Loading...
HomeMy WebLinkAbout20120868 Ver 3_More Info Received - Email_20170505SPECIAL CONDITIONS Carolina Beach Inlet SDI -5 IDMMS Modification SAW -2014-02006 As part of the operation and maintenance of the federally authorized project, the Wilmington District routinely surveys and dredges portions of the Carolina Beach Inlet complex the including, but not limited to, areas *mat its intersection with th AIWW in order to assess and maintain dredging reeds to mak * iii navigability of the Carotin Beach Inlet. The permittee must coordinate with the Navigation and Coastal Engineering branches of the U.S. Army Corps of Engineers, Wilmington District both pre- and post - construction when use of the IDMMS is proposed. U.S. Army Corps of Engineers Operations Division, Navigation Branch Attention: Chief of Navigation 69 Darlington Avenue Wilmington, North Carolina 28403 (910)251-4822 Ro ger.D.Bullo ck(&usace.army.mil U.S. Army Corps of Engineers Engineering Division, Attention: Chief of Engineering 69 Darlington Avenue Wilmington, North Carolina 28403 (910)251-4822 Beach Inlet, Tthe permittee shall coordinate with SAW's Navigation and Surveying branches t provide pre-dredging/placement hydrographic (bathymetry) surveys Before Dredge, or BD) o f the entire inlet complex (to include the borrow area, federal navigation channel and I_inl t crossing) at least two weeks prior to the commencement of maintenance dredging. to -This period will allow NHC and the District time to review the survey of the area that may b potentially affected affected by the proposed maintenance project. The permittee shallcoordinat with the District o' * r the approval of the n'^*"'^* prior to initiating work on any propose project that involves disposal of material in the IDMMS. If the District Engineer, in his sole discretion and with prior NHC coordination„ determines that existing conditions indicate that the modified activity (disposal of material in the IDMMS) will likely adversely impaet-affect the Federal Project, to include the borrow area and federal navigation channel, or in the adjacent AIWW, he will notify the permittee of any limitations on disposal location that will minimize the potential for adverse impacts effects., or deny the request until more favorable cond tions exist. The permittee shall coordinate with SAW's Navigation and Surveying Branches to must also provide post-dredging/placement (After Dredge, or AD) hydrographic (bathymetry) surveys of the entire inlet complex to the same extent as the pre -dredging survey listed above within 30 days of the end of construction. -In the event NHC contracts maintenance dredging of Carolina Beach Inlet and/or the AIWW crossing through the private sector, all coordination and the BD and AD stipulations will be followed durine the IDMMS use. — - - Formatted: Indent: Left: 0.25' If the District Engineer, in his sole discretion and with prior NHC coordination, determines that the modified activity (disposal of material in the IDMMS) has caused additional shoaling (above historical amounts, taking into account inlet dynamics and storm effects) within the Federal Project's borrow area and potentially effecting the federal navigation channel or the adjacent AIWW and that such sections should be dredged in order to maintain safe and efficient navieation_ he will so notifv the permittee in writine. Proiec* to include the borrow area and permittee in wr g. Additional shoaling above historical amounts is defined herein as the result of active placement with the IDMMS bottom elevations being sustained above -14' MLW for a period of one month. The notification will specify the extent to which additional shoaling has occurred, , the inlet feature that must be dredgedthe area of the inlet Crossing that must be dredged, the depth to which it must be dredged, and the time frame within which dredging must begin (a minimum of 90 days will be allowed). The permittee shall either provide contributed funds to compensate the government for the portion of the costs associated with dredging the additional shoal material, or cause the area of the Inlet Crossing specified by the District Engineer to be dredged in a manner and within the time frame specified in the notice. 3— If a USACE's shallow draft dredge operationTesults in -such -short dumps and/or stacking of_ < material as to potentially effect navigation, the USACE will be responsible for remediating the area with no recourse to NHC. Likewise, if a NHC contractor's action results in such short _ dumps and/or stackjg of material as to potentially effect navigation, NRC's plans and ------- specifications _specifications will provide the contractor clear guidance and oversight for site remediation. ` Formatted: Indent: Left: 0.25', No bullets or numbering Formatted: Font: Times New Roman, Fontcolor: Auto Formatted: Font: Times New Roman, Font color: Auto Formatted: Font: Times New Roman, Font color: Auto Formatted: Left, Numbered + Level: 1 + Numbering Style: 1, 2, 3, ... + Start at: 2 + Alignment: Left + Aligned at: 0" + Tab after: 0.25' + Indent at: 0.25' Formatted: Font: Times New Roman, Font color: Auto Formatted: Font: Times New Roman, Font color: Auto Formatted: Font: Times New Roman, Font color: Auto Formatted: Font: Times New Roman, Font color: Auto The District Engineer, in his sole discretion and in prior coordination with NHC, may requir additional remedial action or revoke the modification in the event that surveyed data reveals contours not consistent with federally authorized depths. A 90 -day window will be allowed for any remedial action required to restore the area to federally authorized and maintained depths. FFH Conditions 4. The permittee shall ensure the implementation of pipeline monitoring for leaks at least twice per day while construction is ongoing. All requests for dredging and placement activities outside the window of November 16 to 30 shall be coordinated with NWS and shall include an explanation as to why the dredging not be conducted within the work window (November 16 to April 30)—If necessar nermittee shall nrovide additional measures (determined in coordination with SAW and NM ensure effects to fishery resources are minimal. taken to ensufe iffTaets to F.. hei resoufees are ninitmi.