Loading...
HomeMy WebLinkAboutNC0039586_Permit Modification_20010201Re: CP&L Harris Plant NPDES NCO039586 Subject: Re: CP&L Harris Plant NPDES NCO039586 Date: Thu, 01 Feb 2001 15:54:29 -0500 From: Tom Belnick <tom.belnick@ncmail.net> To: "Cooke, Joanie" <joanie.cooke@pgnmail.com> CC: Tom Belnick <Tom.Belnick@ncmail.net> Joanie- based on the attached data the facility will remain well within its design flow, therefore CP&L can proceed foward without any permit modifications. "Cooke, Joanie" wrote: > Tom, > As we discussed, the Harris plant is going to add some lift station that > will receive flow from 19 toilets (fixtures). Based on my calculation of > flow and the existing capacity of the system, the plant can proceed with > installation. Below is the usual information on the expected additional > load. > The sewage treatment plant is permitted to a effluent flow of 0.05 MGD.. > Proposed to add 19 new fixtures (loading) to the existing system's hydraulic > load. Each new fixture adds 250 gallons of loading (state number) to the > system. Hence, the new fixtures will add an additional 4,750 gallons of > load a day to the system. > Using past operating values for flow, the maximum monthly value was 0.019 > MGD (19,000 gals per day). Therefore, looking at the worst case monthly > value of 19,000 gals and increasing that flow by 4,750 gals per day to a > total of 23,750 gals per day or 0.02375 MGD, the permitted design flow for > the STP will not be exceeded. Based on the above information, the plant can > proceed with the installations. > Joanie P. Cooke > CP&L, A Progress Energy Company > (919) 362-3553, joanie.cooke@pgnmail.com > Pager (919) 565-6832 > Fax (919) 362-3266 Mailto:tom.belnick@ncmail.net N.0 DENR-DWQ/NPDES Unit 1617 Mail Service Center, Raleigh NC 27699-1617 Work: (919) 733-5083 ext. 543 Fax: (919) 733-0719 1 of 1 2/1/01 4:03 PAR