Loading...
HomeMy WebLinkAbout20081706 Ver 1_EEP Acceptance Letters_20080910September 4, 2008 Mr Eric Alsmeyer U S Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Dear Mr Alsmeyer Subject EEP Mitigation Acceptance Letter ;10 3 ?a X79, ? ? ?_ B-4307, Replace Bridge Number 4 over Shocco Creek on US 401, Warren County, Tar-Pamlico River Basin (Cataloging Unit 03020102), Central Piedmont (CP) Eco-Region The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory riparian wetland mitigation for the unavoidable impact associated with the above referenced project As indicated in the NCDOT's mitigation request dated August 27, 2008, riparian wetland mitigation from EEP is required for approximately 0 31 acre of riparian wetland impacts Riparian wetland mitigation associated with this project will be provided in accordance with Section X of the Amendment No 2 to the Memorandum of Agreement between the N C Department of Environment and Natural Resources, the N C Department of Transportation, and the U S Army Corps of Engineers fully executed on March 8, 2007 (Tri-Party MOA) EEP commits to implement sufficient riparian wetland mitigation up to 0 62 riparian wetland credits to offset the impacts associated with this project by the end of the MOA year in which this project is permitted If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP If you have any questions or need additional information, please contact Ms Beth Harmon at 919-715-1929 Sincerely, William D Gilmore, P E EEP Director cc Mr Gregory J Thorpe, Ph D, NCDOT-PDEA Mr Brian Wrenn, Division of Water Quality, Wetlands/401 Unit File B-4307 rnhnn Frncvctam Fnhnnramant Prnarnm 16[7 Kad Carv,rn rantar Rnla,nh v 77600.1657 / 010_71C_ftd76 / ,u.v,u September 4, 2008 Mr Gregory J Thorpe, Ph D Environmental Management Director Project Development and Environmental Analysis Branch North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Dr Thorpe Subject EEP Mitigation Acceptance Letter B-4307, Replace Bridge Number 4 over Shocco Creek on US 401, Warren County The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory riparian wetland mitigation for the subject project Based on the information supplied by you on August 27, 2008, the impacts are located in CU 03020102 of the Tar-Pamlico River Basin in the Central Piedmont (CP) Eco-Region, and are as follows Riparian Wetland 0 31 acre EEP commits to implementing sufficient riparian wetland mitigation credits to offset the impacts associated with this project by the end of the MOA Year in which this project is permitted, in accordance with Section X of the Amendment No 2 to the Memorandum of Agreement between the North Carolina Department of Environment and Natural Resources, the North Carolina Department of Transportation, and the U S Army Corps of Engineers, fully executed on March 8, 2007 If the above referenced riparian wetland impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP ,a NCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh,f NC 21699-1652 / 919-115-0416 / www nceep net If you have any questions or need additional information, please contact Ms Beth Harmon at 919-715-1929 Sincerely, nj William D Gilmore, P E EEP Director cc Mr Eric Alsmeyer, USACE - Raleigh Regulatory Field Office Mr Brian Wrenn, Division of Water Quality, Wetlands/401 Unit File B-4307