HomeMy WebLinkAbout20061052 Ver 2_Staff Comments_2008091006-1052v2 Springhill Subdivision
AML Comments
September 10, 2008
All of the drainage areas on this project appear to be well over the threshold of 24
percent impervious. Per the requirements of GC 3705, this project must comply
with Stormwater Management Plan (SMP) Requirements for Applicants Other
Than the North Carolina Department of Transportation, available at:
http://h2o. enr. state. nc. us/ncwetland s/documents/SMPRequirementsforApplicants
otherthanNCDOT.pdf. Please include an SMP that removes a minimum of 85
percent TSS from the stormwater generated by this project. For each proposed
BMP, please provide a completed BMP Supplement Form, with all the required
items. The BMP Supplement Forms are available at the following web site:
http://h2o.enr.state.ne.us/su/bmp forms.hthn.