HomeMy WebLinkAbout20081399 Ver 1_More Info Received_20080915Sep 15 08 01:21p
X1II. Violations (required by DWQ)
p.1
-To'. Q I a ? .S 6Yt, c-S
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
littp://h2o.enr.state.ne.us.lncwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
l`a C )E5
Applicant/'Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Updated 1111/2005
Page 12 of 12
SEP-15-2008 MON 13:12 TEL:9197336893 NAME:DWO-WETLANDS P. 1