Loading...
HomeMy WebLinkAboutNC0084638_Compliance Evaluation Inspection_20170508t. .y ROY COOPER . Governor MICHAEL S. REGAN Secretary Water. Resources S. JAY ZIMMERMAN Environmental. Quality Director May 8, 2017 RECEIVEDINCDEWWR Mr. Michael Shatynski MAY 15'' 2017 Solvay, USA, Inc. 8 Cedar Brook Drive , Water Quality Cranberry, New Jersey 08512 Permitting Section Subject: Compliance Evaluation Inspection Rhodia Groundwater Remediation System NPDES Permit No. NCO084638 Gaston County . , Dear Mr. Shatynski: Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on May 5, 2017, by Edward Watson and. Ori Tuvia. The MRO would like to thank Mr. Teg Williams and Mr. Scott Smida for their assistance during the site visit. A copy of the report is attached. The report should be self-explanatory. However, should you have any questions regarding this report, please do not hesitate to contact me. I may be reached by phone at (704) 235-2198 or email edward.watson@ncdenr.gov. Sincerely, Edward Watson, Hydrogeologist Mooresville Regional Office Water Quality'Regional Operations Section Division of Water Resources, NCDEQ Attachment: Inspection Report CC:. NPDES (Derek Denard) MRO Files State of North Carolina I Environmental Quality I Water Resources 1 Water Quality Regional Operations Mooresville Regional Office 16 10 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 704-663-,1699 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (Le, PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 IF I 3 I NCO084638 I11 12 17/05/05 j17 181 r• I 19 I G I 20L 21111111 111111111II1IIIIII i lilii) I I I I I I I I I I [_f6 eserved-----------_-_-- Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA --- ----------- — ---- Reserved---------------- 67 1.0 70 711 72 .73LiJ74 7 67L LJ tyl80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10:10AM 17/05/05 16/05/01 Rhodia remediation site 207 Telegraph Dr Exit Time/Date Permit Expiration Date Gastonia NC 280561306 11:30AM 17/05/05 20/08/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Scott Alan Smida/ORCR04-543-3286/ Name, Address of Responsible Official/Title/Phone and Fax Number Michael Shatynski,8 Cedar Brook Dr Cranbury NJ 08512//732-516-1104/6098602203 Contacted. , No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) . . Permit Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran Facility Site Review Compliance Schedules Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Edward Watson MRO GW/// Ori A Tuvia MRO WQ//704-663-1699/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. I '?w Page# 1 NPDES yr/mo/day Inspection Type (Cont.) 1 31 NP0084638 I19 '121 17/05/05 17 18 Section D: Summary of Finding/Comments (Attach additionalsheetsof narrative and checklists as necessary) The recovery well next to the treatment system was reviewed during the inspection. The well was in good order. The MW -23A broken hinged was reported to be repaired. However, the wells were not reviewed during the site visit._ It is expected that the system will be shut down to observe rebound of the treated area. The GW monitoring wells would be sampled to observe rebound and therefore indicate if remediation has been completed to an acceptable level. If it has been determined that system be turned off is warranted, the permittee will request permit rescission. The rebound study will be for the period of one year. The MRO has requested that we be kept informe, of any decisions made that would affect the permitted treatment system, so that we are made aware if the. permit will a rescinded, or if the system will be turned back on for futher remediation. The MRO is also aware the system start-up may affect Chronic Toxicity testing negatively during system start up due to chemical build-up that could occur during the rebound study period. Page# Permit: NCO084638 Owner- Facility: Rhodia remediation site Inspection Date: 05/05/2017 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new M ❑ ❑ ❑ application? I - Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? ❑ ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? M ❑ ❑ ❑ Comment: The permit was present and available to be reviewed during the site visit. Teg Williams of CH2MHi11 commented that they were considering shutting down the system to monitor site rebound as part of a possible permit rescission. It was requested by MRO DWR that we be kept in communication with the DWM regarding correspondence for system closure so we are made aware that the permit was able to be rescinded. Compliance Schedules Yes No NA NE Is there a compliance schedule for this facility? ❑ M ❑ ❑ Is the facility compliant with the permit and conditions for the review period? M ❑ ❑ ❑ Comment: All systems were operating within the scope of the permit. Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? 0 ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? M ❑ ❑ ❑ (If units are separated) Does the.chart recorder match the flow meter? M ❑ ❑ ❑ Comment: Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? M ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable M ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment:- Operations and maintenance records werre observed during the site visit. The records are in good order. Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Are all other parameters(excluding Feld parameters) performed by a certified lab? ❑ N ❑ ❑ Page# 3 r Permit: NCO084638 Owner -Facility: Rhodia remediation site Inspection Date:-- 05/05/2017 Inspection Type: Compliance Evaluation Laboratory "" ' Yes No NA NE # Is the facility using a contract lab? 0 ❑ ❑ ❑ - # Is'proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? -Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ N ❑ Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ N ❑ Comment: ETS is performing Chronic Toxicity testing. Prisms Labs are performed analytical testinq for the chlorinated solvents. The ORC performs PH calibrations on site prior to sampling fig led parameters. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained?, N ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? M ' ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? M ❑ ❑ ❑ Comment: Effluent discharge was observed. No foams solids or odors were present. i Page# 4