HomeMy WebLinkAboutNC0039586_Authorization to Construct_19880315�'40J5�__
_4
State of North Carolina
Department of Natural Resources and Community Development
Division of Environmental Management
512 North Salisbury Street • Raleigh, North Carolina 27611
James G. Martin, Governor R. Paul Wilms
S. Thomas Rhodes, Secretary March 15, 1988 Director
Mr. G.H. Wariner, Manager
Environmental Services
Carolina Power and Light
Rt. 1 Box 327
New Hill, N.C. 27562
SUBJECT: Permit No. NC0039586
Authorization to Construct
Carolina Power and Light
Shearon Harris Nuclear Plant
Wake County
Dear Mr. Warriner:
A letter of request for an Authorization to Construct was received February 3,
1988, by the Division and final plans and specifications for the subject project have
been reviewed and found to be satisfactory. Authorization is hereby granted for the
construction of a dechlorination system for the cooling tower blowdown consisting of a
solution cylinder, metering pump, booster pump, diffuser and associated controls.
This Authorization to Construct is issued in accordance with Part III paragraph B
of the NPDES Permit No. NC0039586 issued July 1, 1983, and shall be subject to
revocation unless the wastewater treatment facilities are constructed in accordance
with the conditions and limitations specified in Permit No. NC0039586.
The Permittee must employ a certified wastewater operator in accordance with Part
III paragraph D of the referenced permit.
The Raleigh Regional Office, telephone number 919/733-2314 shall be notified at
least twenty-four (24) hours in advance of operation of the installed system so that
an in-place inspection can be made of said system prior to operation. Such
notification to the Regional Supervisor shall be made during the normal office hours
from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays.
In event the facilities fail to perform satisfactorily in meeting its NPDES
permit effluent limits, the permittee shall take such immediate corrective action as
may be required by this Division, including the construction of additional wastewater
treatment and disposal facilities.
Upon completion of construction and prior to operation of this permitted
facility, a certification must be received from a professional engineer certifying
:hat the permitted facility has been installed in accordance with the approved plans
_ind specifications. Mail the Certification to the Permits and Engineering Unit, P.O.
Box 27687, Raleigh, N.C. 27611-7687
Pollution Prevention Pats
P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015
41,_.
-4
One (1) set of approved plans and specifications is being forwarded to you. If
you have any questions or need additional information, please contact Mrs. Babette
McKemie, telephone number 919/733-5083, ext 177.
cc: Wake County Health Department
Raleigh Regional Supervisor
Mr. Dennis R. Ramsey
Engineer's Certification
Sincerely,
R. Paul Wilms
/I--
-
l , as a duly registered Professional Engineer in
the State of North Carolina, hereby certify that construction of these permitted
facilities has been completed in accordance with the approved plans and
specifications.
Signature,
Date
NCO039586
Registration Number
to