Loading...
HomeMy WebLinkAbout20041644 Ver 2_Staff Comments_20080916Michael F. Easley, Governor August 1, 2008 Ap WIA 44, r '..WA 0?41ey* NCDENR Department of Environment and Natural Resources Division of Coastal Management James H. Gregson, Director William G. Ross Fecretaryy MEMORANDUM: RECF-,IVMID AUG a 6 2008 TO: Ed Beck Division of Water Quality - 401 BY: FROM: Doug Huggett 15 Major Permits Processing Coordinator SEP 1 8 r'0?a8 SUBJECT: CAMA/DREDGE & FILL Permit Application Review WETLANDS R - AWATER ND STORMWATER BRANCH Applicant: Cape Carteret Baptist Church Project Location: The project site is located at 101 Anita Forte Drive, adjacent to Highway 24, Cape Carteret, Carteret County Proposed Project: The applicant is proposing to construct three new buildings, 9tormwater system, repair an existing culvert, redo the existing parking area, install new wastewater system and maintenance excavate an existing stormwater pond. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 8/22/2008. If you have any questions regarding the proposed project, please contact Heather Styron at (252) 808-2808. When appropriate, in-depth comments with supporting data are requested. cla, GL?vcttt REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. agency objects to the project for reasons described in the attached comments. SIGNED ? V4,14WC4 n 11dQte 0 _'r Pho e: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastaimanagement.net An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper