Loading...
HomeMy WebLinkAbout20081234 Ver 1_No Written Concurrence_20080909oi? W AT ??QG Michael F. Easley, Governor co y William G. Ross Jr., Secretary C? North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality September 9, 2008 Brunswick County WQ Project #: 08 1234 WF Holdings, Oak Island, LLC Attn: Bryon Nelson Is PO Box 49756 Greensboro, NC 27419 A t;AMA th PERMIT Subject Property: 203 and 205 16 Place East, Oak Island NO WRITTEN CONCURRENCE NEEDED Dear Mr. Nelson: You have our approval, in accordance with the attached conditions, to construct an access pier, platform and docking facility as described in your CAMA Express application dated August 13, 2008. After reviewing your application, we have decided these impacts are below the threshold for written authorization as long as all conditions of General Water Quality Certification Number 3687 (GC3687) are met. This certification may also be viewed on our website at http://h2o.enr.state.nc.us/ncwetlands. This Certification allows you to use the Regional General # 198700056 Permit when issued by the US Army Corps of Engineers. This approval is only valid for the purpose and design that is described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of these Certifications and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). This approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Conditions of Certification: 1) You will be required to put stops on the boatlifts eighteen.inches above the substrate as recommended by the NC Division of Marine Fisheries (DMF) to protect potential water quality issues (i.e. turbidity in a PNA). These stops need to be maintained for the life of the slips. 2) Upon completion of the project, the applicant shall complete and return the enclosed ,Certification of Completion Form" to notify DWQ that all the work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality. o??`hCarolina ?/Vlllll/Y1??11 North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: www ncwaterquality ora Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Page Two WF Holdings, Oak Island, LLC Attn: Bryon Nelson DWQ Project #: 08 1234 September 9, 2008 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ian McMillan at 919.733.1786 or Joanne Steenhuis at our Wilmington Regional Office at 910.796.7215. Sincerely, :' oanne Steenhuis Senior Environmental Specialist Enclosures GC 3687 Certification of Completion cc: Craig Moore - Moore Development of NC, Inc. Ian McMillan - DWQ 401 Oversight Unit David Timpy - Corps of Engineers Wilmington Doug Huggett - DCM Morehead City Jason Dail - DCM Wilmington Central Files WiRO