Loading...
HomeMy WebLinkAbout20140422 Ver 1_FW May 3 Hudson site visit_20170509 Strickland, Bev From: Haupt, Mac Sent: Wednesday, May 10, 2017 4:20 PM To: Baker, Virginia Subject: FW: May 3 Hudson site visit From: Haupt, Mac Sent:Tuesday, May 09, 2017 3:23 PM To: Schaffer,Jeff<jeff.schaffer@ncdenr.gov>;Todd Tugwell <Todd.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>;Andrea Hughes<Andrea.W.Hughes@usace.army.mil> Cc: Scott McGill <SMcGill@ecotoneinc.com>; Ed Temple <edtemple@vol.com>;Ashby Brown <ashbybrown@woodswaterandwiIdIife.com>; Miguez, Kristin <kristin.miguez@ncdenr.gov>; Scarbraugh,Anthony <anthony.scarbraugh@ncdenr.gov>; Steffens,Thomas A SAW (Thomas.A.Steffens@saw02.usace.army.mil) <Thomas.A.Steffens@saw02.usace.army.mil> Subject: RE: May 3 Hudson site visit J eff, One thing to add to the minutes is that IRT does not believe the bottom of Reach 5 was built as designed. Mac From: Schaffer,Jeff Sent:Tuesday, May 09, 2017 2:38 PM To:Todd Tugwell <Todd.Tugwell@usace.army.mil>; Haupt, Mac<mac.haupt@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil>;Andrea Hughes<Andrea.W.Hughes@usace.army.mil> Cc: Scott McGill <SMcGill@ecotoneinc.com>; Ed Temple <edtemple@vol.com>;Ashby Brown <ashbybrown@woodswaterandwiIdIife.com>; Miguez, Kristin <kristin.miguez@ncdenr.gov> Subject: FW: May 3 Hudson site visit All, Please find the meeting summary for the May 4,2017 site visit to the Hudson Property Site in the email below. If there is anything you would like to add or amend,please let us know. Thanks! Jeff Schaffer Eastern Supervisor,Project Management Division of Mitigation Services (http://portal.ncdenr.org/web/eep) NC Department of Environmental Quality (NCDEQ) (919) 707-8308 office (919) 812-2634 mobile Jeff.Schaffer&ncdenr.gov 217 West Jones St., Suite 3000A 1 1652 Mail Service Center Raleigh,NC 27699-1652 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Scott McGill [mailto:SMcGill@ecotoneinc.com] Sent:Tuesday, May 09, 2017 2:33 PM To: Schaffer,Jeff<jeff.schaffer@ncdenr.gov> Cc: edtemple@vol.com;Ashby Brown <ashbybrown@woodswaterandwildlife.com>; Miguez, Kristin <kristin.miguez@ncdenr.gov> Subject: May 3 Hudson site visit Jeff. Below is a summary of the topics discussed last week at the site meeting. Thanks for offering to forward to all those in attendance. Hudson Site Visit minutes EEP Project#95361 Contract #004638 Date: May 3, 2017 • The upstream limit of Reach 1 did not meet the 30-day continuous flow requirement in year 1 monitoring. An additional well was suggested in the middle of reach 1 to further document flow conditions. • Albemarle Restorations constructed 2891 linear feet of restoration, 291 feet more than DMS is purchasing. This may provide flexibility if a reach or reaches do not meet success criteria. • All liked the additional buffers which were made a part of the conservation easement and mitigation plan. Concern was discussed over the elevation of the crossing pipes directly upstream of Reach 5. • There was some concern expressed by Todd Tugwell over the woody vegetation in that it appeared to be a lot of sycamore and not many other species as you move away from the stream channels. • There were areas within easement that had minimal herbaceous and tree growth that should be monitored. • Several attendees thought the pipe elevations should be reduced. There was visible flow within the left pipe (looking downstream). As-built elevations should be verified to verify the pipes were not set too high. • Reach 2-4 had flow during the site visit and were functioning as designed • Reach 5 - The ditch feature is still present and is limiting overall function of Reach 5. All agreed that if any adaptive management is performed,the overall goal should be to improve overall ecological function. Albemarle Restorations, LLC agreed to investigate grading modifications to enhance function and promote more sheet flow commensurate with swamp run morphology. Shop drawings of any modifications will be circulated to DMS and IRT before proceeding. 2 • If the lower end of reach 5 continues to behave as a ditch. With no further modifications,the IRT may consider reducing credit from Priority 1 to Enhancement E1 or E2. • Wells should be maintained and sealed per DMS specifications for flow monitoring devices. Next Steps • Albemarle Restorations will develop adaptive management plans for Reach 5 for review by the IRT,with the goal of performing the modifications summer of 2017. • Albemarle Restorations will install an ADDITIONAL flow monitoring device on Reach 1. • Continue YEAR 2 monitoring. Ecotone Scott McGill I President smcgilICcDecotoneinc.com/410-459-6312 Ecotone Inc. Office: 410.420.2600 ext. 102 1 Fax: 410.420.6983 2120 High Point Road, Forest Hill, MD 21050 www.ecotoneinc.com 00000 RIVERS -WETLANDS•FORESTS-WILDLIFE- STORMWATER 2016 OUTSIDE Magazine Best Places to Work 2016 Baltimore Sun Media Group Top Workplace Maryland Department of Transportation- Environmental Excellence Award,2015 2014 BBB Greater Maryland Torch Award for Marketplace Excellence Finalist Harford Business Award,Entrepreneur Category,2014 3