Loading...
HomeMy WebLinkAboutNC0039586_Evironmental Monitoring Report_20120223P&MCWt,ir vcn39586 r At, NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Ernest J. Kapopoulos, Jr. Plant Manager, Harris Nuclear Plant 5413 Sharon. Harris Blvd New Hill, North Carolina 27562 Division of Water Quality Charles Wakild, P. E. Director February 23, 2012 Dee Freeman Secretary Response: Review of Progress Energy, Harris Nuclear Plant (NPDES Permit NC0039586): 2010 Environmental Monitoring Report. Dear Mr. Kapopoulos: Thank you for your recent submittal of the 2010 Environmental Monitoring Report for this facility. Based on reviews by Environmental Sciences Staff (ESS) Debra Owen (limnology and physical -chemical), Bryn Tracy (fisheries) and Mark Vander Borgh (macrophytes) as well as by Autumn Romanski from the Raleigh Regional Office, we request that the following matter be addressed in subsequent monitoring reports: 1) As noted in your NPDES permit (Page 9) under "4. Test Procedures" and as required by 15A NCAC 02B .0505(e)(4): "All test procedures must produce minimum detection and reporting levels that are below the permit discharge requirements and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. If no approved methods are determined capable of achieving minimum detection and reporting levels below permit discharge requirements, then the most sensitive method with the lowest possible detection and reporting level must be used'. Currently, Nickel concentrations are being reported at Outfall 006 at a reporting limit of <50 pg/L. Water quality standards for Nickel in WS -V waters is 25 pg/L and the NCDWQ lab reports Nickel at 10 pg/L. As a result, ESS would request that Progress Energy report Nickel at the 10 pg/L level and would also request Nickel monitoring in the lake to confirm that the concentrations of this parameter in Outfall 006 is not causing an exceedance of the water quality standard in the lake. Specifically, sampling for Nickel is recommended at existing stations (E2, H2, P2, and S2) as noted in Appendix 2. If you have any questions regarding these requests, please do not hesitate to contact me, my staff, or Danny Smith, Supervisor of the Raleigh Regional Office. Sincerely, Jay H. Sauber Chief, Environmental Sciences Section Cc: Danny Smith, Raleigh Regional Office Tom Belnick, Surface Water Protection Section Environmental Sciences Section 1621 Mail Service Center, Raleigh, North Carolina 27699-1621 Location: 4401 Reedy Creek Road, Raleigh, North Carolina 27607 Phone: 919-743-8400 1 FAX: 919-743-8517 One Internet: http://portal.ncdenr.org/web/wgless/home NorthCarolina An Equal Opportunity \Affirmative Action Employer NaNn7l`ff A�. :* Belnick, Tom From: Fleek, Eric Sent: Thursday, February 23, 2012 2:00 PM To: Smith, Danny; Belnick, Tom Cc: Romanski, Autumn Subject: Harris Nuclear Plant Monitoring Report Attachments: Harris Nuclear Plant Monitoring Report 2010.pdf Is attached. If there are questions or comments, you know where to find me. Thanks Eric D. Fleck Biologist Supervisor Bioassessment Unit Environmental Sciences Section North Carolina Division of Water Quality "For the biologist itis not so important that his theorysurvive the test of prediction; it is more important that his theoryis useful in solving problems." Ernst Mayer