HomeMy WebLinkAbout20160982 Ver 1_Study_20080911Department of Environment and Natural Resources
Office of Legislative and Intergovernmental Affairs
Project Review Form
Project Number
oq-ooul County
CATAW2)A Date Received
of 1010% Date Response Due (firm deadline)
101(010%
This project is being reviewed as indicated below
Regional Office Regional Office Area In-House Review
Asheville N Air _ Soil & Water _ Marine Fisheries
Fayetteville Water _ Coastal Management
Mooresville Aquifer Protection Wildlife W
Raleigh ')L_ Land Quality Engineer Forest Resources
Washington _ Water Resources Environmental Health
Wilmington Parks & Recreation _ Solid Waste Mgmt
Winston-Salem Water Quality r oT _ Radiation Protection
Air Quality _ Other
Manager Sign-Off/Region Date In-House Reviewer/Agency
Response (check all applicable)
- No objection to project as proposed
No comment
Insufficient information to complete review
- Other (specify or attach comments)
i 'ZZ ,
a S,?p l ? ?'
h?5 AD^q?fiRn,.
a?
RETURN TO:
Melba McGee
Environmental Coordinator
Office of Legislative & Intergovernmental Affairs
wn/Cy
?tz
V R ,4
? A
?n
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F EASLEY
GOVERNOR
September 2, 2008
MEMORANDUM TO
FROM
Ms Valane McMillan
State Clearinghouse
Department 4 Ad 041r Iii
Gregory J Thorp,
Project Develop t and
LYNDo TIPPETT
SECRETARI
Analysis Branch
SUBJECT Start of Study Notification for Widening of NC 16 from SR 1895
to SR 1800 Southeast of Newton, Catawba County, Federal-Aid
Project No STP-16(4), WBS No 34522, TIP No R-3100
The Project Development and Environmental Analysis Branch is starting the project
development, environmental and engineering studies for the proposed widening of NC 16 from
SR 1895 to SR 1800 Southeast of Newton The project is included in the 2009-2015 North
Carolina Transportation Improvement Program and is scheduled for right of way in fiscal year
2013 and construction in fiscal year 2015
Attached for your review and comments are the scopmg information sheets for the
subject project (see attached map for project location) The purpose of these sheets and the
related review procedure is to develop the scope of the work for the project development,
environmental, and engineering studies The scoping meeting for this project is scheduled for
October 29, 2008 at 10 30 AM in the Protect Development and Environmental Analysis Branch
Conference Room (Rom 470) You may provide us with your comments at the meeting or mail
them prior to that date
Thank you for your assistance in the project development process If you have any
questions about the meeting or the information sheets, please call Zahid Baloch, Project
Development Engineer, at 733-7844, Ext 228 Please include the TIP Project Number in all
correspondence and comments
GJT/plr
Attachment
MAILING ADDRESS TELEPHONE 919-733-3141 LOCATION
NC DEPARTMENT OF TRANSPORTATION FAX 919-733-9794 TRANSPORTATION BUILDING
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1 SOUTH WILMINGTON STREET
1548 MAIL SERVICE CENTER WEBSITE WWW NCDOT ORG RALEIGH NC
RALEIGH NC 27699-1548
cc Ms Deborah M Barbour, P E , Deputy Highway Administrator - Preconstruction
Mr Art McMillan, P E, State Highway Engineer - Design
Mr Jay A Bennett, P E , State Roadway Design Engineer
Mr Tony Houser, Roadway Design Project Engineer
Mr Greg Perfetti, P E , State Bridge Design Engineer
Mr D R Henderson, P E, Hydraulics Unit Head
Mr David Chang, P E , Hydraulics Unit
Mr Doug Lane, Project Services
Mr Doug Allison, Right of Way Branch Manager
Mr Robert Memory, Utilities Coordination Unit, Construction
Mr Kevin Lacy, P E , Traffic Engineering Branch
Mr Mated Al-Ghandour, Program Development Branch, Room G106M
Mr Al Avant, Program Development Branch
Mr Dan Holderman, P E , Acting State Bridge Maintenance Engineer
Mr Charles W Brown, P E, PLS, Location & Surveys Unit Head
Mr Keith Johnston, P E , PLS, Photogrammetry Unit Head
Mr Tom Norman, Director, Division of Bicycle and Pedestrian Transportation
Mr Mike Bruff, P E, Manager, Transportation Planning Branch
Ms Sarah Small, Project Engineer, Transportation Planning
Mr James B Hams, P E, Engineering Manager, NCDOT Rail Division
Mr Bill Williams, Jr, Aviation
Mr Mike Holder, Division Engineer, Division 12
Ms Trish Simon, Division Environmental Officer
Mr Ron Lucas, Federal Highway Administration
Ms Teresa Hart, P E , Unit Head, Project Development, PDEA
Mr John Conforti Project Engineer, Project Development, PDEA
Mr Phil Hams, P E, Unit Head, Natural Environment Unit, PDEA
Mr Ed Lewis (2 copies), Human Environment Unit, PDEA
Mr Greg Smith, Human Environment Unit, PDEA
Mr Kim So, P E, Scheduling/PMII Unit Head
Ms Sharon Lipscomb, Manager, Office of Civil Rights
Mr Stuart Bourne, Work Zone Traffic Control Unit
Ms Laura Cove, Congestion Management Unit
Mr Njoroge Wamaina, PE, Geotechmcal Unit
Ms Miriam Perry, Public Transportation
Mr John Tippett, Greater Hickory MPO
Mr Calvin Leggett, P E , Program Development
Mr Rodger Rochelle, P E , Project Services
Ms Terry Hopkins, P E , Traffic Safety Unit
Ms Deborah Hutchings, P E , Transportation Planning Branch
Mr David Wasserman, P E , Transportation Planning Branch
Mr Victor Barbour, P E , Project Services Unit, Construction
Mr Ron Allen, P E, Roadway Design Assistant Unit Head
Mr DeWayne Sykes, P E , Roadway Design Assistant Unit Head
Ms Betty Yancey, Right of Way Branch
Mr Ellis C Powell, P E , State Construction Engineer, Construction
Mr Steve Gurganus, ICE Permitting Coordinator
PDEA Scopmg Procedures
Rev 4/10/06
Project Development and Environmental Analysis Branch
Scoping Information Sheet
TIP No R-3100
WBS No 345221 1
Federal Aid No STP-16 4
Division 12
Sent Date 09-02-2008
Revision Date r _-,
Meeting Date r10-29-2008
County CATAWBA
Widening of NC 16 from north of Tower Rd (SR 1895) to Caleb Setzer Road (SR-1800)
southeast of Newton
NOTE EA and FONSI were done in January 1998 and December 1998
Section C is complete, Section A and B needs to to be completed
The purpose of the widening NC 16 is to improve traffic service for motorists in the project
area NC 16 is a mayor north-south route in the western piedmont of North Carolina The
portion of NC 16 studied in this report serves as redial route between Charlotte and
Newton NC 16 is also heavily used to access Interstate 40
Metropolitan / Rural Planning Organization Unifour RPO Coordinator John C Marshall
Area
NEPA/404 Merg er Candidate? ? Yes ? No ® Not sure
Feasibility Stud y Completed? ® Yes ? No 1 Date
Type of Environmental Documents to be Prepared / Proiect Schedule
Dates Ty e of Doc t
Environmental Document
Right of Way
Let
FY-2015
p umen
Environmental Assessment
FONSI
Air Quality Status ? Non-attainment ? Maintenance ® Attainment
PAGE 1 OF 8
PDEA Scoping Procedures
Design Criteria:
Length of Proiect Limits 9 1 MILES
Type of Access Control
(Existing / Proposed)
Structure Inventory
Functional
Classification
Rev 4/10/06
1) Tributary to South Fork Mountaan Creek 1 @ 7'X7'
RCBC
2) South Fork Mountain Creek 2@ 9'X9' RCBC
3) Tributary to South Fork Mountain Creek 2@ 9'X8'
RCBC
4) Bee Branch 1 @ 7' X7' RCBC
5) Tributary to Maiden Creek 1 @ TX 6' RCBC
6) Tributary to Symre Creek 1 @ 9'X 9' RCBC
7) Tributaryto Symre Creek 1 @ 10' X 8' RCBC
8) Tnbutaryto Symre Creek 1 @6' X 6' RCBC
Rural Principal Arterial
Strategic Highway Corridor
Information
CTP/Thoroughfare Plan
Designation (Facility Type)
Roadway Typical
Section
(Existing / Proposed)
No existing access control
Typical Section in Compliance with Conformity Determination
® Yes ? No
Right of Way
(Existing / Proposed)
Existing Posted
Speed
NC 16 Corridor from Charlotte to Newton
Existing two 12 ft lanes w/graded shulders (very form
4-10 ft in width) Proposed 4 lane divided facility with
46 ft grass median and 10-12 outside shoulders
Existing R/W vanes from 60-100 ft Proposed will be 100-
200 ft
35-55 mph Proposed Design 50-60 mph
Speed
Traffic (AADT) % TTST
Current Year ( ) % Dual
Design Year % DHV
Design Standards Applicable Yes AASHTO 3R
Railroad Involvement
PDEA Scoping Procedures
Rev 4/10/06
NO
Note TIP Cost is broken as Fallow
Section A Right of way --------------$7,770,000 Section B $5,550,000
Section A Mitigation ------------ $494,000 Section B $147,000
Section A Construction -------$24,000,000 Section B $12,700,000
Prior Year Cost $3,454,000
Total Cost $ 54,115,000
*Source TIP 2009-2015 R/W vanes from 60-100 ft Proposed will be 100-200
Cost Estimate
TIP Estimate
Current Estimate
Construction Right of Way Total Cost
36,700,000 13,320,000 54,115,000
36,700,000 13,320,000 54,115,000
7qA
? T7 3 t'a'° ? Iy111 ?r ?^
VWA
a ' IF ! w
r4
ii?? fY•
?? tw
fir
A
vi A,
X?j
? ok t *'
6 tt = r t ?
y
I 't4
to g o o STUDY MAP
m
c- W
w cn
^'
D?
NC 16 FROM NORTH CAROLINA DEPARTMENT
cn
N y NORTH OF TOWER RD (SR 1895) TO OF TRANSPORTATION
D
V
.oab N I
ISION OF HIGHWAYS
CALEB SETZER (SR 1800) SOUTHEAST
40 ° v OF NEWTON PROJECT DEVELOPMENT AND
O
' co
-'
ENVIRONMENTAL ANALYSIS BRANCH
n o CATAWBA COUNTY
w c !? TIP PROJECT R-3100
ir
I
x ": ::N .: ?•. ?', :ter - r
lie
?F: p ...
J
sd .
?.-?. r • v?•?. ? y rS'? r
y F? , l? .?tr t? ?y ?.? y
jrj&
t t + xi' y rr''
-71
,
t? r 4
s r ? ?
{ ati'•y YIp?1 f SY .f r
A. J/?r? f I? y
`'f
77
o
° STUDY AREA MAP
3
?p
T
c-
w
- n =
D 'g NC 16 FROM*H ,
NORTH CAROLINA DEPARTMENT 9
! n
* NORTH OF TOWER RD (SR 1895) TO OF TRANSPORTATION r
DIVISION OF HIGHWAYS
CALEB SETZER (SR 1800) SOUTHEAST
O
°
w Im OF NEWTON PROJECT DEVELOPMENT AND
w
co ENVIRONMENTAL ANALYSIS BRANCH
CATAWBA COUNTY
!? TIP PROJECT R-3100
•
yy a
.y a.. Y 1 r
r
_ > _? ;fir ? '?-a art
1,771
2G9; rA
ti
t ? fOf'Z-!B # dPl
Er 7 ? ?• ?
04 •?, r .
r 40 e.a
ww'
1
U
Al I
10
•::9 rod. i.fR }.,, ?, T?'?-.
-IN
N o STUDY AREA MAP
c_ co
w cn < o
D
NC 16 FROM TM
NORTH CAROLINA DEPARTMENT
m
_? ? a NORTH OF TOWER RD (SR 1895) TO OF TRANSPORTATION
DIVISION OF HIGHWAYS
CALEB SETZER ( SR 1800 ) SOUTHEAST
N
? rL
w v OF NEWTON PROJECT DEVELOPMENT AND
Q
co ENVIRONMENTAL ANALYSIS BRANCH ,
2
°'T"
T 0 CATAWBA COUNTY
w ° TIP PROJECT R-3100