Loading...
HomeMy WebLinkAbout20061052 Ver 2_Staff Comments_2008091006-1052v2 Springhill Subdivision AML Comments September 10, 2008 All of the drainage areas on this project appear to be well over the threshold of 24 percent impervious. Per the requirements of GC 3705, this project must comply with Stormwater Management Plan (SMP) Requirements for Applicants Other Than the North Carolina Department of Transportation, available at: http://h2o. enr. state. nc. us/ncwetland s/documents/SMPRequirementsforApplicants otherthanNCDOT.pdf. Please include an SMP that removes a minimum of 85 percent TSS from the stormwater generated by this project. For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http://h2o.enr.state.ne.us/su/bmp forms.hthn.