HomeMy WebLinkAbout20081412 Ver 1_Application_20080917Office Use Only: Form Version March 05
0 8- 1 4 1 2
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 39
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), chec ( ( 011/72
v `=a tS 1?> 1
II. Applicant Information 09
SEP 1 7 ?
X008
1. Owner/Applicant Information DENR - WATER UUA,.h Y
Name: City of Salisbury WETLANDS AND STORMWATER BRANCH
Mailing Address: Attention: Richard Kelly
Post Office Box 479
Salisbury, North Carolina 28145-0479
Telephone Number: (704) 638-5218 Fax Number: (704) 638-8412
E-mail Address: rkellgsalisburcgov
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Fax Number:
Updated 11/1/2005
Page 5 of 13
III. Project Information
3
5.
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Former Landfill Environmental Improvements: 75-Foot Culvert
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
Property Identification Number (Tax PIN): 450A021
4. Location
County: Rowan Nearest Town: Salisbury
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers/names, landmarks, etc.): From I-85, take Exit 75
(US-601/Jake Alexander Blvd). West on Jake Alexander Blvd. Right on Industrial Avenue.
Rip,ht at Old Wilkesboro Road. Entrance to former landfill will be on the rip'ht. Address:
1920 Old Wilkesboro Road. Location is shown on Figures 1 and 2.
Site coordinates (For linear projects, such as a road or utility line, attach
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 35.6767 ON 80.4992
6. Property size (acres): Approximately 100 acres
7. Name of nearest receiving body of water: Grants Creek
8. River Basin:-Yadkin-Pee Dee
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Former municipal landfill. A composting operation there
was recently discontinued. Land use in the general vicinity includes industrial commercial
a sheet that
°W
Updated 11/1/2005
Page 6 of 13
and residential. The site boundaries are shown on Figure 3. Relevant portions of the
Salisbury and Rowan Mills USGS quadranlamps are shown on Figure 4 The relevant
portions of the soils maps from the Rowan County Soil Survey are shown on Figure 5.
10. Describe the overall project in detail, including the type of equipment to be used: Installation
of the culvert extension will consist of placing approximately 75 feet of reinforced concrete
pipe at the inlet end of the existing culvert and backfilling around the pipe to the existing
grade with a backhoe Rip-rap inlet protection is proposed The existing culvert and the
extension are shown on Figure 6 and the extension is shown in detail on Figure 7. Proposed
impacts to jurisdictional areas are shown on Figure 7. The City recently installed, as shown
on Figure 6 a high visibility construction fence 50 feet landward of a flagged wetlands line
in order to minimize the risk of inadvertent impacts to the jurisdictional areas during compost
removal and other activities at the site. A portion of the fencing will be temporarily
removed to the extent necessary, and reinstalled after completion of the culvert extension.
11. Explain the purpose of the proposed work: The City of Salisbury proposes the culvert
extension as part of environmental improvements identified by Division of Water Quality
Mooresville Regional Office for the former landfill. The primary contact person at DWQ-
MRO is Ms. Donna Hood.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. N/A
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
Updated 11/1/2005
Page 7 of 13
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: Existing jurisdictional areas are
shown on Figure 6 Proposed impacts will include installation of a culvert pipe extension in
a jurisdictional area that includes a stream and wetlands.
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
cannrntaly lict immi-tc clip. to hnth ctrnctrnre and flnodin47_
Located within Distance to Area of
Wetland Impact Type of Wetland 100-year Nearest Impact
Site Number Type of Impact (e.g., forested, marsh, Floodplain Stream (acres)
(indicate on map) herbaceous, bog, etc.) (yes/no) (linear feet)
W-1 Fill for culvert Herbaceous Yes 0.0 0.017
extension
W-2 Rip-Rap inlet Herbaceous Yes 0.0 0.001
protection
Total Wetland Impact (acres) 0.018
3. List the total acreage (estimated) of all existing wetlands on the property: About 5 acres
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must he included. To calculate acreage. multinlv length X width. then divide by 43.560.
Stream Impact
Number
(indicate on ma)
Stream Name
Type of Impact
Perennial Intermittent?
? Average
Stream Width
Before Impact Impact
Length
(linear feet) Area of
impact
(acres)
S-1 Unnamed Tributary
to Grants Creek Fill for culvert
extension perennial 1 ft 37 0.0008
Total Stream Impact (by length and acreage) 37 0.0008
Updated 11/1/2005
Page 8 of 13
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill- excavation_ dredging- flooding- drainage- hulkheads_ etc.
Open Water Impact
Site Number
(indicate on ma) Name of Waterbody
(if applicable)
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay,
ocean, etc.) Area of
Impact
(acres)
N/A
Total Open Water Impact (acres) 0.0
6. List the cumulative impact to all Waters of the U.S. resultiniz from the project:
Stream Impact (acres): 0.0008
Wetland Impact (acres): 0.018
Open Water Impact (acres): 0.0
Total Impact to Waters of the U.S. (acres) 0.019
Total Stream Impact (linear feet): 37
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USAGE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): N/A
Current land use in the vicinity of the pond: N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. DW personnel recommended
Updated 11/1/2005
Page 9 of 13
the culvert extension in lieu of other streambank stabilization methods due to the existing
conditions at the site In order to minimize impacts to jurisdictional areas, the culvert extension
is only long enough to achieve the desired streambank stabilization.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
Updated 11/1/2005
Page 10 of 13
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.ne.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ? No
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Updated 11/1/2005
Page 11 of 13
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3 (2 for Catawba) N/A
2 1.5 N/A
Total N/A
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260. N/A
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. The surveyed area of the site is 97.18 acres. The
nronertv is a former landfill and has one structure_ on it. Access to the site is provided by an
asphalt drive The total impervious surface is less than one acre (<l% of total area). The
proposed construction should not increase the impervious area.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
Updated 11/1/2005
Page 12 of 13
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No Z
If ,yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
htttr//112o.enr.state.nc.us/ncwetlsnds. If no, please provide a short narrative description
The installation of a 75-foot culvert extension in an existing former landfill. will. not cause
additional development.
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
world schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
The City desires to complete this environmental improvement as soon as possible.
Applicant/Ag6a's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Updated ! I/]/2005
Page 13 of 13
p MAP QUE S-f Ronda Boonville Rural Nall
[ast
Fairplains fig' Janesville' < Bend Walkertc
BUS -_?
421'. Wilkesboro Yadkin; Ile ; 67.
aus Winston-Sal,
Moravian Falls 421'; ?
Boomer,
311';
Union Grove Farmington Clemmons
1151 - Harmon,, ?15Sai
Taylorwilie 8011
Niddenrce 2_.1 Welcome
Thoi
- Stony Point Mocksville 2g! 4
Bethlehem J s '"-1 ,exirtgtortt =_
-- 64! Cooleemee
North Hickory d9D; >
Statesville Woodteaf 29f
tok+0 to mi
8
Dion ace a
M1Surnmerfield
22 0' - ,
S' y :29'. 1
ti7or i
!?fA3?14T0 ? - ?'
421
gh Point -
ea5dnx Garden
ille ; 62' i 22
Randleman v
311` Hickory Cleveland
Z mil A,hetnr
_ ,Conover Troutman 641
{70f Nevacin 7D1' - SaDsbury Southmont
SITE C.
v a~ Sherrilis Ford '15a; 'zb granite Quarry Denton Ulah !42;1
Maiden Mooresville - ' 13
49'1
China G rove
> High Rock -- Seagrove
0
Land Rockwell
-- Davidson is Kannapolis ? ;103'
$, 7flS
Lncolnton Cornelius'
cy
Misenheimer 34"
'rouse - Lo:vm0 Concord
;2r: Hunters.+ille Mount Pleasant New London l Star
1)Cherrtville - 49` Troy 0
'Stanley
Albemarle .. B4coe
3211 Harrisburg
Candor
Gastonia Locust - 'z2o; t
T4 Belmont 'Charlotte Norwood w
- »Stanfietd i3?, - 2201
?? - 521, 74 ? 24?
} f -- _ Mount Gilead
.. ,.gig
73j
r9 Clover Lake Vbylae Matthew+n a Ansornville 11
New Salem -
r- 49}tiiF+ is Indian Trail Ellerbe
0 2009 f."Kpouesl Inc. r -- 6- Map Data afi 2608 1.4apCucsl Irc. -,r AND
REGIONAL VICINITY MAP
7?&'Z CITY OF SALISBURY FORMER LANDFILL PROPERTY
OLD WILKESBORO ROAD
TRIGO SALISBURY, NORTH CAROLINA
I APPROVED BY PROJECT NO: 042-08-01
SOURCE: MA VEST
SCALE: AS SHOWN
GREENSBORO, NORTH CAROLINA DATE: 5/19/08 z+rr_rme. 1
MAPQUES?
f', 208 MapQuest Inc.
-1 V-4
`'_a to
c1
601't f 0':
SITE
a?
'ylf ^t
Z01't o'
A
V
J?
200 m
600 ft
fr?OrrEk St
.J
J [
4'a
c
!
Q
a/
of
v
-oC?t, .gr c
MapDafi?ZqOBIVYIVTEO or TeIFFTfAs
LOCAL VICINITY MAP
CITY OF SALISBURY FORMER LANDFILL PROPERTY
OLD WILKESBORO ROAD
SALISBURY, NORTH CAROLINA
APPROVED BY PROJECT NO: 042-08-01
URCE: MAP VEST
SCALE: AS SHOWN
GREENSBORO, NORTH CAROLINA I DATE: 5/19/08 FIGURE 2
N
a °
W O O
U w
E??'??` A QI 0.0 ? a ILE,
a ?aa°
u o
SOU
3° aax
d W z ??o
a ¢ a
xWz
w ? W ?A? a
w
O ?' G
N w? `' (s, ? za
w ? O w ?' o
0 Pq
o r„a U `?
w ?a A
F
0
z
d
21
0?
Q
< F
a ,r
O
w rd n ?
Ifi
FE
211
Ij a?(se
°?!I = mQ r
S, . f,
999
e,
4
u Q
L
4 e tv
i
a
b o e
? u
4,e tin
Ppy?'
O
.E?
- a
l e.
X13
N
8
'° ?? 33www333w 333w3www
o - fF- q? ma- ma,' i.,Nln
g zz S?^?n
g 88
U UU
•
•
. •. ? ? ? . it ?\
?' \ ?% ?• 11: ?• -ICI i?.?
a SAIII URY
E-, I f..
?` !•? I Ill i _?
Athletic _
Fields
\\ ` •
CATAW BA
\I ?i ®;,l J COLLEGE
Tower „
s ?'I
1
O WSTP
f • r
?'?C17- •A '? a`\, ? I{nay
y o
?'-?ER? ? °?• o / ? _ - ', I - ?"??? • Jr High Sch
Radio Tow ? ', - • e _ _ 'r
lRaddiio®, ®? ?I
(. ® •?? VA HOSPITAL
?7 01
U / 'SS
l i
Substation•'J 7 \q Ro •a
Pumpmj, Sjaon SOt/T
MIT
000-
hletic?l' ? IaR9? ??_
O Ath
e
\ Fiel
Radio
P'rk i?tvari
Towers
er
- ? WSAT /\ t = -
11 `B (1 Y•Id'`•?
Union Hill -?1igh Me Sc e -? 7
Hh
/n Cem
Branch
ion Ch
Mt Calvary
Cem oCh Chapel'1.
C liege
O
4 y
?? o o A\?RO v Ch
ily St PltiJlips y?
_l ?MARL Chapel • Ch
TOiySecg7d• yy/
O ?Ch `Ilr 77
den
0D 1.'- • . I °r. _ "P /t??, - >. ?o '? igh Sch'/ S,ALISBV
_. - ?.1 - -?, :'Q 0 • ;° 4 ?_ l F`y Wiley
u \ SAL, S13 RYY MT Sah,
3PP
V? q` F F?I? ? P:. 1J.
\ ?? /j Jh h Clt:" ate
IId ank\'
MBup,nAve %4,,
2, Ch.o
00
6/
J
V
526 V f r.7s5,.' ".?y
l i ?, ?: ki o i• o O I A letic
t A no
- r
SITE LOCATION MAP
CITY OF SALISBURY FORMER LANDFILL PROPERTY
OLD WILKESBORO ROAD
TRIGION SALISBURY, NORTH CAROLINA
SOURCE: USGS TOPOGRAPHIC APPROVED BY PROJECT NO: 042-O8-Ol
MAPS, SALISBURY AND ROWAN
7 MY MILLS QUADRANGLES SCALE: I"=2,000'
GREENSBORO, NORTH CAROLINA I)ATF• S11 Wng ,.
SOIL SURVEY MAP
CITY OF SALISBURY FORMER LANDFILL PROPERTY
OLD WILKESBORO ROAD
SALISBURY, NORTH CAROLINA
SOURCE: USDA SCS SOIL APPROVED BY
SURVEY OF ROWAN COUNTY, PROJECT NC
SHEETS 6 AND 7
DATE: 5/19/08
GREENSBORO, NORTH CAROLINA
mA
J 8
? ??mmo?ma????91g N??m
C u? n
g 33www333 wbw333 w3 w ww
33 ^??4gmn'? 4 N w'
?^,? zmzzz?wmw?,$?iz?wzz
_3 S$
mm
z"
U U U
0
0
o
z
a
Q'
z
a
W
3
d?
¢'
a
:
o
0.
°
Qr,??
CG
?
W
w
?
z
a
W
0
W
F
w
U W
W
?z
O
u
"
0.1 U
O
xU
aa
Q'
a
e
°
N
k
w ?
? o
0
N
Q.
I
i
WZO
1 y 2 F
OpQU
O?0
p
rcaw
Ow
zo
F-
D)
OJ_
FLL
UY
QQ
LLm
O0
u)
0Z w
F a
?O
x'o
U
U)
O
F
H
O
z
}
F
az
?O
?w
F
??
w
U) a
0OH
Ww0 O_j
0-jN a
IL ? ?
W
OUP
LWLu
m
w
J
o
°o LL
w 11
it
(L Q J W
55 Q J
w U)
J U
F
X J
w ZU
0p
w m;
0
U
o
N
0
°
°
N
CG N
z
Q
~
a U ?
a
z
? Qo
wv
a?
aQ
?.y
z
w
O
z F
a
oo
? .z.
o? o w
a S?
WWho
??
A W
Ao
a? 3k
h
0
z
r
Z
a
z
a Qo
z
O z
O Q
Z m
LL
O
w 0g o
~ Q
w>
J
<of
w w
Q
n
J
LL
W
z u)
a0
W
a
x
w
1 ? I
I_I
J
0
z
w
w w
U ?
U) O
F w
z
w
C7 z
7
W ? O a w
aw
0, 0-
w < ?U) w
w D :D U' w H
U U) co U) w w
m U
Z N F} W z
O Of w O
U° W J IL U
z
co
<< Yo M
?t6 zccoo °aQaUag
U > } Z z
W<2 z z z w w w
w w< O F E O ax w
HQ ' ~QCc F--
j w U) U of m 7 7?
Q_Q E W of
F--
U) (n?UHF-H
U) U) U)
O p z Q Q
W W
Z
W Ir
2 X U) U)
w z d
O ?: =)
U O
W p
x
z
O
F
U
W
U)
J
Q
U
a