Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20170537 Ver 1_Revised Mitigation Plans_20170517
.. urfldkS r J•Iry � RV 1 L 2 PROJECT SITE S1reAland Cross Wads ,C—read, u' • r o,oNn a arvoxzo,sm�� ro „o IiT.P`�c VICINITY MAP NTS 811. Know what's below. Call before you dig NOTICE TO CONTRACTOR PRIOR TO CONSTRUCTION, DIGGING, OR EXCAVATION THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES (PUBLIC OR PRIVATE) THAT MAY EXIST AND CROSS THROUGH THE AREA(S) OF CONSTRUCTION, WHETHER INDICATED ON THE PLANS OR NOT. CALL "811"A MINIMUM OF 72 HOURS PRIOR TO DIGGING OR EXCAVATING. REPAIRS TO ANY UTILITY DAMAGED RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. REV RECORD: BY I DATE I DESCRIPTION REV RECORD: BY I DATE I DESCRIPTION HANNAH BRIDGE STREAM MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DW LOWER HANNAH CREEK: HUC 030202011302 JULY 2016 RESOURCE ENVIRONMENTAL SOLUTIONS, LLC 302 JEFFERSON ST, SUITE 110 RALEIGH, NC 27605 DL'/G S7Q /A HORIZ. 1 inch = 300%. DRAWING LIST TABLE DRAWING NUMBER DRAWING TITLE 1 COVER Al OVERALL AERIAL E1 EXISTING CONDITIONS INDEX E2 EXISTING CONITIONS E3 EXISTING CONITIONS S1 REACH HB S2 REACH HB S3 REACH HIS S4 REACH HB S5 REACH HB S6 REACH HB S7 REACH HIS S8 REACH HB S9 REACH HB S10 REACH HB S11 REACH HF1 S12 REACH HF1 S13 REACH HF1 S14 REACH TH3 S15 REACH TH3 W1 WETLAND ENHANCEMENT W2 WETLAND ENHANCEMENT F1 FENCING PLAN P1 PLANTING PLAN P2 PLANTING PLAN M1 MONITORING PLAN D1 DETAILS D2 DETAILS D3 DETAILS D4 DETAILS D5 DETAILS D6 DETAILS PROFESSIONAL SEAL E O 8 0 OZYSOZ OWz N�m J Zm Ooio Y r- �E ¢0_ a � w U Z O o d i U ro o `D N m LL Z w w !;E C) C> a C) Ci 1-- 0 U LU O z � J �O Z cr O Q H U C.7 � H CC O z Q � W Z OZ Z u~, O LL, O c'S z 00 m � z S 2 Q w z O � Z z Q w 0 cr W 0 U z Z 3 0 w m T � a Z z Q 2 O D a WKD PROD. NO.: 2015020500 �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v)919.782.0495 (t) 919.782.9672 www.wkdickson.com NC. UCEN5E NO —74 FULL SCALE: 1"=200 0 200 400 2" = FULL SCALE y 1" = HALF SCALES 16ILL z PROJ. DATE: FEB 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: Al PROJ. NO.: 2015020500 lii o $ O � � a a z 0 U Z O z � O � O � F � o O �r uj Z � F O W. U ILL p Z o z� o_a �g � U w N O H J Z Z � to � Z � w z w ¢ Q � Q U o � J � w w H U) O W `� ti p LU U (7Z > O F� m az Y N _F W I ¢ ¢ a U ILL p Z o z� o_a �g � U w N O H J Z Z � to � Z � w z w ¢ Q � Q U o � J � w w H U) O W `� ti p LU U (7Z > O F� m az g 0CO �� rn Oz w Lij = Z �Q 0 J O e� =w N ZZ Z Z � tN W S I 3 Er W W W W z ¢z- mo m O a D ¢ate �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v)919.782.0495 (t) 919.782.9672 www.wkdickson.com NC. UCEN5E NO —74 FULL SCALE: 1"=200 0 200 400 2" = FULL SCALE y 1" = HALF SCALES LU PROJ.DATE: �FEB2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: E1 PROJ. NO.: 2015020500LUo $ O � � a a z 0 U Z O z cc O O � � F to o O �r uj Z U F W. U h U y ILL! � Q O Z �_ o 5 � J Z � W y � $ OQ 0 zN �U Z �c� cc Z ZO s Z !Z:Z U o Q LL1 Z 0 y w w w � W O Z U z a 0 F- U)w Y N _F W Lij W I ¢ ¢ a U h U y ILL! � Q O Z �_ o 5 � J Z � W y � $ OQ 0 zN �U Z �c� cc Z ZO s Z !Z:Z U o Q LL1 Z 0 y w w w � W O Z U z a 0 F- U)w F O o Fr It—X CO CD Lij W O U °r w `Y � Z z¢ C) � i-- Z� U Z c7 Z ,y Im ¢m..w � Q 3 w www z ¢zm O O O a ¢ate UUYYHIUH 1 (9, W.K. UIUKSUN 5 (:U., IND. ALL HIGH 15 RESERVED. HEHHUUUU I ION UH USE OF I HE UUN I EH 18 OF 1 HIS UUUUMEN I; AUDI I TUNS UH VELE I IONS I U I HIS UUUUMEN I, IN WHOLE UH IN PAH I, WI I HUD I WHI I I EN UUNSEN I OF W.K. DICKSON 6 (:U., IND., IS YHUHItlI I U. ONLY UUPIES -HUM I HE UHIUINAL OF I HIS UUUUMEN I, MARKED WI I H AN UHIUINAL SIUNAI UHE AND SEAL SHALL BE UUNSIUEHEU I U BE VALID, I HUE OUPIES. FILE NAME: OFILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA-Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA SHT EXIST COND.dwg - Apri126, 2017- Ben Car 11 Environmental Solutions\2015020500RA-Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA SHT EXIST COND.dwg -April 26, 2017- Ben Carroll �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v)919.782.0495 (t) 919.782.9672 www.wkdickson.com NC. UCEN5E NeF 74 FULL SCALE: V=100 0 100 200 2" = FULL SCALE y 1" = HALF SCALEI H PROJ. DATE: FEB 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: E2 PROJ. NO.: 2015020500 � � N I- N O a a Z O U H Z O z cLL c U U N w I O � Q O EUGENE A. LEE DB S ELZ 0 EL Z � 519, PG 506 ~ U C')w z z 'U� Z _o ,x � 0 Z w ¢ c� Z 0 � O EIS r z O �r (n 0 W V (n HPC, •I A A A �- I LANDMARK LEGACY, LLC- DB oQQf W X w z > I- N o ow m e2 3332, PG 668 PB 10, PG 133 � !ILI == °C , N w z a p H Z� � CS' N M A yIm U Z CONTROL POINT' 24" RCP �' Q �. 1 \ C'� N=593.138.0142' SW INV=125.09 E=2.112,54].5539' ' / r W wluw Z ¢Z - � O a NE INV- ELEVATION \ ELEVATION=139 88' HO \ E \ \\ \ \\ \I \\ EIP `0 ���Qy��Py� THOMPSON, JR_ ' V A :`\�\(ELP�HP6MP THOMPSON DB _ PG 723 i °o' V 1111 4' 0, PG 437 P ElEl \ ` I Icy Im m I \ CO mCONTROL POINT I \ N 593.085.5440' _ I A A L E=2,172,898 9773' NAHUM MADRID �\ ELEVATION --126.80' / I I Z - - CRISTINA MADRID - REACH HB1 DB 3807, PG 14 '--.�' I DENNIS RAY WILLIAMS, JR. SHEA WILLIAMS DB 4075, PG z .� . . ; 294 - - \ WANDA L. MASSENGILL PB 36, PG 67 - - _ `` _I , 1 IP - E _ IP D�AAVID GARCIA ANDEZ LETIC A EZQUITA VALDOVINOS DB 291 - 711.-==y=7�- - M AL - , I' _�N� .- �C3'LZ PB 66, PG 247 � DING II \1 r t I IIS 1\ o+ Too REACH HF1 J y } DENNIS RAY WILLIAMS, 2200, PG 667 PB 59, PG 108 C.P. THOMPSON, JR. ddd Is o l \,\ l 1 63 ���Y�. v. '..,� J . EVELYN H. , PIG 75 ON DB 1 4„PVC ' ` . �GEIIP 832. PG 75 V-132. _-_ NW IN 56 TERESA LEE BLB 36, PG 7, ((II 1235, PG 718 PB 36. PG 6T'/ n_ - -_ - J rt pp Iri 0 / • . .. Q b �Y�� /' '�'-. Y3.Q � � _ �' a ' SE INV 131 45- EIP \ 4 _ \ ° � �:} �o � .a � � � Els' � �' �. i i' �, Is - � •� ��,®,{�. no © �• _ fi1 '1. na '�nE+3' d 'i. .6f© �-/-�V 'i � Q',, © .�63 {8. Q © £•3 - ..'I. \ \ \ C.P. THOMPSON. JFK' VELYN H THGMPS0 t4 [ �'T \\ '��7i •® 832 PG 75 r3D E I _ X�Oi'll - __ _- � `C` _IDS gy�y`d J pEVENCIO 1\ I } .\ ', 7AVALET DE 4, PPG 614 P' SHERRY M DIXON SHELIA MASSENGI LL DB 4659, PG 193 PB 36, Pc 67 � II � o-” -r �i � k ®., 1 I . 1 v � I � m � d� I : j V J & M HOG FARM, INC. DB 1316, PG 140 PB 35, PG 265 J & M HOG FARM, INC. DB \ t 1316, PG 140 PB 35, PG 265 / r6) CONTROL POINT N=592,683.1338'�' /W/ I r,. •� �Ig (�'. / E=2,173.625.3896' %1 ELEVATION=146.15' n €. . ' \ :� :dg LEGEND EXISTING CONTOUR MAJOR - _50- 50-15 15" CPP -� NW INV -136,98 . ^ jQ ;_ .© �` \ EXISTING CONTOUR MINOR 46 - - - - SE INV=131.59 "_ - !3 -- O� • 63 EXISTING TOP OF BANK - - - - TB J EXISTING BOTTOM OF BANK ----gg Q EXISTING CHANNEL CENTERLINE REACH HB2 EXISTING FENCELINE X—XX .�\ ®rgr EXISTING TREELINE TON JR.LOIS ET. B12'S.P T. JOHN ON DB 1218, PG 278 PB JOH EXISTING WETLAND D EIS 35, PG 265 EXISTING TREE ���r��•',;VV�`ry��� "'LLLJJJLLLTTT 'VLT UUYYHIUH 1 (9, W.K. UIUKSUN 5 (:U., IND. ALL HIGH 15 RESERVED. HEHHUUUU I ION UH USE OF I HE UUN I EH 18 OF 1 HIS UUUUMEN I; AUDI I TUNS UH VELE I IONS I U I HIS UUUUMEN I, IN WHOLE UH IN PAH I, WI I HUD I WHI I I EN UUNSEN I OF W.K. DICKSON 6 (:U., IND., IS YHUHItlI I U. ONLY UUPIES -HUM I HE UHIUINAL OF I HIS UUUUMEN I, MARKED WI I H AN UHIUINAL SIUNAI UHE AND SEAL SHALL BE UUNSIUEHEU I U BE VALID, I HUE OUPIES. FILE NAME: OFILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA-Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA SHT EXIST COND.dwg - Apri126, 2017- Ben Car 11 Environmental Solutions\2015020500RA-Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA SHT EXIST COND.dwg -April 26, 2017- Ben Carroll �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v)919.782.0495 (t) 919.782.9672 www.wkdickson.com NC. UCEN5E NeF 74 FULL SCALE: V=100 0 100 200 2" = FULL SCALE y 1" = HALF SCALEI H PROJ. DATE: FEB 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: E2 PROJ. NO.: 2015020500 � � N I- N O a a Z O U H Z O z cLL c U U N w O � Q O S ELZ 0 EL Z � z $ ~ U C')w z z 'U� Z _o ,x � 0 Z w ¢ c� Z 0 � O ¢ w r z O �r (n 0 W V (n O Y N oQQf W X w z > I- N o ow m U U N w O � Q O S ELZ 0 EL Z � z $ ~ U C')w z z 'U� Z _o ,x � 0 Z w ¢ c� Z 0 � _d c`3 � w w w. (n 0 W V (n F ti o a (Dz DO X w z > I- N o ow m e2 � Z � !ILI == °C , N w z a p H Z� � CS' N M A yIm U Z Z W wluw Z ¢Z - � O a ¢ate RONALD GREG THOMPS< 1226, PG 509 PB 35, PG N/F EARNESTINE BENDER REACH .......... C P THOMPSON, JR E ELY N Hl THOMPSON DBS. j832,PO 75, - .. 6 V/. RCP/` . . HE INV 12693 . - - JAMES KEVIN MASSENGILL JAMES BRYSON MASSENGILL DS 3938, PG 696 N/F EARNESTINE BENDER \ - 1 "o ae = ..NMAH CREEK C.P. THOMPSON, JR. EVELYN H.. THOMPSON DB ����,gy-�����•� - N• M , NW IN 119.65 1432PG 212 BE INV 19.69 C. HOMPSON, JR. EVFLY H. TPIS 723 NDB �SW IMV i,�B 25' -.�� � � \ x— X- X� '� — \!.'" 3633, PG 723 ° �0 t� CONTROL POINT — — �. _ II N=594,822.2581' �- -`V A _E=2.173,9441695' / \ X ELEVAT,IQN 122]9' Ni@QL POINT _ N 594 976.4499�9 /y1 x a ELEVATION 11991 I \r hv1 JAMES KEVIN MASSENGILL JAMES BRYSON MASSENGILL DB C.P. THOMPSON JR. _ �"✓� ` 3938, PG 698 EVELYN H. THOMPSON DB C.P. THOMPSON, JR. \ I 3633, PG 7.EVELYN H THOMPSON DS 3633. PG 723_ /C.P. THOMPSON, J . f '� REACH HB4 _g }EVELYN H. THOMPSO N DS 832, PG 75 y� Q 'ErP Q I C.P. THOMPSON, JR. EVELYN H. THOMPSON DS 832, PG 75 24" RCP - - —_TB \1 NE INV=110.50 x I \) REACH HB3 SW INV=111.38 I�p 12" CPP �k I } EN EIPWINV=111,77 CONT04ROL POINT ® ' . \ EINV=111,83 — _ N 50671240 11 6� '"-X `� �'' \X_Y, � -JE 21748431408 - - JOSEPEE k \k x "}- _ _ 1 _ — _ _ _ ELEVATION 11495 C. BEASLEY DB EVE - J �_ �___ - - INv=119]6 V f 10 \ - "� 00 I -z4• P 1163, PG 644 �\ _ sa ♦ 1 Z/+VALE DB _ 36 RCP 1 \ \ ��e ` '� e ' 7 r SW INV=111.06 4164, ;PG 61 B \ ., IP / � / WINV=12469_ } \\ - '\' ' F3 67,'RG 43 EINV=124 58 '� X I \ W CPP �l 1 . \\.. ` nW Tg ✓ - _ 15" RCP E INV-1NV=1111166 EIP 1 ���' �� .l / 1CONTROL POINT r,// I \ WINV 113.10 O VZ2 N-592,886.6797 V NE INV 113.73 E2,nas11.516a EUGENESTEWART U / ELEVATION=12333 I ' 12"MPj _ LAURA A. STEWART NW INV =116.44 ,: g� DS 656, PG 553 SE INV 116.08 �� \ 15' RCP 1 '- — gy ` p " �� — — EARL BENTON JOHNSON, JR. LOIS EIP SW INV=123.84 _ o+f r ti — - NE INV=123x3 / _ -� + 0 I C3 T. JOHNSON DB 1218, PG 278 PB - +00 �g—++o4 s �. � / / -- — — 3 35, PG 266 �1 EARL JOHNSON IJOHNSON, 27 LOIS T. JOHNSON DB 1218, PG 278 PB EI �. 35, PG 265 REACH HB2 ...{.... EXISTING CONTOUR MAJOR — . . . . . . . . — . N W Q Q —. .r, - - I. .l .I I. EXISTING CONTOUR MINOR C.P. THOMPSON, JR.., - - .-� z� EIR, �— t . C.PTHOMPSON, JR. EVELYN H. THOMPSON DB - ` EVELYN H. THOMPSON DB 3633, PG 723 _ - _ - ' _' ' _ ./' -' _' w� r 1432, PG 212 �Z Z ow w ¢ ti O H-� W � � EXISTING FENCELINE :P: THOMPSO W Y N EUGENE STEWART W EV LYN.H: THOM SON DS - I' ' . �_ f. f / LAURA A. STEWART EXISTING TRE LINE _ 3633, PG 23 ,,— tit Eia.,, DB 656, PG 553 EXISTING WETLAND � Q 3 � Z ¢zm O v 1 ¢ate EARL BENTON JOHNSON, JR. LOIS EXISTING TREE T. JOHNSON DS 1218, PG 278 PB 35, PG 265 24" RCP - - —_TB \1 NE INV=110.50 x I \) REACH HB3 SW INV=111.38 I�p 12" CPP �k I } EN EIPWINV=111,77 CONT04ROL POINT ® ' . \ EINV=111,83 — _ N 50671240 11 6� '"-X `� �'' \X_Y, � -JE 21748431408 - - JOSEPEE k \k x "}- _ _ 1 _ — _ _ _ ELEVATION 11495 C. BEASLEY DB EVE - J �_ �___ - - INv=119]6 V f 10 \ - "� 00 I -z4• P 1163, PG 644 �\ _ sa ♦ 1 Z/+VALE DB _ 36 RCP 1 \ \ ��e ` '� e ' 7 r SW INV=111.06 4164, ;PG 61 B \ ., IP / � / WINV=12469_ } \\ - '\' ' F3 67,'RG 43 EINV=124 58 '� X I \ W CPP �l 1 . \\.. ` nW Tg ✓ - _ 15" RCP E INV-1NV=1111166 EIP 1 ���' �� .l / 1CONTROL POINT r,// I \ WINV 113.10 O VZ2 N-592,886.6797 V NE INV 113.73 E2,nas11.516a EUGENESTEWART U / ELEVATION=12333 I ' 12"MPj _ LAURA A. STEWART NW INV =116.44 ,: g� DS 656, PG 553 SE INV 116.08 �� \ 15' RCP 1 '- — gy ` p " �� — — EARL BENTON JOHNSON, JR. LOIS EIP SW INV=123.84 _ o+f r ti — - NE INV=123x3 / _ -� + 0 I C3 T. JOHNSON DB 1218, PG 278 PB - +00 �g—++o4 s �. � / / -- — — 3 35, PG 266 �1 EARL JOHNSON IJOHNSON, 27 LOIS T. JOHNSON DB 1218, PG 278 PB EI �. 35, PG 265 REACH HB2 ...{.... EXISTING CONTOUR MAJOR — —50 — — . N W Q Q p 5 � J a EXISTING CONTOUR MINOR 46- z� l EXISTINGTOPOFBANK � TB / EXISTING BOTTOM OF BANK — — — — BB w� EXISTING CHANNEL CENTERUNE �Z Z ow w ¢ ti O H-� W � � EXISTING FENCELINE X XX W Y N W e� H f EXISTING TRE LINE tit f I I EXISTING WETLAND � Q 3 � Z ¢zm O a ¢ate EARL BENTON JOHNSON, JR. LOIS EXISTING TREE T. JOHNSON DS 1218, PG 278 PB 35, PG 265 �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v)919.782.0495 (t) 919.782.9672 www.wkdickson.com NC. LICENSE NO —74 FULL SCALE: 1"=100 0 100 200 2" = FULL SCALE HALF SCALE��'CcEL 06Lij Jul PROJ.DATE: FEB 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: E3 PROJ. NO.: 2015020500 � N F N O a a Z O U H Z O Z � O � O � F- 0 w Z O Jul U U N W Q Q p 5 � J a � z� Z� O_ Q ~ U � w z Z z �Z Z w� �Z Z ow w ¢ ti O H-� W � � U ti o C7 Z 00 W Y N W W e� H U U N W Q Q p 5 � J a � z� Z� O_ Q ~ U � w z Z z �Z Z w� �Z Z ow w ¢ ti O H-� W � � U ti o C7 Z 00 W la— N g ow 2 C0 W e� H S w z Q � � Z� U Z CO Z �y Im ¢m..w � Q 3 � Z ¢zm O a ¢ate AF MO 24"GT EUGENE A. LEE DB ^' } a '+ 7 REACH HB 519, PG 506 /I P1 RESTORATION / - (STA 00+15 TO STA 14+45) - 4x00 O 4)I + Ul I tV V 18"GT z -r � � 3+00 � \ 1 1 - "GT 15"BTt5 GT \ u -0 NO GnT - ' ) 'i15"GT 18"GT F i 18"GT 16"GT _ F ° �� A /tom REMOVE EXISTING PIPE / L \ \ / e✓ . �. AND DISPOSE OF OFFSITE. I 70"OTU Ar . - .y\\ 24"G7 / - FILL EXISTING CHANNEL, \ / '24"G ) y SEE DWG D2 y t7 15"O 0 \ \ LL / SO "` 24" RCP SW INV=125.09 -�'•2 \ >\ O 18" 20' NEINV=1-5.49 ,. 15'GT O.L 135 132 129 126 123 120 117 115 0+00 COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projecte\Resource Environmental Solutions\2015020500RA - Hannah SCALE: HOR 1"=30'; VERT 1"=3' DELETIONS TO THIS 11 , 2017 - Ben Carroll 135 132 129 126 123 120 117 115 4+50 12.2 2.5 3.8 BANKFULL STAGE 16 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH I 2:2 4 TYPICAL RIGHT MEANDER CROSS SECTION 1 7 2� IL TYPICAL LEFT MEANDER CROSS SECTION NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. LEGEND EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR — — — — 46 — — PROPOSEDCONTOURMAJOR H D N PROPOSED CONTOUR MINOR EXISTING WETLAND EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG D2) (SEE DETAIL DWG D2) PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE Naz5��zwUNUQz�=¢Ni (SEE DETAIL DWG 134) BRUSHTOE (SEE DETAIL DWG 133) LOG RADE CONTROL (SEE DETAIL SHEET D4) LOG TOE PROTECTION STA 0 29 LOG SILL (SEE DETAIL DWG D4) ELEV 25.58 PROPOSEE LOG SILL EXISTING GRADE ALONG (SEE DETAIL DWG D3) TOP OF BA 4K STA 2+03 /-STREAM CENTERLINE LOG GRADE CON ftOL - ELEV 124�:9'h - LOG SILL STA 2+93 STA 4135 - - (SEE DETAIL DWG D6) FLOODPLAIN SILL ELEV 124.44 ELEV 124 20 - LOG GRADE CONTROL j (PROFILE) (WTt I O (PROFILE) o DOUBLE LOG DROP a PROPOSED aj ANNEL BOTTOM N m m (PROFILE) N (PROFILE) w N W co w W w, > w w � w N N w N N N r N '�" N J m w IIJI w w co w o —w w N >> w w. w J co w w w —> j w ..w. > �2 —> — M w w w w w w J w p �' w m n N } N N y H Q F ur y r m r in 115 0+00 COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projecte\Resource Environmental Solutions\2015020500RA - Hannah SCALE: HOR 1"=30'; VERT 1"=3' DELETIONS TO THIS 11 , 2017 - Ben Carroll 135 132 129 126 123 120 117 115 4+50 12.2 2.5 3.8 BANKFULL STAGE 16 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH I 2:2 4 TYPICAL RIGHT MEANDER CROSS SECTION 1 7 2� IL TYPICAL LEFT MEANDER CROSS SECTION NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. LEGEND EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR — — — — 46 — — PROPOSEDCONTOURMAJOR H D N PROPOSED CONTOUR MINOR EXISTING WETLAND EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG D2) (SEE DETAIL DWG D2) PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE Naz5��zwUNUQz�=¢Ni (SEE DETAIL DWG 134) BRUSHTOE (SEE DETAIL DWG 133) DOUBLE LOG DROP (SEE DETAIL SHEET D4) LOG TOE PROTECTION (SEE DETAIL DWG D2) LOG SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL STRUCTURE (SEE DETAIL DWG D2) LOG VANE (SEE DETAIL DWG D3) LOG J -HOOK _ (SEE DETAIL DWG D6) RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL j (PROFILE) (WTt LOG SILL O (PROFILE) o DOUBLE LOG DROP a (PROFILE) aj BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) DD CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (V) 919.782.0495 (1) 919.782.9672 www.wkdicksorl tees. No. 1.7. FULL SCALE: 1"=30 0 30 60 FULL SCALE y 1" =HALF SCALE I` DZuj0 ==Qz¢yoa�Yg IJ�3OlIIi l � WOaJ H D N V z�n�o='Nm Naz5��zwUNUQz�=¢Ni �o>a UWZ O 0 cc: y OQ w 0ZODJz LU cr C/) O W7Z �z D ILE 0 ° mH 8 Z ZQ0z yiF,ZZ JW0Q ¢zm�Z¢waO PRODATE: �FEB2016 O.C.: MS O.C. DATE: JUN 2016 DRAWING NUMBER: S1 PROJ. NO.: 2015020500o�m z�n�o='Nm n¢QU- r 135 132 129 126 123 120 - 117 115 4+50 a' �T CONTROL POINT N=593 085.5440' _ E=2.1]2,886.9773' x �\ ELFvnnoN=lz6so• / „6'X�� p01 �O 4 -�- - - - — — , 0 0 CO Id� REACH HB V ` P1 RESTORATION .. \ 1e'T (STA 00+15 TO STA 14+45) \ FILL EXISTING CHANNEL. ` SEE DWG D2 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah DELETIONS TO THIS 11, 2017 - Ben Carroll 135 132 129 126 123 120 117 115 9+00 12.2 2.5 3.6 BANKFULL STAGE 6 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH '\\\ __/ 1 I 22 4 TYPICAL RIGHT MEANDER CROSS SECTION 2� TYPICAL LEFT MEANDER CROSS SECTION NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PRO POSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. LEGEND EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR H D N PROPOSED CONTOUR MINOR EXISTING WETLAND EXISTING TOP OFBANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF EXISTING GRADE ALONG EXISTING FENCELINE — — — — X EXISTING TREELINE PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE STREAM CENTERLINE PROPOSED (SEE DETAIL DWG D2) D2) STA 8+2 DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) F BANK ELEV. 722.6 - - LOG SILL STA 5+48 [TOP LOG TOE PROTECTION G JHOOK TA 6+81 DOUBLE LOG DROP �� LOG SILL ELEV 123.74 LOG GRADE CONTROL STRUCTURE LEV 123.30 (SEE DETAIL DWG D2) LOG VANE (SEE DETAIL DWG D3) LOG J -HOOK _ STA 8+15 RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL tLtV 12Z.95 FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL , L (PROFILE) LOG SILL O (PROFILE) on DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) w w W w— w w •- co w a > W w W w > W W J J W W w w w N ry w m o ri ry N �i LLl >N w N i ^ —� t m m -m m W < —� - W ulN— W -tu w w W w w��— o F N r�Q a p—a JW—.J w$ w WW— F a AF N .i ra- a m a m _; ^ n -. in n . + N N H F N N Fa- N t~n F Q m T °JQ Q PR POSED m in y m� CHANNEL OTTOM 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah DELETIONS TO THIS 11, 2017 - Ben Carroll 135 132 129 126 123 120 117 115 9+00 12.2 2.5 3.6 BANKFULL STAGE 6 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH '\\\ __/ 1 I 22 4 TYPICAL RIGHT MEANDER CROSS SECTION 2� TYPICAL LEFT MEANDER CROSS SECTION NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PRO POSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. LEGEND EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR H D N PROPOSED CONTOUR MINOR EXISTING WETLAND EXISTING TOP OFBANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG (SEE DETAIL DWG D2) D2) PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) BRUSHTOE (SEE DETAIL DWG D3) DOUBLE LOG DROP (SEE DETAIL SHEET D4) LOG TOE PROTECTION (SEE DETAIL DWG 02) LOG SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL STRUCTURE (SEE DETAIL DWG D2) LOG VANE (SEE DETAIL DWG D3) LOG J -HOOK _ (SEE DETAIL DWG D6) RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG DB) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL , L (PROFILE) LOG SILL O (PROFILE) on DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transportat on + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (V) 919.782.0495 (1) 919.782.9672 www.wkdickson.com CENSE NO '171 FULL SCALE: 1"=30 0 30 60 FULL SCALE 1" =ALF SCALE I` LEI Jaz5�zw¢yUQ�Ni n H D N HaO z�yn��wNzLL�Nm UWZ O 0 y O w Vcc: LU fr 0 oZ q O WZ 0O Zo¢ ErZW� J= ZQz0UZ 2 N Q Z¢LLi O zuo>amOO PROJ.DATE: FEB 2016 OCMS O.C. JUN 2016 DRAWING NUMBER: S2 PROD. NO.: 2015020500H�mrnJl ¢a� z�yn��wNzLL�Nm y 129 126 123 120 117 114 111 109 c � NOTES: s �7 �N �JI FT - /+ 12'2 i. IND GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. / + w 2.5 '3.8 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. BANKFULL STAGE 3, ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 12" 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND \ -� . — — _ i _ / I �. C _ I a / 15• a + SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. —X — y`%+ � / + a 4. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE TYPICAL SHALLOW CROSS SECTION „T ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 16"GT 12.0 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, REACH HB ` + "GT ,� + + 1�' 3.5 5.0 3.5 THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL P7 RESTORATION SECTIONS. (STA 00+15 TO STA 14+45 ` BANKFULL STAGE 4 ) 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. o „ _- • 2.1 + 00 Biu Z./ •." EIS O J U Q , -_- + \ . } 12"T + FILL EXISTING CHANNEL. SEE DWG D2� 1 PT a REACH HF1 + P(i ` ham° //' "GT' it II �t P1 RESTORATION (SEED WG S13) + }3 / �+ r + \12" i 15• �,;5J3LL +15 T",.�i�/ ��// 18" /% 9® 45, T. 1S X5 12"T 12"T Z � GThU 15 MI Q COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah SCALE: HOR 1"=30'; VERT 1"=3' DELETIONS TO THIS 11, 2017 - Ben Carroll 129 126 123 120 117 114 111 109 0 TYPICAL POOL CROSS SECTION STRAIGHT REACH / Z 11 2 4 TYPICAL RIGHT MEANDER CROSS SECTION 2 2 TYPICAL LEFT MEANDER CROSS SECTION EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR J ai PROPOSED CONTOUR MINOR EXISTING WETLAND 0 Z EXISTING TOP OF BANK — — — — TB EXISTING GRAD= ALONG PROPOSED CENTERLINE OF CHANNEL � .PROPOSED — — — — X STREAM CE TERLINE PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED OP OF BANK LCE PROPOSED CHANNELDWG UG w D2) (SEE DETAIL DWG D2) = LOG SILL DIFFUSE FLOW STRUCTURE LOG GRADE CONTROL LU LOG SILL g ¢ (SEE DETAIL DWG 133) z > DOUBLE LOG DROP STA 9+2 LOG SILL o O E r LOG TOE PROTECTION STA 11-6 (SEE DETAIL DWG D2) STA 12+64 LOG SILL Z Q (SEE DETAIL DWG D4) N m O1 ELEV 12 .21 STA 9+88 (SEE DETAIL DWG D2) � Q ELEV121.00 Z¢zm ELEV 120 O LOG J -HOOK ELEV 121.E 3 00=2 RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL 7J (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL wi2 (PROFILE) LOG SILL m N a ry N o o F,m BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) W w w > w co w > N o o N o ry W w W W J w co w w w J w w w > J o •- w > > o w w w > w o w > J > w mn w m a o a N m m ,� w yr m w o co w w w- w w Fm ,o Lcw w O o N y N M y N f~b N Q Q N m F Q F F F Q O Q Q + N � w — P PROP CHANNELBO SED OM +nn R+50 1n+00 10+50 11+00 11+50 17+00 19+5n 13+( COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah SCALE: HOR 1"=30'; VERT 1"=3' DELETIONS TO THIS 11, 2017 - Ben Carroll 129 126 123 120 117 114 111 109 0 TYPICAL POOL CROSS SECTION STRAIGHT REACH / Z 11 2 4 TYPICAL RIGHT MEANDER CROSS SECTION 2 2 TYPICAL LEFT MEANDER CROSS SECTION EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR J ai PROPOSED CONTOUR MINOR EXISTING WETLAND 0 Z EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF CHANNEL � EXISTING FENCELINE — — — — X EXISTING TREELINE HCJ PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG w D2) (SEE DETAIL DWG D2) = PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE � O (SEE DETAIL DWG 134) LU BRUSHTOE g ¢ (SEE DETAIL DWG 133) z > DOUBLE LOG DROP (SEE DETAIL SHEET D4) o O E r LOG TOE PROTECTION ¢ a � LL H (SEE DETAIL DWG D2) J LOG SILL Z Q (SEE DETAIL DWG D4) N m O1 LOG GRADE CONTROL STRUCTURE Z (SEE DETAIL DWG D2) � Q LOG VANE Z¢zm (SEE DETAIL DWG D3) O LOG J -HOOK _ (SEE DETAIL DWG D6) 00=2 RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL , L (PROFILE) LOG SILL O (PROFILE)01 DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON communitynfrastructure consultants Transportat on + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (V) 919.782.0495 (f) 919.782.9672 www.Wkdicksorl CENSE No. 1.7. FULL SCALE: 1"=30 0 30 60 2" — FULL SCALE y 1" =HALF SCALE I` PROJ. DATE: FEB 2016 O.C.: MS O.C. DATE: JUN 2016 DRAWING NUMBER: S3 PROJ. NO.: 2015020500 Ill H � � N O a z O U It Z O U z � O ¢ F y 0 I o ¢ Z O � a ujLL 0 U J ai W p 0 Z 5 � J y � O Q n w� HCJ �z z 0 � = w Z = Z I � O uQWi LU i g ¢ ¢ d U J ai W p 0 Z 5 � J y � O Q n w� HCJ �z z 0 � = w Z = U o cc: LU lq O W z > C3 Z Q z N o O E r ¢ a � LL H Li C0 Ib Z J Z Q H N m O1 U z 0 z Z y i rn 2NLLlJ � Q 3 Z¢zm O O a 00=2 129 126 123 120 117 114 111 110 1 COPYRIGHT FILE NAME: IJ I ITOT W 14"T 4` 14�'GT" \� 4 14"PT �� 14"° 12•G1�Q � 12'T i6 G y Y �/ �16-PT Q I` ST d o � r REACH HB i wrl '� i 2a"Or� Mas f — .— — — — — P1 RESTORATION 12'G� 14 GT � . 18 'F W �� 00 - y1 (STA 0+15 TO STA 14+45) �/ / . 'r ^ S`s X78 U?"PT 4 REMOVE ISLAND, REGRADE 16" ITi% ��5 REACH HB LEFT BANK AND INSTALL n 00 24'T(STA 14ENHANCEMENT II 14"PT `? BRUSH TOE tU j� X 7,1 3s^P 12^ +45 TO STA18+37)— r 1'T� f- 12T 17+00 15+00 � 12"PT. 1z PT 14"T —� \\/f 12 14' \� \ y`1� },•- -HH-� ..r _ aj/ r /� �� • 11'PT was\ •16"T 12"G .122 T i 12" t W� 14"7 \� FILL EXISTING CHANNEL. • - `3 � f SEE DWG D2 CI 14" dib i6'P 14"PT `LCE 16 o Y `L \ 1 3.2 . 12"T CE `14"PT tZ"P LCE 14 -PT. -PT. m I LCE 1 15"P LCE I PT rP, i \ Pf' 12.2 2.5 3.6 BANKFULL STAGE 6 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH 6.5 3.5 BANKFULL STAGE ,\\\ __/ 2.2 4 TYPICAL RIGHT MEANDER CROSS SECTION EARL BENTON JOHNSON, JR. LOIS T. JOHNSON DB 1218, PG 278 PB 35, PG 265 2.2 L Hannah SCALE: HOR 1"=30': VERT 1"=3' 11, 2017 - Ben Carroll 129 126 123 120 117 114 111 110 0 TYPICAL LEFT MEANDER CROSS SECTION NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. LEGEND EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR — — — — 46 — — — — PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR ,QZ EXISTING WETLAND EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF CHANNEL � EXISTING FENCELINE — — — — X EXISTING TREELINE - PROPOSED TOP OF BANK PROPOSED LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG o a uj PROPOSED FILL AREA — DIFFUSE FLOW STRUCTURE � O OG GRADE CONTROL LU P OF BANK g ¢ (SEE DETAIL DWG 133) z > DOUBLE LOG DROP (SEE DETAIL SHEET D4) o O E r LOG TOE PROTECTION ¢ a � LL N (SEE DETAIL DWG D2) LOG SILL a 2 2 Z Q (SEE DETAIL DWG D4) _ STA 14+18 Z (SEE DETAIL DWG D2) � Q LOG VANE J Z¢zm _ _El PV 12n LOG J -HOOK _ (SEE DETAIL DWG D6) ¢a� RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL EXIST NG GRADE ALONG LOG GRADE CONTROL , L (PROFILE) LOG SILL - --- --- -- — — — — DOUBLE LOG DROP STREAM CENTERLINE LOG SILL BRUSH BED SILL (PROFILE) I_ - RIFFLE GRADE CONTROL (PROFILE) STA 16+6 \ ELEV 119.47 PROP CHANNEL SED BOTTOMH W > W WW W > W W � w > W W > W > W Q N Q FF F ¢ Q rn � V! O y N to N - 4n0 13+fin 1d+On 1d+fi0 15+nn 15+fin 1R+nn 1R+fin 17+ nn 17+fin 1R+f Hannah SCALE: HOR 1"=30': VERT 1"=3' 11, 2017 - Ben Carroll 129 126 123 120 117 114 111 110 0 TYPICAL LEFT MEANDER CROSS SECTION NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. LEGEND EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR — — — — 46 — — — — PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR ,QZ EXISTING WETLAND EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF CHANNEL � EXISTING FENCELINE — — — — X EXISTING TREELINE _ H C J PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG D2) (SEE DETAIL DWG D2) o a uj PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE � O (SEE DETAIL DWG 134) LU BRUSHTOE g ¢ (SEE DETAIL DWG 133) z > DOUBLE LOG DROP (SEE DETAIL SHEET D4) o O E r LOG TOE PROTECTION ¢ a � LL N (SEE DETAIL DWG D2) J LOG SILL a 2 2 Z Q (SEE DETAIL DWG D4) = n LOG GRADE CONTROL STRUCTURE Z (SEE DETAIL DWG D2) � Q LOG VANE J Z¢zm (SEE DETAIL DWG D3) O LOG J -HOOK _ (SEE DETAIL DWG D6) ¢a� RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL , L (PROFILE) LOG SILL O (PROFILE) on DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) WK CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatice 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com CENSE NO. F 71 FULL SCALE: 1"=30 0 30 60 F HULL SCALE 1" =ALF SCALE I`zz PROJ. DATE: �FEB2016 O.C.: MS O.C. DATE: JUN 2016 DRAWING NUMBER: S4 PROD. NO.: 2015020500 W H � D N H O a z 0 U tt Z U Z � O ¢ F y 0 U � o � J y � O Q n w � _ H C J z z 0 � I o a uj ¢ Z O � � Z I � O uQWi LU i g ¢ ¢ d U � o � J y � O Q n w � _ H C J z z 0 � Z = U o z LU lq O W z > C7Z ¢ zy o O E r ¢ a � LL N di C0 DD Z J a 2 2 Z Q � = n U z 0 Z Z y i rn 2 NLLi � Q 3 J Z¢zm O O O a ¢a� 123 120 117 114 111 108 105 1 • �h3t b t f G��PT t t O co 00 (STA 14+45 TO STA18+37) r _ _ \ X16"PT 16„ NS / 12"FT 'Y'GT t 26"G14'G' )f' ( e� F\ COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah SCALE: HOR 1"=30': VERT 1"=3' DELETIONS TO THIS 11 , 2017 - Ben Carroll 123 120 117 114 111 108 105 0 12.2 2.5 3.8 BANKFULL STAGE ,s 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH '\\\ __ / 1 I 22 4 TYPICAL RIGHT MEANDER CROSS SECTION 2� TYPICAL LEFT MEANDER CROSS SECTION NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. EXISTING CONTOUR MAJOR — —50— — — EXISTING GRADE ALONG PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR ------- EXISTING WETLAND 0 Z EXISTING TOP OF BANK STREAM CENTERLINE — — — — BB PROPOSED CENTERLINE OF CHANNEL LOG GRADE CONTROL EXISTING TREELINE PROPOSED LOG SILL ---------- LOG SIL CONSERVATION EASEMENT LCE STA 18+g w TOP OF BANK STA 20+4 PROPOSED FILL AREA STA 21+6 LO JHOOK (SEE DETAIL DWG 134) ELEV 117.82_ BRUSHTOE U O W ELEV 117.41 z > ELEV 116.91 S IFA 22+44 00 � r — -- __ (SEE DETAIL DWG D2) J LOG SILL Q = = Z Q L ELEV 116.7p V116.73 LOG GRADE CONTROL STRUCTURE Z (SEE DETAIL DWG D2) � Q LOG VANE Z¢zm (SEE DETAIL DWG D3) O LOG J -HOOK _ (SEE DETAIL DWG D6) ¢a� RIFFLE GRADE CONTROL — - BRUSH BED SILL (SEE DETAIL DWG DB) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL , L (PROFILE) LOG SILL O (PROFILE) on DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) w w j �_ w w w w co ww—`u > w w J > w. w w w co w w w w w— co w > W. _ —, _ w co —w _ w w r n > w w m w w w_— w w —M w N m m Q Q rn m m N r N N Q Q N w `+ N + Q N F N o N IT N CHANNEL BOTTO I+nn 1R+sn 19+nn 1q+sn gn+nn gn+sn g1+nn 99+nn 99+! COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah SCALE: HOR 1"=30': VERT 1"=3' DELETIONS TO THIS 11 , 2017 - Ben Carroll 123 120 117 114 111 108 105 0 12.2 2.5 3.8 BANKFULL STAGE ,s 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH '\\\ __ / 1 I 22 4 TYPICAL RIGHT MEANDER CROSS SECTION 2� TYPICAL LEFT MEANDER CROSS SECTION NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR ------- EXISTING WETLAND 0 Z EXISTING TOP OF BANK — — — — TB EXISTINGBOTTOM OFBANK — — — — BB PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE H U PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG w D2) (SEE DETAIL DWG D2) = PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE N W (SEE DETAIL DWG 134) BRUSHTOE U O W (SEE DETAIL DWG 133) z > DOUBLE LOG DROP (SEE DETAIL SHEET D4) 00 � r LOG TOE PROTECTION ZE � LL H (SEE DETAIL DWG D2) J LOG SILL Q = = Z Q (SEE DETAIL DWG D4) N N m O1 LOG GRADE CONTROL STRUCTURE Z (SEE DETAIL DWG D2) � Q LOG VANE Z¢zm (SEE DETAIL DWG D3) O LOG J -HOOK _ (SEE DETAIL DWG D6) ¢a� RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG DB) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL , L (PROFILE) LOG SILL O (PROFILE) on DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (V) 919.782.0495 (f) 919.782.9672 www.wkdicksorl CENSE NO. F 71 FULL SCALE: 1"=30 0 30 60 F HULL SCALE 1" =ALF SCALE I` PROJ. DATE: �FEB2016 O.C.: MS O.C. DATE: JUN 2016 DRAWING NUMBER: S5 PROJ. NO.: 2015020500 W H � D N O J V a Z O U It Z O U z � O ¢ F y 0 I o ¢ Z O � a uU. j z LU cr cc D 0 Z O uQWi i g ¢ U-1 f— U N W p 0 Z 5 � J y WN H U z z O = w Z = U o N W U O W d f— U N W p 0 Z 5 � J y WN H U z z O = w Z = U o N W U O W z > Q � 00 � r ZE � LL H co Z J �+ Q = = Z Q F- i- - ' N N m O1 I_ U z 0 z Z y i rn 2NLLlJ � Q 3 Z¢zm O O O a ¢a� GATE / 3D 3Dl 331 'CONTROL POINT a a \ \N 592,896.6797' / E'$2,173.911.5163' p ELEVAi'YON=123.31 — — — � 1 a REACH HIS Pi RESTORATION ) (STA 18+37 TO STA 36+44) 23"'00 y / sstiF2% re- m 123 120 117 114 111 108 105 2 1' AA FILL EXISTING CHANNEL. SEE DWG D2 ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK DOUBLE LOG DROP PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE STA 24+37 PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT -LOG-SIL - - ELEV. 115.88. D2) (SEE DETAIL DWG Dz) EXISTING GRAD ALONG DIFFUSE FLOW STRUCTURE STA 23+2 (SEE DETAIL DWG 134) P OPOSED STREAM CENTERLINE DOUBLE LOG DROP (SEE DETAIL SHEET D4) DOUBLE LOG DROP LOG TOE PROTECTION Zf: LOG SILL (SEE DETAIL DWG D4) ----__ STA24+31 LOG GRADE CONTROL STRUCTURE (SEE DETAIL DWG D2) LOG VANE -- (SEE DETAIL DWG D3) _ � _LEY 116.20 LOG J -HOOK _ (SEE DETAIL DWG D6) RIFFLE GRACE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) LOG SILL FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL /1 , L (PROFILE) STA 25+89 LOG SILL O (PROFILE) on DOUBLE LOG DROP (PROFILE) ELEV115.10 BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) m 6ul. j N '6 W WJ W > > w W n wV W > W j w w w N !-r w W w w w w rn — w w J w W1. W w W N N N Q N F N N Q H N N f F Ul Ul Q N N N Q N f N N N F V! PROPOSED Q u~i � in y N in CHANNELBOTTOM +gin �a+nn �s+sn �a+nn 94+Fn 9s+00 95+SO 9R+00 7R+FO 97+1 COPYRIGHT ®, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\P rojectslResource Environmental Solutions12015020500RA - Hannah SCALE: HOR 1"=30': VERT 1"=3' DELETIONS TO THIS 11, 2017 - Ben Carroll 123 120 117 114 111 108 105 0 12.2 2.5 3.8 BANKFULL STAGE 1s 4 TYPICAL SHALLOW CROSS SECTION B ES 3.5 BANKFULL STAGE 2:2 4 TYPICAL RIGHT MEANDER CROSS SECTION TYPICAL LEFT MEANDER CROSS SECTION NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR — — — — 46 — — — — PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR EXISTING WETLAND EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG D2) (SEE DETAIL DWG Dz) PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE NN5tezwUN¢Qz�=¢N (SEE DETAIL DWG 134) BRUSHTOE (SEE DETAIL DWG 133) DOUBLE LOG DROP (SEE DETAIL SHEET D4) LOG TOE PROTECTION (SEE DETAIL DWG D2) LOG SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL STRUCTURE (SEE DETAIL DWG D2) LOG VANE (SEE DETAIL DWG D3) LOG J -HOOK _ (SEE DETAIL DWG D6) RIFFLE GRACE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL /1 , L (PROFILE) I(,jAJ1 LOG SILL O (PROFILE) on DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transponation + Water Resources Urban Development + Geomatice 720 Corporate Drive Raleigh, NC 27607 (V) 919.782.0495 (1) 919 782 9672 www wkdicksorl CENSE NO -71 FULL SCALE: 1"=30 0 30 60 FULL SCALE HALF SCALE I`zz fr uHDlJa¢�uQWUi] iiI LLa i iNVO�UZO O a:O 00 ujO¢¢ d UFZZ� TYPICAL POOL CROSS SECTION STRAIGHT REACH 12 zt�rNoO�Nm NN5tezwUN¢Qz�=¢N UWZ p 0 yd O¢ w UOQ ccz LU := O n O W U } Z NZ 0O ¢ Er 8LL W�Z ZQ0zUZWQ Z¢¢z O O2 PROJ. DATE: FEB 2016 O.C: MS O.C. JUN 2016 DRAWING NUMBER: S6 PROD. NO.: 2015020500�o>aH�mrn�m zt�rNoO�Nm yN 120 117 LOG SIL STA 27+' ELEV 114.1 114 111 108 105 102 2 FILE NAME: a Hannah SCALE: HOR 1"=30'; VERT 1"=3' 11, 2017 - Ben Carroll 12.2 2.5 3.8 }r BANKFULL STAGE I 1.6 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH ES 3.5 BANKFULL STAGE 2:2 4 TYPICAL RIGHT MEANDER CROSS SECTION TYPICAL LEFT MEANDER CROSS SECTION 120 117 114 111 108 NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. 105 10.0 PE 70 EX C TIE 11_E LPEEE AT 15:1 SLOPE AT 15.1 5 ' 102 o.s 0 SWALE TYPICAL SECTION LEGEND EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR J ai PROPOSED CONTOUR MINOR -4 0 Z EXISTING TOP OF BANK — — — — TB EXISTINGBOTTOM OFBANK — — — — BB PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE _ H V PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG EXISTING GRADE ALONG PROPOSED FILL AREA 4 L G JHOOK (SEE DETAIL DWG 134) RLINE g ¢ (SEE DETAIL DWG 133) z > TA 27+84 DOUBLE LOG DROP DOUBLE LOG DROP o O � F- - asED -- --- ELEV 113.97 STA 28,73 _ - LE .113. (SEE DETAIL DWG D4) OP OF BANK LOG GRADE CONTROL STRUCTURE — (SEE DETAIL DWG D2) ELEV 113.2 LEY. 113.24 2 (SEE DETAIL DWG D3) O LOG J -HOOK _ (SEE DETAIL DWG D6) ¢a� RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL , L (PROFILE) � LOG SILL I (PROFILE) on DOUBLE LOG DROP 0 > > of W W �_ c2 (PROFILE) w wM w w W w W w w w ry W w > W N `^" j W W W N � " ry `r M m W - - N G Q + W > > W W W W W W W - _- 'W W_N W' Q mIT m N N N Io m ` w W W _W > > W j _W W J W- W .-. - n F N N ul N h y N N y n N Q N ~ H N m F N ry F n o o +o m n N a PROPOSED CHANNELBOTTOM '+On 97+5n 9A+nn 9A+5n 9Q+nn 9Q+60 3n+nn 3n+Hn 31+nn 31+! Hannah SCALE: HOR 1"=30'; VERT 1"=3' 11, 2017 - Ben Carroll 12.2 2.5 3.8 }r BANKFULL STAGE I 1.6 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH ES 3.5 BANKFULL STAGE 2:2 4 TYPICAL RIGHT MEANDER CROSS SECTION TYPICAL LEFT MEANDER CROSS SECTION 120 117 114 111 108 NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. 105 10.0 PE 70 EX C TIE 11_E LPEEE AT 15:1 SLOPE AT 15.1 5 ' 102 o.s 0 SWALE TYPICAL SECTION LEGEND EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR J ai PROPOSED CONTOUR MINOR EXISTING WETLAND 0 Z EXISTING TOP OF BANK — — — — TB EXISTINGBOTTOM OFBANK — — — — BB PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE _ H V PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG (SEE DETAIL DWG D2) D2) o a uj PROPOSED FILL AREA 4 DIFFUSE FLOW STRUCTURE � O (SEE DETAIL DWG 134) BRUSHTOE g ¢ (SEE DETAIL DWG 133) z > DOUBLE LOG DROP (SEE DETAIL SHEET D4) o O � F- LOG TOE PROTECTION ¢ a � LL N (SEE DETAIL DWG D2) W J LOG SILL Q = _ Z Q (SEE DETAIL DWG D4) = N n N m O1 LOG GRADE CONTROL STRUCTURE Z (SEE DETAIL DWG D2) � Q LOG VANE J Z¢zm (SEE DETAIL DWG D3) O LOG J -HOOK _ (SEE DETAIL DWG D6) ¢a� RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL , L (PROFILE) LOG SILL O (PROFILE) on DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatice 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1) 919.782.9672 www.wkdicksorl CENSE NO. F 71 FULL SCALE: 1"=30 0 30 60 2" - FULL SCALE y 1" =HALF SCALE I` zz PROJ. DATE: FEB 2016 O.C.: MS O.C. DATE: JUN 2016 DRAWING NUMBER: S7 PROJ. NO.: 2015020500 W H � D N l] J V a O U Q Z O U Z � O ¢ F y EL 0 fr 0 U J ai W p 0 Z 5 � J y O w N _ H V z z � O I o a uj ¢ Z O � � Z 4 I � O uQWi i g ¢ ¢ d U J ai W p 0 Z 5 � J y O w N _ H V z z � O Z = ¢ o 4 N lq O W z > Z ¢ Z y o O � F- ¢ a � LL N CO � m Z W J D � Q = _ Z Q = H' = N n N m O1 U z 0 Z Z y i rn 2 NLLi � Q 3 J Z¢zm O I= O O ¢a� 120 117 114 111 108 105 102 3 12" CPP u V"11.77 C.P. THOMPSON, JR. EVELYN H. THOMPSON DB 3633, PG 723 11.33 331331---301 `3b7 -- -- -- REMOVE EXISTING PIPES PA7 -� AND DISPOSE OF OFSITE -- _ _ REACH HIS ---_--- P1 RESTORATION (STA 18+37 TO STA 36+44 CONTROL POINT \„ 1 N=594.067.1240' �F* I E=EVATI43.1408' ELEVATION= 114.9T Ing'' 88 p \ O / 12"CPP / W INV=111.]6Z" EINV=111.65 12bT LCE 1�E LCE LCE LCE L� ++ + Lam+ Q _LCE+ •/ • G} LCE 'GT EUGENE STEWAF LAURA A. STE WAI COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projecte\Resource Environmental Solutions\2015020500RA - Hannah SCALE: HOR 1"=30'; VERT 1"=3' DELETIONS TO THIS 11, 2017 - Ben Carroll 120 117 114 111 108 105 102 0 12.2 2.5 3.8 BANKFULL STAGE 16 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH 2:2 lE TYPICAL RIGHT MEANDER CROSS SECTION 2 2� TYPICAL LEFT MEANDER CROSS SECTION NOTES: i. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR SQ PROPOSED CONTOUR MINOR EXISTING WETLAND 0 Z EXISTING TOP OF BANK — — — — TB EXISTINGBOTTOM OFBANK — — — — BB PROPOSED CENTERLINE OF CHANNEL ter• EXISTING FENCELINE — — — — X EXISTING TREELINE HCJ PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED z O ¢ CONSERVATION EASEMENT LCE PROPOSED EL UG F O (SEE DETAIL DWG D2) DETAIL DWG D2) o a uj PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE � O (SEE DETAIL DWG D4) BRUSHTOE g ¢ (SEE DETAIL DWG D3) z > DOUBLE LOG DROP EXISTING STREAM CENTERLINE RADE ALONG. PROPOSED LOG SIL (SEE DETAIL DWG D2) LOG SILL Q = _ Z Q (SEE DETAIL DWG D4) = N n N m O1 LOG GRADE CONTROL STRUCTURE Z (SEE DETAIL DWG D2) W 0 Q LOG VANE J Z¢zm (SEE DETAIL DWG D3) O LOG J -HOOK _ (SEE DETAIL DWG D6) ¢a� RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG DB) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL , L (PROFILE) STA 31+87 ELEV_1.12.39—. LOG SILL O (PROFILE)01 STA 34+16 ELEV 111.78 DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) _N W_— W -16 F y to PROPOSED. CHANNEL BOTTOM W W G y F J W W W- n F W W _ W M F H y r W W w .- r ro o W W >'> W F Q m w w W W — f> W ly�j w W Q i i y w Q Q +S(1 32+nn S2+Sn 3S+nn n3+sn u+nn 3d+Sn 35+nn 35+5n 3R+( COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projecte\Resource Environmental Solutions\2015020500RA - Hannah SCALE: HOR 1"=30'; VERT 1"=3' DELETIONS TO THIS 11, 2017 - Ben Carroll 120 117 114 111 108 105 102 0 12.2 2.5 3.8 BANKFULL STAGE 16 4 TYPICAL SHALLOW CROSS SECTION TYPICAL POOL CROSS SECTION STRAIGHT REACH 2:2 lE TYPICAL RIGHT MEANDER CROSS SECTION 2 2� TYPICAL LEFT MEANDER CROSS SECTION NOTES: i. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR SQ PROPOSED CONTOUR MINOR EXISTING WETLAND 0 Z EXISTING TOP OF BANK — — — — TB EXISTINGBOTTOM OFBANK — — — — BB PROPOSED CENTERLINE OF CHANNEL ter• EXISTING FENCELINE — — — — X EXISTING TREELINE HCJ PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED z O ¢ CONSERVATION EASEMENT LCE PROPOSED EL UG F O (SEE DETAIL DWG D2) DETAIL DWG D2) o a uj PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE � O (SEE DETAIL DWG D4) BRUSHTOE g ¢ (SEE DETAIL DWG D3) z > DOUBLE LOG DROP (SEE DETAIL SHEET D4) o O � r LOG TOE PROTECTION ¢ a � LL H (SEE DETAIL DWG D2) LOG SILL Q = _ Z Q (SEE DETAIL DWG D4) = N n N m O1 LOG GRADE CONTROL STRUCTURE Z (SEE DETAIL DWG D2) W 0 Q LOG VANE J Z¢zm (SEE DETAIL DWG D3) O LOG J -HOOK _ (SEE DETAIL DWG D6) ¢a� RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG DB) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL , L (PROFILE) F(,jAJ1 LOG SILL O (PROFILE)01 DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh NC 27607 (V) 919.782.0495 (1) 919 782 9672 www.wkdicksorl CENSE NO. '171 FULL SCALE: 1"=30 0 30 60 FULL SCALE HALF SCALE I`cc: LU PROJ. DATE: FEB 2016 O.C.: MS O.C. DATE: JUN 2016 DRAWING NUMBER: S8 PROJ. NO.: 2015020500 W � Uai H � N W H O a 0 Z O CcJ U ter• O¢ Q U Z HCJ O U z O ¢ � y F O I o a uj ¢ Z O (� � Z I � O uQWi i g ¢ ¢ d Uai W z O 0 Z 5 CcJ y ter• O¢ w N HCJ �z z Z = U o lq O W z > C7Z Q z� a o O � r ¢ a � LL H Q = _ Z Q = H' = N n N m O1 U z 0 Z Z y i rn 2 NLLi W 0 Q 3 J Z¢zm O O a ¢a� 117 STA 36+ 114 111 108 105 102 99 3 FILE NAME: \V \ NOTES: >y ( I 12'2 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO 3.8 DOWNSTREAM DIRECTION. 2.5 -r I 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. BANKFULL STAGE 3, ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. J> � la 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. r r e 4. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION BE TYPICAL SHALLOW CROSS SECTION ANDSTABILIZATIONONED ATIANSHALL IO PLACED INSIDE THE EXISTING DRAHANNETOWAR ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE `CE 12.0 PROPOSED CHANNEL. r k r GRADE LEFT BANK FROM STA 36+84 TO 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, STA 42+63 PER TYPICAL BANK GRADING 3.5 5.0 3.5 THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. REACH HBDETAIL (DWG D3) r r BANKFULL STAGE \ 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS i RESTORATION v (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED W ' (STA 36+84 TO STA 42+63) '�" \ \ r INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. r j INSTALL 30 LF OF 24" HDPE AND 30 LF OF 42" HDPE _ — _ - 40+00 - - r_e �_� +C' PER DETAIL DWG DS / 39'+ ems— Te -TB _-_ ,' 4B z4• RCP —NEINV=110.50 / 2� EBL �— _--_ Jo SW INV=111.36 / /gV ' fla i' e = ' S h � r 127 eLIP r J W �� � �•G80 '� ♦ e � r r r --- � r e L j G ��� r 19" p r t�•. -- 367 r r r r � MT CRI 361 ? r r r rEIP }16Tr � r r r • e I �-iY _�\ \r t AU -BL_, r ar 7.. rad' .`_IaGt G` FILL EXISTING CHANNEL. , s SEE DWG D2�301� Y r H LCE , 11 _LCE REMOVE EXISTING PIPES - '. I -3O _ _ 1z"v--'� ' AND DISPOSE OF OFFSITE EUGENE STEWART 12^na,T \ `� ncPr 11 v — c -- — — LAURA A. STEWART PROPOSED 30 LF OF —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR 24 INCH CORRUGATED HDPE PIPE @ 0.83 PROPOSED CONTOUR MINOR EXISTING WETLAND _ STA 36+78.69 ELEV 110 89 TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF - ELEV 111.15 CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE - .61 �'`� PROPOSED TOP OF BANK ---------- PROPOSED k#ANNEL-BOT�f3M LOG SILL STA 37+34 BRUSH BED SILL N HBED SILL - ELEV 110.70 STA 39+-0BRU STA 40+4 ELEV 110. > w w I EXISTING GRADE ALONG _ STREAM CENTER INE Q � f N i PROPOSED 30 LF OF _ 42 INCH CORRUGATED HDPE PIPE @ 0.87% +nn 3R+Fin 37+nn 37+rr0 3R+00 3R+Fn 39+00 39+Fin do+nn 4o+50 41+1 Hannah SCALE: HOR 1"=30': VERT V=3' 2017 - Ben Carroll 117 114 111 108 105 102 99 0 TYPICAL POOL CROSS SECTION STRAIGHT REACH ES 3.5 BANKFULL STAGE rL TYPICAL RIGHT MEANDER CROSS SECTION TYPICAL LEFT MEANDER CROSS SECTION 1 Gr_Gnln EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR EXISTING WETLAND EXISTING TOP OF BANK — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF z��nN�wNzLL'Nm CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT —LCE— PROPOSED CHANNEL PLUG (SEE DETAIL DWG D2) PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG 134) BRUSHTOE (SEE DETAIL DWG 133) DOUBLE LOG DROP (SEE DETAIL SHEET D4) LOG TOE PROTECTION (SEE DETAIL DWG D2) LOG SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL STRUCTURE (SEE DETAIL DWG D2) LOG VANE (SEE DETAIL DWG D3) LOG J -HOOK (SEE DETAIL DWG D6) RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL (PROFILE) LOG SILL (PROFILE) DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com CENSE NO. F 71 FULL SCALE: 1"=30 0 30 60 2" — FULL SCALE y 1" =HALF SCALE I` IlJcD PROJ. DATE: FEB 2016 OO.CC.:DE: JUN 2016 DRAWING NUMBER: S9 PROJ. NO.: 2015020500 Q�a¢OQWU I wo 0OZOUa:O0 u, OZ Z' O u ¢ ¢ d fH�QlZJ— z��nN�wNzLL'Nm UWQ p 0CZ cr cOQU 3cr 0Z o U O W> 7Z 0 z�¢ Er D]ZW ZQ~H ZOUZ¢n Q3Z¢zwoaJmO a0 O¢ fH�QlZJ— z��nN�wNzLL'Nm N LCE—LCE CCf REACH HB RESTORATION \LCE _ r (STA 36+84 TO STA 42+63) cce N �Cf I r rt 42+00 \ I TB Z -A .UU 45+06 \ i^ v /3.O • \ \ \ xt\'�y </ 15`N / F 0 JAMES KEVIN MASSENGILL Ni0 Zm _ < j \ \ d 0 2"T 15"f a•T "Ryk JAMES BRYSON MASSENGILL DB r \ 1T2p�. v �\. `� \ V (w. 2,T <12'r 3938, PG 696 p 18•, C7 'P2 � \ 12' 20,tI5 < GRADE LEFT BANK FROM STA 36+g4 TO 1s ,,,..� STA 42+63 PER TYPICAL BANK GRADING t2 \�\ ` "Y' DETAIL (DWG D3) � i.� / ` \\ ` 4 12'T ZT LIP 20" P v 2"T 4 . " 12^Pw /< < a \ 1EIR 240 S✓J 1 T 5 T H 12�r \ 24 15" 12"T 24"T 5`i"1B•T 16"T 39 r u r rfP v \ v 12^T o 7 REACH HB p 15^T BUFFEfI�pl CEMENT 12 p (STA 42+63 TO'S'T�l � 6 15"ri" 2T � p o EUGENE STEWART \ 12° LAURA A. STEWART DB 656, PG 553 p 12 120 117 114 111 108 105 102 100 4' FILE NAME: Hannah SCALE: HOR 1"=30'; VERT 1"=3' 2017 - Ben Carroll NOTES: i. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2, ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. LEGEND LCE— PROPOSED CHANNELDWG UG EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- DOUBLE LOG DROP DIFFUSE FLOW STRUCTURE PROPOSED CONTOUR MAJOR SQ PROPOSED CONTOUR MINOR LOG TOE PROTECTION EXISTING WETLAND (SEE DETAIL DWG D2) EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF LOG GRADE CONTROL STRUCTURE CHANNEL (SEE DETAIL DWG D2) BRUSH BED SILL STA 42+2 ELEV 109.90 EXISTING FENCELINE — — — — X EXISTING GRADE ALO STREAM CENTERLINE G _ _ LOG J -HOOK _ — — — — — I _ _ — — _ 114 — — — (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) 111 FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL j 42+00 49+50 108 LOG SILL (PROFILE) DOUBLE LOG DROP (PROFILE) 43+50 105 44+50 4S+I +00 BRUSH BED SILL 41+50 43+00 44+00 Hannah SCALE: HOR 1"=30'; VERT 1"=3' 2017 - Ben Carroll NOTES: i. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2, ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. LEGEND LCE— PROPOSED CHANNELDWG UG EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- DOUBLE LOG DROP DIFFUSE FLOW STRUCTURE PROPOSED CONTOUR MAJOR SQ PROPOSED CONTOUR MINOR LOG TOE PROTECTION EXISTING WETLAND (SEE DETAIL DWG D2) EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF LOG GRADE CONTROL STRUCTURE CHANNEL (SEE DETAIL DWG D2) EXISTING FENCELINE — — — — X EXISTING TREELINE (SEE DETAIL DWG D3) PROPOSED TOP OF BANK ---------- LOG J -HOOK _ LIMITS OF PROPOSED CONSERVATION EASEMENT LCE— PROPOSED CHANNELDWG UG (SEE DETAIL DWG D2) D2) PROPOSED FILL AREA DOUBLE LOG DROP DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG 134) 100 )0 �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1) 919.782.9672 www.wkdicksorl CENSE NO. F 374 FULL SCALE: 1"=30 0 30 60 FULL SCALE y 1" =HALF SCALE I` IlJcD BRUSHTOE (SEE DETAIL DWG 133) DOUBLE LOG DROP (SEE DETAIL SHEET D4) 120 LOG TOE PROTECTION (SEE DETAIL DWG D2) LOG SILL (SEE DETAIL DWG D4) '3 Cf_H�44WZ— LOG GRADE CONTROL STRUCTURE 117 (SEE DETAIL DWG D2) LOG VANE (SEE DETAIL DWG D3) LOG J -HOOK _ (SEE DETAIL DWG D6) 114 RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) 111 FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL j (PROFILE) (WT1 108 LOG SILL (PROFILE) DOUBLE LOG DROP (PROFILE) 105 BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) 102 100 )0 �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1) 919.782.9672 www.wkdicksorl CENSE NO. F 374 FULL SCALE: 1"=30 0 30 60 FULL SCALE y 1" =HALF SCALE I` IlJcD N OvaU�Q�¢O�QU I �o Z O a:0 66 W 0 ¢¢ d '3 Cf_H�44WZ— �N5�zw¢yUQ¢N z��nN��owNLLNm y UWZ p 0 cc:J y 0 w U0Z U O W UQFZ�> 7Z z 00 z�¢ Er = ZQH OH' ZZU ¢nww0Q Z¢10am a za0J O O¢ PROJ. DATE: FEB 2016 O.C.:DE:M OCJUN 2016 DRAWING NUMBER: S10 PROJ. NO.: 2015020500oH�L '3 Cf_H�44WZ— 14' 13E 13: 13, 12E 12E 12: 12( REACH HF1 ENHANCEMENT III (STA 2+18 TO STA 13+58) \ I i \ � N 3+0 1 *00 10" 88 <-7+90 k COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah SCALE: HOR 1"=30'; VERT 1"=3' DELETIONS TO THIS I 11, 2017 - Ben Carroll 141 138 135 132 129 126 123 120 NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER, EXISTING CONTOUR MAJOR — —50— — — EXISTINGCONTOURMINOR ----46----- PROPOSED CONTOUR MAJOR N�ZZUa:O0 PROPOSED CONTOUR MINOR ,QZ EXISTING WETLAND 0 EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE UOZUwZ PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT La' PROPOSED CHANNELDWG UG (SEE DETAIL DWG D2) D2) ujO¢d PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG 134) BRUSHTOE UO WZ (SEE DETAIL DWG 133) z o>'PZ DOUBLE LOG DROP (SEE DETAIL SHEET D4) Er LOG TOE PROTECTION oLLUFZZ�a (SEE DETAIL DWG D2) LOG SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL STRUCTURE (SEE DETAIL DWG D2) LOG VANE O (SEE DETAIL DWG D3) LOG J -HOOK _ (SEE DETAIL DWG D6) RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL j (PROFILE) (WT1 LOG SILL O (PROFILE) o DOUBLE LOG DROP a (PROFILE) aj BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (V) 919.782.0495 (1) 919.782.9672 www.wkdickson.conn CENSE NO. F-"374 FULL SCALE: 1"=30 0 30 60 F HULL SCALE 1" =ALF SCALE I` 0a f��rGaWD— ] z�nNw'Nm yN � IDHOa¢O�uQWU¢l UwZ N�ZZUa:O0 o 0 Cc y OQ w UOZUwZ ujO¢d ilI UO WZ PROJ.DATE: �FEB2016 D.C.: MS D.C. DATE: JUN 2016 DRAWING NUMBER: S11 PROJ. NO.: 2015020500� UwZ o 0 Cc y OQ w UOZUwZ UO WZ z o>'PZ 0 Zy¢ Er J oLLUFZZ�a ZQOZUZWQ ¢zm�Z¢J O 13E 13E 132 12E 12E 122 12C 117 o I + V7 Z J to 2 H \ t • t ' / ' EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR ------- r t t \t t E t t t\ Te - 3 Q '8"_'00 aa� �1 M —gy wfL� 7Q �t t xoo 1,1+00, e 3e moi— Tq� `/msµ\' ' REACH HF1� ENHANCEMENT III (STA 2+18 TO STA 13+58) -------- _ LCELCE—LCEILLCE' — A—x COPYRIGHT 0, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUC FILE NAME: 0:\Projects\Resource Environmental Solutions\2015020500RA - Hannah SCALE: HOR 1"=30': VERT 1"=3' DELETIONS TO THIS I 11, 2017 - Ben Carroll 38 35 32 29 26 23 20 17 NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER, EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR ------- EX STING EXISTING WETLAND EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG (SEE DETAIL DWG D2) D2) PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE N (SEE DETAIL DWG 134) BRUSHTOE (SEE DETAIL DWG 133) DOUBLE LOG DROP (SEE DETAIL SHEET D4) LOG TOE PROTECTION (SEE DETAIL DWG D2) LOG SILL (SEE DETAIL DWG D4) �N5��z¢UQ¢wN y LOG GRADE CONTROL STRUCTURE (SEE DETAIL DWG D2) LOG VANE (SEE DETAIL DWG D3) LOG J -HOOK _ (SEE DETAIL DWG D6) RIFFLE GRACE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL j (PROFILE) (WTt LOG SILL O (PROFILE) o DOUBLE LOG DROP a (PROFILE) aj BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (V) 919.782.0495 (1) 919.782.9672 www.wkdicksorI eEes 40. r_o3,a FULL SCALE: 1"=30 0 30 60 FULL SCALE HALF SCALE I` Wa :f��rGaWZ- 0 PROJ. DATE: FEB 2016 D.C.: MS D.C. DATE: JUN 2016 DRAWING NUMBER: S12 PROJ. NO.: 2015020500 IQDHOa¢O�uQWU¢l ilI �N�ZOZOUa:O0 65 O¢d z�ynN�wLL'Nm N UWZ p 0 CCcc y OQ w UOZUwZ UO LEI (Z z 0 Z�¢ Er '2 CO ZQH OH' ZZU2NLLi Q Z¢UIFZ�to>am0 za0J O O¢ z�ynN�wLL'Nm �N5��z¢UQ¢wN y 132 129 126 123 120 117 114 112 11 COPYRIGHT 0, W.K. DI FILE NAME: O:\Projects\ I \ —X— X I \\ �f�yF �a o REACH HFI ' C h e .+- ENHANCEMENTIII (STA 2 „ \ +18 TO STA 13+58) W Cv REACH HB" P1 RESTORATION ' (SEE DWG S3) X— — _ \\ 11+00 r \VA r REACH HF1 r®� R P1 RESTORATION (STA 13+58 TO STA 16+04) " R14+00 � 11 lit= p �. \ oo \ a , //—� + 096+15 _ yj e 9I s LOE r r �X—X�Y max— \ \ \ \\ ��—_______ Hannah SCALE: HOR 1"=30': VERT 1"=3' 11, 2017 - Ben Carroll 32 29 26 23 20 17 14 12 6.0 1.5 1.5 BANKFULL STAGE 0.7 4 TYPICAL SHALLOW CROSS SECTION 4.0 1.0 BANKFULL STAGE 1.0 rL TYPICAL RIGHT MEANDER CROSS SECTION TYPICAL LEFT MEANDER CROSS SECTION NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER, LEGEND EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR H D N PROPOSED CONTOUR MINOR EXISTING WETLAND EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE — — — — X EXISTING TREELINE PROPOSED TOP OF BANK ---------- LIMITS OF PROPOSED CONSERVATION EASEMENT La' PROPOSED CHANNELDWG UG „¢O�uQWU D2) (SEE DETAIL DWG D2) PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG 134) BRUSHTOE (SEE DETAIL DWG 133) DOUBLE LOG DROP (SEE DETAIL SHEET D4) LOG TOE PROTECTION (SEE DETAIL DWG D2) LOG SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL STRUCTURE (SEE DETAIL DWG D2) W0a LOG VANE (SEE DETAIL DWG D3) LOG J -HOOK _ (SEE DETAIL DWG D6) RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL j (PROFILE) (WTt LOG SILL O (PROFILE) o DOUBLE LOG DROP a (PROFILE) aj BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1) 919.782.9672 www.wkdickson.conn CENSE NO -71 FULL SCALE: 1"=30 0 30 60 HALF FULL SCALE 1" = SCALE I` cc:=) PROJ. DATE: FEB 2016 O.C: MS O.C. JUN 2016 DRAWING NUMBER: S13 PROJ. NO.: 2015020500 iI 0�ZUa:O0 6j O¢ d¢ UIFZ�t N�5��z¢¢UQ�2wN . � IllHaO Uf�mrGaW— H D N zN�yn��LL'm „¢O�uQWU N�5��z¢¢UQ�2wN . Uf�mrGaW— zN�yn��LL'm „¢O�uQWU + yN W0a 1 PROPOSED 30 LF OF - 18" CORRUGATED HDPE PIPE @0.17% BAb� 0+0 J ` C.P. THOMPSON, JR. EVELYN H. THOMPSON OB 1432, PG 212 10" MP NW NV -11965 f'SE INV=119.69---------_ J REACH TH3 LCE LCE LCE— S� NF6"0 ENHANCEMENTII _ i r 0 (STA 0+63 TO STA7+79) 1+00 Tg � BB — 86_ I _C I I REMOVE EXISTING PIPE AND DISPOSE OF OFFSITE I ) `1.�iiI, \ CONTROL POINT 'r x N=594,622.2581' �E=2,173,943.1695' ELEVATION,22.79' 126 123 120 117 114 111 108 106 COPYRIGHT ®, W.K. DICKSON FILE NAME: O:\Projects\Resourc X 3+00 � _ 4+00 L r TB BB BB y\ PATH GRADE RIGHT BANK FROM STA 0+66 TO / STA 5+38 PER TYPICAL BANK GRADING DETAIL (DWG D3) / 3Dl 3M -3n -3M 3DlJ Hannah SCALE: HOR 1"=30'; VERT 1"=3' 11, 2017 - Ben Carroll 126 123 120 117 114 111 108 106 NOTES: 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 2, ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PRO POSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS. 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. LEGEND EXISTING CONTOUR MAJOR — —50— — — EXISTING CONTOUR MINOR ----46----- PROPOSED CONTOUR MAJOR N PROPOSED CONTOUR MINOR 42 EXISTING WETLAND 0 Z Z N EXISTING TOP OF BANK — — — — TB EXISTING BOTTOM OF BANK — — — — BB PROPOSED CENTERLINE OF 0 CHANNEL � EXISTING FENCELINE — — — — X EXISTING TREELINE � U PROPOSED TOP OF BANK � z z LIMITS OF PROPOSED O ¢ CONSERVATION EASEMENT LCE PROPOSED CHANNELDWG UG F � D2) (SEE DETAIL DWG D2) o a uj PROPOSED FILL AREA a � W Z DIFFUSE FLOW STRUCTURE O Y N (SEE DETAIL DWG D4) BRUSHTOE g ¢ (SEE DETAIL DWG 133) z > DOUBLE LOG DROP (SEE DETAIL SHEET D4) 0 Q � r LOG TOE PROTECTION ¢ a � LL H (SEE DETAIL DWG D2) LOG SILL Z Q (SEE DETAIL DWG D4) = N LOG GRADE CONTROL STRUCTURE (SEE DETAIL DWG D2) W 0 Q LOG VANE J Z¢zm (SEE DETAIL DWG D3) O LOG J -HOOK _ (SEE DETAIL DWG D6) ¢a� RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL j (PROFILE) (WT1 LOG SILL O (PROFILE) o DOUBLE LOG DROP a (PROFILE) aj BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (V) 919.782.0495 (1) 919.782.9672 www.wkdicksorI CENSENo.E 71 FULL SCALE: 1"=30 0 30 60 FULL SCALE y 1" = HALF SCALE I` PROJ. DATE: FEB 2016 O.C.: MS O.C. DATE: JUN 2016 DRAWING NUMBER: S14 PROJ. NO.: 2015020500 LEI � D N O a U Q Z U z a: f— U N W p 0 Z Z N 5 c J CEL y 0 � O Q n w N � U � z z O ¢ y F � I o a uj ¢ Z O � � Z a � W Z U O Y N uQWi UI � i g ¢ ¢ d f— U N W p 0 Z Z N 5 c J CEL y 0 � O Q n w N � U � z z M z w rG = ¢ o a � W Z U N U O W z > C'3 Q z 0 Q � r ¢ a � LL H Li C0 Z Q H = N U Z O Z 2 NLLi W 0 Q 3 J Z¢zm O O a ¢a� FILE NAME: \ V A A NOTES: \ \ JAMES KEVIN MA i. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO JAMES BRYSON MA; DOWNSTREAM DIRECTION. 3936, PGE 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. ,I \ \ \ \ \\_ •�/ In 15"T 15T �\ \ \ 9,E 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND REACH TH3 \ \ L 4'lT(\\\ \ SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL \ \ \ \ \ \ ` `\' \ \ \ SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF ---/ ENHANCEMENTII \ X \ \`-.-\� THE TREES TO BE SAVED. (STA 0+63 TO STA7+79) 157 5. \\ \ \ / 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE (( / / ,/ I I + l ` `. \ W q,W_ 12 T \ \ I ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE '" 2.T 18"T PROPOSED CHANNEL. 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS, -' _ —__ / // ��Y� THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL - - - - - + -- i SECTIONS u/ TB �`� 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS / . (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED D2�.-Y—X/ / . . a i.�,t�12"T INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER, 24 12"T 00 15 6+00 B z r z"T LEGEND 111 114 11' 10£ 10: 10: EPRODUC %- Hannah ;RADE RIGHT BANK FROM STA 0+66 TO - \ a v \ 1Y ITAPER TYPICAL BANK GRADING — - - - ;ETAIL IL (DING D3) � \ 36^T � 1z'T I CI \ \ \\ \\ C.P. THOM \ \ � �yy �� �iT 3M � 3'�i�' \ \ - \s EVELYN H. Th 3633, F \ SCALE: HOR 1"=30': VERT 1"=3' 11, 2017 - Ben Carroll 123 120 117 114 111 108 105 102 EXISTING CONTOUR MAJOR — —50- — - EXISTING CONTOUR MINOR ----46----- D2) (SEE DETAIL DWG D2) PROPOSED CONTOUR MAJOR DIFFUSE FLOW STRUCTURE PROPOSED CONTOUR MINOR ------- (SEE DETAIL DWG D4) EXISTING WETLAND (SEE DETAIL DWG D3) EXISTING TOP OF BANK - - - - TB EXISTING BOTTOM OF BANK - - - - BB PROPOSED CENTERLINE OF z�nNw�oNm CHANNEL EXISTING FENCELINE - - - - X EXISTING TREELINE PROPOSED TOP OF BANK N LIMITS OF PROPOSED CONSERVATION EASEMENT La' PROPOSED CHANNELDWG UG D2) (SEE DETAIL DWG D2) PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) BRUSHTOE (SEE DETAIL DWG D3) DOUBLE LOG DROP (SEE DETAIL SHEET D4) LOG TOE PROTECTION SEE DETAIL DWG D2 LOG SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL STRUCTURE (SEE DETAIL DWG D2) LOG VANE (SEE DETAIL DWG D3) LOG J -HOOK (SEE DETAIL DWG D6) RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) BRUSH BED SILL (SEE DETAIL DWG D6) FLOODPLAIN SILL (SEE DETAIL DWG D4) LOG GRADE CONTROL (PROFILE) LOG SILL (PROFILE) DOUBLE LOG DROP (PROFILE) BRUSH BED SILL (PROFILE) RIFFLE GRADE CONTROL (PROFILE) �D CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1) 919 782 9672 www wkdickson.com CENSE NO -71 FULL SCALE: 1"=30 0 30 60 FULL SCALE HALF SCALE I`zz 0a Uf�_�rGaWZ- HH3O ==Uz¢yoa�Yg z�nNw�oNm IIi N N Wa p pCEL 0 cy O w 0M OFZ N Z UO W UQFZZ�> 0 z 0 zy¢a Fr F- 00LLoH ZQOZU Z W LLJQ Z¢zm�O¢a PROJ.DATE: �FEB2016 OCMS O.C. JUN 2016 DRAWING NUMBER: S15 PROJ. NO.: 2015020500� z�nNw�oNm �5��z¢U¢=2zN NN PILLS LUUA I LU VVI I HIN WE I LAND ENHANULMEN I - HIUH AREAS. 2. ALL WETLAND ENHANCEMENT AREAS LOCATED WITHIN ACTIVE PASTURES ARE TO BE PLANTED WITH WETLAND VEGETATION. SEE PLANTING PLAN SHEETS P1 AND P2. ;END J i WETLAND ENHANCEMENT -LOW WETLAND PRESERVATION D FVD CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919782.0495 (0919. 782.9672 vmv✓.wkdickson.com NC. IMENSE NO. rPi14 FULL SCALE: V=30 0 30 60 2" =FULL SCALE HALF SCALE��'cn PROJ. DATE: FEB 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: W1 PROJ. NO.: 2015020500 Iii o $ O � � a a z 0 U Z O z cc O O � � r � O o O �r uj Z � F W. U (� N W � Q Q p S 01:J 0 d Z F � Q Q Z Z N � U Luz z (7 H uJ U 0 :21 f� � Z Q z ¢ z U ¢ o Q� W 0.. v)0 W CJ � Y N _F W U3': I ¢ ¢ a U (� N W � Q Q p S 01:J 0 d Z F � Q Q Z Z N � U Luz z (7 H uJ U 0 :21 f� � Z Q z ¢ z U ¢ o Q� W 0.. v)0 W CJ � U N o z > 0o U3': QZN o � m Z J 2' W z Q � 2 F- Z m U Z LuQ Z 3 W w Iil W = ¢z- mo m O a D ¢ate LEGEND GENERAL WETLAND NOTES: WETLAND RESTORATION 1. PLUG/FILL ALL DITCHES AND REMOVE BERMS/SPOIL PILES LOCATED WITHIN WETLAND ENHANCEMENT - HIGH AREAS. WETLAND ENHANCEMENT -HIGH 2. ALL WETLAND ENHANCEMENT AREAS LOCATED WITHIN ACTIVE PASTURES ARE TO BE PLANTED WITH WETLAND ENHANCEMENT- LOW WETLAND VEGETATION. SEE PLANTING PLAN SHEETS Pi AND P2. WETLAND PRESERVATION D FVD CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919782.0495 (0919. 782.9672 wwW.wkdickson.com NC.0—SE NO.r Pi14 FULL SCALE: 1"=30 0 30 60 2"= FULL SCALE y 1" = HALF SCALES PROJ. DATE: FEB 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: W2 PROJ. NO.: 2015020500 cn wa s o F N O a a Z O U Z O z cc O O � � r � O o O �r uj Z � F W. U (� N W � Q Q U p S 01:J � d Z F � Q Q Z Z N � U LUz z (7 H uJ � _ EU � Z Cw. Q z ¢ U ¢ o Q � W O= W w y O v) W Y N _F W U3': I ¢ ¢ a U (� N W � Q Q U p S 01:J � d Z F � Q Q Z Z N � U LUz z (7 H uJ � _ EU � Z Cw. Q z ¢ U ¢ o Q � W O= W w y O v) W N o z > 0o U3': Z N o � m Z J �' W z Q � � F- Z m U Z LuQ Z 3 W wILW = z ¢z- mo m O a D ¢ate L LEGEND EXISTING FENCE—x—x—x—x—x—x— PROPOSEDFENCE x x t1� 2 q 7_ GG'Am PO J �C R, r' 4 \ ti o'14. � I 869 LF (OVEN N Ds � I e INSTALL 704 LF (TOTAL) OF WOVEN WIRE FENCE. SEE �+ DETAIL DWG D5 4,e INSTALL 1,421 LF (TOTAL) OF WOVEN WIRE FENCE. SEE DETAIL DWG D5 D s Z �� -- z g�� 1 ®® r ............. 0 9 FVD CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919782.0495 (0919. 782.9672 www.wkdickson.com NC.0—SE NO.r Pi14 FULL SCALE: 1"=150 0 150 300 2" = FULL SCALE HALF SCALE��' zOrnz0c5 Cc 16 cO OrZ Oo� ONW � N I— N aO a uUOO�OS�F=Nj ti�otiLLNM LUQa� Zg O zz z 0awZ0�W z , Ir 0 ¢ 0W0 cnlL W <'10 OU 2 m Z 2 zF- Z0 Z m ZWzLuom ate PROJ.DATE: FEB2016 Q.C: MS Q.C. JUN 2016 DRAWING NUMBER: F1 PROJ. NO.: 2015020500wo¢"AW— r t ti�otiLLNM yw¢m¢ Ll Iz PLANTING TABLE Permanent Riparian Seed Mix Camman Nam. Scientific Name Percent compoeaion Virginia Wildrye Elymus virginicus 25% Switchgrass Panic mvirgatum 25% Lid. Blue Stem Schizachynum smpanum 10% Soft Rush J.— .fi — 10% Blackeyed susan Rudbeckia Md. 10% Deenongue Oich.nth.h mcI-d.s n— 10% Wild senna Senna hebecarpa 1 10% Live Staking and Live Cuttings Bundle Tree Species Common Name Sci.mific Name Percent QomPosRion Silky dogwood Comus amomu 20% Silky willow Salix S.— 20% Black willow Salix nig. 40% Cott.r-.d Populus deftoldes 20% E i -- (j) m Wetland and Riparian Planting Camman Nam. Scientific Name Percent C—posalon River birch Betula nigra 15% Willowoak Querns phsllos 10% Swamp chestnut oak OU—Is michauxii 10% Amedcan sycamore Platanus ccidenfalis 10% Black gum Nyssa sylvatica 15% Yellow poplar Lmodendmn tulipifem 15% Overcup oakQuercus lytta 10% Bald cypmss Taxotlium tllstichum 15% 1 I I 'A M m I Z I D C C Ip A rm I I (7 A �Z n ti A I I 7 _ EIF': 6 I PLANTING LEGEND RIPARIAN PLANTING (TOTAL AREA: 26.4 AC) <e PLANTING NOTES ALL PLANTING AREAS 1. EROSION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. THE CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAV TO ENSURE MEASURES ARE FUNCTIONING PROPERLY. 2. DISTURBED AREAS NOT AT FINAL GRADE SHALL BE TEMPORARILY VEGETATED WITHIN 10 WORKING DAYS. UPON COMPLETION OF FINAL GRADING, PERMANENT VEGETATION SHALL BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 10 WORKING DAYS. SEEDING SHALL BE IN ACCORDANCE WITH EROSION CONTROL PLAN. 3. ALL DISTURBED AREAS SHALL BE PREPARED PRIOR TO PLANTING BY DISC OR SPRING -TOOTH CHISEL PLOW TO MINIMUM DEPTH OF 12 INCHES. MULTIPLE PASSES SHALL BE MADE ACROSS PLANTING AREAS WITH THE IMPLEMENT AND THE FINAL PASS SHALL FOLLOW TOPOGRAPHIC CONTOURS. 4. BARE ROOT PLANTINGS SHALL BE PLANTED ACCORDING TO DETAIL SHOWN ON SHEET D2. LIVE STAKES SHALL BE PLANTED ACCORDING TO DETAIL SHOWN ON SHEET D2. 5. TREATMENT/REMOVAL OF INVASIVE SPECIES, PINES AND SWEET GUMS LESS THAN 6- DBH SHALL BE PERFORMED THROUGHOUT THE PLANTED AREA. 5. SPECIES SHALL BE DISTRIBUTED SUCH THAT 3 TO.6 PLANTS OF THE SAME SPECIES ARE GROUPED TOGETHER, 6. BARE ROOT PLANTING DENSITY IS APPROXIMATELY 680 STEMS PER ACRE 7. LIVE STAKES ARE PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS AND ALONG BOTH BANKS OF STRAIGHT REACHES ADJACENT TO POOLS. 8. TEMPORARY SEED MIX SHALL BE APPLIED AT A RATE OF 150 LBS/ACRE TO ALL DISTURBED AREAS WITH SLOPES EQUAL TO OR STEEPER THAN 3:1. 9. PERMANENT RIPARIAN SEED MIX SHALL BEAPPLIED TO ALL DISTURBED AREAS WITHIN THE CONSERVATION EASEMENT AT A RATE OF 15 LBS/ACRE. 10. PERMANENT HERB SEED MIX SHALL BE APPLIED TO ALL DISTURBED AREAS WITHIN THE CONSERVATION EASEMENT BREAKS AT A RATE OF 15 LBS/ACRE. FVD CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. U—SE N0. F mi4 FULL SCALE: 1"=100 0 100 200 2" = FULL SCALE =HALF SCALE I'EL PROJ. DATE: FEB 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: P1 PROJ. NO.: 2015020500 H � � N � a a Z O U H Z O z � 0 � o ¢ F- 0 U U N � Q Q O S 01:J 0 a- 0 � Zg O U Q � z z z 0_ cs �LU 0 a w� � Z Z ¢ o Q � � w o w % ¢' S � a rri o � o z W O a o Y N oQQ, W E i -- (j) m U U N � Q Q O S 01:J 0 a- 0 � Zg O U Q � z z z 0_ cs �LU 0 a w� � Z Z ¢ o Q � � ►= o w % ¢' S � g W O a U z E i -- (j) m O LL t � Z z Q � J H = N 2 I- Z m �U Z Q Z 3 W 'U" W W = z ¢z- DO m O a � ¢ate PLANTING NOTES ALL PLANTING AREAS 1. EROSION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. THE CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE MEASURES ARE FUNCTIONING PROPERLY. 2. DISTURBED AREAS NOT AT FINAL GRADE SHALL BE TEMPORARILY VEGETATED WITHIN 10 WORKING DAYS. UPON COMPLETION OF FINAL GRADING, PERMANENT VEGETATION SHALL BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 10 WORKING DAYS. SEEDING SHALL BE IN ACCORDANCE WITH EROSION CONTROL PLAN. 3. ALL DISTURBED AREAS SHALL BE PREPARED PRIOR TO PLANTING BY DISC OR SPRING -TOOTH CHISEL PLOW TO MINIMUM DEPTH OF 12 INCHES. MULTIPLE PASSES SHALL BE MADE ACROSS PLANTING AREAS WITH THE IMPLEMENT AND THE FINAL PASS SHALL FOLLOW TOPOGRAPHIC CONTOURS. 4. BARE ROOT PLANTINGS SHALL BE PLANTED ACCORDING TO DETAIL SHOWN ON SHEET D2. LIVE STAKES SHALL BE PLANTED ACCORDING TO DETAIL SHOWN ON SHEET D2. 5. TREATMENT/REMOVAL OF INVASIVE SPECIES, PINES AND SWEET GUMS LESS THAN 6" DBH SHALL BE PERFORMED THROUGHOUT THE PLANTED AREA. 5. SPECIES SHALL BE DISTRIBUTED SUCH THAT 3 TO 6 PLANTS OF THE SAME SPECIES ARE GROUPED TOGETHER. 6. BARE ROOT PLAWING DENSITY IS APPROXIMATELY 680 STEMS PER ACRE 7. LIVE STAKES ARE PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS AND ALONG BOTH BANKS OF STRAIGHT REACHES ADJACENT TO POOLS. 8. TEMPORARY SEED MIX SHALL BE APPLIED AT A RATE OF 150 LBS/ACRE TO ALL DISTURBED AREAS WITH SLOPES EQUAL TO OR STEEPER THAN 3:1. 9. PERMANENT RIPARIAN SEED MIX SHALL BE APPLIED TO ALL DISTURBED AREAS WITHIN THE CONSERVATION EASEMENT AT A RATE OF 15 LBS/ACRE. 10. PERMANENT HERB SEED MIX SHALL BE APPLIED TO ALL DISTURBED AREAS WITHIN THE CONSERVATION EASEMENT BREAKS AT A RATE OF 15 LBS/ACRE. PLANTING LEGEND RIPARIAN PLANTING (TOTAL AREA: 26.4 AC) CREEK PLANTING TABLE Wetland and Riparian Planting Common Name Selentific Name Percent ComposRion River birch Betula nigra Permanent Riparian Seed Mix ICommon Querns phellos 10% Percent Il 10% American sycamore Name Scientific Name ComposRion 10% J Nyssa syf alica Virglnla Wild" Elymw virginicus 25% Switchgrass Panicum vi/gatum 25% LJdodendron tukp&. q Overtop oak Little Blue Stem Schizachynum scopanum 10% 10% Bad cypress Taxod dtllstichum Soft Rush Juncos ef/usus 10% Blackeyed Susan Rutlbeckia hila 10% f1, pj Daertongue Dichanthelium clandesbhum10% Mid senna Senna hebecarpe 10% - 4fry Live Staking and Live Cuttings Bundle Tree Species z 'lH/jq' i Common Name Scientific Name CPercent n y Silkyd gwood Cornus 20% amnmu �� Silky willow Salix sericeam 20% Black willow Salix nigra 40% / Cottonwood PopalaS deltoides 20% Wetland and Riparian Planting Common Name Selentific Name Percent ComposRion River birch Betula nigra 15% Willow oak Querns phellos 10% Swamp chestnut oak Quero michauxii 10% American sycamore P/atanu occidentalis 10% Black gum Nyssa syf alica 15% Veliow poplar LJdodendron tukp&. 15% Overtop oak Querous lyrata 10% Bad cypress Taxod dtllstichum 1 15% FVD CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (V) 919782.0495 (0919. 782.9672 www.wkdickson.com Nc.DOENSENO. Fl— FULL SCALE: 1"=100 0 100 200 2" = FULL SCALE y 1" = HALF SCALE I' LEI z0ZO O cc Oro Oo ¢¢a � N F N aO a gN�orLLNM nO�WQQ 0 16 pW0 01:0z� zzz QZ2= 0ZZw 11.Ir z -ow Z 0 U�ZF_FO �wa Z Zzy O 2mZ 2 zt- Z0 ZZzLUWOm ate¢ PROJ.DATE: FEB2016 QC.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: P2 PROJ. NO.: 2015020500%pAmWr t gN�orLLNM nO�WQQ l yw¢D Wz CREEK o i I Gr_Gnln RIPARIAN PLANTING PROPOSED VEGETATION PLOT VP (AREA: 0.02 AC) PROPOSED MONITORING CROSS-SECTION PROPOSED STAGE RECORDER d FVD CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919782.0495 (0919. 782.9672 wwW.wkdickson.com NC.0-SE NO.r Pi14 FULL SCALE: V=200 0 200 400 2" = FULL SCALE HALF SCALES PROJ. DATE: FEB 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: M1 PROJ. NO.: 2015020500 cn wo $ O � � a a z 0 U Z O z cc O O � � r � O o O �r uj Z � F W. I vp U (� N W � Q Q p S 01:J 0 z N � U Z z z � Z Z v ¢ o Q � W x 0 ow ' w � ¢ H 0 Z N o vJ0 W (J O 2 Y N _F W I ¢ ¢ a Q 3 z ¢zm S 00 a � O ¢ate U (� N W � Q Q p S 01:J 0 z N � U Z z z � Z Z v ¢ o Q � W x 0 ow ' w � ¢ H 0 Z N o vJ0 W (J O 2 �N o ¢ zO o O z ¢ �~ m oLL � i Z z � xN F- Z 0 CO Ji I m Lu Z Z w w iii w WREN ANO WHERE TO USE IT SILT FENCE IS APPLICABLE IN AREAS: 1.25 LB./LINEAR FT. STEEL POSTS FLOW U WHERE THE MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE IS 100 -FEET. WHERE THE MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO FENCE LINE) IS 2H:iV. EXTRA STRENGTH THAN B• THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER AN 0.5 CFS. FILTER FABRIC M B MIDDLE LAYER I BOTTOM LAYER L TOPLAYER U.1 EARTH SURFACE DO NOT PLACE SILT FENCE ACROSS CHANNELS OR USE IT AS A VELOCITY CONTROL BMP. ST s CONSTRUCTION SPECIFICATIONS: '9NOA/j0 A V iOggR 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, C 2 WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS HEAVY DUTY PLASTIC TIE g TRENCH NEDEEPO SURFACE PLACED ON EARTH SURFACE IN ASTM D 6461. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND FOR STEEL POSTS PLAN VIEW ENDS OF BAGS IN ADJACENT STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0' TO 120' F. BACKFILL TRENCH WITH COMPACTED EARTH ROWS BUTTEDTOGETHER SEE NOTE TOGETHER Z Z 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 FT STEEL WITH A MINIMUM ' .� ` `` `` ` SEE NOTE ¢ HAVE LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE \' \ �� / LOWEST POINT GROUND SECTION B -B FASTENING THE FABRIC. J�O� \ (L // / LEVEL / Z CONSTRUCTION: �� �� - `^ /✓ O Y N 1. CONSTRUCT THE SEDIMENT BARRIER OF EXTRA STRENGTH SYNTHETIC FILTER FABRICS. BURY FABRIC 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE USE EITHER FLAT -BOTTOM - - - -- - -- - -- 10 GROUND SURFACE (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE OR V -BOTTOM TRENCH EARTH SURFACE FAILURE OF THE STRUCTURE.) SHOWN BELOW SECTION A -A 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER SILT FENCE INSTALLATION g Z H TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. NOTE: END OF DIKE AT GROUND LEVEL TO BE AT GROUNDL VELOF NOTE: ENDO DIKETHE 1. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR 4. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH HIGHER ST OW ISOLATED SECTIONS OF CHANNEL. SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. HIRE OR PLASTIC SUFFICIENT SANDBAGS ARE TO BE CHECK. SUSU O ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. PLACE. PREVENT SCOURING. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS 5. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED FILTER FABRIC FILTER FABRIC FROM STREAM FLOW. LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 6. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. COMPACTED N COMPACTED a SANDBAG BARRIERS SHALL BE CONSTRUCTED OF THREE LAYERS OF 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN 7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH EARTH O EARTH p COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. � SANDBAGS. THE BOTTOM LAVER SHALL CONSIST OF 3 ROWS OF BAGS, THE MIDDLE LAVER SHALL CONSIST OF2ROWS OF BAGS AND THE TOP LAVER SHALL BE STABILIZED IN ONE WORKING DAY. A MAXIMUM OF 200 FEET MAY BE DISTURBED AT ANY ONE TIME. 8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. RUNOFF RUNOFF CONSIST OF 1 ROW OF BAGS. THE RECOMMENDED DIMENSION OF A FILLED SANDBAG SHALL BE APPROXIMATELY 0.5 FTX 0.5 FT%1.5 FT. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING PUMP SIZE SUFFICIENT TO PUMP BASE FLOW. m MAINTENANCE: ( III C III IIJ, 5. DIKE MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED Y y REPAIRS IMMEDIATELY. SANDBAG IMPERVIOUS DIKE SUCH AS SANDBAGS. III NTS SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, - > . FILTER REPLACE IT PROMPTLY. FABRIC 4" FILTER FABRIC 1. INSTALL STIWNG BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAPTHE DOWNSTREAM END OF THE DESIGNATED REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT PROJECT WORKINGAREA. RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE V -SHAPED TRENCH DETAIL DURING CLEANOUT. FLAT -BOTTOM TRENCH DETAIL 2. THE CONTRACTOR SHALL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE FROM UPSTREAM OF THE WORK AREA TO THE STABILIZED AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. OUTFALL. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING TEMPORARY SILT FENCE�\STFO (LOpO COARSE AGGREGATE- OPERATIONS FOR STREAM DIVERSION. NTS STONE SIZE 2"-3" ' 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND DEWATERING PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL ALSO BE PUMPED TO AN OUTFALL STABILIZED WITH CLASS A RIP RAP. 2"Xi" OR 2"X2" WOODEN STAKE MINIMUM 9" EROSION 5. THE CONTRACTOR SHALL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. EXISTING CONTROL STRAW WATTLE NOTE L GRADE 111��� OR COIR WATTLE/LOG EROSION CONTROL WATTLES OR COIR LOGS/WATTLES MAY BE USED IN WHEN DEWATERING AREA, ALL DIRTY WATER MUST BE PUMPED THROUGH A SILT BAG. REMOVE IMPERVIOUS DIKES, PUMPS, AND PLACE OF SILT FENCE. o TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE SLOPESO• M/M\�S DOWNSTREAM DIKE FIRST. \ /\\\\\\�)\�T\\�\\`\` \�\,\ ] 6. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND IMPERVIOUS DIKES AND STABILIZE DISTURBED AREAS WITH %�//vim//jvjv//v//�//��j�j�//EROSION CONTROL WATTLE�� Q SEED AND MULCH. NTS INSTALL WATTLE IN 3" 7. ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING IMPERVIOUS DIKE. TO 5" TRENCH PURPOSE: STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND MOVING DIRECTLY ONTO A PUBLIC ROAD. INSTALLATION NOTES: KEY -IN MATTING PER CONSTRUCTION SPECIFICATIONS: 20' FIG. 1 OR FIG. 2 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE FLOW SITE PREPARATION MIN., MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE DETAIL, AND GRADE AND COMPACT AREA. SMOOTH IT. INTAKE HOSE 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. CLASS REMOVE ALL ROCKS, CLODS, VEGETATION, AND OBSTRUCTIONS SO THAT MATTING WILL HAVE DIRECT CONTACT WITH THE SOIL. ,�� 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. STONE PUMP AROUND PREPARE SEEDBED BY LOOSENING 3 TO INCHES OF TOPSOIL ABOVE FINAL GRADE. KEY -IN AND/OR PUMP STAKE MATTING TEST SOILS FORA ES AND SUBMIT SOIL RESULTS THE JUST ABOVE MAINTENANCE: WORK IZERSTEST ANY TREATMENENT T IF ENGINEER. APPLY AVIV TREATMENT SUCH AS LIME OR FERTILIZERS TO THE SOIL IF NEEDED. CHANNEL TOE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE DE -WATERING AREA SEEDING CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2 -INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. PUMP SEE SHEETS P1 AND P2 FOR SEEDING REQUIREMENTS. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS, OR AIRFIELD PAVEMENTS. IMPERVIOUS APPLY SEED TO SOIL BEFORE PLACING MATTING. DIKE INSTALLATION - STREAM BANK TRENCH APPROX. TRENCH APPROX. SOIL PILE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE IMPERVIOUS DIKE IL4�m 8" WIDE X 8" DEEP 8" WIDE z 8" DEEP FROM TRENCH SO:TRENCH NTS SEE GRADING NOTES ON PLAN AND PROFILE SHEETS AND DETAIL SHEETS FOR INFORMATION FROM REGARDING WHAT AREAS ARE TO RECEIVE COIR MATTING.FLOWOVERLAP FLOW ADJACENT MATS IN DIRECTION PARALLEL FLOW AND ANCHOR EVERT 12°18"( ) DISCHARGE HOSE E E / /////'/\\ � . \�\ MATOSS THE OVERLAP.THE UPSTREAM MAT SHOULD BE PLACED OVER THE DOWNSTREAM FI L=W GENERAL NOTES: LTSCLASS / '\/\\\\/%\\/(� CONSTRUCT DAM ACCORDING TO NCDENR EROSION VEDGES B # 5 WASHEDNOTE: TONEA1. SHOULD BE SHINGLED AWAY FROM THE FLOW OF WATER. //\//\\/�\/ \�\ CONTROL MANUAL. HOSE SHOULD BE / \�j j\ �\�// 2. ROCK DAM RIPRAP SHALL BE 50/50 MIX OF CLASS I AND KEPT OUTSIDE OF WORK LAV MAT LOOSE TO ALLOW CONTACT WITH SOIL DO NOT STRETCH TIGHT. \./SILT .,�\1 ROW OF STAPLES A A 3. PLACE ROCK DAM AS SHOWN ON PLANS. EXTEND CLASS BAGAREA LOCATION ANCHOR MAT U91N0 BIODEGRADABLE STAKES OR PINB. /� ✓ 1 ROW OF STAPLES /'�\ OR STAKES, MIN. OF B RIP RAP ROCK APRON 5 FEET DOWNSTREAM FROM TOE OF ROCK DAM. CUT B". 8" TRENCH ALONG TOP OF BANK FOR MAT TERMINATION AS SHOWN IN FIGURES I&2. l\\S OR STAKES, MIN. OF 24" O.0 EMEND MAT 2 TO 3 FEET PAST TOP OF BANK.///` 24" O.0 STEP 1 PLACE ADJACENT ROLLS IN THE ANCHOR TRENCH WITH A MINIMUM OF 4" OVERLAP. SECURE STABILIZED OUTFALL FILTER FABRIC CLASS A STONE WITH BIODEGRADABLE STAKES OR PINES, BACKFILL ANCHOR TRENCH, AND COMPACT SOIL. STEP 1 1.5' THICK II STAPLE AT 12" INTERVALS ALONG OVERLAP. 1 ROW OF STAPLES 1 ROW OF STAPLES OR STAKES, MIN. OF OR STAKES, MIN. OF STREAM BANK MATTING TO BE INSTALLED FROM TO OF BANK TO A MINIMUM OF 2.0' PAST FLOW 18" O.0 12" O.0 5'-0" MIN. CLASS B B. -I ROCK APRON PLAN DISCHARGE EXISTING HOSE TOP OF BANK. SEE FIGURE 3 FOR TERMINATION AT TOP OF BANK. J� \� IFMORE THAN ROLL IS REQUIRED TO COVER THE CHANNEL FROM THE TOP OF BANK DOWN TO �/ //�/�f�W \ \ \\�\ THE TOE, THEN OVERLAP MATTING BY A MINIMUM OF 1'. //\\�/\\�i\\�/j\�/��//\ �/, ��� \\�\�VCUSSI SOIL FILLED \ \ \ SPILLWAY 2:1 W (SPILLWAY) CREST _ 1- MIN OF # 5 3:1 WASHED STONE MIN 2/3 STREAM WIDTH AND II RIP RAP aFLOWASTONE GROUND STABILIZED 16* TO 20' OUTFALL CLASS FROM SOIL PILE,VVCOMPACT T�l WITH FOOT/// OIL FILLED 1CLASSCBEROSION CONTROL MATTING MUST MEET OR EXCEED THEROM SOIL PILE, �\COMPACT WITH FOOT ROCK APRONM 2FOLLOWING REQUIREMENTS: \`:` --� LOWEST BANK • 100%COCONUT FIBER (COIR) TWINE WOVEN INTO _ LEVEL (MIN) CLASS I AND FILTER FABRIC HIGH STRENGTH MATRIX. STEP 2 CUTOFF II RIP RAP FILTER FILTER 8" OF CLASS A • THICKNESS- 0.351N. MINIMUM. TRENCH SECTION A -A FABRIC FABRIC STONE FIGURE 1 FIGURE 2 SECTION B -B • FLOW VELOCITY -OBSERVED 16 FT/SEC • WEIGHT --38% CHANNEL CHANNEL SILT BAG PROFILE • OPEN AREAA-38% COIR MATTING PUMP AROUND & DEWATERING DETAIL NTS TEMPORARY ROCK CHECK DAM NTS NTS FVD CKSON community Infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v)919.782.0495 (t) 919.782.9672 www.wkdickson.com NC. UCENSE No -14 PROJ. DATE: �JULY2016 CC.:MS Q.C. DATE: JUN 2016 DRAWING NUMBER: D1 PROJ. NO.: 2015020500 111 a s O c a Z O U H z 0 z cc � O ¢ F- 0 � O I o ¢ ? O (EL CC 0 jr 9 U U N U.1 p o a s d 2 Q Q Z Z � J ¢ � w � uj Z � O Y N oQQf _ W � � wU U U N U.1 p o a s d 2 Q Q Z Z � J ¢ � w � W O w w y � O Q � � wU 10 0 � <' 8W ¢ C0 m e�2 g Z H = ry � Z a Q 7 W Z Z W W W W O Z ¢Z - O a ¢ate NOTES: 1. LOGS SHOULD BEAT LEAST 10 INCHES IN DIAMETER, 5-8 FEET LONG, RELATIVELY STRAIGHT, AND HARDWOOD. 2. CABLE ANCHORS SHOULD BE PLACED V TO Y FROM EACH END OF LOG. REBAR (5/8" MINIMUM DIAMETER 3' MIN. LENGTH TYPICAL) MAY BE USED AS A SUBSTITUTION FOR CABLE ANCHORS PER DIRECTION OF ENGINEER. 3. IF REBAR IS USED, PRE -DRILL HOLES WITH 518" DRILL BIT. BANKFULL ELEVATION III TO 113 OF LOG DIAMETER CAN BE EXPOSED PRIOR TO FINAL GRADING -PROPOSED BED NTS BANKFULL ELEVATION 1.5' MINIMUM (1T LIFTS) 1 OSED NG BED LOG DIAMETER NNEL INVERT NOES; 1. INSTALL STAKES ON S CENTERS ON EACH SIDE OF ROLL. TOP OF STAKE SHOULD NOT EXTEND ABOVE ROLL. 2. EXCAVATE A SMALL TRENCH (DEPTH APPROX} TO j OF LOG DIAM)FOR PLACEMENT OF ROLL. 3. COIR LOGS SHALL BE 10 FT LONG AND HAVE A DIAMETER OF 121N. COIR LOG (TOE PROTECTION) NTS NEW CHANNEL TO BE 03� CONSTRUCTED OLD CHANNEL TO r�CHANNELPLUG BE DIVERTED OR ABANDONED PLAN VIEW 30' IMPERVIOUS SELECT MATERIALS TYPICAL SECTION (PER DIRECTION OF ENGINEER) CHANNELPLUG NTS BANKFULL ELEVATION -NEW CHANNEL BANK SHALL BE TREATED AS SPECIFIED IN PLANS CHANNEL INVERT LOG TOE OR COIR LOG CHANNEL BOTTOM OF BANK B FLOW I I I A I CHANNEL TOP .dam OF BANK 5.0' A MIN I I I I TYPICAL PLAN VIEW NOTES: 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. 2. LOG DIMENSIONS: MIN DIAM. = 10", MIN LENGTH = 15' 3, NAIL FILTER FABRIC USING 3" 10D GALVANIZED COMMON NAIL EVERY 1.6 ALONG THE LOG 4. DUCKBILL ANCHORS MAY BE USED IN PLACE OF REBAR. PLANTED COIR - FIBER ROLL NORMAL WATER LEVEL f DENSE COIR MATTING JI (ROLANKA BIODI 90 OR EQUIVALENT) WOOD STAKE SECTION VIEW PROPOSED STREAM BED MIN I COARSE AGGREGATE -� 4 BACKFILL (1"TO 4") B NON -WOVEN GEOTEXTILE FABRIC (NCDOTTYPE II) TACK FABRIC TO LOG SECTION A -A PROPOSED STREAM BANK HEADER LOG - - FOOTERLOG - REBAR OR DUCKBILL ANCHOR 0.75" TO T PLANTER, FIRMING FORWARD SOIL AT BOTTOM, FIRMING SOIL \��.. MINIMUM OFOF LOG THOROUGHLY. DIAMETER BEDDED BELOW D 1.25' EXISTING CHANNEL INVERT 10" MINIMUM LOG NOTES: DIAMETER (TYP.) BARE ROOTS SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM INSTALL CABLE ANCHOR AS SHOWN. DRILL (OR SAW 0.5' TO 1.5' CUTI PILOT HOLE THROUGH LOG Ay TO Y OF THE WAY DOWN SO THAT ANCHOR CABLE IS NOT EXPOSED. LOG TOE PROTECTION NTS BANKFULL ELEVATION 1.5' MINIMUM (1T LIFTS) 1 OSED NG BED LOG DIAMETER NNEL INVERT NOES; 1. INSTALL STAKES ON S CENTERS ON EACH SIDE OF ROLL. TOP OF STAKE SHOULD NOT EXTEND ABOVE ROLL. 2. EXCAVATE A SMALL TRENCH (DEPTH APPROX} TO j OF LOG DIAM)FOR PLACEMENT OF ROLL. 3. COIR LOGS SHALL BE 10 FT LONG AND HAVE A DIAMETER OF 121N. COIR LOG (TOE PROTECTION) NTS NEW CHANNEL TO BE 03� CONSTRUCTED OLD CHANNEL TO r�CHANNELPLUG BE DIVERTED OR ABANDONED PLAN VIEW 30' IMPERVIOUS SELECT MATERIALS TYPICAL SECTION (PER DIRECTION OF ENGINEER) CHANNELPLUG NTS BANKFULL ELEVATION -NEW CHANNEL BANK SHALL BE TREATED AS SPECIFIED IN PLANS CHANNEL INVERT LOG TOE OR COIR LOG CHANNEL BOTTOM OF BANK B FLOW I I I A I CHANNEL TOP .dam OF BANK 5.0' A MIN I I I I TYPICAL PLAN VIEW NOTES: 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. 2. LOG DIMENSIONS: MIN DIAM. = 10", MIN LENGTH = 15' 3, NAIL FILTER FABRIC USING 3" 10D GALVANIZED COMMON NAIL EVERY 1.6 ALONG THE LOG 4. DUCKBILL ANCHORS MAY BE USED IN PLACE OF REBAR. PLANTED COIR - FIBER ROLL NORMAL WATER LEVEL f DENSE COIR MATTING JI (ROLANKA BIODI 90 OR EQUIVALENT) WOOD STAKE SECTION VIEW PROPOSED STREAM BED MIN I COARSE AGGREGATE -� 4 BACKFILL (1"TO 4") B NON -WOVEN GEOTEXTILE FABRIC (NCDOTTYPE II) TACK FABRIC TO LOG SECTION A -A PROPOSED STREAM BANK HEADER LOG - - FOOTERLOG - REBAR OR DUCKBILL ANCHOR 0.75" TO T PLANTER, FIRMING FORWARD SOIL AT BOTTOM, FIRMING SOIL MATTING j THOROUGHLY. FLAT TOP END D 1.25' PLANTING NOTES: @I� NOTES: MIN 3.0' BARE ROOTS SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM DURING PLANTING, SEEDLINGS SHALL BE KEPT IN A MOIST CANVAS 0.5' TO 1.5' BAG OR SIMILAR CONTAINER TO CENTER, APPROXIMATELY 680 LATERAL ~ 2.0' TO 3.0' DRYING. DETAIL _ �(� � __ BUD PLANTING BAR SHALL HAVE A PLAN VIEW LIVE STAKES SHOULD BE LONG ENOUGH 11 `✓/T' LONG, 41NCHES WIDE AND 1 INCH 2-4 FT INTO BANK 1. DESIGNER TO MARK LOCATIONS AND DIMENSIONS OF TO REACH BELOW THE GROUNDWATER TABLE. (GENERALLY, A LENGTH OF 2 TO ROOT PRUNING SILLS IN THE FIELD PRIOR TO CONSTRUCTION. ALL SEEDLINGS SHALL BE ROOT 3 FEELS SUFFICIENT.) ADDITIONALLY. INCHES BELOW THE ROOT COLLAR. TOP OF STAKE SHOULD NOT EXTEND ABOVE ROLL. THESTAKES SHOULD HAVE A DIAMETER 3'. EXCAVATE A SMALL TRENCH(APPROX tin DEEP) FOR PLACEMENT OF ROLL. IN THE RANGE OF 0.75 TO 2 INCHES. " SIDE BRANCH NTS _ REMOVED AT SLIGHT ANGLE MIN 18' COARSE AGGREGATE WATER TABLE IV TO 4") SECTION B -B REBAR (5/8' MIN. DIAMETER, 4' MIN. LENGTH) OR DUCKBILL ANCHORS INSTALLED PER MANUFACTURERS LOG GRADE CONTROL INSTRUCTIONS(TYP.) NTS BACKFILL AREA BETWEEN BANK AND COIR FIBER ROLL (APPLY PERMANENT SEED MIX 8 COIR MATING) EXISTING BANK PLANTED COIR FLOW FIBER ROLL PLANTER, FIRMING FORWARD SOIL AT BOTTOM, FIRMING SOIL WOOD j THOROUGHLY. STAKES D 1.25' PLANTING NOTES: @I� NOTES: PLANTING BAG BARE ROOTS SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM DURING PLANTING, SEEDLINGS SHALL BE KEPT IN A MOIST CANVAS SPACING, AVERAGING 8 FT. ON BAG OR SIMILAR CONTAINER TO CENTER, APPROXIMATELY 680 PREVENT THE ROOT SYSTEMS FROM 2.0' TO 3.0' DRYING. KBC PLANTING BAR KEY IN UPSTREAM PLANTING BAR SHALL HAVE A PLAN VIEW END OFROLLAPPROX NOTES, LONG, 41NCHES WIDE AND 1 INCH 2-4 FT INTO BANK 1. DESIGNER TO MARK LOCATIONS AND DIMENSIONS OF ROOT PRUNING SILLS IN THE FIELD PRIOR TO CONSTRUCTION. ALL SEEDLINGS SHALL BE ROOT 2. INSTALL STAKES ON X CENTERS ON EACH SIDE OF ROLL. INCHES BELOW THE ROOT COLLAR. TOP OF STAKE SHOULD NOT EXTEND ABOVE ROLL. 3'. EXCAVATE A SMALL TRENCH(APPROX tin DEEP) FOR PLACEMENT OF ROLL. VEGETATED SILL DEFLECTOR NTS _ BACKFILL (12" TO 18" LIFTS) NOTES: 1. FILL EXISTING CHANNEL TO BANKFULL ELEVATION WHEN POSSIBLE. 2. CHANNEL MUST BE FILLED IN 12" TO 18" LIFTS, 3. IF CHANNEL CANNOT BE COMPLETELY FILLED TO TOP OF BANK, FILL TO TOP OF BANK FOR 25' OUT OF EVERY 100' SEGMENT. CHANNEL BACKFILL NTS 45 DEGREE TAPERED BUTT END SECTION VIEW LIVE STAKES SHALL BE SPACED 3 FEET APART, ALTERNATE SPACING. NOTE: 1, ACCEPTABLE SPECIES INCLUDE BLACK WILLOW (SALIX NIGRA), SILKY WILLOW (SALIX SERICEA) AND SILKY DOGWOOD (CORNUS AMMOMUM). 2. LIVE STAKES SHALL BE PLANTED IN AN AREA EXTENDING 3 FEET OUT FROM TOP OF BANK TO JUST BELOW BANKFULL. LIVE STAKE NTS METHODDIBBLE PLANTING USING THE KBC PLANTING BAR ,� -sn '� I I II n' 11-111 '. Ilbll- SII -II n I n= � n n nl I n %I,N= Ian=,hi=i nnal�=n�%=n it R,hi n 5��n I �nl 1. INSERT 2. REMOVE 3. INSERT PLANTING BAR AS PLANTING BAR PLANTING BAR 2 SHOWN AND PULL AND PLACE INCHES TOWARD HANDLETOWARD SEEDING ATPLANTER FROM PLANTER. CORRECT DEPTH. SEEDING. I II '�11=1L,11 I. II II 11 II I II 11111 I nu n nano nn.I�ILUI 11 IL 1L II JI n ll v. II 1 JI I I 11 II I� 11- n II II II II LL':;II LL I II JY IICII II Ik^II 11 II II[ II�� II II II I II -ISI IL IL L JI IIS II II 1 J II LL I I ]I I .R 4. PULL HANDLE OF 5. PUSH BARTOWARD HANDLE 6. LEAVE COMPACTION PLANTER, FIRMING FORWARD SOIL AT BOTTOM, FIRMING SOIL HOLE OPEN. WATER AT TOP. THOROUGHLY. PLANTING NOTES: @I� NOTES: PLANTING BAG BARE ROOTS SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM DURING PLANTING, SEEDLINGS SHALL BE KEPT IN A MOIST CANVAS SPACING, AVERAGING 8 FT. ON BAG OR SIMILAR CONTAINER TO CENTER, APPROXIMATELY 680 PREVENT THE ROOT SYSTEMS FROM PLANTS PER ACRE. DRYING. KBC PLANTING BAR PLANTING BAR SHALL HAVE A BLADE WITH A TRIANGULAR CROSS SECTION, AND SHALL BE 12 INCHES LONG, 41NCHES WIDE AND 1 INCH THICK AT CENTER. ROOT PRUNING ALL SEEDLINGS SHALL BE ROOT PRUNED, IF NECESSARY, SO THAT NO ROOTS EXTEND MORE THAN 10 INCHES BELOW THE ROOT COLLAR. BARE ROOT PLANTING NTS FVD CKSON community Infrastructure Consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. UCENSE NoT 74 Nw$i�wu�wMy �cnN?ZZccOr UL O 'LU LU ULI IN UJI 09 L5 DZ O�f W��rOa¢WQQ F- 16 d�Z 2OZ Z w¢ Uo_ A z ¢tiQ UO C/)0 O WU <'10 DO a Ftm[1)UCZUU 2 Z Zm Z Wwlu Hin PROJ. DATEJULY 2016 QC: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: D2 PROJ. NO.: 2015020500w>e�Aw- �t _ l TIE TO EXISTING GRADE MIN SLOPE 2.5H TV NOTES: 1. TREES NOT INDICATED TO BE REMOVED SHALL BE PROTECTED DURING CONSTRUCTION IN ACCORDANCE WITH PLANS. 2. SEED AND MULCH ALL BANKS PRIOR TO INSTALLING COIR MATTING. INSTALL COIR MATTING PER DETAIL DWG D1 - EXCAVATE / GRADE UPPER BANK INSTALL LIVE STAKES (SEE PLANTING PLAN) - EXISTING CHANNEL BANK (DESIGNER TO MARK IN FIELD PRIOR TO CONSTRUCTION) EXISTING 10'TO 15' CHANNELBED BENCH PLAN VIEW -TRENCHING METHOD IOULDER AS DIRECTED IY ENGINEER) ROOT WAD IF ROOT WAD DOES NOT COVER ENTIRE BANK & CONSTRUCTION IS BETWEEN MID OCTOBER TO MID MARCH, PROTECT BANK SOD MATS WITH BRUSH LAYER. FLOOD PLAIN TOP OF BANK BOULDER4,:BAGEFL( BANK (AS DIRECTED BY ENGINEER) BOULDER 24" MIN' DIAMETER FOOTER LOG> 12' DIAMETER MINIMUM OF 1/2 OF DIAMETER 10-15 FEET LONG INSTALLED BELOW STREAM BED >10" DIAMETER CROSS SECTION VIEW �O 4 ROOT WAD BOULDER (AS DIRECTED BY ENGINEER) PLAN VIEW - DRIVE POINT METHOD DRIVE POINT METHOD: SHARPEN THE END OF THE LOG WITH A CHAINSAW BEFORE "DRIVING' IT INTO THE BANK. ORIENT ROOT WADS UPSTREAM SO THAT THE STREAM FLOW MEETS THE ROOT WAD AT A 90—DEGREE ANGLE, DEFLECTING THE WATER AWAY FROM THE BANK. A TRANSPLANT OR BOULDER SHOULD BE PLACED ON THE DOWNSTREAM SIDE OF THE ROOT WAD IF A BACK EDDY IS FORMED BY THE ROOT WAD. THE BOULDER SHALL BE APPROXIMATELY 3' X 3' X 2'. TRENCHING METHOD: IF THE ROOT WAD CANNOT BE DRIVEN INTO THE BANK OR THE BANK NEEDS TO BE RECONSTRUCTED, THE TRENCHING METHOD SHOULD BE USED. THIS METHOD REQUIRES THAT A TRENCH BE EXCAVATED FOR THE LOG PORTION OF THE ROOT WAD. IN THIS CASE, A FOOTER LOG SHOULD BE INSTALLED UNDERNEATH THE R00T WAD IN A TRENCH EXCAVATED PARALLEL TO THE BANK AND WELL BELOW THE STREAMBED. ONE-THIRD OF THE ROOT WAD SHOULD REMAIN BELOW NORMAL BASE FLOW CONDITIONS. ROOTWAD NTS INSTALL COIR MATTING PER DETAIL DWG Dt II MIN 2.0' COMPACTED SOIL -•^W,•Y^�.w« I LIVE STAKES TOP OF BANK LIVE CUTTINGS SMALL BRANCH ES -- AND BRUSH 1/4 MAX POOL DEPTH"'+?S �1 - -_..--- _.._ 1/4 MAX POOL DEPTH II - SMALL LOGS AND/OR LARGE BRANCHES WITH A MIN DIAMETER OF 4'. SECTION A -A NOTES 1. OVER EXCAVATE THE OUTSIDE BEND OF THE CHANNEL. PLACE LARGER BRANCHES AND LOGS IN A CRISS-CROSS PATTERN. LOCK IN PLACE WITH FILL COVERING 61N TO 181N OF THE LARGER BRANCHES/SMALL LOGS. 2. PLACE SMALLER BRANCHES AND BRUSH OVER THE LARGER BRANCHESISMALL LOGS (HARDWOOD SPECIES ONLY) AND COMPACT LIGHTLY TOGETHER. BACKFILL AND COMPACT TO LOCK IN PLACE. 3. ACCEPTABLE LIVE CUTTINGS SPECIES A INCLUDE BLACK WILLOW (SALIX NIGRA) AND SILKY WILLOW (SALIX SERICEA). WILLOW CUTTINGS SHOULD BE RINSED AT CUTTING POINT TO ALLOW BETTER ROOTING. 4, INSTALL EROSION CONTROL (COIR) MATTING OVER COMPACTED SOIL PER DIRECTION OF ENGINEER. 5. INSTALL i TO 3 ROWS OF LIVE STAKES ABOVE THE LIVE CUTTINGS LAYER PER DIRECTION OF ENGINEER. FVO`N 1 '•� BALLAST BOULDER BANKFULL '1 OR DUCKBILL ANCHORS LEFT OR RIGHT VANE ARM BANK COIR MATTING INTERCEPT CONTROL POINT PLAN VIEW FL -'W VARIES -------- ' 3Ho�TO1% BANKFULL STREAM BANK _ /--F CHANNELTOP <j�S --- - lOW COARSE AGGREGATE /// - �� OF BANK \ BACKFILL (7"TO5") POOL FOOTER LOG \ HEADER LOG p� FOOTER LOG HEADER LOG TOE OF BANK - - PROFILE VIEW A \ STREAM BED IN POOL CHANNEL BOTTOM OF BANK NON -WOVEN GEOTEXTILE FABRIC (NCDOTTYPE - - _ VARIES LOG VANE TYPICAL PLAN VIEW 0, TOJWIDTH NTS BRUSH TOE rvrs SECTION A -A FVD CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v)919.782.0495 (f) 919.782.9672 wwWwkdickson.com NC. LICENSE NO FW14 PROJ. DATE: �JULY2016 Q.C. MS Q.C. DATE: JUN 2016 DRAWING NUMBER: D3 PROJ. NO.: 2015020500 LU � N r� O c a Z O U Z O z cc � O ¢ r to 0 LL O (LU LU Up EL Z jr 09 L5 cc z w. 9 TYPICAL BANK GRADING NTS U TOE OF BANK NOTES: U-1 1. LOG VANES SHALL BE CONSTRUCTED OF ONE OR MORE LOGS HELD IN PLACE BY EITHER BALLAST BOULDERS, DUCKBILL � Q ANCHORS, OR REBAR. LOGS SHALL BE OF A LENGTH AND DIAMETER SPECIFIED BY THE DESIGNER AND BE RELATIVELY NON -WOVEN GEOTEXTILESTREAM STRAIGHT HARDWOOD, RECENTLY HARVESTED. THE LENGTH SHALL BE SUCH THAT THE LOG IS BURIED INTO THE SOIL OF THE BANK (ON ONE END)ANO STREAM BED (ON THE OTHER END) A MINIMUM DISTANCE OF 4.0'. FLAT -SIDED BALLAST FABRIC (NC00T TYPE II) / OyA STREAM BANK BOULDERS SHALL BE OF SIZE 2'X 2'X 1.5'OR AS SPECIFIED BY THE DESIGNER, Y2W/D 4 2...._...................................................._._........................................ AN ELEVATION CONTROL POINT MAY BE ESTABLISHED AT THE LEFT OR RIGHT STREAM BANKNANE INTERCEPT POINT. THE VANE INTERCEPT LOCATION MAY BE OTHERWISE DESCRIBED BY ITS RELATIONSHIP TO BANKFULL STAGE OR BY THE LENGTH /•7� AND SLOPE OF THE VANE ARM. BANKFULL IS NOT NECESSARILY THE TOP OF THE STREAM BANK SLOPE. ... ........ jr -BALLAST BOULDER 3. FILTER FABRIC SHALL BE USED TO SEAL THE GAPS BETWEEN THE LOGS AND UNDER THE COARSE BACKFILL MATERIAL OFM THE / OR DUCK BILL ANCHORS VANE. THERE SHALL 8E NO FILTER FABRIC VISIBLE IN THE FINISHED WORK; EDGES SHALL BE FOLDED TUCKED, OR TRIMMED AS W NEEDED. q 4. LOG VANES SHALL BE BUILT TYPICALLY AS FOLLOWS: oQQf W % A. OVER -EXCAVATE STREAM BED TO A DEPTH EQUAL TO THE TOTAL THICKNESS OF THE HEADER (AND FOOTER IF COARSE SPECIFIED) LOGS. 8. PLACE FOOTER LOG OF THE VANE ARM IF SPECIFIED. THE SLOPE OF THE VANE ARM IS MEASURED ALONG THE VANE AGGREGATE ARM WHICH IS INSTALLED AT AN ANGLE TO THE STREAM BANK AND PROFILE. BACKFILL BANKFULL C. INSTALL HEADER LOG OF THE VANE ARM ON TOP OF AND SLIGHTLY FORWARD OR BACK FROM THE FOOTER LOG. (1"TO 5") D. NAIL FILTER FABRIC TO THE HEADER LOG USING A GALVANIZED NAIL WITH A PLASTIC CAP. THE SIZE AND GAGE OF NAIL Z I— Z� LD AND NAIL SPACING SHALL BE SPECIFIED BY THE DESIGNER. E. PLACE BALLAST BOULDERS OR DUCKBILL ANCHOR ON THE VANE. A LOG VANE F. PLACE COARSE BACKFILL BEHIND LOGS ENSURING THAT ANY VOIDS BETWEEN THE LOGS ARE FILLED. G. BACKFILL REMAINDER OF VANE WITH PREVIOUSLY EXCAVATED MATERIAL. / i 5. IF ANY EROSION CONTROL MATTING IS SPECIFIED FOR USE IN THE VICINITY OF THE STREAM BANK(VANE INTERCEPT POINT THE a MATTING EDGES SHALL BE NEATLY SECURED AROUND THE LOGS. / POOL Y I LEFT OR RIGHT VANE ARM BANK ({ INTERCEPT CONTROL POINT PLAN VIEW -TRENCHING METHOD IOULDER AS DIRECTED IY ENGINEER) ROOT WAD IF ROOT WAD DOES NOT COVER ENTIRE BANK & CONSTRUCTION IS BETWEEN MID OCTOBER TO MID MARCH, PROTECT BANK SOD MATS WITH BRUSH LAYER. FLOOD PLAIN TOP OF BANK BOULDER4,:BAGEFL( BANK (AS DIRECTED BY ENGINEER) BOULDER 24" MIN' DIAMETER FOOTER LOG> 12' DIAMETER MINIMUM OF 1/2 OF DIAMETER 10-15 FEET LONG INSTALLED BELOW STREAM BED >10" DIAMETER CROSS SECTION VIEW �O 4 ROOT WAD BOULDER (AS DIRECTED BY ENGINEER) PLAN VIEW - DRIVE POINT METHOD DRIVE POINT METHOD: SHARPEN THE END OF THE LOG WITH A CHAINSAW BEFORE "DRIVING' IT INTO THE BANK. ORIENT ROOT WADS UPSTREAM SO THAT THE STREAM FLOW MEETS THE ROOT WAD AT A 90—DEGREE ANGLE, DEFLECTING THE WATER AWAY FROM THE BANK. A TRANSPLANT OR BOULDER SHOULD BE PLACED ON THE DOWNSTREAM SIDE OF THE ROOT WAD IF A BACK EDDY IS FORMED BY THE ROOT WAD. THE BOULDER SHALL BE APPROXIMATELY 3' X 3' X 2'. TRENCHING METHOD: IF THE ROOT WAD CANNOT BE DRIVEN INTO THE BANK OR THE BANK NEEDS TO BE RECONSTRUCTED, THE TRENCHING METHOD SHOULD BE USED. THIS METHOD REQUIRES THAT A TRENCH BE EXCAVATED FOR THE LOG PORTION OF THE ROOT WAD. IN THIS CASE, A FOOTER LOG SHOULD BE INSTALLED UNDERNEATH THE R00T WAD IN A TRENCH EXCAVATED PARALLEL TO THE BANK AND WELL BELOW THE STREAMBED. ONE-THIRD OF THE ROOT WAD SHOULD REMAIN BELOW NORMAL BASE FLOW CONDITIONS. ROOTWAD NTS INSTALL COIR MATTING PER DETAIL DWG Dt II MIN 2.0' COMPACTED SOIL -•^W,•Y^�.w« I LIVE STAKES TOP OF BANK LIVE CUTTINGS SMALL BRANCH ES -- AND BRUSH 1/4 MAX POOL DEPTH"'+?S �1 - -_..--- _.._ 1/4 MAX POOL DEPTH II - SMALL LOGS AND/OR LARGE BRANCHES WITH A MIN DIAMETER OF 4'. SECTION A -A NOTES 1. OVER EXCAVATE THE OUTSIDE BEND OF THE CHANNEL. PLACE LARGER BRANCHES AND LOGS IN A CRISS-CROSS PATTERN. LOCK IN PLACE WITH FILL COVERING 61N TO 181N OF THE LARGER BRANCHES/SMALL LOGS. 2. PLACE SMALLER BRANCHES AND BRUSH OVER THE LARGER BRANCHESISMALL LOGS (HARDWOOD SPECIES ONLY) AND COMPACT LIGHTLY TOGETHER. BACKFILL AND COMPACT TO LOCK IN PLACE. 3. ACCEPTABLE LIVE CUTTINGS SPECIES A INCLUDE BLACK WILLOW (SALIX NIGRA) AND SILKY WILLOW (SALIX SERICEA). WILLOW CUTTINGS SHOULD BE RINSED AT CUTTING POINT TO ALLOW BETTER ROOTING. 4, INSTALL EROSION CONTROL (COIR) MATTING OVER COMPACTED SOIL PER DIRECTION OF ENGINEER. 5. INSTALL i TO 3 ROWS OF LIVE STAKES ABOVE THE LIVE CUTTINGS LAYER PER DIRECTION OF ENGINEER. FVO`N 1 '•� BALLAST BOULDER BANKFULL '1 OR DUCKBILL ANCHORS LEFT OR RIGHT VANE ARM BANK COIR MATTING INTERCEPT CONTROL POINT PLAN VIEW FL -'W VARIES -------- ' 3Ho�TO1% BANKFULL STREAM BANK _ /--F CHANNELTOP <j�S --- - lOW COARSE AGGREGATE /// - �� OF BANK \ BACKFILL (7"TO5") POOL FOOTER LOG \ HEADER LOG p� FOOTER LOG HEADER LOG TOE OF BANK - - PROFILE VIEW A \ STREAM BED IN POOL CHANNEL BOTTOM OF BANK NON -WOVEN GEOTEXTILE FABRIC (NCDOTTYPE - - _ VARIES LOG VANE TYPICAL PLAN VIEW 0, TOJWIDTH NTS BRUSH TOE rvrs SECTION A -A FVD CKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v)919.782.0495 (f) 919.782.9672 wwWwkdickson.com NC. LICENSE NO FW14 PROJ. DATE: �JULY2016 Q.C. MS Q.C. DATE: JUN 2016 DRAWING NUMBER: D3 PROJ. NO.: 2015020500 LU � N r� O c a Z O U Z O z cc � O ¢ r to 0 LL O (LU LU Up EL Z jr 09 L5 cc z w. 9 U U N U-1 z O � Q S D_ 2 Q Q Q Z Z Z J � W ¢ ylm w O o_ W Z O Y N oQQf W � � W U U U N U-1 z O � Q S D_ 2 Q Q Q Z Z Z J � W ¢ ylm w O o_ W � w w � � W U ~ N O Q z > 0 � O ZOw ¢ CI) m g Z Z I— Z� LD W Z Z W W W W O Z ¢Z - O a ¢ate PLAN VIEW NOTE: REBAR (1/2" MINIMUM DIAMETER 3' MIN. LENGTH TYPICAL) SHOULD BE PLACED T TO 3' FROM END OF LOG. ADDITIONAL REBAR TO BE PLACED AT 6' OFFSETS. LAST REBAR SHOULD BE PLACED V TO 3' FROM END OF LOG. DUCK BILL ANCHORS MAY BE USED AS A SUBSTITUTION FOR REBAR. 2 PER LOG. FLOODPLAIN SILL NTS PROPOSEDFLOODPIAIN SURFACE DOWN VALLEY B" (TVP.) `.L\\\\\ i E.0' `518'RERAR SECTIONAL VIEW A - A' C PLAN VIEW M1�5FT MIN 5� PROFILE B -B' DOWNSTREAM LOG MIN SIFT MIN SFT OVERLAP OF UPSTREAM LOG 4% To 6% PROFILE C -C' NOTES: 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. 2. LOG DIMENSIONS: MIN DIAM. = 12", MIN LENGTH = 18' 3. NAIL FILTER FABRIC USING 3" 10D GALVANIZED COMMON NAIL EVERY 1.5' ALONG THE LOG DOUBLE LOG DROP NTS TS OF THIS DOCUMENT; ADDMONS OR DELETI n Set)2015020500RA_BHT DETAILS.dwg - April 11 CHANNEL BOTTOM OF BANK COARSE BACKFILL NONWOVEN GEOTEXTILE FABRIC (NCDOT TYPE II) Et ROOTWAD OR BRUSHTOE— CHANNEL TOP OF BANK CHANNEL BOTTOM OF BANK COARSE BACKFILL FILTER FABRIC B ROOTWAD OR BRUSHTOE� � 5.0 MIN I I I I A POC I I TYPICAL PLAN VIEW (OPT 1) FLOW I I I A I I 5.0' IN I I I I I —� CHANNELTOP DF A P00 BANK TYPICAL PLAN VIEW (OPT 2) PROPOSED STREAM REBAR OR DUCKBILL BED ANCHOR COARSEAGGREGATE BACKFILL (1" TO 5") MIN. 5.0' POOL APPROX. 0.75' TO 1.5' — DEEP —__— COARSE AGGREGATE BACKFILL (1"TO 5") B GEOVEXTILE FABRIC TACK FABRIC TO—/ (NCDOT TYPE II) LOG SECTION A -A HEADER FOOTER 1, 4' MIN. LENGTH) OR -ED PER MANUFACTURERS INSTRUCTIONS (TYP.) SECTION B -B (OPT 1) (REAM BANK HEADER LOG \ I1°A 703% B ;H FOOTER LOG REBAR (5/8" MIN. DIAMETER, W MIN. LENGTH) OR DUCKBILL ANCHORS INSTALLED PER MANUFACTURERS OVERLAP OF INSTRUCTIONS MP.) DOWNSTREAM LOG SECTION B -B (OPT 21 NOTES: 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. 2. LOG DIMENSIONS: MIN DIAM. =12", MIN LENGTH = 18' NAIL FILTER FABRIC USING 3"10D GALVANIZED COMMON NAIL EVERY 1.5' ALONG THE LOG LOG SILL 3. DUCKBILL ANCHORS MAY BE USED IN PLACE OF REBAR. NTS DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919 782 9672 www.wkdickson.com NC. LICENSE W. I—MCD200 20 61LUCr z PROW. DATE: JULY 2016 G.C.: MS O.C. DATE: JUN 2016 DRAWING NUMBER: D4 PROJ. NO.: 2015020500 3 0 HEADER LOG H O J V a %INVERT ELEVATION EXISTING DITCHLOG BANK LL y\i B EXISTING DITCH SILL (SEE DETAIL) EXISTING GRADE PROPOSED CONSERVATION EASEMENT LIMITS LOG HEADE4'708' Z Z LOG STRUCTURE (SEE DETAIL) O d TOP OF BANK �G � PROPOSED GRADE F- Z O C7 Z 1 I � O m w BANKFULL > POINT REFERENCED IN MIN 5.0' � Q ¢ a U N w STRUCTURE TABLE ____ --- O.SS SLOPE - ---- -------- TIE-IN 70 - ¢ � Z. '=w m COARSE AGGREGATE c cILL � Z Z ¢ DROP OF 0.5 FT ---__-� _ MAX -- --- EXISTING ylf W Z 2 Z 3 ¢ N W W III Z ¢zm FILL DITCH SUCH THAT EXISTING ._, �J I� < FLOODPLAIN �\ -��J1�� 1�c��G ELEVATION d' PROPOSED HEADER THE DOWNSTREAM DITCH INVERT O H� LIMITS\\� /�" COARSE AGGREGATE NTO EXISTING GRA EELEVATION TIES IOF THE CONSTRUCT FLOW BACKFILL (2" TO 6") FILL DITCH AND OF GRADING �`///��� 'MIN FLOODPLAIN LOG BURIED IN POOL INSTALL COIR J 9V /j' B SECTION A -A MMATTINGMATTING\i ¢ GEOTEXTILE LOG BURIED IN FABRIC (NCDOT L) Q. POINT REFERENCED IN GRADE AREA SUCH THAT EXISTING TYPE II) PROFILE A -A' STRUCTURETABLE MAX SLOPE BELOW LOG STRUCTUREIS1%6UT1. GROUND L NOFLOODPLAIN GRADING IS ALLOWED WITHIN 10 FT OF THE PROPOSED CHANNEL TOP OF BANK. /\/- ; v 2. LOGS SHOULD BE AT LEAST 10'-20' LONG AND AT V 31 MAX LEAST 8 INCHES IN DIAMETER, AND HARDWOOD. D 3 :1 MAX SLOPEi�// \/�\/�\/\\/, /f /�C%% SLOPE VARIES (TYPICALLY 20' TO 40') INSTALL colli MATTING PER MANUFACTURER'S SECTION B -B FILL DITCH INSTRUCTIONS PLAN VIEW DIFFUSE FLOW STRUCTURE NTS C PLAN VIEW M1�5FT MIN 5� PROFILE B -B' DOWNSTREAM LOG MIN SIFT MIN SFT OVERLAP OF UPSTREAM LOG 4% To 6% PROFILE C -C' NOTES: 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. 2. LOG DIMENSIONS: MIN DIAM. = 12", MIN LENGTH = 18' 3. NAIL FILTER FABRIC USING 3" 10D GALVANIZED COMMON NAIL EVERY 1.5' ALONG THE LOG DOUBLE LOG DROP NTS TS OF THIS DOCUMENT; ADDMONS OR DELETI n Set)2015020500RA_BHT DETAILS.dwg - April 11 CHANNEL BOTTOM OF BANK COARSE BACKFILL NONWOVEN GEOTEXTILE FABRIC (NCDOT TYPE II) Et ROOTWAD OR BRUSHTOE— CHANNEL TOP OF BANK CHANNEL BOTTOM OF BANK COARSE BACKFILL FILTER FABRIC B ROOTWAD OR BRUSHTOE� � 5.0 MIN I I I I A POC I I TYPICAL PLAN VIEW (OPT 1) FLOW I I I A I I 5.0' IN I I I I I —� CHANNELTOP DF A P00 BANK TYPICAL PLAN VIEW (OPT 2) PROPOSED STREAM REBAR OR DUCKBILL BED ANCHOR COARSEAGGREGATE BACKFILL (1" TO 5") MIN. 5.0' POOL APPROX. 0.75' TO 1.5' — DEEP —__— COARSE AGGREGATE BACKFILL (1"TO 5") B GEOVEXTILE FABRIC TACK FABRIC TO—/ (NCDOT TYPE II) LOG SECTION A -A HEADER FOOTER 1, 4' MIN. LENGTH) OR -ED PER MANUFACTURERS INSTRUCTIONS (TYP.) SECTION B -B (OPT 1) (REAM BANK HEADER LOG \ I1°A 703% B ;H FOOTER LOG REBAR (5/8" MIN. DIAMETER, W MIN. LENGTH) OR DUCKBILL ANCHORS INSTALLED PER MANUFACTURERS OVERLAP OF INSTRUCTIONS MP.) DOWNSTREAM LOG SECTION B -B (OPT 21 NOTES: 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. 2. LOG DIMENSIONS: MIN DIAM. =12", MIN LENGTH = 18' NAIL FILTER FABRIC USING 3"10D GALVANIZED COMMON NAIL EVERY 1.5' ALONG THE LOG LOG SILL 3. DUCKBILL ANCHORS MAY BE USED IN PLACE OF REBAR. NTS DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919 782 9672 www.wkdickson.com NC. LICENSE W. I—MCD200 20 61LUCr z PROW. DATE: JULY 2016 G.C.: MS O.C. DATE: JUN 2016 DRAWING NUMBER: D4 PROJ. NO.: 2015020500 COARSE AGGREGATE BACKFILL (2" TO 6") HEADER LOG H O J V a %INVERT ELEVATION `b` i B O Q Z LOG HEADE4'708' Z Z O d � LL �G � INVERT ELEVATION ATION F- Z O C7 Z 1 I � O m w BANKFULL > POINT REFERENCED IN MIN 5.0' � Q ¢ a U N w STRUCTURE TABLE _ 00 MAX ALLOWABLE ¢ � Z. '=w m COARSE AGGREGATE c cILL � Z Z ¢ DROP OF 0.5 FT m Q F-Z� BACKFILL 12" TO 6") ylf W Z 2 Z 3 ¢ N W W III Z ¢zm FOOTER LOG ._, �J I� �/ MA%DEPT H}OFLOG DIAMETER (TYP)) / HEADER COARSE AGGREGATE LOG BACKFILL(2"T06"I - /�" COARSE AGGREGATE FOOTER BACKFILL (2" TO 6") LOG 'MIN \,,\/` LOG BURIED IN �C IIS-a� 3.0' B.` BANK MIN SFT NON -WOVEN _ GEOTEXTILE LOG BURIED IN FABRIC (NCDOT POINT REFERENCED IN BANK TYPE II) PROFILE A -A' STRUCTURETABLE MIN 5FT C PLAN VIEW M1�5FT MIN 5� PROFILE B -B' DOWNSTREAM LOG MIN SIFT MIN SFT OVERLAP OF UPSTREAM LOG 4% To 6% PROFILE C -C' NOTES: 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. 2. LOG DIMENSIONS: MIN DIAM. = 12", MIN LENGTH = 18' 3. NAIL FILTER FABRIC USING 3" 10D GALVANIZED COMMON NAIL EVERY 1.5' ALONG THE LOG DOUBLE LOG DROP NTS TS OF THIS DOCUMENT; ADDMONS OR DELETI n Set)2015020500RA_BHT DETAILS.dwg - April 11 CHANNEL BOTTOM OF BANK COARSE BACKFILL NONWOVEN GEOTEXTILE FABRIC (NCDOT TYPE II) Et ROOTWAD OR BRUSHTOE— CHANNEL TOP OF BANK CHANNEL BOTTOM OF BANK COARSE BACKFILL FILTER FABRIC B ROOTWAD OR BRUSHTOE� � 5.0 MIN I I I I A POC I I TYPICAL PLAN VIEW (OPT 1) FLOW I I I A I I 5.0' IN I I I I I —� CHANNELTOP DF A P00 BANK TYPICAL PLAN VIEW (OPT 2) PROPOSED STREAM REBAR OR DUCKBILL BED ANCHOR COARSEAGGREGATE BACKFILL (1" TO 5") MIN. 5.0' POOL APPROX. 0.75' TO 1.5' — DEEP —__— COARSE AGGREGATE BACKFILL (1"TO 5") B GEOVEXTILE FABRIC TACK FABRIC TO—/ (NCDOT TYPE II) LOG SECTION A -A HEADER FOOTER 1, 4' MIN. LENGTH) OR -ED PER MANUFACTURERS INSTRUCTIONS (TYP.) SECTION B -B (OPT 1) (REAM BANK HEADER LOG \ I1°A 703% B ;H FOOTER LOG REBAR (5/8" MIN. DIAMETER, W MIN. LENGTH) OR DUCKBILL ANCHORS INSTALLED PER MANUFACTURERS OVERLAP OF INSTRUCTIONS MP.) DOWNSTREAM LOG SECTION B -B (OPT 21 NOTES: 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. 2. LOG DIMENSIONS: MIN DIAM. =12", MIN LENGTH = 18' NAIL FILTER FABRIC USING 3"10D GALVANIZED COMMON NAIL EVERY 1.5' ALONG THE LOG LOG SILL 3. DUCKBILL ANCHORS MAY BE USED IN PLACE OF REBAR. NTS DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919 782 9672 www.wkdickson.com NC. LICENSE W. I—MCD200 20 61LUCr z PROW. DATE: JULY 2016 G.C.: MS O.C. DATE: JUN 2016 DRAWING NUMBER: D4 PROJ. NO.: 2015020500 H IL r � o� U H O J V a LU O Z Z U O Q Z Z Z O d � LL �G � ¢ W F- Z O C7 Z Z I � O m w I > J [C � Q ¢ a H � U z LU O Z o O Q Z N Z Z �G � J w ¢ Z Q w o F [n O U N w a ¢ z > 00 ¢ � Z. '=w m � c cILL � Z Z ¢ ~ m Q F-Z� O ylf W Z 2 Z 3 ¢ N W W III Z ¢zm O¢a� a O UNE 16 FT MAX VE POST BARBED OR ELECTRIC WIRE UNE POST z 4' TO 6'1 WOVEN WIRE: ASTM CLASS 3 GALVANIZED. `t TOP AND BOTTOM WIRES MIN. 12 GAUGE. WOVEN WIRE z INTERMEDIATE AND STAY WIRES MIN. GROUND UNE l 12 1/2 GAUGE. M Z O Z N WOVEN WIRE WITH ONE BARB DETAIL LINE POSTS (WOODEN): MIN. 41N, DIAM. OR 41N. SQUARE. LINE POSTS (STEEL): STUDDED OR PUNCHED T, U, OR Y SHAPED, WITH ANCHOR PLATES. MIN. WEIGHT 1.3 LBS./FT. (EXCLUDING ANCHOR PLATE). POSTS SHALL BE DRIVEN A MINIMUM OF 18" DEEP AND MUST BE AT LEAST 5.5 FT IN LENGTH SPECIES AND TREATMENT FOR ALL WOOD: USE UNTREATED DURABLE POSTS OF SPECIES SUCH AS RED CEDAR, BLACK LOCUST OR OSAGE—ORANGE WITH BARK REMOVED, OR NON—DURABLE WOOD THAT IS PRESERVATIVE PRESSURE TREATED (0.40 UBS./CUBIC FOOT CCA, OR EQUIVALENT NON—CCA TREATMENT). DO NOT USE RED PINE. WOVEN WIRE FENCE (NRCS DETAIL 382A) CLASS NTS TALLED T FILTER FABI /_ COARSE AGGREGATE (y5 WASHED STONE) 6" DEEP NOTES: 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS LOW. 2. INSTALL STREAM CROSSING PERPENDICULAR TO FLOW. 3. CONTRACTOR TO COORDINATE APPROPRIATE BEDDING MATERIAL WITH MANUFACTURER. 4. FILTER FABRIC USED SHALL BE NCDOT TYPE 2 ENGINEERING FABRIC OR EQUIVALENT. 5. WIDTH OF TYPICAL FARM CROSSINGS SHALL BE PER PLAN OR A MINIMUM OF 12'. 6. WHEN REQUIRED, CONTRACTOR TO ENSURE PIPE MATERIAL AND COVER MEET H-20 LOADING REQUIREMENTS. NTS RODUC Hannah :TIONS TO THIS DOC 11. 2017 - Ben Carroll DD CKSON community intras[ructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1) 919.782.9672 www.wkdickson.com NC. UCENSE No. voaPa PROJ. DATE: JULY 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: D5 PROJ. NO.: 2015020500 Ill O� F O v 0- z O U 2 Z O U O � a Er 0 3f cc z 0 BURY CULVERT 1.0' J z W O OZ LOG SILL � � J UNLESS NOTED OTHERWISE lL Z � FLOW � N SET TOP OF LOG 1.0 FOOT TIMBER MAT INSTALLED PERPENDICULAR Q BY ENGINEER � INSTALL CLAY PLUG 2 FEET BELOW CULVERT INVERT ~ Z Z � uj ABOVE CULVERT INVERT W ¢ � O Y N F aQQi W SECTION VIEW I � ¢ ¢ a NO W U �y o ¢ > C3 Z NOTES: z I- $ g DO ow o g m Z MIN 3' F PLAN VIEW F Z O W Z iD Z N I rn It V) II W 2 3 Z ¢zm O a 0 1. TIMBER MATS SHALL BE USED FOR TEMPORARY CONSTRUCTION ACCESS TO TRAVERSE WET AND/OR MUDDY COARSE AGGREGATE ARES ADJACENT TO THE STREAM AND TO CROSS THE ' . . � ' , MIN 3' IMBERMATINSTALLED STREAM AND OTHER CONCENTRATED FLOW AREAS. O U U U V O O O O O" OO O. OO "O O"O" OO V O"O O O O" O. O O O O O O (. C CARRIAGE BOLT,/—T2. TYPICAL CLASS B RIP RAP PERPENDICULAR TIMBER MAT THE STREAM CROSSING SHALL T INSTALLED WHEN FLOW IS LOW. THERE SHALL BE MINIMAL TO NO DISTURBANCE OF EARTH RLL COVERED BY O C C O TOP OF BANK INSTALLED PARALLEL THE CHANNEL BED AND BANKS AS A RESULT OF INSTALLING CROSSING. LARGE ANGULAR O IO C OC THE APPROACHES OR ROCK V L ° ° 3. THE LENGTH OF TIMBER MAT REQUIRED TO CROSS THE 0 O 0 STREAM OR CONCENTRATED FLOW AREAS SHALL BE SUCH O ( O O THAT THE TIMBER AT EXTENDS PAST THE TOP OF BANK ON EACH SIDE OF THE CROSSING A SUFFICIENT DISTANCE TO O ( f5goc 0 0 _ SUPPORT THE MAXIMUM EQUIPMENT SIZE USING THE 0 00 CROSSING. O C FILTER FABRIC 4. STREAM CROSSINGS SHALL BE INSTALLED WITH THE TIMBER O Ov O v Ov Ov Ov Ov Ov ` O V 0"0"0"0 C TOE OF BANK, MAT LENGTHS ORIENTED PERPENDICULAR TO THE TOPS OF C 0,�0�0 0 0 0 O n n n n O n Or,O�C n _ O O�O�O O O O O n n TYPICAL APPROXIMATE BASE FLOW THE STREAMBANKS. TIMBER MAT STREAM APPROACHES SHALL BE INSTALLED WITH THE TIMBER MAT LENGTHS —_—_— WATER SURFACE ORIENTED PARALLEL TO THE TOPS OF THE STREAM BANKS. 10' 10' 5. STREAM CROSSING APPROACHES FROM DRY AREAS SHALL MINIMUM MINIMUM BE CONSTRUCTED USING CLASS B RIP RAP PLACED OVER SECTION VIEW FILTER FABRIC. TOP OF BANK STREAM CHANNEL LOG SILL 6. ALL TIMBER MATS, FILTER FABRIC, AND RIP RAP SHALL BE SET TOP OF LOG 1.0 FOOT COMPLETELY REMOVED FROM THE SITE WHEN THE ABOVE CULVERT INVERT CROSSING IS REMOVED. PROPOSED CULVERT CROSSING PLAN VIEW NTS TIMBER MAT TEMPORARY CROSSING NTS RODUC Hannah :TIONS TO THIS DOC 11. 2017 - Ben Carroll DD CKSON community intras[ructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1) 919.782.9672 www.wkdickson.com NC. UCENSE No. voaPa PROJ. DATE: JULY 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: D5 PROJ. NO.: 2015020500 Ill O� F O v 0- z O U 2 Z O U O � a Er 0 3f cc z 0 U J z W O OZ � � J y lL Z � � N Q � U � ~ Z Z � uj O Ur � ZZ_F W ¢ � O Y N F aQQi W 0 I � ¢ ¢ a U J z W O OZ � � J y lL Z � � N Q Z z � c') w ¢ Z U o W y W 0 ¢ ti O NO W U �y o ¢ > C3 Z z I- $ g DO ow o g m Z Z Q F N m F Z O W Z iD Z N I rn It V) II W 2 3 Z ¢zm O a 0 ¢ate LOG BURIED IN STREAM FROM LOG BURIED IN STREAM DEPTH OF NEAREST BANK STREAM BED RIFFLE invcnr_ MIN. 5FT ELEVATION HEADER LOG SELECT BACKFILL MATERIAL (MIX OF COARSE AGGREGATE FOOTER LOG AND #5 STONE) SECTION A -A' NOTES: 1. LOGS SHALL HAVE MINIMUM DIMENSIONS AS FOLLOWS: MIN DIAM = 10" MIN LENGTH = 30' 2. ALL LOGS SHALL BE RELATIVELY STRAIGHT, HARDWOOD, AND LIMBS SHALL BE TRIMMED FLUSH. 3. FOOTER LOGS/BOULDERS ARE LOGS/BOULDER PLACED TO PROVIDE A FOUNDATION AND SCOUR PROTECTION FOR THE HEADER LOGS/BOULDERS. 4. HEADER LOGS/BOULDERS SHALL BE UNDERLAIN BY FOOTER LOGS/BOULDERS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 5. HEADER LOGS ARE THE TOP MOST LOGS USED IN EACH LOG STRUCTURE. ALL HEADER LOGS CAN BE SEEN PROTRUDING FROM THE WATER SURFACE DURING EXTREMELY LOW FLOWS. 6. HEADER LOGS SHALL BE OFFSET SLIGHTLY DOWNSTREAM OF THE FOOTING LOGS WHERE SCOUR POOLS ARE ANTICIPATED TO FORM AS SHOWN IN THE DETAIL. 7. SILL LOGS SHALL BEP LACED PERPENDICULAR TO THE BANKFULL FLOW DIRECTION. 8. THE FOOTER LOGS SHALL EXTEND FROM THE SILL LOG TO THE END OF THE HEADER LOG TOWARD THE BANK. 9. HOOK BOULDERS SHALL EXTEND FROM THE HEADER LOG TO BEYOND BANKFULL WIDTH. 10. SET INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. 11. HEADER LOG SHALL TIE INTO THE STREAM BANK AT A MAXIMUM ELEVATION OF} DMAX (MEASURED AT THE NEXT DOWNSTREAM RIFFLE) BELOW BANKFULL ELEVATION AND A MINIMUM ELEVATION OF' DMAX (MEASURE AT THE NEXT DOWNSTREAM RIFFLE) BELOW BANKFULL ELEVATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 12. CUTTING OF THE SILL LOG ROOTWAD BAY BE REQUIRED TO PREVENT THE ROOTWAD FROM PROTRUDING ABOVE THE BANKFULL ELEVATION. 13. ALL GAPSNOIDS LARGER THAN 1 INCH BETWEEN THE HEADER AND FOOTING LOGS SHALL BE CHINKED WITH LIMBS AND/OR BRUSH ON THE UPSTREAM SIDE PRIOR TO PLACEMENT OF THE GEOTEXTILE. 14. ALL GAPS/VOIDS LARGER THAN 1 INCH BETWEEN THE HEADER AND FOOTING BOULDERS SHALL BE CHINKED WITH GRAVEL AND COBBLES. 15. ON THE UPSTREAM SIDE OF THE LOGS AND/OR BOULDERS, NON -WOVEN GEOTEXTILE FABRIC SHALL BE PLACED AS SHOWN IN PLANVIEW AND IN SECTION B -B'. PLACE SELECT BACKFILL FOR THE ENTIRE LENGTH OF THE LOG AND BOULDER HOOK. 16. BACKFILL STRUCTURE WITH SELECT BACKFILL MATERIAL AS SHOWN SHOWN IN PLANVIEW AND IN SECTION B -B'. 17. SELECT BACKFILL AND SOIL BACKFILL MATERIAL SHALL BE COMPACTED SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 18. NAIL NON -WOVEN GEOTEXTILE USING Y 10D GALVANIZED COMMON NAIL TO EDGE OF HEADER LOG AND BACKFILL AS SHOWN IN THE GEOTEXTILE PLACEMENT AND SELECT BACKFILL DETAIL. 11 FLOW MATERIAL CONSTRUCTED RIFFLE NTS LOG J -HOOK NTS GEOTE) INC S I LIVE STAKES (TYP.) BOULDERS, TYP BANKFULL TOP OF BANK SOIL BACKFILL CHANNEL 4,0' SELECT -� HEADERLOG BACKFILL MATERIAL \JI) NON -WOVEN PROPOSED TOE OF BANK GEOTEXTILE FABRIC ' RIFFLE MATERIAL; EQUAL MIX (NCDOT TYPE II) STREAMBED vOi Z3 FOOTER LOG SECTION B -B' SMALL POOL, TYP LARGE COBBLE/SMALL BOULDERS, TYP U TOP OF BANK 4.0' CHANNEL 4,0' TYP BOTTOM WIDTH TYP BRUSH)COMPACTED 1.0' MI PROPOSED TOE OF BANK 1.5' MIN ' RIFFLE MATERIAL; EQUAL MIX LOGS/WOODY DEBRIS OF NATIVE SUBSTRATE MATERIAL AND GRAVEL (D50 = J..) GRADE CONTROL ROCK vOi Z3 50/50 MIX OF CLASS A AND B CROSS SECTION A -A' RIPRAP RIFFLE MATERIAL; EQUAL MIX OF - NATIVE SUBSTRATE MATERIALAND GRAVEL (1350 =1") 4' MII BEGIN RIFFLE CONTROL POINT THALWEG LOGS/WOODY DEBRIS a OF BANK FLOW �tt GRADECONTROLROCK 50/50 MIX OF CLASS A AND B RIPRAP PROFILE DOWN VALLEY A DITCH TOP OF BANK COMPACTED FILL �� DITCH BOTTOM OF BANK EXISTING - _ - GROUND--------- MIN COMPACTED FILL J WOODY DEBRIS FILL (LOGS, BRANCHES, AND BRUSH) COMPACTED WITH SOIL TO PROPOSED GRADE. MIN 1.0 EXISTING DITCH J INVERT COMPACTED FILL WOODY DEBRIS FILL (LOGS, BRANCHES, AND BRUSH) COMPACTED WITH SOIL A TYPICAL PLAN VIEW PROPOSED GROUND U WOODY DEBRIS FILL �- (LOGS, BRANCHES, AND p BRUSH)COMPACTED WITH SOIL TO PROPOSED � ? GRADE. EXISTING DITCH d INVERT vOi Z3 SECTION A -A OEM VALLEY (TYP 10' TO 20') PROFILE VIEW BRUSH BED SILL NTS GROUND 12" MIN DIAM. HARDWOOD LOG; MIN LENGTH = 20' '—NON -WOVEN GEOTEXTILE FABRIC TYP.) NOTES: 1. CONSTRUCTED RIFFLES SHALL BE INSTALLED IN NEWLY GRADED CHANNEL SECTIONS, AS SPECIFIED BY THE DESIGNER. 2. ELEVATION CONTROL POINTS SHALL BE DESIGNATED AT THE BEGINNING AND END OF RIFFLE POINTS TO ESTABLISH PART OF THE PROFILE OF THE CHANNEL. SURVEY OF CONTROL POINTS SHALL BE ......................................... 3. GRADE CONTROL ROCK SHALL BE COMPRISED OF A 50/50 MIX OF CLASS A AND B RIPRAP. GRADE CONTROL ROCK SHALL BE PLACED SUCH THAT THE ADDITION OF THE SPECIFIED THICKNESS OF RIFFLE MATERIAL SHALL ACHIEVE THE DESIGNATED GRADES. 4. RIFFLE MATERIAL SHALL BE COMPRISED OF ROCKS AND WOOD. THE ROCK MATERIAL SHALL CONSIST OF A 50/50 MIX OF GRAVEL (D50=1") AND NATIVE SUBSTRATE MATERIAL. RIFFLE MATERIAL SHALL BE EXCAVATED, STOCKPILED, AND RE -USED FROM ABANDONED CHANNEL SECTIONS. OTHERWISE ROCK ..............."........................................................................................................................................... CHARACTERISTICS ARE APPROPRIATE FOR THE CHANNEL. IN ADDITION, LOGS AND WOODY DEBRIS SHALL BE INCLUDED WITH THE ROCK MATERIAL AS SPECIFIED BY THE DESIGNER. 5. THE PLACEMENT OF GRADE CONTROL ROCK AND/OR RIFFLE MATERIAL SHALL BE DONE IN A MANNER ......._........................................................................................................................................................... . AND THE DOWNSTREAM RUN -POOL. THE FINISHED CROSS SECTION OF THE RIFFLE MATERIAL SHALL GENERALLY MATCH THE SHAPE AND DIMENSIONS SHOWN ON THE RIFFLE TYPICAL SECTION WITH SOME VARIABILITY OF THE THALWEG LOCATION AS A RESULT OF THE SMALL POOLS AND LOGS. 6. THE END OF RIFFLE CONTROL POINT MAY TIE IN TO ANOTHER IN -STREAM STRUCTURE (LOG SILL OR J -HOOK). 7. THE CONSTRUCTED RIFFLE SHALL BE KEYED IN TO THE STREAM BANKS AND/OR BED AS DESIGNATED BY THE DESIGNER. THE "KEY" SHALL EXTEND BEYOND THE TOP OF BANK AT THE BEGINNING (CREST) OF THE RIFFLE. WHERE PRESERVATION OF EXISTING STREAM BANK VEGETATION IS A PRIORITY A "KEY" MAY NOT BE USED (OR THE DIMENSIONS MAY BE ADJUSTED) TO LIMIT DISTURBANCE. FVD CKSON community Infrastructure Consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkcIickson.com NC. UCENSE No 14UL CcZ jrcc z tj PROJ. DATE: JULY 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: D6 PROJ. NO.: 2015020500 � n � N F O c a Z O U Z Z � O � O ¢ F- 0 U U w ILL p o a s � ? d vOi Z3 O¢ Q = O Z � J Z � w ¢ Z � � O � a rri o � o z o Y N � W � � W U U U w ILL p o a s � ? d vOi Z3 O¢ Q = O Z � J Z � w ¢ Z � U o_ � W O w w y � � W U F ti o z > (} Z <, w g m � g Z Z a Q � Z� ED ,ylm W Z Z W W W W Z ¢Z - O O a ¢ate