Loading...
HomeMy WebLinkAboutbridge 422 RobesonNORTH CqROLINA DEPqRTMENT OF TRANSppRTA710N FIELD SCOPING MEETING WpRKSHEET Design gu��d process WBS No.: 17Bp,6.R.81 Division: g Field Scoping Meeting Date: Ma Route (US/NC/SR : Location: pn��te y$' Zo�� ) SR 2105 Project Description: Brid e �ounty: Robeson 9 No. 77p422 over Jackson Swam Tier: Subregional - Local ponSR2105 Municipality: Funding: State Division Bridge Program Manager Division Environmental Officer Resident Engineer Div, 6 Construction Engineer �ro• s Locating Engineer Div. 6 Maintenance Engineer Div. 6 Bridge Engineer Div. 6 Dist. 1 Engineer Hydraulics Engineer Hydraulics Engineer DENR-DWR USACE PPU PPU USFWg NCWRC Structure No: 77p422 Attendees Name Phone No. E-mail Christy Huff 910-364-0600 chuff@ncdot.gov Jim Rerko 910-364•0580 jJrerkoca ncdot.gov Mike Parker 910-618.5688 Jmparkerj r@n cdot.go� Randy W�Se 919-364-0600 rwise@ncdot.go John Kaukola 91p-qgg. 1338 jkaukola@n�qot 9ov Ken Murphy 910-364-0600 rkmurphy@ncdot.go� Darren Pittman 910-364-0670 Charles Miller, Jr 910- dp�ttman@ncdot.gov 678-5546 csmiller@ncdot.gov Galen Cail 919J07-g711 Jon Moore 8�ai1@ncdot.gp� 919-707.6738 Jlmoore6@ncdot.gov Joanne Steenhuis 910-7gg.7306 Joanne.steenhuis@ncdenr.g Liz Hair O° 910-Z51-4049 sarah.e.hair Jamie Lancaster 919-707-6620 °eusace.army.mil jla n caster@ncdot.gp� Pam Williams 919-707-6608 Gary Jordan p�����ams@ncdot.go� 919-856-qgYO ext 32 9a►Y.Jordan@N,ys.gov Travis Wilson 919-7p7.0370 travis,wi�son _ @ncwildlife.org Existinq Features Feature Bridged: 770422 over Jackson Swamp on SR 2105 Ex. Bridge Clear Deck Width: 19.8 (Ft.) Roadway width: 19.1(Ft.) (Bridge / Culvert) Length: 36(Ft.) Deck Width (Out To Out): 20 ft. Water Depth: 8 (Ft.) Height Bed-To-Crown: 13 (Ft.) Year Built: 1960 Posted: SV 12 Tons Superstructure: Timber Deck nST: 20 Tons on Timber Joist Abutment: Timber Caps on Timber Piles Pier Type: Temp. Shored: No Historic High Water (Elev. To The Existing Structure ): PRI: 37.55 (Ft) �P: $•44 SR: 50 Posted Speed Limit Vicinity: 55 (mph) School Bussing crossings per day: Detour Off-Site ❑ Stage Construction � New Alignment If Off-Site, Description Of Detour Route: � On-site ❑ N/A Approximate Length Of Detour? Improvements Needed To Road(s) On Detour? N/A N/A Div. Traffic Eng. Recommend Off-site detour signing? N�q Improvements Needed To Bridges On Detour? N/A Are future plans for upgrading this roadway either at or in the vicinity of this project? Are Bridges On Detour Currently Ph grammed97 Are There EMS Or Business Access Issues? N/A Are There Any Railroad Crossings On Detour? No N/A Should Work Zone Pedestrian Access Be Maintained During Construction? No Overhead Utility Lines In Conflict Power Transmission Lines In Conflict Telephone In Confiict Cable Lines In Conflict Fiber Optic In Conflict Water In Conflict Sewer In Conflict Natural Gas In Conflict Other In Conflict Is There Any Future Utility Construction Anticipated In The Project Area: Is A FEMA Buy-Out Property Being Impacted: No No Structure No: 770422 2 of4 Environmental �iK� '�J���,�._ L-(' /vl�c,o..'t-�r �/ Wetlands At Site: �7/� Comments: Endangered Species In County: American Alligator, Red-cockaded woodpecker, Michaux's sumac T&E species effect: Trout County: No TVA County: No CAMA County: No �j Primary Nursery Area: No I .� Moratoria: ��i � ��,1tVhich species: Duration: �Y� �.�<� / Permits discussion: � � � � /'�.j ,y , , �_� Water Quality Classification: C; Sw (14 2 10) 303d: No Coast Guard Permit? No Drainage Basin: Lumber Riparian Buffer Rules: No Is The Project Site In Or Near Any Of The Following: National Forest: No Wildlife Refuge: No State, County, Or Local Park: Airport: Water Supply Reservoir: Public Use Boat Ramp: VAD/Farmland Protection: No No No No No Known Or Potential Historic Properties In The Area: Architecture: Wild And Scenic River: Recreation or Power Generation Nutrient Sensitive Waters: Cemeteries: Game Lands: Archaeology: is The Bridge Structure Itself, Or Any Part Thereof, Considered Historic: Impacts to a Church, Community Center, Or Other Public Facility? Is this a Statewide Bicycle Route or a Local Non-Marked Bicycle Route: No Comments: Geotechnical No No No No Are There Any Historical and/or Vibration Sensitive Structures Near By? -------- Comments: Are There Any Known Landfills and/or Geo-environmental Hazard Sites at/or Within Close Proximity To The Project Site? -------- Comments: Are Any Impacts Anticipated To Natural Springs Or Artesian Wells? ---..--- Comments: Possible Foundation Type: End Bents: Interior Bents: Structure No: 770422 3 of4 Hvdraulics jvo� �� ''-��� ^��-�. � � FEMA Approval? �MOA ) ��; , � > v � . � �� � d-vnfl Is There Unusual Scour Potential? �✓ Is Protection Needed? S�,cp,�; Are Banks Stable? � Is Protection Needed? S�f1,,�/ Appreciable Amount Of Large Debris? �� c.-�-% Placement Of Bents In The Water Be Allowed: �i % Where: Structure Type: Bri ge or ulv If Bridge: CS r BB Length Of Structure� Min. Numb r Of Spans: t Waive offset: � �� � EB Cap. 2'-6' or 4'•0" �--�_��<.�i� c:2 - ��`i p.: r 3v �,�( � ��- If girder; why? Span Arrangement: Skewed: �J Items To Be Discussed / Resolved At FSM Bv Attendees Off-Site ❑ Stage Construction ❑ New Alignment ❑ On-site ❑ Clear roadway width: Clear roadway width: Temp. Signals: one lane w/ signals: or two lanes CRW: Alignment: N, E, W, S Alignment: N, E, W, S Alignment: N, E, W, S Environmental Document Prepared by DBE: Low Impact Data Spreadsheet ❑ Minimum Criteria Checklist ❑ ADT: 30per BIR NHS: No Tier: Subregional Func. Class: Local Bridge Min. Clear Deck Width Recommended by Div.: 3�� ��'�,.�-� "�= '"�/ Roadway lane width: 10' with 3' shoulders Extension of Paved shoulders: end of construction limits and taper down to 2' and blunt end??? Pave to face of guardrail and taper 8:1 to travel lane/paved shoulder? Yes Min. Pavement Surface Course: � Z�� Existing Roadway: 20' Pavement Marking: Thermoplastic or Paint Will Railroad Involvement Be Required: No Truck Percentage: Pavement Markers: Raised/Snowplowable/None Method of Clearing: II modified Reasonable Safe Speed per SIRs�mph Liquidated damages: will be imposed after �days of closure/construction. Amt: $� per day , CEI by? NCDOT R/W by? DBT R/W monuments? Pin and cap. Salvageable materials: Contact Person/number: Deliver to: Removal of previous structure remnant abutments/piers: Sequencing priority in construction? Comments: Structure No: 770422 4 of4