Loading...
HomeMy WebLinkAbout20140957 Ver 2_14_Appendix_F_2_Neuse River_20170509LEGEND PERMANENT RIGHT-OF-WAY F%L7Z1lIj_z7] TEMPORARY RIGHT-OF-WAY TEMP. IMPACT TOPSOIL SEGRAGATION AREA i EXTRA WORK SPACE ........ I WETLAND — — — STREAM — — LIMITS OF DISTURBANCE IY CONTOUR SILT FENCE SILT SOCK — — — — — ACCESS ROADS o ROCK CONSTRUCTION ENTRANCE T TRENCH PLUG - WATER BAR 0 TEMPORARY SLOPE BREAKER 200 150 100 50 0 0+00 2+00 WATERBODY IMPACT WATERBODY # TEMP. IMPACT PERMANENT IMPACT SJOB105 0.27 ACRES 0.0 ACRES 0If IY O O W W 0 (7 0 0 W W EXISTI G GRADE PROT70 I 3' MIN. SEU AH -2 � 'MIN. -_ m I 2+00 WATERBODY IMPACT WATERBODY # TEMP. IMPACT PERMANENT IMPACT SJOB105 0.27 ACRES 0.0 ACRES WATERBODY IMPACT WATERBODY CONSTRUCTION NOTES: 1. CROSSING TO BE A COFFERDAM. 2. CONSTRUCTION TO BE PERFORMED IN LOW FLOW PERIODS. 3. RIP RAP (OR OTHER NON -ERODIBLE MATERIALS) TO BE PLACED IN SEMICIRCLE ALONG SIDE OF STREAM. 4. DISCHARGED WATER INTO A SEDIMENT TRAPPING DEVICE. 5. STABILIZE WATERBODY BANKS AND INSTALL TEMPORARY SEDIMENT BARRIERS WITHIN 24 -HOURS OF COMPLETING IN -STREAM CONSTRUCTION ACTIVITIES. 6. RETURN ALL WATERBODY BANKS TO PRE -CONSTRUCTION CONTOURS OR TO A STABLE ANGLE OF REPOSE AS APPROVED BY THE ENVIRONMENTAL INSPECTOR. 7. INSTALL TRENCH PLUGS AND WATERBARS AS DIRECTED BY THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN ON BOTH SIDES OF THE WATERWAY, AND AS DEPICTED. ON THIS PLAN. 8. DO NOT USE HERBICIDES OR PESTICIDES WITHIN 100 FEET OF THE WATERBODY. :.:.•::.0000 7 3+00 4+00 5+00 6+00 7+00 STREAM CROSSING PROFILE 50' 0 50' 100' SCALE:1 "=50' ' TEMPORARY RIGHT OF WAY 25' PERMANENT RIGHT OF WAY — PROPOSED AP -2 — 25' PERMANENT RIGHT OF WAY STOCKPILE AREA FOR TOP , 12" OF STREAM BED MATERIAL 8+00 9+00 I LAT:35026'06" LON:78°20'16" STOCKPILE AREA FOR TOP I 1011!lC Or�rARA Mrn RAAr lAl == = Y= � �� 1 PROPOSED COFFERDAM — (TYP.) INSTALLATION I PLAN VIEW 50' 0 50' 100' SCALE:1 "=50' 10+00 11+00 12+00 200 150 100 50 0 13+00 � l N GENERAL NOTES AND COMMENTS: SYM. DATE BY I REVISION INFORMATION PROJECT/TASK APP. SEAL REFERENCE Engineering and Consulting, LLCg, INNOVATION Atlantic Coast Pipeline, LLC_ 3 INTEGRI"PY ELEVATION DATA FROM THE USGS GIS DATA CLEARING HOUSE. 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 DRAWN: RRC / RLR / KLA 3/22/17 PIPELINE SURVEY INFORMATION PROVIDED BY GAI CONSULTANTS. CHECKED: RVS / DLM 3/22/17 TITLE: AP -2 SITE SPECIFIC PLAN FOR STREAM AND WETLAND DATA COLLECTED BY NATIONAL RESOURCE GROUP, LLC. APP. FORBID: NEUSE RIVER MAPPING DATUM -NC STATE PLANE - NAD 83 APP. FOR CONST.: DISTRICT: COUNTY: JOHNSTON STATE: NC GROUP DWG. NO. KI CONTOUR INTERVAL -5FEET LE 3/21/17 KLA ISSUED FOR REVIEW SCALE: AS SHOWN DIWFILE: DOM/ACP/Neuse River/Site Specific/Cofferdan REV A