations should be available.
14. MLS, Newspaper, Realtor, Real Estate publications,
Internet
**NOTE**
4
0
0
�
5
15
20
• Possible 4-F exchange needed due to proposed
acquisition on 2 balifields owned by Weddington Optimist
Park.
r' �
�.�.�--
Relocation Coordinator
12/29/14
Date