Loading...
HomeMy WebLinkAbout20081379 Ver 1_More Info Received_20080919o8- 1319 KE KELLER ENVIRONMENTAL ENVIRONMENTAL CONSULTANTS September 15, 2008 James Lastinger US Army Corps of Engineers Raleigh Regional Office Unit 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Cyndi Karoly NC Division of Water Quality 401 Wetlands WQ Certification 1650 Mail Service Center Raleigh, NC 27699-1650 Re: Grace Haven Baptist Assembly Proposed Stream Crossings Franklin County, North Carolina DWQ Project # 08-1379 sEP 1 s Zoos DENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH Dear Mr. Lastinger & Ms. Karoly: Thank for your assistance and DWQ staff assistance with this project. We are submitting the following information for Grace Haven Baptist Assembly regarding our phone conversation this past Friday (September 9/12/08) with Mr. Lastinger. We are requesting for Corps of Engineers (COE) and NC Division of Water Quality (DWQ) written approval under Sections 404 and 401, Clean Water Act, 33 USC 1344 and the Tar-Pamlico River Buffer Rules. The following information pertains to the existing first (east) stream crossing and the area to the west of the existing second (west) stream crossing. Existing first (east) stream crossing - There is an existing culverted stream crossing on the first (east) stream. This crossing is approximately 100-feet south of cedar creek. Plans for this crossing in the immediate future are for it to remain. It will be used for future construction traffic to prevent damage to the new road. Upon completion of the future projects, it will be removed. West area- There is a large upland area to the west of the second (west) existing stream crossing. This area is currently being used as a recreation area and has a large network of maintained trails. The proposed road end lines up with one of the existing trails. Grace Haven currently provides worship and bible study services at Youngsville Elementary School. Future plans are to construct a building in this large upland area and provide these services on this site. Details of these plans are not known at this time. Grace Haven Baptist Assembly Proposed Stream Crossings September 15, 2008 Page 2 of 2 If you should have questions or require additional clarification during the review please feel free to contact me immediately at (919)844-7437 (office), (919)749-8259 (cell) or email: jay@kellerenvironmental.com Sincerely, Keller Environmental, LLC Jay Kellen Principal Cc: Lauren Witherspoon; DWQ Raleigh Regional Office Attachments: Grace Haven Cover Plan fl8- 13`) q a 11 a ! ? 99 gg k gaaEyā€˛ ? l e800I _ See. ze?aagiia o 0 1 C I t c ??? 6{?yd¦ ? d?> ax?1i ae ?97F§Bg3?? a CCRAilflp I . 4 J ! ( I i I I r' I ` I ----- ----- - - lo l 6 t '' ? 3= ,i i. M,jj n I go w m N U FZ W O W m ? 3 0 m d ra C1 ul rn n n rr rc a 0 \\ ?I :i li. \l\ 1\ a m - ? n Q H o r N II Q o w o a ? rr F ? 0 0 5 a a W U Z Q a m cn O 2 W z X O Q U