HomeMy WebLinkAbout20081379 Ver 1_More Info Received_20080919o8- 1319
KE
KELLER ENVIRONMENTAL
ENVIRONMENTAL CONSULTANTS
September 15, 2008
James Lastinger
US Army Corps of Engineers
Raleigh Regional Office Unit
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
Cyndi Karoly
NC Division of Water Quality
401 Wetlands WQ Certification
1650 Mail Service Center
Raleigh, NC 27699-1650
Re: Grace Haven Baptist Assembly
Proposed Stream Crossings
Franklin County, North Carolina
DWQ Project # 08-1379
sEP 1 s Zoos
DENR - WATER QUALITY
WETLANDS AND STORMWATER BRANCH
Dear Mr. Lastinger & Ms. Karoly:
Thank for your assistance and DWQ staff assistance with this project. We are submitting the
following information for Grace Haven Baptist Assembly regarding our phone conversation
this past Friday (September 9/12/08) with Mr. Lastinger. We are requesting for Corps of
Engineers (COE) and NC Division of Water Quality (DWQ) written approval under Sections
404 and 401, Clean Water Act, 33 USC 1344 and the Tar-Pamlico River Buffer Rules.
The following information pertains to the existing first (east) stream crossing and the area to
the west of the existing second (west) stream crossing.
Existing first (east) stream crossing - There is an existing culverted stream crossing on
the first (east) stream. This crossing is approximately 100-feet south of cedar creek.
Plans for this crossing in the immediate future are for it to remain. It will be used for
future construction traffic to prevent damage to the new road. Upon completion of the
future projects, it will be removed.
West area- There is a large upland area to the west of the second (west) existing stream
crossing. This area is currently being used as a recreation area and has a large network
of maintained trails. The proposed road end lines up with one of the existing trails.
Grace Haven currently provides worship and bible study services at Youngsville
Elementary School. Future plans are to construct a building in this large upland area
and provide these services on this site. Details of these plans are not known at this
time.
Grace Haven Baptist Assembly
Proposed Stream Crossings
September 15, 2008
Page 2 of 2
If you should have questions or require additional clarification during the review please
feel free to contact me immediately at (919)844-7437 (office), (919)749-8259 (cell) or email:
jay@kellerenvironmental.com
Sincerely,
Keller Environmental, LLC
Jay Kellen
Principal
Cc: Lauren Witherspoon; DWQ Raleigh Regional Office
Attachments: Grace Haven Cover Plan
fl8- 13`) q
a 11
a !
? 99 gg k
gaaEyā€˛ ? l
e800I _
See. ze?aagiia o 0 1 C I
t
c
???
6{?yd¦ ? d?> ax?1i
ae
?97F§Bg3?? a CCRAilflp
I .
4
J
!
( I
i
I I
r'
I `
I
----- ----- - -
lo
l 6 t ''
? 3=
,i
i.
M,jj
n
I
go
w
m
N
U
FZ
W
O
W
m ? 3
0
m
d
ra
C1
ul
rn
n
n
rr
rc
a
0
\\
?I
:i
li.
\l\ 1\
a
m -
? n
Q
H
o r
N
II
Q
o
w o
a ?
rr
F ?
0 0 5
a
a
W
U
Z
Q
a
m
cn
O
2
W
z
X
O
Q
U