HomeMy WebLinkAboutNCG160220_More Information Received_20150630RECEIVE®
BREC JUN 3 0 2U1Engi
DENR-LAND QUALITY
STORMWATER PERMITTING
June 29, 2015
NCDENR / DEMLR / Stormwater Permitting Program
Richard L Riddle Jr., Stormwater Engineer
1612 Mail Service Center
Raleigh, NC 27699-1612
RE: Comments on Glendale Springs Plant (06/25/2015)
Mr. Riddle:
The following responses are pertaining to the email that was received on Thursday, June 25,
2015. Please let us know if you have any further questions or concerns.
1. C) Street address of plant (question 2 of application)
R) The correct street address has been added to the application, please see question 2.
2. C) Correct Latitude and Longitude of plant location (question 4 of application)
R) The correct Latitude and Longitude of the plant location has been added to the
application, please see question 4.
3. C) The "settling pond and stilling basin" needs to be shown on the site diagram as stated
on the answer for Question #10 in the application, page 2 of 4.
R) The settling pond and stilling basin has been added to the plans. Please see C 100 of
the plans.
126 Executive Dr., Suite 220 v staff@brec.biz 336.844.4088
Wilkesboro, NC 28697 www.brec.biz
4. C) Site diagram also needs to show (as listed on checklist on page 4 of 4 of application)
• Stormwater management structures
• Outline of drainage areas
• Location of stormwater outfalls (application says seven and only one is shown)
corresponding to which drainage areas.
• Runoff conveyance structures
• Impervious areas
• Detail about activities taking place in the existing process areas (question 7 B)
R)
• Stormwater management structures — Shown on plans, please see sheet C 100
• Outline of drainage areas — Shown on plans, please see sheet C200
• Location of stormwater outfalls (application says seven and only one is shown)
corresponding to which drainage areas. — Corrected on application. Shown on
plans, please see sheet C 100.
• Runoff conveyance structures — Shown on plans, please see sheet C 100
• Impervious areas — Shown on plans, please see sheet C300
• Detail about activities taking place in the existing process areas (question 7 B) —
The production of Asphalt paving mix for Highway and Road Construction.
Stockpiled materials are #2 Diesel Stone Aggregate and Liquid Asphalt Cement.
Thanks.