HomeMy WebLinkAbout20080653 Ver 1_Other Agency Comments_20080910REPLY TO
ATTENTION OF:
Regulatory Division
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON. NORTH CAROLINA 28402-1890
gr�s��C
September 8, 2008%
jJ,
S '_ F' 1
fl 2�r)R
Action ID No. SAW -2008-01955-010
Ms. Samantha Hughes
1750 Shallotte Point Loop Road
Shallotte, North Carolina 28470
Dear Ms. Hughes:
Please reference your application for Department of the Army (DA) authorization, pursuant
to Section 10 of the Rivers and Harbors Act of 1899, to undertake regulated activities within
Waters of the United States, for the purpose of developing The Point & C. W's Bar & Grill.
Your application includes a proposal to reconfigure the existing docks and perform maintenance
dredging within the existing marina, located at 1800 Village Point Road, adjacent to the Shallotte
River and the Atlantic Intracoastal Waterway, near the Town of Shallotte, in Brunswick County,
North Carolina.
As you are aware, your proposed project is located in proximity to the intersection of two
Federally -authorized Navigation projects: Shallotte River, North Carolina and Atlantic
Intracoastal Waterway, North Carolina (AIWA). The U.S. Army Corps of Engineers (Corps),
Wilmington District is responsible for ensuring that piers, docks, or any other waterfront
structures do not interfere with vessel traffic or dredging operations along these Federal
Navigation channels. As such, the Corps manages the location of these structures by establishing
channel "setbacks" to ensure that such structures are constructed landward of these setbacks. In
addition to the setbacks associated with each Navigation project, the Corps has also established a
setback for the intersection between the Shallotte River and the AIWW. The purpose of the
intersection setback is to ensure that vessels are able to navigate their turns from the Shallotte
River channel to the AIWW channel and vice versa.
Upon review of your proposal and in coordination with the Corps' Operations Division, we
have determined that your project, as designed, does not meet the conditions of Regional General
Permit (RGP) 198000291. Specifically, General Condition e. states "activities authorized by this
general permit must not interfere with the public's right to free navigation on all navigable
waters of the U.S. No attempt will be made by the permittee to prevent the full and free use by
the public of all navigable waters at or adjacent to the authorized work for a reason other than
-2 -
safety. In addition, General Condition k. states, "This general permit does not authorize the
interference with any existing or proposed federal project". As you will note on the attached
Figure, "Proposed Marina Conflict with Shallotte River and AIWW Setbacks", developed by the
Operations Division, portions of your proposed project encroach into the channel set -back.
If you wish to pursue your project under the Regional General Permit process, you must
modify your proposal to meet the terms and conditions of this RGP. To assist you in a project
re -design, we have attached another Figure, "Channel Setback for Shallotte River and AIWW",
courtesy of the Operations Division, that depicts the State Plane Coordinates of the setback
boundaries.
If you decide to pursue your project as currently designed, we must proceed with evaluating
your request under our Individual Permit process. Please be aware, however, that due to your
project's conflict with the Corps' channel setbacks and Navigational concerns, the Regulatory
Division may be unable to authorize (permit) the encroachments.
As such, we request that you submit to this office, within 30 days of receipt of this letter,
either a modified proposal to qualify for the RGP or an Individual Permit request. In addition,
we ask that you submit a copy of your response to the North Carolina Division of Coastal
Management, see addresses below. If we do not receive your response within the 30 -day
timeframe, we will consider your application withdrawn and close the file.
If you have any questions regarding these matters, please contact Mr. David Timpy, Project
Manager at (910) 251-4634.
Enclosures
Copies Furnished (with enclosures):
Jim Gregson
Division of Coastal Management
N.C. Department of Environment
and Natural Resources
400 Commerce Avenue
Morehead City, North Carolina 28557-3421
Sincerely,
S. Kenneth Jolly, Chief
Regulatory Division
Doug Huggett
Division of Coastal Management
N.C. Department of Environment
and Natural Resources
400 Commerce Avenue
Morehead City, North Carolina 28557-3421
-3 -
Mr. Chad Coburn
Division of Water Quality
N.C. Department of Environment
and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Ms. Molly Ellwood
N.C. Wildlife Resources Commission
SE Permit Coordinator
127 Cardinal Drive Extension
Wil ' gton, North Carolina 28405
s. Ci
Karoly
Division of Water Quality
N.C. Department of Environment
and Natural Resources
2321 Crabtree Blvd, Suite 250
Raleigh North Carolina 27604-2260
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636-3726
Mr. Ron Sechler
National Marine Fisheries Service
Habitat Conservation Service
Pivers Island
Beaufort, North Carolina 28516
Mr. Ronald J. Mikulak, Chief
Wetlands Regulatory Section
Water Management Division
U.S. Environmental Protection Agency
61 Forsyth Street, SW
Atlanta, Georgia 30303
CWO Steve Lyons
Staff Symbol: Aton
2301 East Ft Macon Rd.
Atlantic Beach, NC 28512
Mr. Steve Everhart
Division of Coastal Management
North Carolina Department of Environment
and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405