HomeMy WebLinkAbout20120748 Ver 1_Field notes - Apr 19 2017 - 3-52 PM_2017051015SO
Mitigation Monitoring Review Checklist
ProleCt/Site N9mPe 6enp'c Rrnnrh
Review Meetine Date of meeting: 04/03/2017
Notes from review meeting:
'Kim B., Toad -bawl et
I a Zr
Kx &v+t
?,a LOASW, 440"d
r �
UQq • N% I�- ir,k 11Df' eAbu I(, Gnu 1. DIN�n3i'1 ey¢l�'S.
S ��VI s wvgs i'J 2 yrs .
9
Xs ; ag5t2C{ci'n`vvL i s sty s
Lois o7 JOcus - W"44 vej 1�
bum-�Ltr" •
FEl
eliminary Determination
Site Visit/Additional Data Required E3 Full Credit Release Approved ii Partial Credit Release Approved
Additional Monitoring/Corrective Measures Required
Contingencies/Follow-::p Actions:
Mitigation: Credit Sur~bmpry_
rE _ Stream Credits Wetland Credits
---� C —
Warm i Cool Cold Riparian Riverine Riparian Non-riverine Non -Riparian Coastal
Total Potential Credits '
Prior Released Credits F
Current Request —7q
Credits Approved
USACE Project Manager Name/Signature Date of Signature
This form is not valid unless signed by the USACE Project Manager. This form is used to document
office
wetland findings
during the monitoring review of USACE-approved mitigation sites. This form does not apply m
isolabuffer credits, or nutrient offsets as approved by NCDWQ• For questions regarding this form or any of the conditions of the
Permit authorization, contact the USACE Project Manager shown above.
Form Updated 20 April 2015
Page 2 of 2
Daniel Ingram
Activity
Date of Data
Collection
Notes
Earthwork Complete
May 2014
Planting Complete
May 2014
As -Built Veg
June 2014
As -Built Survey
June 2004
Year 1 Veg
Jan 2015
7 months from As -Built
Year 1 Survey
Jan 2015
7 months from As -Built
Year 2 Veg
Sep 2015
8 months from Year 1
Year 2 Survey
Oct -Nov 2015
9 months from Year 1
Year 3 Veg
June 2016
9 months from Year 2
Year 3 Survey
Aug -Dec 2016
10 months from Year 2
Daniel IngramINC Project Managerl Resource Environmental Solutions, LLC
302 Jefferson St., Suite 110 1 Raleigh, NC 27605
Direct: 919.209-1056 1 Mobile: 919.622.3845
Oms