Loading...
HomeMy WebLinkAbout20070812 Ver 2_Dissolved Oxgyen Report_20080908ALCOA September 4, 2008 ELECTRONIC FILING Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Alcoa Power Generating Inc. Yadkin Project (FERC No. 2197) Tailwater Dissolved Oxygen Monitoring Dear Secretary Bose: L !? S E P 8 2008 DE!?R - +&,J ER QU L, TY V,IE UkNDS AND ST OW.VVATER SRA1ICAM By letter dated July 11, 2008, Alcoa Power Generating Inc. (APGI) notified the Federal Energy Regulatory Commission (FERC) and the North Carolina Division of Water Quality (NCDWQ) of the need to temporarily remove the continuous dissolved oxygen monitor in the Tuckertown tailwater due to extreme low water conditions, which made it unsafe to service the monitor and could damage the monitor probe. APGI reinstalled the Tuckertown tailwater monitor on September 2, 2008 because recent rainfall raised the water level in Narrows Reservoir (which significantly influences the water levels in the Tuckertown tailwater). By copy of this letter, APGI is also notifying NCDWQ of this situation. Please do not hesitate to contact me at (704) 422-5606 or gene.ellis??alcoa.com if you have any questions. Sincerely, Gene Ellis Licensing and Property Manager cc: John Dorney, NCDWQ Dianne Reid, NCDWQ Heather Patt, NCDWQ Steve Reed, NC Division of Water Resources Alcoa Power Generating Inc. Yadkin Division PO Box 576 Badin, North Carolina 28009-0576 Tel: 1-888-886-1063 Fax: 1-704-422-5776 www.alcoa.com/yadkin CERTIFICATE OF SERVICE I hereby certify that I have this day served the foregoing document upon each person designated on the official service list in this proceeding in accordance with the requirements of Rule 2010 of the Commission's Rules of Practice and Procedure. Dated at Aylett, Virginia this 4th day of September 2008. ?c. &.,o1?,r Joyce Brooks Long View Associates, Inc. 179 Clarks Lane Aylett, VA 23009 804-769-1667