HomeMy WebLinkAbout20140957 Ver 2_24_Appendix_N_ACP & SHP Tribal Communications_20170509Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project
Tribe Date
Summary
Filed to the Docket
Absentee-Shawnee Tribe of Indians of Oklahoma 7/29/2014
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/17/2014
Follow-up letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/28/2014
Initial letter from DTI to the Tribe requesting comments on the SHP.
9/18/2015
12/4/2014
Follow-up telephone phone call (message) from Atlantic and DTI to the Tribe requesting
9/18/2015
comments on the ACP and SHP.
3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/2015
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments for the ACP and SHP.
Catawba Indian Nation 10/17/2014
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
11/12/2014
Letter from the Tribe to Atlantic requesting a cultural resources survey for the ACP.
9/18/2015
3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/2015
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
6/22/2016
Email from the Tribe to FERC requesting additional information on the ACP and SHP.
9/15/2016
8/8/2016
Letter from Atlantic and DTI to the Tribe (sent at FERC's request) providing updated project
8/15/2016
descriptions and maps for the ACP and SHP.
8/25/2016
Letter from the Tribe to Atlantic/DTI in which the Tribe states there are no concerns regarding
9/1/2016
cultural resource sites in the ACP and SHP project areas. The Tribe additionally asked to be
notified in the event of an unanticipated find.
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
Cherokee Nation 7/29/2014
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/17/2014
Follow-up letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
12/4/2014
Follow-up telephone call (message) from Atlantic to the Tribe requesting comments on the
9/18/2015
ACP.
12/19/2014
Voicemail message from the Tribe regarding the ACP.
9/18/2015
12/19/2014
Email from Atlantic to the Tribe transmitting copies of Atlantic's 7/29/14 and 10/17/14 letters
9/18/2015
requesting comments on the ACP.
3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/2015
Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project
Tribe Date
Summary
Filed to the Docket
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
Delaware Nation 7/29/2014
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/17/2014
Follow-up letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/28/2014
Initial letter from DTI to the Tribe requesting comments on the SHP.
9/18/2014
12/1/2014
Letter from the Tribe to FERC in which the Tribe states that no sites of interest to the Tribe
9/18/2015
will be affected by the ACP. The Tribe additionally asked to be notified in the event of an
unanticipated find.
2/11/2015
Letter from the Tribe to DTI in which the Tribe states that no sites of interest to the Tribe will
9/18/2015
be affected by the SHP. The Tribe additionally asked to be notified in the event of an
unanticipated find.
3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/2015
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
1/8/2016
Email from the Tribe to Atlantic concurring with the unanticipated discoveries plan for the
MNF.
1/29/2016
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
Delaware Tribe of Indians 7/29/2014
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/17/2014
Follow-up letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/28/2014
Initial letter from DTI to the Tribe requesting comments on the SHP.
9/18/2014
12/4/2014
Follow-up telephone phone call (message) from Atlantic/DTI to the Tribe requesting
9/18/2015
comments on the ACP and SHP.
Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project
Tribe Date
Summary
Filed to the Docket
3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/2015
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
6/21/2016
Email from the Tribe to FERC in which the Tribe states that its land interests in Virginia are in
9/15/2016
Accomack and Northampton Counties and its land interests in West Virginia are in Brooke,
Hancock, Marshall, and Ohio Counties. (Note: the ACP and SHP do not cross these
Counties.)
8/10/2016
Letter from Atlantic and DTI to the Tribe (sent at FERC's request) providing updated project
8/15/2016
descriptions and maps for the ACP and SHP.
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
2/9/2017
Letter from Atlantic and DTI to the Tribe transmitting recent Phase I archaeological survey
reports and requesting comments on the ACP and SHP.
Eastern Band of Cherokee Indians 7/29/2014
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/17/2014
Follow-up letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
11/5/2014
Email from the Tribe to FERC in which the Tribe states that the ACP is outside the aboriginal
9/18/2015
territory of the Cherokee people.
3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/2015
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
9/7/2016
Letter from the Tribe to FERC in which the Tribe states that the ACP and SHP are within the
9/22/2016
aboriginal territory of the Cherokee. The Tribe additionally requested updated project
information and copies of archaeological survey reports.
10/5/2016 Letter from Atlantic to the Tribe providing updated information on the ACP and SHP and 10/17/2016
transmitting copies of archaeological survey reports for the projects.
8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project
Tribe Date
Summary
Filed to the Docket
10/5/2016
Letter from Atlantic and DTI to the Tribe transmitting Phase I archaeological survey reports
10/31/2016
and updated, revised route maps and renewing requests for comments on the ACP and SHP.
2/9/2017
Letter from Atlantic and DTI to the Tribe transmitting recent Phase I archaeological survey
reports and requesting comments on the ACP and SHP.
Eastern Shawnee Tribe of Oklahoma 7/29/2014
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/17/2014
Follow-up letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/28/2014
Initial letter from DTI to the Tribe requesting comments on the SHP.
9/18/2014
12/4/2014
Follow-up telephone phone call (message) from Atlantic/DTI to the Tribe requesting
9/18/2015
comments on the ACP and SHP.
3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/15
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
8/1/2016
Email from the Tribe to FERC requesting a follow-up telephone call.
9/15/2016
8/4/2016
Follow-up telephone call from FERC to the Tribe in which the Tribe requested additional
9/15/2016
information on the ACP.
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
Pamunkey Tribe 4/24/2015
Initial letter from Atlantic to the Commonwealth recognized Tribe requesting comments on
9/18/2015
the ACP.
8/5/2015
Initial letter from Atlantic to the federally recognized Tribe requesting comments on the ACP.
9/18/2015
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
Seneca -Cayuga Nation 10/28/2014
Initial letter from DTI to the Tribe requesting comments on the SHP.
9/18/2015
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
12/4/2014
Follow-up phone call from NRG to the Tribe requesting comments on the SHP.
9/18/2015
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project
Tribe Date
Summary
Filed to the Docket
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
Seneca Nation of Indians 10/28/2014
Initial letter from DTI to the Tribe requesting comments on the SHP.
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
12/4/2014
Follow-up phone call from NRG to the Tribe requesting comments on the SHP.
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
7/5/2016
Email from the Tribe to FERC expressing interest in the ACP and SHP and requesting an
9/15/2016
archaeological survey in undisturbed areas.
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
The Shawnee Tribe 7/29/2014
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/17/2014
Follow-up letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/28/2014
hritial letter from DTI to the Tribe requesting comments on the SHP.
12/4/2014
Follow-up phone call from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
12/4/2014
Follow-up phone call from DTI to the Tribe requesting comments on the SHP.
3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/2015
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
Stockbridge Munsee Community 3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/2015
Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project
Tribe Date
Summary
Filed to the Docket
4/24/2015
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
4/30/2015
Letter from the Tribe to Atlantic deferring consultation on the ACP.
9/18/2015
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
Tonawanda Band of Seneca 10/28/2014
Initial letter from DTI to the Tribe requesting comments on the SHP.
9/18/2015
12/4/2014
Follow-up phone call from DTI to the Tribe requesting comments on the SHP.
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
6/23/2016
Telephone call from FERC to the Tribe in which the Tribe requested additional information on
the ACP and SHP.
8/8/2016
Letter from Atlantic and DTI to the Tribe (sent at FERC's request) providing updated project
8/15/2016
descriptions and maps for the ACP and SHP.
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
Tuscarora Nation of New York 7/29/2014
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/17/2014
Follow-up letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
12/4/2014
Follow-up phone call from NRG to the Tribe requesting comments on the ACP.
9/18/2015
3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/2015
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
6/23/2016
Telephone call from FERC to the Tribe in which the Tribe requested additional information on
9/15/2016
the ACP and SHP.
8/8/2016
Letter from Atlantic and DTI to the Tribe (sent at FERC's request) providing updated project
8/15/2016
descriptions and maps for the ACP and SHP.
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project
Tribe Date
Summary
Filed to the Docket
10/18/2016
Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing
10/31/2016
requests for comments on the ACP and SHP.
United Keetoowah Band of Cherokee hidians 7/29/2014
Initial letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/17/2014
Follow-up letter from Atlantic to the Tribe requesting comments on the ACP.
9/18/2015
10/29/2014
Email from the Tribe to Atlantic deferring consultation on the ACP.
9/18/2015
3/25/2015
Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP.
9/18/2015
10/28/2015
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological
10/30/2015
survey report and draft unanticipated discoveries plan for the MNF.
6/21/2016
Email from FERC to the Tribe requesting comments on the ACP and SHP.
9/15/2016
8/29/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft
9/15/2016
archaeological survey report for the MNF. (Note: this letter also references an updated
unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was
omitted from this submittal.)
10/4/2016
Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated
10/31/2016
discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a
submittal on 8/29/2016.)
In addition to the communications listed above, Atlantic provided copies of draft survey reports and unanticipated finds plans for the MNF (by letters dated 10/28/2015, 8/29/2016, and
10/4/2016) to the Oneida Indian Nation and Onondaga Nation, both of whom are MNF Tribal Partners.