HomeMy WebLinkAbout20150717 Ver 1_Staff Notes_20170407Strickland, Bev
From:
Homewood, Sue
Sent:
Friday, April 07, 2017 12:03 PM
To:
'Cahoon, Steve'
Cc:
Montalvo, Sheri A
Subject:
RE: Dan River 36 inch Pipe; SAW -2014-01447
Steve,
I have spoken with the Central Office and you can submit both applications electronically but you'll have to send the
check via mail (or in person). Here's what you need to do separately for each project:
Go to this link and submit the PCN and associated documents, you'll reference the DWR# for each project (20150717 for
the 48" culvert and 20140694 for the 36" culvert). For each one this application will be Version 2
Once you've done that send the check to our Central Office, attention Sheri Montalvo and reference the above DWR#
and Version 2. She'll log the check's in and let me know. Once we have all the documents and the checks then I can
issue new 401 approvals to match up with the USACE re -verifications.
Let me or Sheri know if you have any questions/concerns.
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.
-----Original Message -----
From: Cahoon, Steve [mailto:Steve.Cahoon@duke-energy.com]
Sent: Monday, April 03, 2017 3:36 PM
To: Homewood, Sue <sue.homewood@ncdenr.gov>
Cc: Bailey, David E CIV USARMY CESAW (US)<David.E.Bailey2@usace.army.mil>
Subject: RE: Dan River 36 inch Pipe; SAW -2014-01447
Okay great thanks.
Steve
1
-----Original Message -----
From: Homewood, Sue [mailto:sue.homewood@ncdenr.gov]
Sent: Monday, April 03, 2017 3:34 PM
To: Cahoon, Steve
Cc: Bailey, David E CIV USARMY CESAW (US)
Subject: RE: Dan River 36 inch Pipe; SAW -2014-01447
*** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from unknown senders or
unexpected email. ***
Steve,
Since these approvals are technically "new" verifications under the new Nationwide Permits (even if nothing has
changed), you will need to submit a new application and fee for issuance of a new 401. 1 think we might be able to
handle this electronically, except for the fee's. I'll look into that.
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.
-----Original Message -----
From: Bailey, David E CIV USARMY CESAW (US)[mai Ito: David. E.Bailey2@usace.army.mil]
Sent: Monday, April 03, 2017 2:33 PM
To: Cahoon, Steve <Steve.Cahoon@duke-energy.com>
Cc: Homewood, Sue <sue.homewood@ncdenr.gov>
Subject: RE: Dan River 36 inch Pipe; SAW -2014-01447
Steve,
I have attached the Nationwide Permit 18 re -verification including Special Conditions and terms and conditions for the
above referenced project to this email. Please let me know if you have any questions or would like a hard copy mailed
to you.
Sincerely,
Fil
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE -SAW -RG -R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David. E.Bailey2@usace.army.miI
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message -----
From: Cahoon, Steve [mailto:Steve.Cahoon@duke-energy.com]
Sent: Monday, March 27, 2017 10:10 AM
To: Bailey, David E CIV USARMY CESAW (US)<David.E.Bailey2@usace.army.mil>
Subject: [Non-DoD Source] Dan River 36 and 48 inch Pipes
David,
Per our discussion last week, Duke Energy received permits in September 2014 for work associated with a 36" pipe and
in 2015 for work associated with a 48' inch pipe. The intention of the projects were to keep uncontaminated
stormwater from entering the ash basin and pump the stormwater collected at these pipes to a stormwater outfall. The
project is continuing pumping/drawdown activities, both of these projects were approved under the Nationwide Permits
that expired on March 18, 2017. There have been no changes associated with these projects, they continue to operate
as permitted. They will continue to operate in this mode until closure activities progress far enough into the future that
they can be directly routed to a stormwater outfall, or until a new outfall can be established specifically for stormwarter
runoff from these areas. Based on the current timeline for ash basin closure rerouting of the stormwater, or
establishing a new outfall should be completed by 2022. Duke Energy request's these projects be reauthorized under
the new Nationwide permits. Below are the Action ID numbers for the permits that have expired on projects still in
progress.
Permits that require request for reauthorization to continue pumping/draw-down activities as permitted
48" - SAW -2015-01670 - Expiration 3/18/17
36" - SAW -2014-01477 - Expiration 3/18/17
Please let me know if you need any further information or have any questions.
Thanks,
Steve
Steve Cahoon
Duke Energy
EHS - CCP Permitting and Compliance
Office - (919) 546-7457
Cell - (919) 632-0129
steve.cahoon@duke-energy.com