Loading...
HomeMy WebLinkAboutbridge 444 RobesonNORTH CAROLINA DEPARTMENT OF TRANSPORTATION FIELD SCOPING MEETING WORKSHEET Design Build Process WBS No.: 17BP.6.R.83 Field Scoping Meeting Date: May s, 2017 Division: 6 Route (US/NC/SR): SR 2204 Location: On-site County: Robeson Project Description: Bridge No. 770444 over Gum Branch Canal on SR 2204 Tier: Subregional - Local Municipality: Lumberton Funding: State Attendees Name Phone No. E-mail Division Bridge Program Manager Christy Huff 910-364-0600 chuff@ncdot.gov Division Environmental Officer Jim Rerko 910-364-0580 jjrerko@ncdot.gov Resident Engineer Mike Parker 910-678-5689 jmparkerjr@ncdot.gov Div. 6 Construction Engineer Randy Wise 919-364-0600 rvvise@ncdot.go Div. 6 Locating Engineer John Kaukola 910-486-7338 jkaukola@ncdot.gov Div. 6 Maintenance Engineer Ken Murphy 910-364•0600 rkmurphy@ncdot.gov Div. 6 Bridge Engineer Darren Pittman 910-364-0670 dpittman@ncdot.gov Div. 6 Dist. 1 Engineer Charles Miller, Jr 910-678•5546 csmiller@ncdot.gov Hydraulics Engineer Galen Cail 919-707-6711 gcail@ncdot.gov Hydraulics Engineer Jon Moore 919-707-6738 Jlmoore6@ncdot.gov DENR-DWR Joanne Steenhuis 910-796-7306 Joanne.steenhuis@ncdenr.g ov USACE Liz Hair 910-251-4049 sarah.e.hair@usace.army.mil PP� Jamie Lancaster 919-707-6620 jlancaster@ncdot.gov PP� Pam Williams 919-707-6608 prwilliams@ncdot.gov USFWS Gary Jordan 979-856-4520 a ordan fws. ov ext 32 g ry—� � g NCWRC Travis Wilson 919-707-0370 travis.wilson@ncwiidlife.org Structure No: 770444 ] of4 Existinq Features Feature Bridged: 770444 over Gum Branch Canal on SR 2204 Ex. Bridge Clear Deck Width: (Ft.) Roadway width: 21 (Ft.) (Bridge / Culvert) Length: 21 (Ft.) Deck Width (Out To Out): Water Depth: 4(Ft.) Height Bed-To-Crown: 8(Ft.) Year Built: 1979 Posted: SV Not Posted TTST: Not Posted Superstructure: 2- 9' x 6' CM Abutment: Pipe Temp. Shored: N/A Historic High Water (Elev. To The Existing Structure ) PRI: DP: 2 SR: 72.84 Pier Type: (Ft) School Bussing crossings per day: Posted Speed Limit Vicinity: 35 (mph) Detour Off-Site � Stage Construction ❑ New Alignment ❑ On-site ❑ If Off-Site, Description Of Detour Route: SR 2203 to SR 2289 to NC41/72(West 2"' Street) to NC 41 Approximate Length Of Detour? 2.1 Miles Improvements Needed To Road(s) On Detour? No Div. Traffic Eng. Recommend Off-site detour signing? Trailblazing with StreeURoad names Improvements Needed To Bridges On Detour? No Are future plans for upgrading this roadway either at or in the vicinity of this project? Are Bridges On Detour Currently Programmed? No Are There EMS Or Business Access Issues? Are There Any Railroad Crossings On Detour? No Should Work Zone Pedestrian Access Be Maintained During Construction? Overhead Utility Lines Power Transmission Lines Telephone Cable Lines Fiber Optic Water ewer Natural Gas Other In Conflict In Conflict In Conflict In Conflict In Conflict In Conflict In Conflict In Conflict In Conflict Is There Any Future Utility Construction Anticipated In The Project Area Is A FEMA Buy-Out Property Being Impacted: No No No Structure No: 770444 2 of4 � Environmental Wetlands At Site: /" Comments: Endangered Species In County: American Alligator, Red-cockaded woodpecker, Michaux's sumac T&E species effect: Trout County: No TVA County: No CAMA County: No Primary Nursery Area: No Moratoria: /�/ Which species: Permits discussion: /U� 3 Water Quality Classification: C; Sw (14-14-1) Coast Guard Permit? No Drainage Basin: Lumber is The Project Site In Or Near Any Of The Following: National Forest: State, County, Or Local Park: Airport: Water Supply Reserooir: Public Use Boat Ramp: No No No No No Duration: 303d: No Riparian Buffer Rules: No Wildlife Refuge: Wild And Scenic River: Recreation or Power Generation: Nutrient Sensitive Waters: Cemeteries: VAD/Farmland Protection: No Game Lands: Known Or Potential Historic Properties In The Area: Architecture: No Survey Required Archaeology: o✓�` �� Is The Bridge Structure Itself, Or Any Part Thereof, Considered Historic: �� Impacts to a Church, Community Center, Or Other Public Facility? Is this a Statewide Bicycle Route or a Local Non-Marked Bicycle Route: No Comments: No No No No No Geotechnical Are There Any Historical and/or Vibration Sensitive Structures Near By? -------- Comments: Are There Any Known Landfills and/or Geo-environmental Hazard Sites at/or Within Close Proximity To The Project Site? -------- Comments: Are Any Impacts Anticipated To Natural Springs Or Artesian Wells? -------- Comments: Possible Foundation Type: End Bents: Interior Bents: Structure No: 770444 3 of4 Hvdraulics �i-' � � C�'�^e c.sk--�/ FEMA Approval? � (MOA ) �f �'�"^ ' T`� `S �� � Is There Unusual Scour Potential? N Are Banks Stable? Y Appreciable Amount Of Large Debris? Is Protection Needed? ��N Is Protection Needed? vP5 Placement Of Bents In The Water Be Allowed: I�C ��e: Structure Type: Bridge r Culvert If Bridge: CS or BB Length Of Structure: Min. Number Of��ans: ��l Waive offset: 1M:� T���i� �� EB Ca'p:(�'-6" or 4'-0'� 1�� � l�s t� 2a?.,� �Jfr r✓�Q�ll If girder; why? Span Arrangement: Skewed: Items To Be Discussed / Resolved At FSM Bv Attendees Off-Site � Stage Construction ❑ New Alignment ❑ On-site ❑ Clear roadway width: Clear roadway width: Temp. Signals: one lane w/ signals: or two lanes CRW: Alignment: N, E, W, S Alignment: N, E, W, S Alignment: N, E, W, S Environmental Document Prepared by DBE: Low Impact Data Spreadsheet ❑ Minimum Criteria Checklist ❑ ADT: 710 per BIR NHS: No Tier: Subregional Func. Class: Local � Bridge Min. Clear Deck WIidth Recommended by Div.: �/U �,u�} r� r�� � I �� Roadway lane width: 1tl' with 3' shoulders N&��- �/VhA�� �Q.J�I STI NQ JiU � Extension of Paved shoulders: end of construction limits and taper down to 2' and blunt end??? Pave to face of guardrail and taper 8:1 to travel lane/paved shoulder? Yes Min. Pavement Surface Course: 3" Existing Roadway: 20' Pavement Markin . Thermoplas or Paint Pavement Markers: Raised/Snowplowable/None Will Railroad Involvement e uired: No Method of Clearing: �nodified � �/�l u.�-�'f�a.� Truck Percentage: 7% per BIR Reasonable Safe Speed per SIR: mph Liquidated damages: will be imposed after,�ays of closure/construction. Amt: $l���per day CEI by? NCDOT R/W by? DBT R/W monuments? Pin and cap. Salvageable materials: �� Contact Person/number: Deliver to: Removal of previous structure remnant abutments/piers: Sequencing priority in construction? Comments: Structure No: 770444 4 of4