HomeMy WebLinkAbout20130957 Ver 1_Mitigation Information_20170419Mitigation Monitoring Report Evaluation
Project ID 20130957
Hydro 1188rn�y(es� Union
Wetland Total
Stream Total
Buffer Total
Nutrient
Offset Total
4020 linear feet
Project Components
Ecosystem Type Ecosystem Activit
Stream Restoration 1
(Perennial)
Stream Enhancement 1
(Perennial)
Stream Enhancement 2
Drainage Area (Sq Mi)
Bankfuul requirement
met for entire state?
Number of Engineered structures
BMPs or other Storm
Control Measures?
BMP or SCM Notes
Size Units
1390 linear
feet
640 linear
feet
1990 linear
feet
49
Project Tributaries of Wicker Branch
Mitigator EEP/DMS (Full Delivery) Credit Release [ Credit Release Schedule
Lead Mitigation Firm? AECOMM
Monitoring Firm? AECOMM
Monitoring Guidance Methodology Not Stated
DMS Template?
Schedule Site Visit? Yes
Project History
Date Event
9/4/2013 Report Receipt: Mitigation Plan
10/1/2013 Report Review - Streams
12/23/2013 Report Receipt: Application
1/14/2014 401 Issued
2/24/2016 Report Receipt: As -Built
4/12/2016 Report Receipt: Monitoring
4/25/2016 Credit Release Meeting
2/23/2017 Report Receipt: Monitoring
Hydrology Criteria 1 ?
No
Hydrology Criteria 2?
Other Monitoring ❑
What type of other
Monitoring?
Monitoring Year Information
Monitorinq
Who
Date
Year (1-10Z
Reviewed?
Reviewed ?
1
Mac
4/14/2016
2
Mac
3/28/2017
Veg Protocal?
CVS
Monday, April 10, 2017 Close Report I Page 1 of 5
Project ID 20130957
Project Tributaries of Wicker Branch
Monday, April 10, 2017 Close Report I Page 2 of 5
Project ID 20130957 Project Tributaries of Wicker Branch
Stream Monitoring Report Evaluation
Successful % Flow
MY Monitored XS Successful Stream Flow Gauges Successful In stream maintenance during current
1-10 XS <15%D xS Gauges >30d? Gauges MY or planned?
1 12 12 100.0%
2 12 12 100.0%
need flow gauges, not sure there is any
water in these channels
Stream monitoring notes.
Need to check for flows on la and 1b, need to have
some sort documentation
Wetland Hydrology Monitoring Report Evaluation
No. Wetland No. Successful % Successful
MY 0-10 Reference Gauge Wetland Gauges Wetland Wells Hydrology Notes
No.
1
2 0
Monday, April 10, 2017 Close Report I Page 3 of 5
Project ID 20130957 Project Tributaries of Wicker Branch
Vegetation Monitoring Report Evaluation
No. No. of No.
MYNo. Fixed Successful % Successful Random Successful % Successful
1-10 Veg Plots Fixed Plots Fixed Plots Plots Random Plots Random Plots Supplemental Planting
1 11 10 90.9%
2 11 9 81.8%
MY CCPV Streams
berms in floodplain from
1 maintenance work, did you
consult DMS, have they seen it?
2 ck berms in floodplain
N
CCPV, Encroachments and Beavers Monitoring Report Evaluation
CCPV VPA CCPV Notes Beavers
CCPV VPA f�Pncity in,,,,,,;,,,,,,
ck stem density
Privet noted, 1 B
noted again
what are green rectangles, what
are red squares above Trib 1 A
and Trib 2
Veg Monitoring Notes
Encroachments
was noted
noted again, ck for signs
Monday, April 10, 2017 Close Report I Page 4 of 5
Project ID 20130957 Project Tributaries of Wicker Branch
Additional Monitoring Report Evaluation Notes
MY Monitoring Notes Monitoring Notes Monitoring Notes Monitoring Notes Monitoring Notes
log sills, have footers? One was replaced Planning a supplemental planting? Should have gauges in these Has the encroachment been 1. gauges in streams; 2. veg density;
at the lower end of 1 b at headcut... they channels to document flow handled, signage up? 3. encroachments, exotics
1 all performing well?
recommend site visit, main concern, flow need documentation of flow, should bankfull noted in report, however,
2 other concerns, berms in floodplain, stem probably visit before credit release, no date on photo was before the as built
density, privet, encroachments, repaired bankfull events as yet was complete
log sill
Credit Credit Release Meeting Notes
MY Meeting Date Meeting Notes Meetingg Notes Meeting Notes Meeting Notes Meeting Notes
Log sills have footers, replaced at
lower end, replanted in winter,
1 4/25/2016 streams 3,4,1A need gauge
Main concern is flow, especially Scheduled to treat invasives in Ron Johnson says he is
1 A. Crest guages installed 1 B. SITE VISIT. Requesting concerned with Trib la where full
2 4/3/2017 previously. Just installed 254.0 SMU credits. restoration done
transducers. Bankfull was before
AsBuilt was complete. Survey
Monday, April 10, 2017 Close Report I Page 5 of 5