Loading...
HomeMy WebLinkAboutNC0039586_NC0039586_Monthly Flow Average_20040323_20040323s Energy's Cape Fear Plant Subject: RE: Progress Energy's Cape Fear Plant From: "Cahoon, Steve" <Steve.Cahoon@pgnmail.com> Date: Tue, 23 Mar 2004 09:23:59 -0500 To: "'Mark McIntire"' <mark.mcintire@ncmail.net> Mark, Under our current NPDES permit (NC00339586) we are permitted to discharge 0.05 MGD from sanitary wastewater treatment plant (Outfall 002) via combined Outfall 006. We would like to request the current NPDES permit be modified as follows: Part I 1. Section A(2): Reduce Monthly Flow Average in the Effluent Limitations column from 0.05 MGD to 0.025 MGD. Thanks for your help, let me know if you have any further questions. Steve Cahoon Progress Energy - Permitting and Compliance Unit Vnet: 772-3568 Bell: (919) 362-3568 Mail Code: HEEC steve.cahoon@pgnmail.com -----Original Message ----- From: Mark McIntire [mailto:mark.mcintire@ncmail.net] Sent: Tuesday, March 23, 2004 9:10 AM To: Cahoon, Steve Subject: Re: Progress Energy's Cape Fear Plant Steve, Do me a favor and send me an e-mail with a detailed description of what you want modified in the Harris permit. I just need it for the permit file. I'm still investigating the ash pond issues at Cape Fear. I've got lots going on at the moment and will get back with you on this when I can. Thanks, Mark Cahoon, Steve wrote: Mark, The Cape Fear Plant would like to amend their NPDES permit application such that the west ash pond (outfall 001) would receive ash sluice water. The west ash pond could receive ash sluice from the boilers or from the east ash pond (through dredging). The characteristics of the ash for the west ash pond should be the same as the east ash pond. CF Plant would also need the ability to do dry stacking in both ponds. Let me know what you need from me to get the process started, and what type of time frame we 1 of 2 3/23/2004 9:24 AM D �s Energy's crape rear Plant are looking at for approval. I'll be in Florida until Friday, but call me and leave a message if you have questions. Thanks! Steve Cahoon Progress Energy - Permitting and Compliance Unit Vnet: 772-3568 Bell: (919) 362-3568 Mail Code: HEEC steve.cahoon _pgnmail.com 2 of 2 3/23/2004 9:24 AM